| Filed | Status | Contractor | Scope | Make / Model / Capacity |
|---|---|---|---|---|
| 04/07/2026 | — | — | Generators, Heating and Air Conditioning Systems, Refrigeration Systems, Ventilation Systems | Heat / Cool Lg ARUM036GSS5 69,000 BTU · Vrf Outdoor ×8 ARNU123SJA4 12,300 BTU · Vrf Indoor ×5 ARNU243SKA4 24,200 BTU · Vrf Indoor ×6 ARNU363SVA4 35,500 BTU · Vrf Indoor ×3 Ventilation Greenheck FJ1-9-BI 100 CFM · Exhaust Fan ×4 USF-13-B7 1,400 CFM · Makeup Air ×4 G-100HP-A 300 CFM ×2 CUBE-100HP 250 CFM · Exhaust Fan ×1 CUE-180-B 2,950 CFM · Exhaust Fan ×1 G-097-A 200 CFM · Exhaust Fan ×2 G-099-A 650 CFM · Exhaust Fan ×1 G-100-A 900 CFM · Exhaust Fan ×1 G-120-A 975 CFM · Exhaust Fan ×1 G-160-A 3,650 CFM · Exhaust Fan ×1 USF-15-B7 2,200 CFM · Exhaust Fan ×1 USF-22-B7 5,000 CFM · Exhaust Fan ×1 VK-H-13-8 13,000 CFM · Exhaust Fan ×4 CUE-140-A 2,250 CFM · Exhaust Fan ×1 G-098-A 450 CFM · Exhaust Fan ×1 GB-100HP 500 CFM · Exhaust Fan ×1 USF-44-B4 28,000 CFM · Exhaust Fan ×1 Annexaire ERP-E-16-EW07-HE-D-SW 16,500 CFM · Rooftop Unit ×2 ERP-E-20-EW09-HE-D-SW 21,000 CFM · Rooftop Unit ×2 AHU-E-12-HE-D 14,000 CFM · Rooftop Unit ×1 ERP-E-04-EW02-HE-D-SW 3,800 CFM · Rooftop Unit ×1 ERP-E-12-EW04-HE-D-SW 12,000 CFM · Rooftop Unit ×1 ERP-E-12-EW05-HE-D 13,000 CFM · Rooftop Unit ×1 ERP-E-25-EW16-HE-D-SW 26,000 CFM · Rooftop Unit ×1 Refrigeration Aermec WWM0500 604 tons · Chiller ×1 Generators Cummins 300DQDAC L2 250 kW · Generator ×1 |
| 02/24/2026 | Permit Issued | NAVILLUS TILE INC | Ventilation Systems | Ventilation Greenheck SQ-9-M1-VG 1,000 CFM · Exhaust Fan ×2 |
| 06/30/2025 | — | — | Ventilation Systems | Ventilation Greenheck SQ-160 1,800 CFM · Exhaust Fan ×1 |
| Filed | Status | Contractor | Scope |
|---|---|---|---|
| 06/30/2025 | — | — | 40 heads |
| Filed | Status | Contractor | Scope |
|---|---|---|---|
| 04/07/2026 | — | — | Storm, Water/Sanitary |
| 02/24/2026 | Permit Issued | FORSYTHE PLBG & HTG CORP | Storm, Water/Sanitary |
| Filed | Status | Contractor | Scope |
|---|---|---|---|
| 04/07/2026 | — | — | 1 scope_items |
| 04/07/2026 | — | — | Steel, Concrete |
| 02/24/2026 | Permit Issued | FORSYTHE PLBG & HTG CORP | 3 scope_items |
| 06/30/2025 | — | — | Steel, Concrete |
| Filed | Status | Contractor | Scope |
|---|---|---|---|
| 04/07/2026 | Permit Issued | NAVILLUS TILE INC | Fence |
| Owner | Filings | Most Recent |
|---|---|---|
| NYC SCHOOL CONSTRUCTION AUTHORITY | 59 | 09/13/2026 |
| Firm | Filings | Most Recent |
|---|---|---|
| PEI COBB FREED & PARTNERS ARCH. LLP | 21 | 04/07/2026 |
| TAREK M. ZEID, PE, PLLC | 2 | 04/07/2026 |
| ENGINEERING GROUP ASSOCIATES, PC | 1 | 04/07/2026 |
| HARTLAND ENGINEERING, DPC | 9 | 02/24/2026 |
| SHENOY ENGINEERING, PC | 7 | 02/24/2026 |
| LORING CONSULTING ENGINEERS, INC. | 5 | 02/24/2026 |
| ARCHITECTURAL PRESERVATION STUDIO, | 3 | 02/24/2026 |
| AKRF, INC. | 1 | 04/23/2025 |
| SHENOY ENGINEERING, P.C. | 6 | 01/23/2025 |
| Representative | Filings | Most Recent |
|---|---|---|
| JMV ASSOCIATES | 104 | 03/21/2026 |
| Firm | Trade | Roles | Most Recent |
|---|---|---|---|
| NAVILLUS TILE INC | General Contractor | 5 | 04/12/2026 |
| FORSYTHE PLBG & HTG CORP | Plumbing | 2 | 09/01/2026 |
| FRANCO BELLI PLMG&HTG SON | Plumbing | 1 | 06/28/2026 |
| Agency | License # | Filings | Most Recent |
|---|---|---|---|
| MUNICIPAL TESTING LABORAT | 230 | 21 | 04/07/2026 |
| Source | Work Type | Status | Applicant | Issued |
|---|---|---|---|---|
| DOB NOW | Plumbing | Permit Issued | FORSYTHE PLBG & HTG CORP | 08/31/2026 |
| DOB NOW | Plumbing | Permit Issued | FRANCO BELLI PLMG&HTG SON | 05/14/2026 |
| DOB NOW | Plumbing | Permit Issued | FORSYTHE PLBG & HTG CORP | 04/14/2026 |
| DOB NOW | Mechanical Systems | Permit Issued | NAVILLUS TILE INC | 04/10/2026 |
| DOB NOW | Structural | Permit Issued | NAVILLUS TILE INC | 04/08/2026 |
| DOB NOW | Earth Work | Permit Issued | NAVILLUS TILE INC | 04/06/2026 |
| DOB NOW | General Construction | Permit Issued | NAVILLUS TILE INC | 04/02/2026 |
| DOB NOW | Construction Fence | Permit Issued | NAVILLUS TILE INC | 03/06/2026 |
| Date | Requirement | Inspector | Role |
|---|---|---|---|
| 07/21/2026 | Structural Stability – Alterations of existing buildings | STEPHEN LATUS | special |
| 07/07/2026 | Concrete - Cast-In-Place | STEPHEN LATUS | special |
| 05/28/2026 | Structural Steel - Details | STEPHEN LATUS | special |
| 05/28/2026 | Post-installed Anchors | STEPHEN LATUS | special |
| 04/28/2026 | Masonry | — | special |
| 04/28/2026 | Subgrade Inspections | — | special |
| 04/28/2026 | Concrete - Cast-In-Place | — | special |
| 04/28/2026 | Wall Panels, Curtain Walls, and Veneers | — | special |
| 04/28/2026 | Post-installed Anchors | — | special |
| 04/28/2026 | Fire-Resistance Rated Construction | — | progress |
| 04/28/2026 | Air barrier — testing | — | energy_progress |
| 04/28/2026 | Insulation placement and R values | — | energy_progress |
| 04/28/2026 | Sprayed fire-resistant materials | — | special |
| 04/28/2026 | Mastic and Intumescent Fire-resistant Coatings | — | special |
| 04/28/2026 | Fire-Resistant Penetrations and Joints | — | special |
| 04/28/2026 | Fenestration air leakage | — | energy_progress |
| 04/28/2026 | Air barrier - visual inspection | — | energy_progress |
| 04/28/2026 | Fenestration and door U-factor and product ratings | — | energy_progress |
| 04/28/2026 | Air barrier continuity plan testing | — | energy_progress |
| 04/28/2026 | Fenestration areas | — | energy_progress |
| 04/28/2026 | Vestibules | — | energy_progress |
| 04/28/2026 | Protection of exposed foundation insulation | — | energy_progress |
| 04/28/2026 | Energy Code Compliance Inspections | — | progress |
| 03/30/2026 | Fire-Resistant Penetrations and Joints | — | special |
| 03/30/2026 | Air barrier continuity plan testing | — | energy_progress |