← Back
Elevator cooperative
45 5 AVENUE
MANHATTAN · BIN 1009273
💬 Discuss this project
1925Year Built
16Stories
D4Building Class
R10Zoning
45,248 sfGross Floor Area
65Units
LL97 CoveredRent Stabilized29 Open Violations 23 unresolved · 6 paperwork only ▸FISP: SAFE
Elevator cooperative · Owner of record: 45 FIFTH AVENUE APARTMENT CORP. · 4,927 sf lot · 9.18 FAR built · Flood zone X
Locations of Work
ArchitectureStructural
Floor 101p · 1 filing · 8 docs
Floor 9
Floor 8
Floor 7
Floor 6
Floor 5
Floor 4
Floor 3
Floor 2
Floor 11 filing · 7 docs
▾Owner History (Filing Record)
Companies and organizations named on filings. Individual owners are not shown.
OwnerFilingsMost Recent
CEPRINE CONSTRUCTION503/22/2026
45 FIFTH AVENUE APARTMENT1003/22/2026
45 FIFTH AVENUE503/22/2026
45 5 AVENUE APT CORP203/22/2026
45 5TH AVENUE APT CORP103/22/2026
TO OWNER OF 45 FIFTH AVE203/22/2026
45 FIFTH CORP RF STUART103/22/2026
RF STUART REAL ESTATE203/22/2026
PLYMOUTH MANAGEMENT103/21/2026
45 FIFTH AVE APT1903/21/2026
▾Design Consultants (Architect / Engineer of Record)
▾Filing Representatives (Expediters)
RepresentativeFilingsMost Recent
JANCO BUILDING CONSULTANTS, LLC.403/21/2026
J CALLAHAN CONSULTING603/21/2026
SYNERGY BUILDING CONSULTANTS103/21/2026
▾Contractors (License-Anchored)
FirmTradeRolesMost Recent
NEW22 CONSTRUCTION CORPGeneral Contractor407/08/2026
CEPRINE CONSTRUCTION INCGeneral Contractor303/21/2026
MARK COSTOSOElectrical103/21/2026
MCGEACHY, DONALDElectrical103/21/2026
NEIL CABERAElectrical103/21/2026
RONALD TESTA, JR.Electrical103/21/2026
DIESEL CONTRACTING OF N.YGeneral Contractor107/08/2026
LD GENERAL CONSTRUCTIONGeneral Contractor107/08/2026
GORMAN, BARTHOLOMEWElectrical103/21/2026
DELTA-SIGMA MECH CORPPlumbing107/08/2026
INNER CITY CONTRACTINGElectrical103/21/2026
▾Special Inspection Agencies
AgencyLicense #FilingsMost Recent
DOMINICK R. PILLA1300310/12/2023
ARCHITECTURE+CONSTRUCTION1326103/31/2022
PIRO STUDIO LLC7503211/19/2021
Building Lifecycle
All (119)Filed (8)Permit Issued (6)Signed Off (5)Facade (FISP) (14)Violation (60)Inspection (3)Objection (4)Special Inspection (19)
03/27/2025
Signed off — Alteration
Moderate interior renovation of unit 15CD consisting of non-load bearing partitions, GWB, trim, painting, plaster, tilework, kitchen cabinet replacement and cosmetic finishes. No change to egress, occupancy or use.
M00701365-I1
11/15/2023
Signed off — Alteration
Interior renovation and combination of two apartments on the 9th and 10th floor with new convenience stair. No change to use egress or occupancy.
M00740180-I1
10/17/2023
Signed off — Alteration
Structural work related to new convenience stair connecting Apt. #9B and #10A. No change to use, egress or occupancy.
M00740232-I1
10/12/2023
Filed — Alteration
Interior renovation and combination of two apartments on the 9th and 10th floor with new convenience stair. No change to use egress or occupancy.
M00740180-P1
10/12/2023
Special inspection requirement — Final
KEVIN LINDORES
10/12/2023
Special inspection requirement — Fire-Resistant Penetrations and Joints
Dominick Pilla
09/21/2023
Special inspection requirement — Fire-Resistant Penetrations and Joints
Dominick Pilla
09/21/2023
Special inspection requirement — Final
KEVIN LINDORES
03/17/2023
Signed off — Alteration
Moderate interior renovation of unit 15CD consisting of non-load bearing partitions, GWB, trim, painting, plaster, tilework, kitchen cabinet replacement and cosmetic finishes. No change to egress, occupancy or use.
M00701365-S1
01/16/2023
Inspection — Certified Water and Sanitary-WS-Fixtures-Finish
Certified
View inspection ↗
11/10/2022
Permit issued — Structural
M00740232-I1-ST
11/10/2022
Permit issued — General Construction
M00740180-I1-GC
10/28/2022
Objection raised — Inspections
10/28/2022
Objection resolved — Addressed
10/28/2022
Objection raised — Admin
10/28/2022
Objection resolved — Addressed
10/19/2022
Filed — Alteration
Structural work related to new convenience stair connecting Apt. #9B and #10A. No change to use, egress or occupancy.
M00740232-I1
10/07/2022
Filed — Alteration
Interior renovation and combination of two apartments on the 9th and 10th floor with new convenience stair. No change to use egress or occupancy.
M00740180-I1
09/02/2022
Special inspection requirement — Structural Stability – Alterations of existing buildings
Dominick Pilla
09/02/2022
Special inspection requirement — Structural Steel - Welding
Dominick Pilla
09/02/2022
Special inspection requirement — Structural Steel - Details
Dominick Pilla
07/01/2022
Inspection — Certified Water and Sanitary-WS-Sanitary Piping-Roughing
Certified
View inspection ↗
06/29/2022
Inspection — Certified Remove/Cap - work done in accordance with code
Certified
View inspection ↗
06/20/2022
Permit issued — Plumbing
M00701365-S1-PL
05/17/2022
Special inspection requirement — Final
Dominick Pilla
04/15/2022
Permit issued — General Construction
M00701365-I1-GC
04/14/2022
Filed — Alteration
Moderate interior renovation of unit 15CD consisting of non-load bearing partitions, GWB, trim, painting, plaster, tilework, kitchen cabinet replacement and cosmetic finishes. No change to egress, occupancy or use.
M00701365-S1
03/31/2022
Filed — Alteration
Moderate interior renovation of unit 15CD consisting of non-load bearing partitions, GWB, trim, painting, plaster, tilework, kitchen cabinet replacement and cosmetic finishes. No change to egress, occupancy or use.
M00701365-I1
03/17/2022
Special inspection requirement — Fire-Resistance Rated Construction
Joshua Pulver
03/17/2022
Special inspection requirement — Fire-Resistant Penetrations and Joints
Joshua Pulver
03/17/2022
Special inspection requirement — Final
Joshua Pulver
03/17/2022
Special inspection requirement — Energy Code Compliance Inspections
Joshua Pulver
03/17/2022
Special inspection requirement — HVAC-R and service water piping design and insulation
Joshua Pulver
01/11/2022
Cycle 9 facade inspection completed
01/07/2022
Cycle 9 facade report signed — SAFE
01/04/2022
Permit issued — General Construction
M00468520-I1-GC
11/19/2021
Filed — Alteration
PROPOSED REPLACEMENT/INSTALLATION AND RELOCATION OF PLUMBING FIXTURES AS PER PLANS. NO CHANGE IN USE OCCUPANCY OR MEANS OF EGRESS.
M00468546-I1
11/19/2021
Cycle 9 facade report submitted
11/18/2021
Filed — Alteration
PROPOSED INTERIOR RENOVATION OF APT. 1C AS PER DRAWINGS. NO CHANGE IN USE OCCUPANCY OR EGRESS.
M00468520-I1
11/04/2021
Special inspection requirement — Fire-Resistant Penetrations and Joints
PIETRO ROSATO
11/04/2021
Special inspection requirement — Energy Code Compliance Inspections
PIETRO ROSATO
03/09/2021
Signed off — Alteration
Installation of temporary sidewalk shed per plan submitted. Work shall comply with 2014 building codes chapter 33. No change in use, egress and/or occupancy with this application.
M00374227-I1
02/18/2021
Special inspection requirement — Energy Code Compliance Inspections
PIETRO ROSATO
02/18/2021
Special inspection requirement — Fire-Resistant Penetrations and Joints
PIETRO ROSATO
02/10/2021
Special inspection requirement — Final
PIETRO ROSATO
09/11/2020
Permit issued — Sidewalk Shed
M00374227-I1-SH
09/10/2020
Filed — Alteration
Installation of temporary sidewalk shed per plan submitted. Work shall comply with 2014 building codes chapter 33. No change in use, egress and/or occupancy with this application.
M00374227-I1
07/22/2020
Special inspection requirement — Final
Karol Zdancewicz
04/25/2020
Violation issued (DOB, closed)
V*-DOB VIOLATION - Resolved
04/25/2020
Violation issued (DOB, closed)
V*-DOB VIOLATION - Resolved
05/17/2019
Violation issued (DOB, closed)
V*-DOB VIOLATION - Resolved
05/17/2019
Violation issued (DOB, closed)
V*-DOB VIOLATION - Resolved
05/04/2018
Violation issued (DOB, closed)
V*-DOB VIOLATION - Resolved
01/14/2018
Violation issued (HPD, open)
A
01/14/2018
Violation issued (HPD, open)
A
01/14/2018
Violation issued (HPD, open)
C
05/04/2017
Violation issued (DOB, closed)
V*-DOB VIOLATION - Resolved
02/01/2017
Cycle 8 facade report submitted
02/01/2017
Cycle 8 facade report signed — SWARMP
12/08/2016
Cycle 8 facade inspection completed
Latest 60 of 119 events.
Permit / Filing Register
SourceWork TypeStatusApplicantIssued
DOB NOWStructuralSigned-offNEW22 CONSTRUCTION CORP11/10/2022
DOB NOWGeneral ConstructionSigned-offNEW22 CONSTRUCTION CORP11/10/2022
DOB NOWPlumbingSigned-offDELTA-SIGMA MECH CORP06/20/2022
DOB NOWGeneral ConstructionSigned-offCENTRAL CONSTRUCTION MAN*04/15/2022
DOB NOWGeneral ConstructionPermit IssuedLD GENERAL CONSTRUCTION01/04/2022
DOB NOWSidewalk ShedSigned-offCEPRINE CONSTRUCTION INC09/11/2020
BISPLISSUEDTRISTAR PLBG & HTG INC01/10/2024
BISPLISSUEDTRISTAR PLBG & HTG INC01/04/2024
BISPLISSUEDTRISTAR PLBG & HTG INC08/05/2021
BISPLISSUEDTRISTAR PLBG & HTG INC08/05/2021
BISPLISSUEDARMON MECHANICAL INC12/09/2020
BISOTISSUEDPOFI CONSTRUCTION CORP10/14/2020
BISOTISSUEDPOFI CONSTRUCTION CORP07/09/2020
BISPLISSUEDTRISTAR PLBG & HTG INC09/24/2019
BISPLISSUEDTRISTAR PLBG & HTG INC09/24/2019
BISOTISSUEDTAG CONTRACTING CORP08/22/2019
BISOTISSUEDTAG CONTRACTING CORP08/22/2019
BISPLISSUEDORBIT PLBG & HTG INC07/16/2018
BISOTISSUEDZALE CONTRACTING INC07/11/2018
BISPLISSUEDSAFETY PLMBG & HTG LLC07/09/2018
BISOTISSUEDFREEDOM GS INC06/21/2018
BISPLISSUEDPLBG P & H INC05/10/2018
BISOTISSUEDORAX CORPORATION05/04/2018
BISPLISSUEDORBIT PLBG & HTG INC03/06/2017
BISPLISSUEDPETER PLUMBING ASSOC. INC.01/06/2017
BISOTISSUEDJSL DESIGN INC09/07/2016
BISPLISSUEDORBIT PLBG & HTG INC02/17/2016
BISOTISSUEDPBS CONSTRUCTION CORP11/05/2015
BISPLISSUEDFLINT MECHANICAL CORP11/05/2014
BISOTISSUEDATS 360 CORP08/04/2014
BISOTISSUEDATS 360 CORP08/04/2014
BISPLISSUEDPRIME PIPING & HEATING IN03/10/2014
BISOTISSUEDG. LUCAJ HOME IMPROVEMENT03/05/2014
BISPLISSUEDSPEEDWAY PLUMBING CORP01/17/2014
BISOTISSUEDTC BROWNE & CO., LLC01/15/2014
BISEQISSUEDSTEEL SYSTEMS LLC05/09/2013
BISMHISSUEDSERGIO GIANNACHI04/10/2013
BISOTISSUEDGALICIA CONTRACTING & REST.12/03/2012
BISEQISSUEDSTEEL SYSTEMS LLC08/24/2012
BISOTISSUEDSERGIO GIANNACHI05/30/2012
+ 16 more permits on file
1 project · most recent 11/19/2021
Water/Sanitary
FiledStatusContractorScope
11/19/2021——Water/Sanitary
6 projects · most recent 10/28/2020
General Wiring Lighting
FiledStatusContractorScope
10/28/2020CompleteAPPROVED ELECTRIC CORP.General Wiring
09/15/2020CompleteBOROWIDE ELECT'L CONTR'S—
07/21/2020CompleteBOROWIDE ELECT'L CONTR'S—
01/24/2019CompleteEINSTEIN ELEC'L CORPGeneral Wiring
07/19/2018CompleteFALCON ELECTRIC CORPGeneral Wiring, Lighting
03/20/2018CancelledDENMAR ELECTRIC CORPGeneral Wiring
▾Field Inspections (DOB CAP) — 3
DateTypeResultReport
01/16/2023Certified Water and Sanitary-WS-Fixtures-FinishCertifiedView ↗
07/01/2022Certified Water and Sanitary-WS-Sanitary Piping-RoughingCertifiedView ↗
06/29/2022Certified Remove/Cap - work done in accordance with codeCertifiedView ↗
▾Special Inspection Requirements (DOB NOW) — 19
DateRequirementInspectorRole
10/12/2023FinalKEVIN LINDORESprogress
10/12/2023Fire-Resistant Penetrations and JointsDominick Pillaspecial
09/21/2023Fire-Resistant Penetrations and JointsDominick Pillaspecial
09/21/2023FinalKEVIN LINDORESprogress
09/02/2022Structural Stability – Alterations of existing buildingsDominick Pillaspecial
09/02/2022Structural Steel - WeldingDominick Pillaspecial
09/02/2022Structural Steel - DetailsDominick Pillaspecial
05/17/2022FinalDominick Pillaprogress
03/17/2022Fire-Resistance Rated ConstructionJoshua Pulverprogress
03/17/2022Fire-Resistant Penetrations and JointsJoshua Pulverspecial
03/17/2022FinalJoshua Pulverprogress
03/17/2022Energy Code Compliance InspectionsJoshua Pulverprogress
03/17/2022HVAC-R and service water piping design and insulationJoshua Pulverenergy_progress
11/04/2021Fire-Resistant Penetrations and JointsPIETRO ROSATOspecial
11/04/2021Energy Code Compliance InspectionsPIETRO ROSATOprogress
02/18/2021Energy Code Compliance InspectionsPIETRO ROSATOprogress
02/18/2021Fire-Resistant Penetrations and JointsPIETRO ROSATOspecial
02/10/2021FinalPIETRO ROSATOprogress
07/22/2020FinalKarol Zdancewiczprogress
▾Documents — 415 on file (BIS + DOB NOW)
▸Plans & Drawings8
▸DOB NOWPlans/Sketch5
09/02/2026M00701365-I1Request digital key ↗
09/02/2026M00701365-S1Request digital key ↗
08/29/2026M00740180-I1Request digital key ↗
Showing 3 of 5 on file for this type
▸DOB NOWPlans/Sketch - Sidewalk Shed1
09/04/2026M00374227-I1Request digital key ↗
▸DOB NOWPlans/Sketch - General Construction1
09/03/2026M00468520-I1Request digital key ↗
▸DOB NOWPlans/Sketch - Plumbing1
09/03/2026M00468546-I1Request digital key ↗
▸Applications & Permits90
▸BISPLAN / WORK APPROVAL APPLICATION43
02/26/2026123306760Open ↗
02/20/2026123306760Open ↗
10/11/2023123718245Open ↗
Showing 3 of 43 on file for this type
▸BISWORK PERMIT APPLICATION39
01/10/2024123718245Open ↗
01/04/2024123718254Open ↗
12/09/2020121660238Open ↗
Showing 3 of 39 on file for this type
▸DOB NOWLPC Approval/Permit7
08/13/2026M00740232-I1Open ↗
08/13/2026M00701365-I1Open ↗
08/13/2026M00740180-P1Open ↗
Showing 3 of 7 on file for this type
▸BISPLAN - WORK & PERMITS - SUPPPORTING DOCUMENTATION1
08/29/2016122658374Open ↗
▸Seals & Professional Certifications77
▸BISTECHNICAL REPORT: RESPONSIBILITY/CERTIFICATION40
08/22/2019123718245Open ↗
08/22/2019123718254Open ↗
05/22/2019123718218Open ↗
Showing 3 of 40 on file for this type
▸DOB NOWProgress Inspector Seal & Signature9
09/01/2026M00468546-I1Open ↗
09/01/2026M00468520-I1Open ↗
09/01/2026M00468520-I1Open ↗
Showing 3 of 9 on file for this type
▸DOB NOWSpecial Inspector Seal & Signature8
09/01/2026M00468546-I1Open ↗
09/01/2026M00468520-I1Open ↗
08/28/2026M00740180-P1Open ↗
Showing 3 of 8 on file for this type
▸DOB NOWDPL-1: Design Professional Seal & Signature8
09/04/2026M00374227-I1Open ↗
08/29/2026M00740180-I1Open ↗
08/29/2026M00740180-P1Open ↗
Showing 3 of 8 on file for this type
▸BISPROFESSIONAL CERTIFIED CHECKLIST4
On file, but not among the 200 most recently loaded documents for this source.
Showing 0 of 4 on file for this type
▸BISPROFESSIONAL CERTIFICATION STATEMENT FORM3
On file, but not among the 200 most recently loaded documents for this source.
Showing 0 of 3 on file for this type
▸BISPROFESSIONAL CERTIFICATION STATEMENT2
06/03/2019140850791Open ↗
Showing 1 of 2 on file for this type
▸BISREQUIRED ITEMS CHECKLIST FOR PROFESSIONAL CERTIFICATION1
06/03/2019140850791Open ↗
▸BISPC FULL REPORT1
On file, but not among the 200 most recently loaded documents for this source.
Showing 0 of 1 on file for this type
▸BISTECHNICAL REPORT STATEMENT OF RESPONSIBILITY1
06/03/2019140850791Open ↗
▸Trade Schedules & Equipment32
▸BISSCHEDULE B - PLUMBING/SPRINKLER/STANDPIPE16
04/02/2019123718245Open ↗
04/02/2019123718254Open ↗
03/29/2019123718218Open ↗
Showing 3 of 16 on file for this type
▸BISSELF-CERT PLUMBING NOTICE6
On file, but not among the 200 most recently loaded documents for this source.
Showing 0 of 6 on file for this type
▸BISSCHEDULE B - PLUMBING5
09/29/2020123718254Open ↗
09/29/2020123718245Open ↗
Showing 2 of 5 on file for this type
▸BISEQUIPMENT USE PERMITS4
On file, but not among the 200 most recently loaded documents for this source.
Showing 0 of 4 on file for this type
▸BISEQUIPMENT USE APPLICATION-PERMIT1
On file, but not among the 200 most recently loaded documents for this source.
Showing 0 of 1 on file for this type
▸Safety & Tenant Protection9
▸BISTenant Protection Plan and Notes8
04/02/2019123718245Open ↗
04/02/2019123718254Open ↗
07/11/2018123588304Open ↗
Showing 3 of 8 on file for this type
▸DOB NOWTenant Protection Plan1
09/04/2026M00374227-I1Open ↗
▸Environmental & Asbestos26
▸BISASBESTOS: CERTIFICATION (DEP ACP5)15
06/03/2019140850791Open ↗
04/12/2019123718254Open ↗
04/02/2019123718245Open ↗
Showing 3 of 15 on file for this type
▸DOB NOWDEP ACP-5: Asbestos Assessment Report7
08/29/2026M00740180-P1Open ↗
08/29/2026M00740180-I1Open ↗
08/13/2026M00468520-I1Open ↗
Showing 3 of 7 on file for this type
▸BISTHIS IS 'NOT AN ASBESTOS PROJECT'3
On file, but not among the 200 most recently loaded documents for this source.
Showing 0 of 3 on file for this type
▸BISASBESTOS EXEMPTION CERTIFICATION LETTER1
On file, but not among the 200 most recently loaded documents for this source.
Showing 0 of 1 on file for this type
▸Energy Compliance21
▸BISTECHNICAL REPORT: ENERGY CODE PROGRESS INSPS9
06/13/2018122872588Open ↗
10/17/2017123306760Open ↗
05/17/2017122658374Open ↗
Showing 3 of 9 on file for this type
▸BISTECHNICAL REPORT: ENERGY CODE - RESPONSIBILITY3
05/03/2021140850791Open ↗
07/09/2020140850791Open ↗
06/03/2019140850791Open ↗
▸BISAS-BUILT ENERGY ANALYSIS3
05/03/2021140850791Open ↗
05/17/2017122658374Open ↗
Showing 2 of 3 on file for this type
▸BISENERGY CODE 1ST REVIEW COMPLETE2
03/29/2019123718218Open ↗
07/11/2018123588304Open ↗
▸BISTECHNICAL REPORT STATEMENT OF RESPONSIBILITY FOR ENERGY CODE PROGRESS INSPECTIONS1
06/03/2019140850791Open ↗
▸BISNYCECC ANALYSIS1
06/03/2019140850791Open ↗
▸BISTECHNICAL REPORT: ENERGY1
On file, but not among the 200 most recently loaded documents for this source.
Showing 0 of 1 on file for this type
▸DOB NOWEN2: As Built Energy Analysis1
08/13/2026M00701365-I1Open ↗
▸Inspections & Test Reports12
▸BISTECHNICAL REPORT: RESPONSIBILITY11
02/12/2026123306760Open ↗
02/12/2026123306760Open ↗
04/30/2024123718254Open ↗
Showing 3 of 11 on file for this type
▸BISFIRE-RESISTIVE RATED CONSTRUCTION1
02/19/2026123306760Open ↗
▸Approvals, Objections & Sign-offs55
▸BISLANDMARKS APPROVAL24
07/15/2019123718245Open ↗
06/03/2019140850791Open ↗
05/13/2019123718218Open ↗
Showing 3 of 24 on file for this type
▸BISCERTIFICATE OF OCCUPANCY/LOC: REQUEST14
05/01/2024123718254Open ↗
03/12/2024123718245Open ↗
05/03/2021140850791Open ↗
Showing 3 of 14 on file for this type
▸BISADMINISTRATIVE OBJECTIONS5
On file, but not among the 200 most recently loaded documents for this source.
Showing 0 of 5 on file for this type
▸BISLANDMARKS SIGNOFF4
10/18/2023123718254Open ↗
01/26/2021121660238Open ↗
07/07/2020122556144Open ↗
Showing 3 of 4 on file for this type
▸BISLETTERS - SUPPORTING DOCUMENTATION4
07/15/2019123718245Open ↗
11/01/2016121124755Open ↗
11/01/2016121124755Open ↗
Showing 3 of 4 on file for this type
▸BISFINAL2
02/19/2026123306760Open ↗
04/30/2024123718254Open ↗
▸BISCCD1-Construction Code Determination1
On file, but not among the 200 most recently loaded documents for this source.
Showing 0 of 1 on file for this type
▸BISSUPERSEDING LETTER1
12/09/2020121660238Open ↗
▸Cost, Insurance & Ownership42
▸BISCOST AFFIDAVIT38
05/03/2021140850791Open ↗
01/26/2021121660238Open ↗
07/07/2020122556144Open ↗
Showing 3 of 38 on file for this type
▸BISHIC LICENSE OR AFFIDAVIT2
09/22/2016122658374Open ↗
11/25/2015122556144Open ↗
▸BISWELDERS AFFIDAVIT1
11/25/2015122556144Open ↗
▸BISCOST AFFIDAVIT (FINAL): PW31
10/11/2023123718254Open ↗
▸Filing & Intake Forms37
▸BISEFILING COVER SHEET19
04/02/2019123718245Open ↗
04/02/2019123718254Open ↗
03/29/2019123718218Open ↗
Showing 3 of 19 on file for this type
▸BISADDITIONAL INFORMATION9
09/11/2018123306760Open ↗
07/23/2018122872588Open ↗
12/28/2016122658374Open ↗
Showing 3 of 9 on file for this type
▸BISBOROUGH INTAKE FORM7
01/10/2024123718245Open ↗
01/04/2024123718254Open ↗
12/09/2020121660238Open ↗
Showing 3 of 7 on file for this type
▸BISEFILING JOB APPLICATION COVER SHEET2
06/03/2019140850791Open ↗
Showing 1 of 2 on file for this type
▸Other Documents6
▸BISDepartment of Consumer Affairs (DCA) Form2
05/07/2018123306760Open ↗
Showing 1 of 2 on file for this type
▸DOB NOWProof of Historic Building2
08/13/2026M00740180-P1Open ↗
08/13/2026M00740180-I1Open ↗
▸BISLAA - Supporting Documentation1
04/18/2018123306760Open ↗
▸BISEXTERNAL FORMS - SUPPORTING DOCUMENTATION1
On file, but not among the 200 most recently loaded documents for this source.
Showing 0 of 1 on file for this type