Elevator apt, fireproof with stores
The Davis
45-57 DAVIS STREET · BIN 4000715
💬 Discuss this project
2019Year Built
10Stories
D6Building Class
M1-5/R7-3Zoning
127,456 sfGross Floor Area
159Units
LL97 CoveredRent Stabilized1 Open Violation ▸
Elevator apt, fireproof with stores · Owner of record: 45 DAVIS REALTY LLC · 21,600 sf lot · 5.9 FAR built · Flood zone X500
Locations of Work
ArchitectureMechanical
Permit Issued — active, not yet Signed-off
Roof1p · 1 filing · 2 docs
CellarUnder Construction14p · 3 filings · 20 docs
▾Owner History (Filing Record)
Companies and organizations named on filings. Individual owners are not shown.
OwnerFilingsMost Recent
OWNERS REP707/08/2026
BIG APPLE DESIGNERS407/08/2026
KEY DEVELOPERS2407/08/2026
VELOCITY MANAGEMENT303/22/2026
45 DAVIS REALTY LLC103/22/2026
CORE SCAFFOLD SYSTEMS1303/21/2026
45 DAVIS ST703/21/2026
GOLD STREET REALTY HOLDINGS303/21/2026
▾Design Consultants (Architect / Engineer of Record)
▾Filing Representatives (Expediters)
RepresentativeFilingsMost Recent
ADVANCED BUILDERS SERVICES803/21/2026
CONSTRUCTION PERMIT SERVICES103/21/2026
AE DESIGN SOLUTION403/21/2026
SYNERGY BUILDING CONSULTANTS403/21/2026
▾Contractors (License-Anchored)
FirmTradeRolesMost Recent
KEY DEVELOPERS INCGeneral Contractor1307/08/2026
CORE SCAFFOLD SYSTEMS INC.General Contractor807/08/2026
DHC POWER MANAGEMENT CORPGeneral Contractor303/21/2026
ATLANTA TRA&ENG CO.LLCGeneral Contractor303/21/2026
ZAQ CONSTRUCTION INCGeneral Contractor204/09/2026
BIG APPLE DESIGNERS INCGeneral Contractor107/08/2026
BELLEROSE PLBG HTGGeneral Contractor104/09/2026
SAFEPIPE PLUMBING INCFire Protection107/08/2026
FT CONSTRUCTION VENTUREGeneral Contractor107/08/2026
V. VASS ELECTRIC CORPElectrical103/22/2026
MEDRA EXHAUST SYSTEMS CORGeneral Contractor104/09/2026
M & J BUILD INCGeneral Contractor106/27/2026
TFK ELECTRIC CORPElectrical103/22/2026
▾Special Inspection Agencies
AgencyLicense #FilingsMost Recent
AMERILAND BROOK LLC15061108/19/2026
ZHENG & ASSOCIATES LLC7330210/08/2025
Z & T ENGINEERING, P.C.591408/19/2025
FRENCH & PARRELLO ASSOCIA1271106/08/2023
Building Lifecycle
All (199)Filed (22)Permit Issued (20)Signed Off (11)Violation (43)Inspection (4)Objection (69)Special Inspection (30)
09/14/2026
Objection raised — Scope
09/04/2026
Signed off — Alteration
Sprinkler application filed in conjunction with Alt-CO, job number: Q01197755-I1.
Q01137971-I1
08/19/2026
Filed — Alteration CO
Proposed interior renovation, change of use / occupancy for the cellar and lobby levels of an existing ten (10) story + cellar mixed-use building.
Q01197755-P1
08/12/2026
Inspection — Pass-Final CND-Occupancy Inspection
Pass
View inspection ↗
08/05/2026
Special inspection requirement — Energy Code Compliance Inspections
XIAOHONG ZHAO
08/05/2026
Special inspection requirement — Interior lighting power
XIAOHONG ZHAO
08/05/2026
Special inspection requirement — Metering
XIAOHONG ZHAO
08/05/2026
Special inspection requirement — Tenant Protection Plan Compliance
08/05/2026
Special inspection requirement — Flood Zone Compliance (attach FEMA elevation/dry floodproofing certificate where applicable)
XIAOHONG ZHAO
08/05/2026
Special inspection requirement — Fire-Resistance Rated Construction
XIAOHONG ZHAO
08/05/2026
Special inspection requirement — Maintenance information
XIAOHONG ZHAO
08/05/2026
Special inspection requirement — Lighting controls
XIAOHONG ZHAO
08/05/2026
Special inspection requirement — Fire-Resistant Penetrations and Joints
XIAOHONG ZHAO
06/24/2026
Filed — Alteration
Sprinkler application filed in conjunction with Alt-CO, job number: Q01197755-I1.
Q01137971-P5
06/24/2026
Special inspection requirement — Fire-Resistant Penetrations and Joints
XIAOHONG ZHAO
06/24/2026
Special inspection requirement — Tenant Protection Plan Compliance
06/24/2026
Special inspection requirement — Fire-Resistance Rated Construction
XIAOHONG ZHAO
06/24/2026
Special inspection requirement — Flood Zone Compliance (attach FEMA elevation/dry floodproofing certificate where applicable)
XIAOHONG ZHAO
06/24/2026
Special inspection requirement — Energy Code Compliance Inspections
XIAOHONG ZHAO
06/24/2026
Special inspection requirement — Lighting controls
XIAOHONG ZHAO
06/24/2026
Special inspection requirement — Lowest Floor Elevation
06/24/2026
Special inspection requirement — Final
06/24/2026
Special inspection requirement — Interior lighting power
XIAOHONG ZHAO
06/23/2026
Special inspection requirement — Fire-Resistance Rated Construction
XIAOHONG ZHAO
06/23/2026
Special inspection requirement — Energy Code Compliance Inspections
XIAOHONG ZHAO
06/23/2026
Special inspection requirement — Flood Zone Compliance (attach FEMA elevation/dry floodproofing certificate where applicable)
XIAOHONG ZHAO
06/23/2026
Special inspection requirement — Lowest Floor Elevation
XIAOHONG ZHAO
06/23/2026
Special inspection requirement — Tenant Protection Plan Compliance
XIAOHONG ZHAO
06/23/2026
Special inspection requirement — Lighting controls
XIAOHONG ZHAO
06/23/2026
Special inspection requirement — Fire-Resistant Penetrations and Joints
XIAOHONG ZHAO
06/23/2026
Special inspection requirement — Interior lighting power
XIAOHONG ZHAO
06/09/2026
Filed — Alteration
Sprinkler application filed in conjunction with Alt-CO, job number: Q01197755-I1.
Q01137971-P4
06/09/2026
Special inspection requirement — Interior lighting power
06/09/2026
Special inspection requirement — Lowest Floor Elevation
06/09/2026
Special inspection requirement — Lighting controls
06/09/2026
Special inspection requirement — Flood Zone Compliance (attach FEMA elevation/dry floodproofing certificate where applicable)
XIAOHONG ZHAO
06/05/2026
Inspection — Pass-Final CND-Occupancy Inspection
Pass
View inspection ↗
05/20/2026
Filed — No Work
Q01138563-I1
05/18/2026
Permit issued — General Construction
Q01197755-I1-GC
05/01/2026
Objection resolved — Addressed
04/29/2026
Objection resolved — Addressed
03/25/2026
Objection resolved — Addressed
03/25/2026
Objection resolved — Addressed
03/25/2026
Objection resolved — Addressed
03/25/2026
Objection resolved — Addressed
03/13/2026
Objection raised — Zoning
03/02/2026
Objection resolved — Addressed
03/02/2026
Objection resolved — Addressed
03/02/2026
Objection resolved — Addressed
03/02/2026
Objection resolved — Addressed
12/23/2025
Objection raised — Scope
12/17/2025
Signed off — Alteration
Sprinkler application filed in conjunction with Alt-CO, job number: Q01197755-I1.
Q01137971-S3
12/02/2025
Objection resolved — Addressed
12/02/2025
Objection resolved — Addressed
12/02/2025
Objection resolved — Addressed
11/21/2025
Objection raised — Fire_Protection
11/21/2025
Objection raised — Fire_Protection
11/21/2025
Objection raised — Fire_Protection
11/21/2025
Objection raised — Fire_Protection
11/21/2025
Objection raised — Fire_Protection
Latest 60 of 199 events.
Permit / Filing Register
SourceWork TypeStatusApplicantIssued
DOB NOWGeneral ConstructionPermit IssuedFT CONSTRUCTION VENTURE05/18/2026
DOB NOWGeneral ConstructionPermit IssuedZAQ CONSTRUCTION INC10/23/2025
DOB NOWMechanical SystemsPermit IssuedZAQ CONSTRUCTION INC10/23/2025
DOB NOWMechanical SystemsSigned-offMEDRA EXHAUST SYSTEMS COR01/21/2025
DOB NOWGeneral ConstructionSigned-offM & J BUILD INC12/23/2024
DOB NOWSprinklersSigned-offBELLEROSE PLBG & HEATING12/12/2024
DOB NOWGeneral ConstructionSigned-offDHC POWER MANAGEMENT CORP11/25/2024
DOB NOWAntennaSigned-offATLANTA TRA&ENG CO.LLC10/26/2023
DOB NOWSidewalk ShedSigned-offKEY DEVELOPERS INC01/25/2021
DOB NOWSupported ScaffoldSigned-offCORE SCAFFOLD SYSTEMS INC01/20/2021
DOB NOWSidewalk ShedSigned-offCORE SCAFFOLD SYSTEMS INC01/07/2021
DOB NOWConstruction FenceSigned-offKEY DEVELOPERS INC07/06/2020
DOB NOWConstruction FenceSigned-offKEY DEVELOPERS INC04/09/2020
DOB NOWSupported ScaffoldSigned-offCORE SCAFFOLD SYSTEMS INC01/24/2020
DOB NOWSidewalk ShedSigned-offCORE SCAFFOLD SYSTEMS INC01/13/2020
DOB NOWConstruction FenceSigned-offKEY DEVELOPERS INC05/08/2019
DOB NOWSupported ScaffoldSigned-offKEY DEVELOPERS INC02/25/2019
DOB NOWConstruction FenceSigned-offKEY DEVELOPERS INC02/14/2019
DOB NOWSidewalk ShedSigned-offKEY DEVELOPERS INC06/02/2018
DOB NOWConstruction FenceSigned-offBIG APPLE DESIGNERS INC03/19/2018
BISEQISSUEDCORE SCAFFOLD SYSTEMS INC.01/19/2021
BISEQISSUEDCORE SCAFFOLD SYSTEMS INC.01/07/2021
BIS—ISSUEDKEY DEVELOPERS INC11/17/2020
BIS—ISSUEDKEY DEVELOPERS INC11/17/2020
BIS—ISSUEDKEY DEVELOPERS INC09/29/2020
BIS—ISSUEDKEY DEVELOPERS INC09/29/2020
BISSDISSUEDPIPING & PLUMBING SOLUTIO09/24/2020
BISPLISSUEDEMPIRE PLUMBING INC09/16/2020
BISEQISSUEDCORE SCAFFOLD SYSTEMS INC.09/03/2020
BIS—ISSUEDKEY DEVELOPERS INC08/27/2020
BIS—ISSUEDKEY DEVELOPERS INC08/27/2020
BIS—ISSUEDKEY DEVELOPERS INC08/18/2020
BIS—ISSUEDKEY DEVELOPERS INC08/18/2020
BIS—ISSUEDKEY DEVELOPERS INC05/27/2020
BIS—ISSUEDKEY DEVELOPERS INC05/27/2020
BIS—ISSUEDKEY DEVELOPERS INC03/05/2020
BIS—ISSUEDKEY DEVELOPERS INC03/05/2020
BISEQISSUEDCORE SCAFFOLD SYSTEMS INC.01/24/2020
BISEQISSUEDCORE SCAFFOLD SYSTEMS INC.01/24/2020
BISEQISSUEDCORE SCAFFOLD SYSTEMS INC.01/13/2020
+ 13 more permits on file
2 projects · most recent 06/24/2026
Heating and Air Conditioning Systems Ventilation Systems
FiledStatusContractorScopeMake / Model / Capacity
06/24/2026Signed-offMEDRA EXHAUST SYSTEMS CORHeating and Air Conditioning Systems, Ventilation Systems
Heat / Cool
Lg ARUM144BTE5 144,000 BTU · Vrf Outdoor ×2
ARUM168BTE5 168,000 BTU · Vrf Outdoor ×1
Ventilation
Systemair FR-1600EL-208-3-CAV. 1,200 CFM · Heat Exchanger ×3
10/08/2025Permit IssuedZAQ CONSTRUCTION INCHeating and Air Conditioning Systems, Ventilation Systems
Heat / Cool
Trane YSK180A3S0L 250,000 BTU · Rooftop Unit ×4
Ventilation
Trane YSK180A3S0L 5,250 CFM · Rooftop Unit ×4
1 project · most recent 06/24/2026
Sprinkler System
FiledStatusContractorScope
06/24/2026Signed-offSAFEPIPE PLUMBING INCSprinkler System
1 project · most recent 06/24/2026
Water/Sanitary
FiledStatusContractorScope
06/24/2026——Water/Sanitary
12 projects · most recent 12/18/2025
General Wiring
FiledStatusContractorScope
12/18/2025Permit IssuedM.R. ELEC'L SERVICE LLCGeneral Wiring
02/18/2025CompleteAL-LECTRIC ELECT'L CONTRGGeneral Wiring
10/30/2023Permit IssuedACCURATE ELEC'L CORP.1,000 meters, 1 new_meters
07/07/2022CompleteTFK ELECTRIC CORPGeneral Wiring
02/24/2020CompleteTFK ELECTRIC CORPGeneral Wiring
02/19/2020CompleteCONTACT PLUS ELEC'L CORP—
02/03/2020CompleteTFK ELECTRIC CORP—
01/10/2020CompleteV. VASS ELECTRIC CORP—
10/17/2019CompleteTFK ELECTRIC CORP—
07/15/2019CompleteV. VASS ELECTRIC CORP—
09/12/2018CompleteFQE ELECTRIC LLC1 meters, 1 new_meters
05/18/2018CompleteV. VASS ELECTRIC CORP—
1 project · most recent 06/24/2026
FiledStatusContractorScope
06/24/2026Signed-offMEDRA EXHAUST SYSTEMS COR1 scope_items
▾Field Inspections (DOB CAP) — 4
DateTypeResultReport
08/12/2026Pass-Final CND-Occupancy InspectionPassView ↗
06/05/2026Pass-Final CND-Occupancy InspectionPassView ↗
10/03/2025Certified Sprinkler-SP-Fixtures-FinishCertifiedView ↗
10/01/2025Certified Sprinkler-SP-Piping Dry/Wet-Hydrostatic TestCertifiedView ↗
▾Special Inspection Requirements (DOB NOW) — 92
DateRequirementInspectorRole
08/05/2026Energy Code Compliance InspectionsXIAOHONG ZHAOprogress
08/05/2026Flood Zone Compliance (attach FEMA elevation/dry floodproofing certificate where applicable)XIAOHONG ZHAOspecial
08/05/2026Fire-Resistant Penetrations and JointsXIAOHONG ZHAOspecial
08/05/2026Tenant Protection Plan Compliance—special
08/05/2026Lighting controlsXIAOHONG ZHAOenergy_progress
08/05/2026Maintenance informationXIAOHONG ZHAOenergy_progress
08/05/2026MeteringXIAOHONG ZHAOenergy_progress
08/05/2026Interior lighting powerXIAOHONG ZHAOenergy_progress
08/05/2026Fire-Resistance Rated ConstructionXIAOHONG ZHAOprogress
06/24/2026Energy Code Compliance InspectionsXIAOHONG ZHAOprogress
06/24/2026Fire-Resistant Penetrations and JointsXIAOHONG ZHAOspecial
06/24/2026Tenant Protection Plan Compliance—special
06/24/2026Lighting controlsXIAOHONG ZHAOenergy_progress
06/24/2026Interior lighting powerXIAOHONG ZHAOenergy_progress
06/24/2026Lowest Floor Elevation—progress
06/24/2026Final—progress
06/24/2026Fire-Resistance Rated ConstructionXIAOHONG ZHAOprogress
06/24/2026Flood Zone Compliance (attach FEMA elevation/dry floodproofing certificate where applicable)XIAOHONG ZHAOspecial
06/23/2026Fire-Resistant Penetrations and JointsXIAOHONG ZHAOspecial
06/23/2026Tenant Protection Plan ComplianceXIAOHONG ZHAOspecial
06/23/2026Flood Zone Compliance (attach FEMA elevation/dry floodproofing certificate where applicable)XIAOHONG ZHAOspecial
06/23/2026Interior lighting powerXIAOHONG ZHAOenergy_progress
06/23/2026Lighting controlsXIAOHONG ZHAOenergy_progress
06/23/2026Energy Code Compliance InspectionsXIAOHONG ZHAOprogress
06/23/2026Lowest Floor ElevationXIAOHONG ZHAOprogress
Latest 25 of 92.
▾Documents — 408 on file (BIS + DOB NOW)
▸Plans & Drawings22
▸DOB NOWPlans/Sketch17
08/29/2026Q00023367-I1Request digital key ↗
08/29/2026Q00045247-I1Request digital key ↗
08/28/2026Q00096722-I1Request digital key ↗
Showing 3 of 17 on file for this type
▸DOB NOWPlans/Sketch - Sidewalk Shed3
08/29/2026Q00045247-I1Request digital key ↗
08/15/2026Q00045247-P1Request digital key ↗
08/15/2026Q00294610-I1Request digital key ↗
▸DOB NOWPlans/Sketch - Supported Scaffold1
08/28/2026Q00294854-I1Request digital key ↗
▸DOB NOWPlans/Sketch - Construction Fence1
08/28/2026Q00130197-I1Request digital key ↗
▸Applications & Permits94
▸BISPLAN / WORK APPROVAL APPLICATION55
04/30/2025421841733Open ↗
07/21/2021421674423Open ↗
07/01/2021421674423Open ↗
Showing 3 of 55 on file for this type
▸BISWORK PERMIT APPLICATION37
12/30/2020420663473Open ↗
12/23/2020420663473Open ↗
12/23/2020420663473Open ↗
Showing 3 of 37 on file for this type
▸BISBPP-5 - Authorization to the Department of Transportation1
On file, but not among the 200 most recently loaded documents for this source.
Showing 0 of 1 on file for this type
▸BISCERTIFICATE OF OCCUPANCY: APPLICATION1
12/29/2020420663473Open ↗
▸Zoning, Tax Lot & Property Records10
▸BISFLOOD ZONE COMPLIANCE2
06/28/2021420663473Open ↗
Showing 1 of 2 on file for this type
▸DOB NOWZoning Exhibit form (1-5)2
08/20/2026Q01197755-P1Open ↗
08/13/2026Q01197755-I1Open ↗
▸BISFLOOD ZONE DESIGN CERTIFICATION1
On file, but not among the 200 most recently loaded documents for this source.
Showing 0 of 1 on file for this type
▸BISZONING EXHIBIT I: CERTIFICATION1
On file, but not among the 200 most recently loaded documents for this source.
Showing 0 of 1 on file for this type
▸BISTAX LOT: TENTATIVE LOT NUMBER ISSUED1
On file, but not among the 200 most recently loaded documents for this source.
Showing 0 of 1 on file for this type
▸BISZONING EXHIBIT III:DESC. & OWNRSHP.STMNT1
On file, but not among the 200 most recently loaded documents for this source.
Showing 0 of 1 on file for this type
▸BISVERIFY TAX LOT1
03/25/2021420663473Open ↗
▸DOB NOWHouse Number Verification: TOPO Stamp1
08/13/2026Q01197755-I1Open ↗
▸Seals & Professional Certifications93
▸DOB NOWProgress Inspector Seal & Signature27
09/03/2026Q01137971-P2Open ↗
09/01/2026Q01197755-P1Open ↗
09/01/2026Q01197755-P1Open ↗
Showing 3 of 27 on file for this type
▸DOB NOWSpecial Inspector Seal & Signature21
09/30/2026Q01137971-S3Open ↗
09/30/2026Q01137971-S3Open ↗
09/30/2026Q01137971-S3Open ↗
Showing 3 of 21 on file for this type
▸DOB NOWDPL-1: Design Professional Seal & Signature21
08/28/2026Q00130197-I1Open ↗
08/28/2026Q00294610-I1Open ↗
08/24/2026Q00883452-I1Open ↗
Showing 3 of 21 on file for this type
▸BISPROFESSIONAL CERTIFICATION STATEMENT7
01/24/2020440582987Open ↗
01/24/2020440582978Open ↗
01/10/2020440581247Open ↗
Showing 3 of 7 on file for this type
▸BISREQUIRED ITEMS CHECKLIST FOR PROFESSIONAL CERTIFICATION6
01/24/2020440582987Open ↗
01/24/2020440582978Open ↗
01/10/2020440581247Open ↗
Showing 3 of 6 on file for this type
▸BISTECHNICAL REPORT STATEMENT OF RESPONSIBILITY6
01/24/2020440582987Open ↗
01/24/2020440582978Open ↗
01/10/2020440581247Open ↗
Showing 3 of 6 on file for this type
▸BISTECHNICAL REPORT: RESPONSIBILITY/CERTIFICATION3
03/06/2019420663473Open ↗
02/21/2019421719554Open ↗
Showing 2 of 3 on file for this type
▸BISAPPLICANT OWNER SIGNATURE1
On file, but not among the 200 most recently loaded documents for this source.
Showing 0 of 1 on file for this type
▸BISPROFESSIONAL CERTIFIED CHECKLIST1
On file, but not among the 200 most recently loaded documents for this source.
Showing 0 of 1 on file for this type
▸Trade Schedules & Equipment16
▸BISSCHEDULE B - PLUMBING8
04/09/2021420663473Open ↗
03/10/2021420663473Open ↗
03/03/2021420663473Open ↗
Showing 3 of 8 on file for this type
▸BISFA - FDNY APPROVAL : FD-FAA2
04/11/2022421712622Open ↗
02/03/2022421674423Open ↗
▸BISEQUIPMENT USE APPLICATION/PERMIT1
06/04/2021420663473Open ↗
▸BIS* SEWER CONNECTION: DEP SD1 & SD21
On file, but not among the 200 most recently loaded documents for this source.
Showing 0 of 1 on file for this type
▸BISEQUIPMENT USE PERMITS1
06/04/2021420663473Open ↗
▸BISELECTRIC CUT-OFF1
On file, but not among the 200 most recently loaded documents for this source.
Showing 0 of 1 on file for this type
▸BISSEWER CUT-OFF1
On file, but not among the 200 most recently loaded documents for this source.
Showing 0 of 1 on file for this type
▸BISSCHEDULE B - PLUMBING/SPRINKLER/STANDPIPE1
On file, but not among the 200 most recently loaded documents for this source.
Showing 0 of 1 on file for this type
▸Safety & Tenant Protection11
▸BISEXCAVATION OR DEMOLITION: 5-DAY NOTICE2
On file, but not among the 200 most recently loaded documents for this source.
Showing 0 of 2 on file for this type
▸BISSTREET TREE CHECKLIST2
On file, but not among the 200 most recently loaded documents for this source.
Showing 0 of 2 on file for this type
▸BISSTREET TREES SITE PLAN2
04/16/2021420663473Open ↗
Showing 1 of 2 on file for this type
▸DOB NOWStreet Tree Checklist2
08/20/2026Q01197755-P1Open ↗
08/20/2026Q01197755-I1Open ↗
▸BISSTREET TREE SIGNOFF1
04/16/2021420663473Open ↗
▸BISSRO MD ANTI-HARASSMENT CHECKLIST1
On file, but not among the 200 most recently loaded documents for this source.
Showing 0 of 1 on file for this type
▸BISSTREET TREES: RECEIPT OF STREET TREES SITE PLAN1
On file, but not among the 200 most recently loaded documents for this source.
Showing 0 of 1 on file for this type
▸Environmental & Asbestos2
▸BISASBESTOS: CERTIFICATION (DEP ACP5)1
On file, but not among the 200 most recently loaded documents for this source.
Showing 0 of 1 on file for this type
▸BISRODENT CONTROL1
On file, but not among the 200 most recently loaded documents for this source.
Showing 0 of 1 on file for this type
▸Energy Compliance12
▸BISTECHNICAL REPORT: ENERGY CODE - RESPONSIBILITY9
09/01/2021420663473Open ↗
08/22/2021420663473Open ↗
07/01/2021420663473Open ↗
Showing 3 of 9 on file for this type
▸BISTECHNICAL REPORT: ENERGY CODE PROGRESS INSPS1
03/06/2019420663473Open ↗
▸BISPRELIMINARY COMMISSIONING REPORT CERTIFICATION1
06/28/2021420663473Open ↗
▸BISAS-BUILT ENERGY ANALYSIS1
09/02/2021420663473Open ↗
▸Inspections & Test Reports56
▸BISTECHNICAL REPORT: RESPONSIBILITY36
09/13/2021420663473Open ↗
09/01/2021420663473Open ↗
08/22/2021420663473Open ↗
Showing 3 of 36 on file for this type
▸BISTECHNICAL REPORT: CONCRETE DESIGN MIX9
01/14/2021420663473Open ↗
01/09/2020420663473Open ↗
01/09/2020420663473Open ↗
Showing 3 of 9 on file for this type
▸BISTECHNICAL REPORT: SOIL INSPECTION5
On file, but not among the 200 most recently loaded documents for this source.
Showing 0 of 5 on file for this type
▸BISTECHNICAL REPORT: CONCRETE/TEST CYLINDER3
12/30/2020420663473Open ↗
03/06/2019420663473Open ↗
02/25/2019420663473Open ↗
▸BISSOIL REPORT1
On file, but not among the 200 most recently loaded documents for this source.
Showing 0 of 1 on file for this type
▸BISHYDRAULIC FLOW CALCULATIONS1
On file, but not among the 200 most recently loaded documents for this source.
Showing 0 of 1 on file for this type
▸BISTR2: CONCRETE FIELD TESTING TECHNICAL REPORT1
06/08/2021420663473Open ↗
▸Approvals, Objections & Sign-offs33
▸BISSCHEDULE A - OCCUPANCY / USE11
07/16/2025421841733Open ↗
04/27/2021420663473Open ↗
05/15/2019420663473Open ↗
Showing 3 of 11 on file for this type
▸BISCERTIFICATE OF OCCUPANCY/LOC: REQUEST10
10/23/2025421674423Open ↗
04/12/2022421712622Open ↗
12/06/2021421719554Open ↗
Showing 3 of 10 on file for this type
▸BISLETTERS - SUPPORTING DOCUMENTATION7
02/21/2025421841733Open ↗
12/30/2020420663473Open ↗
11/09/2020420663473Open ↗
Showing 3 of 7 on file for this type
▸BISSUPERSEDING LETTER2
03/14/2020420663473Open ↗
09/30/2019421719554Open ↗
▸BISTRANSIT AUTHORITY/MTA/PANYNJ APPROVAL2
On file, but not among the 200 most recently loaded documents for this source.
Showing 0 of 2 on file for this type
▸BISTAP LETTER - DOM SVC : DEP-DOM1
On file, but not among the 200 most recently loaded documents for this source.
Showing 0 of 1 on file for this type
▸Cost, Insurance & Ownership6
▸BISPROJECT-SPECIFIC GL INSURANCE3
03/06/2019420663473Open ↗
Showing 1 of 3 on file for this type
▸BISDEPT OF FINANCE VERIFICATION1
On file, but not among the 200 most recently loaded documents for this source.
Showing 0 of 1 on file for this type
▸BISAcord 25 (Acord Certificate of Liability Insurance)1
On file, but not among the 200 most recently loaded documents for this source.
Showing 0 of 1 on file for this type
▸BISCOST AFFIDAVIT1
On file, but not among the 200 most recently loaded documents for this source.
Showing 0 of 1 on file for this type
▸Filing & Intake Forms42
▸BISADDITIONAL INFORMATION22
08/22/2021420663473Open ↗
04/28/2021420663473Open ↗
04/28/2021420663473Open ↗
Showing 3 of 22 on file for this type
▸BISEFILING COVER SHEET9
04/30/2025421841733Open ↗
Showing 1 of 9 on file for this type
▸BISEFILING JOB APPLICATION COVER SHEET7
01/24/2020440582987Open ↗
01/24/2020440582978Open ↗
01/10/2020440581247Open ↗
Showing 3 of 7 on file for this type
▸BISBOROUGH INTAKE FORM4
12/18/2020420663473Open ↗
11/09/2020420663473Open ↗
05/29/2020420663473Open ↗
Showing 3 of 4 on file for this type
▸Other Documents6
▸BISCONSTRUCTION - SUPPORTING DOCUMENTATION2
09/17/2020420663473Open ↗
05/29/2020420663473Open ↗
▸DOB NOWProperty Ownership Certification2
08/20/2026Q01197755-P1Open ↗
08/20/2026Q01197755-I1Open ↗
▸BISBPP - SUPPORTING DOCUMENTATION1
On file, but not among the 200 most recently loaded documents for this source.
Showing 0 of 1 on file for this type
▸BISFEMA ELEVATION CERT (086-0-33)/ FLOODPROOFING CERT (086-0-34)1
08/22/2022420663473Open ↗