← Back
Factory, industrial, miscellaneous
45-48 51 STREET
QUEENS · Sunnyside · BIN 4052866
💬 Discuss this project
1931Year Built
2Stories
F9Building Class
M1-1Zoning
5,530 sfGross Floor Area
1Units
30 Open Violations 29 unresolved · 1 paperwork only ▸
Factory, industrial, miscellaneous · Owner of record: PNK REALTY LLC · 10,560 sf lot · 0.52 FAR built · Flood zone X
Locations of Work
PlumbingGeneral
Roof1p · 1 filing · 11 docs
Floor 12p · 1 filing · 11 docs
▾Owner History (Filing Record)
Companies and organizations named on filings. Individual owners are not shown.
OwnerFilingsMost Recent
PNK REALTY LLC103/22/2026
▾Design Consultants (Architect / Engineer of Record)
FirmFilingsMost Recent
SERDAR CEYLAN ARCHITECT, PC611/17/2022
▾Contractors (License-Anchored)
FirmTradeRolesMost Recent
HYDRAULICS MECHANICAL INCPlumbing207/08/2026
▾Special Inspection Agencies
AgencyLicense #FilingsMost Recent
CEYLAN DESIGN AND CONSULT8422311/09/2022
Building Lifecycle
All (81)Filed (6)Permit Issued (2)Signed Off (1)Violation (52)Inspection (3)Objection (6)Special Inspection (11)
07/28/2025
Signed off — Alteration
INSTALLATION OF NEW BOILER ON THE 1ST FLOOR OF THE 1-STORY COMMERCIAL BUILDING
Q00579261-I1
09/23/2024
Violation issued (DOB, open)
V-DOB VIOLATION - ACTIVE
09/23/2024
Violation issued (DOB, open)
V-DOB VIOLATION - ACTIVE
09/23/2024
Violation issued (DOB, open)
V-DOB VIOLATION - ACTIVE
09/14/2023
Inspection — Certified Water and Sanitary-WS-Fixtures-Finish
Certified
View inspection ↗
06/30/2023
Violation issued (DOB, open)
V-DOB VIOLATION - ACTIVE
06/30/2023
Violation issued (DOB, open)
V-DOB VIOLATION - ACTIVE
06/30/2023
Violation issued (DOB, open)
V-DOB VIOLATION - ACTIVE
06/30/2023
Violation issued (DOB, open)
V-DOB VIOLATION - ACTIVE
06/20/2023
Violation issued (DOB, open)
V-DOB VIOLATION - ACTIVE
06/20/2023
Violation issued (DOB, open)
V-DOB VIOLATION - ACTIVE
06/20/2023
Violation issued (DOB, open)
V-DOB VIOLATION - ACTIVE
06/20/2023
Violation issued (DOB, open)
V-DOB VIOLATION - ACTIVE
04/25/2023
Violation issued (DOB, open)
V-DOB VIOLATION - ACTIVE
04/25/2023
Violation issued (DOB, open)
V-DOB VIOLATION - ACTIVE
11/17/2022
Filed — Alteration
PROPOSED TWO FURNACES AT CEILING OF THE 1ST FLOOR AND ADDITIONAL GAS PIPELINE TO THE BOILER ROOM IN THE EXISTING ONE STORY COMMERCIAL BUILDING
Q00579591-P2
11/17/2022
Special inspection requirement — Energy Code Compliance Inspections
SERDAR CEYLAN
11/17/2022
Special inspection requirement — HVAC-R and service water piping design and insulation
SERDAR CEYLAN
11/13/2022
Special inspection requirement — HVAC-R and service water heating equipment
SERDAR CEYLAN
11/13/2022
Special inspection requirement — HVAC-R and service water heating system controls
SERDAR CEYLAN
11/13/2022
Special inspection requirement — Heating Systems
SERDAR CEYLAN
11/10/2022
Inspection — Pass-Final PL - Up to 3 Requested Floors
Pass
View inspection ↗
11/09/2022
Filed — Alteration
INSTALLATION OF NEW BOILER ON THE 1ST FLOOR OF THE 1-STORY COMMERCIAL BUILDING
Q00579261-P2
11/09/2022
Inspection — Pass-Final Boiler Equipment Inspection
Pass
View inspection ↗
11/09/2022
Special inspection requirement — Heating Systems
SERDAR CEYLAN
11/09/2022
Special inspection requirement — HVAC-R and service water heating equipment
SERDAR CEYLAN
11/09/2022
Special inspection requirement — HVAC-R and service water heating system controls
SERDAR CEYLAN
10/26/2022
Filed — Alteration
PROPOSED TWO FURNACES AT CEILING OF THE 1ST FLOOR AND ADDITIONAL GAS PIPELINE TO THE BOILER ROOM IN THE EXISTING ONE STORY COMMERCIAL BUILDING
Q00579591-P1
10/26/2022
Filed — Alteration
INSTALLATION OF NEW BOILER ON THE 1ST FLOOR OF THE 1-STORY COMMERCIAL BUILDING
Q00579261-P1
10/07/2022
Special inspection requirement — HVAC-R and service water heating equipment
SERDAR CEYLAN
10/07/2022
Special inspection requirement — HVAC-R and service water heating system controls
SERDAR CEYLAN
10/07/2022
Special inspection requirement — Heating Systems
SERDAR CEYLAN
09/29/2022
Permit issued — Plumbing
Q00579591-I1-PL
09/29/2022
Permit issued — Boiler Equipment
Q00579261-I1-BE
06/30/2022
Objection raised — Scope
06/30/2022
Objection resolved — Addressed
06/09/2022
Objection raised — Mechanical
06/09/2022
Objection resolved — Addressed
06/09/2022
Objection raised — Scope
06/09/2022
Objection resolved — Addressed
06/08/2022
Filed — Alteration
INSTALLATION OF NEW BOILER ON THE 1ST FLOOR OF THE 1-STORY COMMERCIAL BUILDING
Q00579261-I1
06/07/2022
Filed — Alteration
PROPOSED TWO FURNACES AT CEILING OF THE 1ST FLOOR AND ADDITIONAL GAS PIPELINE TO THE BOILER ROOM IN THE EXISTING ONE STORY COMMERCIAL BUILDING
Q00579591-I1
11/08/2019
Violation issued (DOB, open)
V-DOB VIOLATION - ACTIVE
11/08/2019
Violation issued (DOB, open)
V-DOB VIOLATION - ACTIVE
04/06/2018
Violation issued (DOB, open)
V-DOB VIOLATION - ACTIVE
04/06/2018
Violation issued (DOB, open)
V-DOB VIOLATION - ACTIVE
02/24/2017
Violation issued (DOB, open)
V-DOB VIOLATION - ACTIVE
02/24/2017
Violation issued (DOB, open)
V-DOB VIOLATION - ACTIVE
05/10/2016
Violation issued (ECB, open)
Boilers
10/01/2015
Violation issued (DOB, open)
V-DOB VIOLATION - ACTIVE
10/01/2015
Violation issued (DOB, open)
V-DOB VIOLATION - ACTIVE
03/03/2015
Violation issued (DOB, open)
V-DOB VIOLATION - ACTIVE
03/03/2015
Violation issued (DOB, open)
V-DOB VIOLATION - ACTIVE
05/15/2014
Violation issued (DOB, open)
V-DOB VIOLATION - ACTIVE
05/15/2014
Violation issued (DOB, open)
V-DOB VIOLATION - ACTIVE
03/01/2013
Violation issued (DOB, open)
V-DOB VIOLATION - ACTIVE
03/01/2013
Violation issued (DOB, open)
V-DOB VIOLATION - ACTIVE
12/13/2011
Violation issued (DOB, open)
V-DOB VIOLATION - ACTIVE
12/13/2011
Violation issued (DOB, open)
V-DOB VIOLATION - ACTIVE
01/01/2009
Violation issued (DOB, closed)
V*-DOB VIOLATION - DISMISSED
Latest 60 of 81 events.
Permit / Filing Register
SourceWork TypeStatusApplicantIssued
DOB NOWPlumbingSigned-offHYDRAULICS MECHANICAL INC09/29/2022
DOB NOWBoiler EquipmentSigned-offHYDRAULICS MECHANICAL INC09/29/2022
BISOTISSUEDALDER NEILSON CO INC07/06/1992
1 project · most recent 11/17/2022
Gas
FiledStatusContractorScope
11/17/2022Signed-offHYDRAULICS MECHANICAL INCGas
▾Field Inspections (DOB CAP) — 3
DateTypeResultReport
09/14/2023Certified Water and Sanitary-WS-Fixtures-FinishCertifiedView ↗
11/10/2022Pass-Final PL - Up to 3 Requested FloorsPassView ↗
11/09/2022Pass-Final Boiler Equipment InspectionPassView ↗
▾Special Inspection Requirements (DOB NOW) — 11
DateRequirementInspectorRole
11/17/2022Energy Code Compliance InspectionsSERDAR CEYLANprogress
11/17/2022HVAC-R and service water piping design and insulationSERDAR CEYLANenergy_progress
11/13/2022HVAC-R and service water heating equipmentSERDAR CEYLANenergy_progress
11/13/2022HVAC-R and service water heating system controlsSERDAR CEYLANenergy_progress
11/13/2022Heating SystemsSERDAR CEYLANspecial
11/09/2022Heating SystemsSERDAR CEYLANspecial
11/09/2022HVAC-R and service water heating equipmentSERDAR CEYLANenergy_progress
11/09/2022HVAC-R and service water heating system controlsSERDAR CEYLANenergy_progress
10/07/2022HVAC-R and service water heating equipmentSERDAR CEYLANenergy_progress
10/07/2022HVAC-R and service water heating system controlsSERDAR CEYLANenergy_progress
10/07/2022Heating SystemsSERDAR CEYLANspecial
▾Documents — 27 on file (BIS + DOB NOW)
▸Plans & Drawings6
▸DOB NOWPlans/Sketch6
08/26/2026Q00579591-P2Request digital key ↗
08/26/2026Q00579591-P1Request digital key ↗
08/25/2026Q00579261-I1Request digital key ↗
Showing 3 of 6 on file for this type
▸Seals & Professional Certifications14
▸DOB NOWDPL-1: Design Professional Seal & Signature6
08/25/2026Q00579261-I1Open ↗
08/25/2026Q00579261-P2Open ↗
08/25/2026Q00579261-P1Open ↗
Showing 3 of 6 on file for this type
▸DOB NOWProgress Inspector Seal & Signature5
09/27/2026Q00579261-P2Open ↗
09/27/2026Q00579261-P1Open ↗
08/28/2026Q00579261-I1Open ↗
Showing 3 of 5 on file for this type
▸DOB NOWSpecial Inspector Seal & Signature3
09/27/2026Q00579261-P2Open ↗
09/27/2026Q00579261-P1Open ↗
08/28/2026Q00579261-I1Open ↗
▸Environmental & Asbestos6
▸DOB NOWDEP ACP-5: Asbestos Assessment Report6
08/25/2026Q00579261-P2Open ↗
08/25/2026Q00579261-P1Open ↗
08/25/2026Q00579261-I1Open ↗
Showing 3 of 6 on file for this type
▸Energy Compliance1
▸DOB NOWEN2: As Built Energy Analysis.1
08/13/2026Q00579261-I1Open ↗