← Back
Two family brick
45 AVENUE
QUEENS · BIN 4625179
💬 Discuss this project
2023Year Built
2Stories
B1Building Class
R3-2Zoning
2,544 sfGross Floor Area
2Units
0 Open Violations
Two family brick · Owner of record: SHUN CHANG LLC · 3,750 sf lot · 0.68 FAR built · Flood zone X
Locations of Work
ArchitectureStructuralPlumbingFire Protection
Floor 227p · 1 filing · 20 docs
Floor 125p · 1 filing · 20 docs
Cellar30p · 1 filing · 20 docs
1 job · most recent 10/18/2024
Gas Plumbing-Sprinkler Storm Water/Sanitary
FiledStatusContractorScope
10/18/2024Signed-offJOHN FITZGERALD PLBG &HTGGas, Plumbing-Sprinkler, Storm, Water/Sanitary
1 job · most recent 12/10/2024
General Wiring
FiledStatusContractorScope
12/10/2024CompleteCL ELECTRICAL CORPGeneral Wiring
Building Lifecycle
All (66)Filed (10)Permit Issued (10)Signed Off (6)Violation (4)Inspection (6)Special Inspection (30)
09/16/2025
Signed off — New Building
INSTALLATION PLUMBING AND SPRINKLER SYSTEM AS PER PLAN FILED HEREWITH IN CONJUNCTION W/ NB #Q00897045 AND GAR #Q00910519. NO CHANGE IN USE, OCCUPANCY OR EGRESS.
Q00897045-I1
08/20/2025
Signed off — New Building
INSTALLATION PLUMBING AND SPRINKLER SYSTEM AS PER PLAN FILED HEREWITH IN CONJUNCTION W/ NB #Q00897045 AND GAR #Q00910519. NO CHANGE IN USE, OCCUPANCY OR EGRESS.
Q00897045-S1
06/02/2025
Signed off — New Building
INSTALLATION PLUMBING AND SPRINKLER SYSTEM AS PER PLAN FILED HEREWITH IN CONJUNCTION W/ NB #Q00897045 AND GAR #Q00910519. NO CHANGE IN USE, OCCUPANCY OR EGRESS.
Q00897045-S2
03/18/2025
Permit issued — Plumbing
Q00897045-S2-PL
03/03/2025
Signed off — New Building
INSTALLATION PLUMBING AND SPRINKLER SYSTEM AS PER PLAN FILED HEREWITH IN CONJUNCTION W/ NB #Q00897045 AND GAR #Q00910519. NO CHANGE IN USE, OCCUPANCY OR EGRESS.
Q00897045-S3
02/14/2025
Inspection — Pass-Final Curb Cut Non-Directive 14
Pass
View inspection ↗
01/15/2025
Inspection — Fail-Final Curb Cut Non-Directive 14
Fail
View inspection ↗
01/09/2025
Signed off — Alteration
Q00878241-I1
01/08/2025
Inspection — Pass-Final CND-Occupancy Inspection
Pass
View inspection ↗
01/06/2025
Permit issued — Curb Cut
Q00897045-S3-CC
12/03/2024
Inspection — Pass-Final CND-Occupancy Inspection
Pass
View inspection ↗
11/12/2024
Special inspection requirement — Electric vehicle service equipment requirements
MEHDI GHAZI
11/12/2024
Special inspection requirement — HVAC-R and service water heating equipment
MEHDI GHAZI
11/12/2024
Special inspection requirement — Air barrier - visual inspection
MEHDI GHAZI
11/12/2024
Special inspection requirement — Interior lighting power
MEHDI GHAZI
11/12/2024
Special inspection requirement — Protection of exposed foundation insulation
MEHDI GHAZI
11/12/2024
Special inspection requirement — Air barrier — testing
MEHDI GHAZI
11/12/2024
Special inspection requirement — Insulation placement and R values
MEHDI GHAZI
11/12/2024
Special inspection requirement — Ventilation and air distribution system
MEHDI GHAZI
11/12/2024
Special inspection requirement — HVAC-R and service water heating system controls
MEHDI GHAZI
11/12/2024
Special inspection requirement — Maintenance information
MEHDI GHAZI
11/12/2024
Special inspection requirement — Permanent certificate
MEHDI GHAZI
11/12/2024
Special inspection requirement — Fenestration air leakage
MEHDI GHAZI
11/12/2024
Special inspection requirement — Fenestration areas
MEHDI GHAZI
11/12/2024
Special inspection requirement — Chimneys and vents
MEHDI GHAZI
11/12/2024
Special inspection requirement — Heating Systems
MEHDI GHAZI
11/12/2024
Special inspection requirement — Subsurface Investigations (Borings/Test Pits)
Rajasekhar Sakhamuri
11/12/2024
Special inspection requirement — Fire-Resistant Penetrations and Joints
MEHDI GHAZI
11/12/2024
Special inspection requirement — Mechanical Systems
MEHDI GHAZI
11/12/2024
Special inspection requirement — Fire-Resistance Rated Construction
MEHDI GHAZI
11/12/2024
Special inspection requirement — Final
MEHDI GHAZI
11/12/2024
Special inspection requirement — Energy Code Compliance Inspections
MEHDI GHAZI
11/12/2024
Special inspection requirement — HVAC-R and service water piping design and insulation
MEHDI GHAZI
11/12/2024
Special inspection requirement — Fenestration and door U-factor and product ratings
MEHDI GHAZI
11/12/2024
Special inspection requirement — Metering
MEHDI GHAZI
11/06/2024
Inspection — Certified Sprinkler (PL)-SP-Fixtures (PL)-Finish
Certified
View inspection ↗
10/18/2024
Filed — New Building
INSTALLATION PLUMBING AND SPRINKLER SYSTEM AS PER PLAN FILED HEREWITH IN CONJUNCTION W/ NB #Q00897045 AND GAR #Q00910519. NO CHANGE IN USE, OCCUPANCY OR EGRESS.
Q00897045-P4
10/17/2024
Special inspection requirement — Soil Percolation Test - Private On-Site Storm Water Drainage Disposal Systems, and Detention Facilities
Rajasekhar Sakhamuri
10/17/2024
Special inspection requirement — Private On-Site Storm Water Disposal Systems-, and Detention Facilities, Installation
MEHDI GHAZI
10/17/2024
Special inspection requirement — Fire-Resistant Penetrations and Joints
MEHDI GHAZI
10/17/2024
Special inspection requirement — Sprinkler Systems
MEHDI GHAZI
10/17/2024
Special inspection requirement — Energy Code Compliance Inspections
MEHDI GHAZI
10/17/2024
Special inspection requirement — HVAC-R and service water piping design and insulation
MEHDI GHAZI
10/16/2024
Filed — New Building
INSTALLATION PLUMBING AND SPRINKLER SYSTEM AS PER PLAN FILED HEREWITH IN CONJUNCTION W/ NB #Q00897045 AND GAR #Q00910519. NO CHANGE IN USE, OCCUPANCY OR EGRESS.
Q00897045-P3
05/07/2024
Violation issued (ECB, closed)
Construction
05/07/2024
Violation issued (ECB, closed)
Construction
05/07/2024
Inspection — Certified Gas-Gas-Piping-Roughing
Certified
View inspection ↗
03/13/2024
Permit issued — Plumbing
Q00897045-S2-PL
02/08/2024
Violation issued (ECB, closed)
Unknown
02/08/2024
Violation issued (ECB, closed)
Construction
12/19/2023
Filed — New Building
INSTALLATION PLUMBING AND SPRINKLER SYSTEM AS PER PLAN FILED HEREWITH IN CONJUNCTION W/ NB #Q00897045 AND GAR #Q00910519. NO CHANGE IN USE, OCCUPANCY OR EGRESS.
Q00897045-P2
11/30/2023
Filed — New Building
INSTALLATION PLUMBING AND SPRINKLER SYSTEM AS PER PLAN FILED HEREWITH IN CONJUNCTION W/ NB #Q00897045 AND GAR #Q00910519. NO CHANGE IN USE, OCCUPANCY OR EGRESS.
Q00897045-P1
11/08/2023
Permit issued — General Construction
Q00897045-I1-MS
11/08/2023
Permit issued — General Construction
Q00897045-I1-GC
10/18/2023
Permit issued — Structural
Q00897045-S1-ST
10/18/2023
Permit issued — General Construction
Q00897045-S1-GC
10/04/2023
Filed — New Building
INSTALLATION PLUMBING AND SPRINKLER SYSTEM AS PER PLAN FILED HEREWITH IN CONJUNCTION W/ NB #Q00897045 AND GAR #Q00910519. NO CHANGE IN USE, OCCUPANCY OR EGRESS.
Q00897045-S2
10/04/2023
Filed — New Building
INSTALLATION PLUMBING AND SPRINKLER SYSTEM AS PER PLAN FILED HEREWITH IN CONJUNCTION W/ NB #Q00897045 AND GAR #Q00910519. NO CHANGE IN USE, OCCUPANCY OR EGRESS.
Q00897045-S3
10/03/2023
Permit issued — Earth Work
Q00897045-S1-FO-EA
09/15/2023
Filed — New Building
INSTALLATION PLUMBING AND SPRINKLER SYSTEM AS PER PLAN FILED HEREWITH IN CONJUNCTION W/ NB #Q00897045 AND GAR #Q00910519. NO CHANGE IN USE, OCCUPANCY OR EGRESS.
Q00897045-S1
Latest 60 of 66 events.
▾Owner History (Filing Record)
Companies and organizations named on filings. Individual owners are not shown.
OwnerFilingsMost Recent
PRIMROSE SERVICE403/22/2026
▾Sales History (ACRIS)
DatePriceUnitSeller → Buyer$/sf
03/27/2023$1.9M—— → —$727/sf building
▾Design Consultants (Architect / Engineer of Record)
FirmFilingsMost Recent
MEI ARCHITECT PLLC910/18/2024
▾Filing Representatives (Expediters)
RepresentativeFilingsMost Recent
ALPHA HOME DESIGN LLC2003/21/2026
▾Contractors (License-Anchored)
FirmTradeRolesMost Recent
PRIMROSE SERVICE INCGeneral Contractor1107/08/2026
L&L CONSTRUCTION DEVELOPGeneral Contractor407/08/2026
JIN SUN CONSTRUCTION INCGeneral Contractor303/21/2026
JOHN FITZGERALD PLBG &HTGPlumbing207/08/2026
CL ELECTRICAL CORPElectrical103/22/2026
▾Special Inspection Agencies
AgencyLicense #FilingsMost Recent
MEHDI GHAZI, P.E. P.C.7129710/18/2024
TRIANGLE INSPECTION & TES7495210/16/2024
Permit / Filing Register
SourceWork TypeStatusApplicantIssued
DOB NOWPlumbingSigned-offJOHN FITZGERALD PLBG &HTG03/18/2025
DOB NOWCurb CutSigned-offL&L CONSTRUCTION DEVELOP01/06/2025
DOB NOWPlumbingSigned-offJOHN FITZGERALD PLBG &HTG03/13/2024
DOB NOWGeneral ConstructionSigned-offPRIMROSE SERVICE INC11/08/2023
DOB NOWGeneral ConstructionPermit IssuedPRIMROSE SERVICE INC11/08/2023
DOB NOWStructuralSigned-offPRIMROSE SERVICE INC10/18/2023
DOB NOWGeneral ConstructionSigned-offPRIMROSE SERVICE INC10/18/2023
DOB NOWEarth WorkSigned-offJIN L. LIN10/03/2023
DOB NOWFull DemolitionSigned-offL&L CONSTRUCTION DEVELOP08/22/2023
DOB NOWConstruction FenceSigned-offPRIMROSE SERVICE INC08/16/2023
▾Field Inspections (DOB CAP) — 6
DateTypeResultReport
02/14/2025Pass-Final Curb Cut Non-Directive 14PassView ↗
01/15/2025Fail-Final Curb Cut Non-Directive 14FailView ↗
01/08/2025Pass-Final CND-Occupancy InspectionPassView ↗
12/03/2024Pass-Final CND-Occupancy InspectionPassView ↗
11/06/2024Certified Sprinkler (PL)-SP-Fixtures (PL)-FinishCertifiedView ↗
05/07/2024Certified Gas-Gas-Piping-RoughingCertifiedView ↗
▾Special Inspection Requirements (DOB NOW) — 69
DateRequirementInspectorRole
11/12/2024Ventilation and air distribution systemMEHDI GHAZIenergy_progress
11/12/2024HVAC-R and service water heating system controlsMEHDI GHAZIenergy_progress
11/12/2024Maintenance informationMEHDI GHAZIenergy_progress
11/12/2024Interior lighting powerMEHDI GHAZIenergy_progress
11/12/2024Electric vehicle service equipment requirementsMEHDI GHAZIenergy_progress
11/12/2024Permanent certificateMEHDI GHAZIenergy_progress
11/12/2024MeteringMEHDI GHAZIenergy_progress
11/12/2024HVAC-R and service water heating equipmentMEHDI GHAZIenergy_progress
11/12/2024Air barrier — testing MEHDI GHAZIenergy_progress
11/12/2024Fenestration areasMEHDI GHAZIenergy_progress
11/12/2024Protection of exposed foundation insulationMEHDI GHAZIenergy_progress
11/12/2024Fenestration air leakageMEHDI GHAZIenergy_progress
11/12/2024Insulation placement and R valuesMEHDI GHAZIenergy_progress
11/12/2024Air barrier - visual inspectionMEHDI GHAZIenergy_progress
11/12/2024Chimneys and ventsMEHDI GHAZIspecial
11/12/2024Heating SystemsMEHDI GHAZIspecial
11/12/2024Subsurface Investigations (Borings/Test Pits)Rajasekhar Sakhamurispecial
11/12/2024Fire-Resistant Penetrations and JointsMEHDI GHAZIspecial
11/12/2024Mechanical SystemsMEHDI GHAZIspecial
11/12/2024Fire-Resistance Rated ConstructionMEHDI GHAZIprogress
11/12/2024FinalMEHDI GHAZIprogress
11/12/2024Energy Code Compliance InspectionsMEHDI GHAZIprogress
11/12/2024HVAC-R and service water piping design and insulationMEHDI GHAZIenergy_progress
11/12/2024Fenestration and door U-factor and product ratingsMEHDI GHAZIenergy_progress
10/17/2024HVAC-R and service water heating system controlsMEHDI GHAZIenergy_progress
Latest 25 of 69.
▾Documents — 92 on file (BIS + DOB NOW)
▸Plans & Drawings10
▸DOB NOWPlans/Sketch10
08/24/2026Q00863218-I1Request digital key ↗
08/24/2026Q00878241-I1Request digital key ↗
08/24/2026Q00897045-P4Request digital key ↗
Showing 3 of 10 on file for this type
▸Zoning, Tax Lot & Property Records7
▸DOB NOWZoning Exhibit form (1-5)3
08/13/2026Q00897045-P1Open ↗
08/13/2026Q00897045-P4Open ↗
08/13/2026Q00897045-I1Open ↗
▸DOB NOWZD1: DOB Zoning Diagram3
08/13/2026Q00897045-P1Open ↗
08/13/2026Q00897045-P4Open ↗
08/13/2026Q00897045-I1Open ↗
▸DOB NOWHouse Number Verification: TOPO Stamp1
08/13/2026Q00897045-I1Open ↗
▸Seals & Professional Certifications30
▸DOB NOWProgress Inspector Seal & Signature11
08/27/2026Q00897045-S2Open ↗
08/27/2026Q00897045-S2Open ↗
08/25/2026Q00897045-P1Open ↗
Showing 3 of 11 on file for this type
▸DOB NOWSpecial Inspector Seal & Signature10
08/27/2026Q00897045-S2Open ↗
08/27/2026Q00897045-S2Open ↗
08/25/2026Q00897045-P1Open ↗
Showing 3 of 10 on file for this type
▸DOB NOWDPL-1: Design Professional Seal & Signature9
08/24/2026Q00878241-I1Open ↗
08/24/2026Q00897045-P4Open ↗
08/24/2026Q00897045-P3Open ↗
Showing 3 of 9 on file for this type
▸Trade Schedules & Equipment7
▸DOB NOWDEP: Sewer Certification (Sanitary/Storm)3
08/13/2026Q00897045-I1Open ↗
08/13/2026Q00897045-P4Open ↗
08/13/2026Q00897045-P1Open ↗
▸DOB NOWWater Cut-Off1
08/13/2026Q00863218-I1Open ↗
▸DOB NOWSewer Cut-Off1
08/13/2026Q00863218-I1Open ↗
▸DOB NOWElectric Cut-Off1
08/13/2026Q00863218-I1Open ↗
▸DOB NOWGas Cut-Off1
08/13/2026Q00863218-I1Open ↗
▸Safety & Tenant Protection9
▸DOB NOWStreet Tree Checklist5
08/24/2026Q00897045-P1Open ↗
08/24/2026Q00897045-P4Open ↗
08/24/2026Q00897045-P2Open ↗
Showing 3 of 5 on file for this type
▸DOB NOWParks Department Acknowledgment Letter for Street Trees Plan2
08/13/2026Q00897045-S1Open ↗
08/13/2026Q00897045-I1Open ↗
▸DOB NOWStreet Tree Sign Off1
08/13/2026Q00897045-I1Open ↗
▸DOB NOWStreet Trees Site Plan1
08/13/2026Q00897045-I1Open ↗
▸Environmental & Asbestos2
▸DOB NOWDEP ACP-5: Asbestos Assessment Report1
08/24/2026Q00863218-I1Open ↗
▸DOB NOWRodent Control1
08/13/2026Q00863218-I1Open ↗
▸Energy Compliance1
▸DOB NOWPreliminary Commissioning Report Certification1
08/13/2026Q00897045-S2Open ↗
▸Inspections & Test Reports7
▸DOB NOWSOIL REPORT5
08/13/2026Q00897045-P1Open ↗
08/13/2026Q00897045-I1Open ↗
08/13/2026Q00897045-P2Open ↗
Showing 3 of 5 on file for this type
▸DOB NOWTR4 Test Report and Plot Diagram2
08/13/2026Q00897045-I1Open ↗
08/13/2026Q00897045-S1Open ↗
▸Other Documents19
▸DOB NOWSite Survey: Initial5
08/13/2026Q00897045-S1Open ↗
08/13/2026Q00897045-I1Open ↗
08/13/2026Q00897045-P1Open ↗
Showing 3 of 5 on file for this type
▸DOB NOWLocal Law 92/94 of 2019 Sustainable Roof Zone5
08/13/2026Q00897045-S1Open ↗
08/13/2026Q00897045-P1Open ↗
08/13/2026Q00897045-P4Open ↗
Showing 3 of 5 on file for this type
▸DOB NOWProperty Ownership Certification4
08/24/2026Q00863218-I1Open ↗
08/24/2026Q00897045-P4Open ↗
08/24/2026Q00897045-P1Open ↗
Showing 3 of 4 on file for this type
▸DOB NOWFull Demo: 10-Day Notice1
08/13/2026Q00863218-I1Open ↗
▸DOB NOWStructure Photographs1
08/13/2026Q00863218-I1Open ↗
▸DOB NOWFinal Survey1
08/13/2026Q00897045-I1Open ↗
▸DOB NOWAdjoining Owners Notification1
08/13/2026Q00897045-S1Open ↗
▸DOB NOWCommunity Board Notification1
08/13/2026Q00863218-I1Open ↗