DOB04/18/2018V-DOB VIOLATION - ACTIVE
DOB06/02/1993V-DOB VIOLATION - ACTIVE
ECB06/07/2014WORK W/O A PERMIT. ILLGAL WORK NOTED : APPROXIMATELY 5,000 SQUARE FEETOF CONCRETE INSTALLED W/O PROPER DRAINAGE. REMEDY: OBTAIN ALL NECESSARY PERMITSNothing owed — awaiting certificate of correction
ECB10/26/2012WORK W/O A PERMIT. NOTED AT REAR OF BLDG EXPOSURE 3,PIPES WERE EXCAVATED FOR PLUMBING REPAIR. DOB RECORDS NO PLUMBING PERMITS FOR REPAIRS HAVE BEEN ISSUED. REMEDY: OBTAIN PERMIT.Nothing owed — awaiting certificate of correction
ECB10/28/2008SEC. 27-525.1. OPERATION OF A PLACE OF ASSEMBLY W/O A CERTIFICATE OF OPERATION. NOTED: A TEMPLE OCCUPIED BY MORE THAN 200 PEOPLE. THERE ARE SUFFICIENT # OF SIGNS & EXITS. REMEDY: OBTAIN A PA CERT. OF OPERATION.Nothing owed — awaiting certificate of correction
ECB06/23/1993FAILURE TO PROTECT ADJOINING STRUCTURES DURING EXCAVATION OPERATION - EXCAVATION FOR FOUNDATION - SIDES OF EXCAVATION MORE THAN 5' HAVE NOT BEEN PROTECTED ON WESTSIDE OF SITE. INADEQUATE BACKFILL ON NORTH SIDENothing owed — awaiting certificate of correction
ECB04/02/1993FAILURE TO PROVIDE PROTECTION AT SIDES OF EXCAVATION A) SHEETING AT SOUTHWEST CORNER EXCAVATIONAPPROX 15FT DEEP ALSO D) UNDERPINNING REQUIRED ALONG NORTH SIDE NDER WALKWAY AND STORAGE SHED STOP ALL WORK EXCEPTNothing owed — awaiting certificate of correction
ECB02/27/1993WORKING WITHOUT A VARIANCE WORK NOTED SHORING AND STEEL WORK. REMEDY OBTAINA VARIANCE.Nothing owed — awaiting certificate of correction
ECB11/20/1992FAILURE TO PROVIDE PROTECTION AT SIDES OF EXCAVATION EAST SIDE AT LOT EXCAVATED. APPROX. 20 FT. DEEP. REMEDY:STOP ALL WORK PROVIDE ADEQUATE PROTECTION SHEETING SHORING BRACING AT ALL SIDES OF EXCAVATION.Nothing owed — awaiting certificate of correction
ECB11/20/1992FAILURE TO FILE 10F PRIOR TO START OF CONTROLLED WORK FOR SHORING. REMEDY:PROVIDE CONTROLLED INSPECTION REPORT ON REQUIRED.Nothing owed — awaiting certificate of correction