← Back
Two stories - detached, small or mid-size
45-39 171 PLACE
QUEENS · BIN 4123607
💬 Discuss this project
1925Year Built
2.5Stories
A1Building Class
R2AZoning
2,340 sfGross Floor Area
1Units
0 Open ViolationsFDNY Report ↗
Two stories - detached, small or mid-size · Owner of record: 4539 HOLDING LLC · 6,067 sf lot · 0.39 FAR built · Flood zone X
Locations of Work
ArchitectureElectricalGeneral
Permit Issued — active, not yet Signed-off
Floor 2Under Construction13p · 2 filings · 20 docs
Floor 1Under Construction10p · 1 filing · 13 docs
CellarUnder Construction15p · 2 filings · 20 docs
▾Owner History (Filing Record)
Companies and organizations named on filings. Individual owners are not shown.
OwnerFilingsMost Recent
4539 HOLDING2407/08/2026
▾Sales History (ACRIS)
DatePriceUnitSeller → Buyer$/sf
03/24/2025$1.1M—— → —$449/sf building
04/29/2016$774K—— → —$331/sf building
▾Design Consultants (Architect / Engineer of Record)
FirmFilingsMost Recent
BRIAN ILL DEVELOPMENT LLC606/08/2026
AMERILAND BROOK LLC105/11/2025
▾Filing Representatives (Expediters)
RepresentativeFilingsMost Recent
AMERILAND BROOK LLC1003/21/2026
▾Contractors (License-Anchored)
FirmTradeRolesMost Recent
ARC CM LLCGeneral Contractor307/08/2026
WATSON'S PLBG, HTG, & BDGPlumbing107/04/2026
▾Special Inspection Agencies
AgencyLicense #FilingsMost Recent
BRIAN ILL DEVELOPMENT LLC1402203/02/2026
AMERILAND BROOK LLC1506105/11/2025
Building Lifecycle
All (43)Filed (7)Permit Issued (4)Signed Off (3)Violation (5)Inspection (7)Objection (8)Special Inspection (9)
07/08/2026
Signed off — Alteration
INSTALL 8' TEMPORARY CONSTRUCTION FENCE AT THE ABOVE ADDRESS
Q01218925-I1
07/06/2026
Signed off — Alteration
Q01301178-I1
07/06/2026
Signed off — Alteration
Q01301178-S1
06/08/2026
Filed — Alteration
Q01301178-P1
06/08/2026
Permit issued — Construction Fence
Q01218925-I1-FN
06/05/2026
Inspection — Pass-Final CND-Occupancy Inspection
Pass
View inspection ↗
06/03/2026
Inspection — Pass-Final PL - Up to 3 Requested Floors
Pass
View inspection ↗
05/27/2026
Permit issued — General Construction
Q01241483-I1-GC-CX
03/25/2026
Inspection — Pass-Final PL - Up to 3 Requested Floors
Pass
View inspection ↗
03/02/2026
Filed — Alteration CO
Q01241483-P1
02/12/2026
Inspection — Certified Gas-Gas-Piping-Roughing
Certified
View inspection ↗
02/12/2026
Inspection — Certified Water and Sanitary-WS-Sanitary Piping-Roughing
Certified
View inspection ↗
02/12/2026
Inspection — Certified Water and Sanitary-WS-Sanitary Piping-Underground
Certified
View inspection ↗
02/10/2026
Inspection — Certified Remove/Cap - work done in accordance with code
Certified
View inspection ↗
02/06/2026
Permit issued — Plumbing
Q01301178-S1-PL
10/15/2025
Filed — Alteration
Q01301178-S1
10/15/2025
Permit issued — General Construction
Q01301178-I1-GC
10/14/2025
Violation issued (ECB, closed)
Construction
10/14/2025
Violation issued (ECB, closed)
Construction
10/14/2025
Violation issued (ECB, closed)
Unknown
10/14/2025
Violation issued (ECB, closed)
Construction
10/14/2025
Violation issued (ECB, closed)
Construction
10/10/2025
Filed — Alteration
Q01301178-I1
06/14/2025
Filed — Alteration CO
Q01241483-I1
05/30/2025
Objection raised — Zoning
05/30/2025
Objection raised — Structural
05/30/2025
Objection raised — Structural
05/30/2025
Objection raised — Scope
05/30/2025
Objection raised — Structural
05/30/2025
Objection raised — Energy
05/30/2025
Objection raised — Zoning
05/30/2025
Objection raised — Admin
05/11/2025
Filed — Alteration CO
INTERIOR RENOVATION OF EXISTING ONE FAMILY. CHANGE METES AND BOUNDS. OBTAIN NEW C OF O.
Q01223955-I1
05/11/2025
Special inspection requirement — HVAC-R and service water piping design and insulation
XIAOHONG ZHAO
05/11/2025
Special inspection requirement — Fire-Resistant Penetrations and Joints
XIAOHONG ZHAO
05/11/2025
Special inspection requirement — Mechanical Systems
XIAOHONG ZHAO
05/11/2025
Special inspection requirement — Energy Code Compliance Inspections
XIAOHONG ZHAO
05/11/2025
Special inspection requirement — Fire-Resistance Rated Construction
XIAOHONG ZHAO
05/11/2025
Special inspection requirement — Final
05/11/2025
Special inspection requirement — Maintenance information
XIAOHONG ZHAO
05/11/2025
Special inspection requirement — HVAC-R and service water heating equipment
XIAOHONG ZHAO
05/11/2025
Special inspection requirement — HVAC-R and service water heating system controls
XIAOHONG ZHAO
04/30/2025
Filed — Alteration
INSTALL 8' TEMPORARY CONSTRUCTION FENCE AT THE ABOVE ADDRESS
Q01218925-I1
Permit / Filing Register
SourceWork TypeStatusApplicantIssued
DOB NOWConstruction FenceSigned-offARC CM LLC06/08/2026
DOB NOWGeneral ConstructionPermit IssuedARC CM LLC05/27/2026
DOB NOWPlumbingSigned-offWATSON'S PLBG, HTG, & BDG02/06/2026
DOB NOWGeneral ConstructionSigned-offARC CM10/15/2025
1 project · most recent 05/11/2025
Heating Systems
FiledStatusContractorScopeMake / Model / Capacity
05/11/2025——Heating Systems
Heating
A.O. Smith PCG-75 75,100 BTU · Water Heater ×1
Williamson GWA-140 140,000 BTU · Boiler ×1
2 projects · most recent 09/16/2026
General Wiring
FiledStatusContractorScope
09/16/2026CompleteCL ELECTRICAL CORPGeneral Wiring
06/08/2026CompleteCL ELECTRICAL CORPGeneral Wiring
1 project · most recent 04/30/2025
Fence
FiledStatusContractorScope
04/30/2025Signed-offARC CM LLCFence
▾Field Inspections (DOB CAP) — 7
DateTypeResultReport
06/05/2026Pass-Final CND-Occupancy InspectionPassView ↗
06/03/2026Pass-Final PL - Up to 3 Requested FloorsPassView ↗
03/25/2026Pass-Final PL - Up to 3 Requested FloorsPassView ↗
02/12/2026Certified Gas-Gas-Piping-RoughingCertifiedView ↗
02/12/2026Certified Water and Sanitary-WS-Sanitary Piping-RoughingCertifiedView ↗
02/12/2026Certified Water and Sanitary-WS-Sanitary Piping-UndergroundCertifiedView ↗
02/10/2026Certified Remove/Cap - work done in accordance with codeCertifiedView ↗
▾Special Inspection Requirements (DOB NOW) — 9
DateRequirementInspectorRole
05/11/2025HVAC-R and service water piping design and insulationXIAOHONG ZHAOenergy_progress
05/11/2025Fire-Resistant Penetrations and JointsXIAOHONG ZHAOspecial
05/11/2025Mechanical SystemsXIAOHONG ZHAOspecial
05/11/2025Energy Code Compliance InspectionsXIAOHONG ZHAOprogress
05/11/2025Fire-Resistance Rated ConstructionXIAOHONG ZHAOprogress
05/11/2025Final—progress
05/11/2025Maintenance informationXIAOHONG ZHAOenergy_progress
05/11/2025HVAC-R and service water heating equipmentXIAOHONG ZHAOenergy_progress
05/11/2025HVAC-R and service water heating system controlsXIAOHONG ZHAOenergy_progress
▾Documents — 40 on file (BIS + DOB NOW)
▸Plans & Drawings7
▸DOB NOWPlans/Sketch7
08/20/2026Q01218925-I1Request digital key ↗
08/20/2026Q01241483-P1Request digital key ↗
08/20/2026Q01241483-I1Request digital key ↗
Showing 3 of 7 on file for this type
▸Applications & Permits4
▸BISPLAN / WORK APPROVAL APPLICATION4
10/03/2025421842778Open ↗
09/15/2025421842778Open ↗
08/26/2025421842778Open ↗
Showing 3 of 4 on file for this type
▸Zoning, Tax Lot & Property Records5
▸DOB NOWHouse Number Verification: TOPO Stamp2
08/13/2026Q01241483-I1Open ↗
08/13/2026Q01241483-P1Open ↗
▸BISZONING EXHIBIT III:DESC. & OWNRSHP.STMNT1
10/15/2025421842778Open ↗
▸BISZONING EXHIBIT I: CERTIFICATION1
10/15/2025421842778Open ↗
▸BISTAX LOT: TENTATIVE LOT NUMBER ISSUED1
10/15/2025421842778Open ↗
▸Seals & Professional Certifications9
▸DOB NOWDPL-1: Design Professional Seal & Signature7
08/20/2026Q01218925-I1Open ↗
08/18/2026Q01301178-S1Open ↗
08/18/2026Q01301178-P1Open ↗
Showing 3 of 7 on file for this type
▸DOB NOWProgress Inspector Seal & Signature1
09/01/2026Q01223955-I1Open ↗
▸DOB NOWSpecial Inspector Seal & Signature1
09/01/2026Q01223955-I1Open ↗
▸Safety & Tenant Protection3
▸DOB NOWStreet Tree Checklist3
08/13/2026Q01241483-P1Open ↗
08/13/2026Q01241483-I1Open ↗
08/13/2026Q01223955-I1Open ↗
▸Environmental & Asbestos4
▸DOB NOWDEP ACP-5: Asbestos Assessment Report4
08/20/2026Q01241483-I1Open ↗
08/18/2026Q01301178-I1Open ↗
08/18/2026Q01301178-P1Open ↗
Showing 3 of 4 on file for this type
▸Filing & Intake Forms2
▸BISBOROUGH INTAKE FORM1
05/15/2025421842778Open ↗
▸BISEFILING COVER SHEET1
05/19/2025421842778Open ↗
▸Other Documents6
▸DOB NOWProperty Ownership Certification3
08/13/2026Q01223955-I1Open ↗
08/13/2026Q01241483-P1Open ↗
08/13/2026Q01241483-I1Open ↗
▸DOB NOWFinal Survey2
08/13/2026Q01241483-I1Open ↗
08/13/2026Q01223955-I1Open ↗
▸BISPLOT DIAGRAM1
09/23/2025421842778Open ↗