← Back
Church, synagogue, chapel
45 GOBLE PLACE
BRONX · BIN 2119156
💬 Discuss this project
1952Year Built
1Stories
M1Building Class
R7-1Zoning
26,826 sfGross Floor Area
1Units
LL97 Covered1 Open Violation ▸
Church, synagogue, chapel · Owner of record: GREATER NEW YORK CORP · 16,292 sf lot · 1.65 FAR built · Flood zone X
Locations of Work
ArchitectureMechanicalPlumbingFire ProtectionGeneral
Roof1p · 1 filing · 12 docs
Floor 17p · 2 filings · 8 docs
Mezzanine3p · 1 filing · 4 docs
Cellar11p · 6 filings · 20 docs
▾Owner History (Filing Record)
Companies and organizations named on filings. Individual owners are not shown.
OwnerFilingsMost Recent
SHAH GROUP ENTERPRISES IN607/08/2026
GREATER NEW YORK CORPORATION OF SEV1207/08/2026
GREATER NY CORP OF SDA603/21/2026
GREATER BT CORP OF SDA103/21/2026
▾Design Consultants (Architect / Engineer of Record)
FirmFilingsMost Recent
ERROL MCINTOSH, R.A., P.C.909/27/2023
ASHRAF CORP104/29/2019
▾Filing Representatives (Expediters)
RepresentativeFilingsMost Recent
NAGAN EX CONSULTANTS1603/21/2026
ADVANCED BUILDERS SERVICES203/21/2026
▾Contractors (License-Anchored)
FirmTradeRolesMost Recent
TOPLINE NYC CONTRACTINGGeneral Contractor807/08/2026
EXPERT FIRE SPRINKLER,LLCFire Protection307/08/2026
RS MECHANICAL SRVCS INCGeneral Contractor303/21/2026
CAPE PLUMBING INCPlumbing107/08/2026
▾Special Inspection Agencies
AgencyLicense #FilingsMost Recent
PRUDIGM ENGINEERING LLCU4304211/01/2022
Building Lifecycle
All (54)Filed (10)Permit Issued (9)Signed Off (1)Violation (12)Inspection (8)Objection (12)Special Inspection (2)
11/14/2025
Violation issued (DOB, open)
V-DOB VIOLATION - ACTIVE
07/18/2024
Inspection — Certified Storm Drainage-ST-Fixtures-Finish
Certified
View inspection ↗
07/17/2024
Inspection — Certified Storm Drainage-ST-Piping-Roughing
Certified
View inspection ↗
06/14/2024
Permit issued — Sprinklers
X00555322-I1-EW-SP
05/23/2024
Permit issued — Sprinklers
X00555322-I1-EW-SP
10/04/2023
Inspection — Pass-Final Boiler Equipment Inspection
Pass
View inspection ↗
09/27/2023
Filed — Alteration
Installation of boiler as shown on plans
X08019801-P3
09/06/2023
Inspection — Fail-Final Boiler Equipment Inspection
Fail
View inspection ↗
08/25/2023
Objection resolved — Addressed
08/24/2023
Objection raised — Other
08/16/2023
Filed — Alteration
Installation of boiler as shown on plans
X08019801-P2
07/13/2023
Inspection — No Access-Final Boiler Equipment Inspection
No Access
View inspection ↗
07/12/2023
Signed off — Alteration
X00160663-I1
07/11/2023
Inspection — Certified Sprinkler-SP-Piping Dry/Wet-Hydrostatic Test
Certified
View inspection ↗
06/15/2023
Inspection — Certified Sprinkler-SP-Piping Dry/Wet-Hydrostatic Test
Certified
View inspection ↗
06/09/2023
Filed — Alteration
Installation of boiler as shown on plans
X08019801-P1
06/09/2023
Inspection — Certified Sprinkler-SP-Fixtures-Finish
Certified
View inspection ↗
05/31/2023
Permit issued — Sprinklers
X00555322-I1-EW-SP
05/31/2023
Permit issued — Mechanical Systems
X08009926-I1-MS
02/02/2023
Violation issued (DOB, closed)
V*-DOB VIOLATION - DISMISSED
01/19/2023
Permit issued — Boiler Equipment
X08019801-I1-BE
12/01/2022
Violation issued (DOB, closed)
V*-DOB VIOLATION - DISMISSED
11/03/2022
Objection raised — Fire_Protection
11/03/2022
Objection resolved — Addressed
11/03/2022
Objection raised — Other
11/03/2022
Objection resolved — Addressed
11/03/2022
Objection raised — Energy
11/03/2022
Objection resolved — Addressed
11/02/2022
Violation issued (DOB, closed)
V*-DOB VIOLATION - DISMISSED
11/01/2022
Filed — Alteration
Installation of boiler as shown on plans
X08019801-I1
11/01/2022
Filed — Alteration
TO INSTALL HVAC SYSTEM IN CONJUNCTION WITH APPLICATION #220534072.
X08009926-I1
08/09/2022
Violation issued (ECB, closed)
Construction
08/09/2022
Violation issued (ECB, closed)
Construction
08/02/2022
Violation issued (DOB, closed)
V*-DOB VIOLATION - DISMISSED
07/22/2022
Objection raised — Scope
07/22/2022
Objection resolved — Addressed
07/22/2022
Objection raised — Scope
07/22/2022
Objection resolved — Addressed
07/15/2022
Filed — No Work
X00773355-I1
07/15/2022
Filed — No Work
X00764913-I1
07/15/2022
Filed — No Work
X00773370-I1
07/12/2022
Filed — Alteration
X00555322-I1
07/12/2022
Special inspection requirement — Public Assembly Emergency Lighting
ERROL MCINTOSH
06/27/2022
Special inspection requirement — Public Assembly Emergency Lighting
ERROL MCINTOSH
06/23/2022
Violation issued (ECB, closed)
Construction
06/01/2022
Violation issued (DOB, closed)
V*-DOB VIOLATION - DISMISSED
04/26/2022
Permit issued — Sidewalk Shed
04/29/2021
Violation issued (DOB, closed)
V*-DOB VIOLATION - DISMISSED
04/27/2021
Permit issued — Sidewalk Shed
12/26/2019
Permit issued — Sidewalk Shed
05/01/2019
Permit issued — Sidewalk Shed
04/29/2019
Filed — Alteration
X00160663-I1
06/13/2018
Violation issued (DOB, closed)
V*-DOB VIOLATION - DISMISSED
03/19/2018
Violation issued (ECB, closed)
Construction
Permit / Filing Register
SourceWork TypeStatusApplicantIssued
DOB NOWSprinklersPermit IssuedEXPERT FIRE SPRINKLER,LLC06/14/2024
DOB NOWSprinklersPermit IssuedEXPERT FIRE SPRINKLER,LLC05/23/2024
DOB NOWSprinklersPermit IssuedEXPERT FIRE SPRINKLER,LLC05/31/2023
DOB NOWMechanical SystemsPermit IssuedRS MECHANICAL SRVCS INC05/31/2023
DOB NOWBoiler EquipmentSigned-offCAPE PLUMBING INC01/19/2023
DOB NOWSidewalk ShedSigned-offTOPLINE NYC CONTRACTING04/26/2022
DOB NOWSidewalk ShedSigned-offTOPLINE NYC CONTRACTING04/27/2021
DOB NOWSidewalk ShedSigned-offTOPLINE NYC CONTRACTING12/26/2019
DOB NOWSidewalk ShedSigned-offTOPLINE NYC CONTRACTING05/01/2019
BISPLISSUEDCAPE PLUMBING INC06/26/2025
BISPLISSUEDCAPE PLUMBING INC05/22/2024
BIS—ISSUEDGREATER NY CONFERENCE OF07/28/2023
BIS—ISSUEDGREATER NY CONFERENCE OF04/03/2023
BISEQISSUEDGREATER NY CONFERENCE OF12/14/2022
BIS—RE-ISSUEDGREATER NY CONFERENCE OF09/07/2022
BISPLISSUEDCAPE PLUMBING INC06/23/2022
BISEQISSUEDGREATER NY CONFERENCE OF12/15/2021
BIS—ISSUEDGREATER NY CONFERENCE OF12/15/2021
BISPLISSUEDCAPE PLUMBING INC10/28/2020
BIS—ISSUEDGREATER NY CONFERENCE OF01/03/2020
BISPLISSUEDCAPE PLUMBING INC09/04/2019
BIS—ISSUEDGREATER NY CONFERENCE OF10/09/2018
BIS—ISSUEDGREATER NY CONFERENCE OF08/22/2018
BISEQISSUEDGREATER NY CONFERENCE OF08/20/2018
1 project · most recent 11/01/2022
Associated Ducts and Piping Heating and Air Conditioning Systems
FiledStatusContractorScopeMake / Model / Capacity
11/01/2022Permit IssuedRS MECHANICAL SRVCS INCAssociated Ducts and Piping, Heating and Air Conditioning Systems
Heat / Cool
Johnson Controls J07YC00A2BLD2 87,700 BTU ×1
J10YDC00A2BLC2 121,000 BTU ×1
J20YDC0)A2BL02 236,400 BTU · Rooftop Unit ×1
V34AC04A6KDABU 480,800 BTU ×1
Ducts & Piping
N/A N/A Ductwork ×1
4 projects · most recent 08/01/2025
General Wiring
FiledStatusContractorScope
08/01/2025CompleteAPPROVED ELECTRIC CORP.General Wiring
11/03/2022CompleteALLBRIGHT ELECTRIC, INC—
04/29/2019Permit IssuedRICHARD NEU—
01/17/2019Permit IssuedJK ELECTRICAL INC—
▾Field Inspections (DOB CAP) — 8
DateTypeResultReport
07/18/2024Certified Storm Drainage-ST-Fixtures-FinishCertifiedView ↗
07/17/2024Certified Storm Drainage-ST-Piping-RoughingCertifiedView ↗
10/04/2023Pass-Final Boiler Equipment InspectionPassView ↗
09/06/2023Fail-Final Boiler Equipment InspectionFailView ↗
07/13/2023No Access-Final Boiler Equipment InspectionNo AccessView ↗
07/11/2023Certified Sprinkler-SP-Piping Dry/Wet-Hydrostatic TestCertifiedView ↗
06/15/2023Certified Sprinkler-SP-Piping Dry/Wet-Hydrostatic TestCertifiedView ↗
06/09/2023Certified Sprinkler-SP-Fixtures-FinishCertifiedView ↗
▾Special Inspection Requirements (DOB NOW) — 2
DateRequirementInspectorRole
07/12/2022Public Assembly Emergency LightingERROL MCINTOSHprogress
06/27/2022Public Assembly Emergency LightingERROL MCINTOSHprogress
▾Tenants in the building
TenantSpaceFloorsRenovation projects
First Ghana S.d.a. ChurchOtherCellar, Floor 1, Mezzanine
Project X08009926 Alteration · Permit Entire · 11/01/2022
Ghana S.d.a. ChurchOtherCellar, Roof
Project X00555322 Alteration · Permit Entire · 07/12/2022
Read from each project’s drawing title blocks and cover sheets and checked twice; a name appears only when it is the occupant, never the owner, landlord or designer.
▾Documents — 123 on file (BIS + DOB NOW)
▸Plans & Drawings10
▸DOB NOWPlans/Sketch6
08/24/2026X00555322-I1Request digital key ↗
08/22/2026X08019801-P1Request digital key ↗
08/22/2026X08019801-P3Request digital key ↗
Showing 3 of 6 on file for this type
▸DOB NOWPlans/Sketch - Place of Assembly3
08/24/2026X00764913-I1Request digital key ↗
08/15/2026X00773370-I1Request digital key ↗
08/15/2026X00773355-I1Request digital key ↗
▸DOB NOWPlans/Sketch - Sidewalk Shed1
08/26/2026X00160663-I1Request digital key ↗
▸Applications & Permits27
▸BISPLAN / WORK APPROVAL APPLICATION16
02/13/2024220165096Open ↗
02/12/2024220163613Open ↗
02/12/2024220163622Open ↗
Showing 3 of 16 on file for this type
▸BISWORK PERMIT APPLICATION7
09/13/2022220534072Open ↗
12/15/2021220534072Open ↗
01/03/2020220534072Open ↗
Showing 3 of 7 on file for this type
▸BISPLACE OF ASSEMBLY3
02/03/2012220163178Open ↗
02/03/2012220163622Open ↗
02/03/2012220163613Open ↗
▸BISCERTIFICATE OF OCCUPANCY: APPLICATION1
04/18/2023220534072Open ↗
▸Zoning, Tax Lot & Property Records1
▸BISADDRESS - NEW HOUSE NUMBER APPROVED1
02/03/2012220165096Open ↗
▸Seals & Professional Certifications21
▸DOB NOWDPL-1: Design Professional Seal & Signature10
08/26/2026X00160663-I1Open ↗
08/24/2026X00555322-I1Open ↗
08/24/2026X00764913-I1Open ↗
Showing 3 of 10 on file for this type
▸BISTECHNICAL REPORT: RESPONSIBILITY/CERTIFICATION7
08/09/2018220534072Open ↗
04/03/2018220534072Open ↗
04/03/2018220534072Open ↗
Showing 3 of 7 on file for this type
▸DOB NOWProgress Inspector Seal & Signature2
09/01/2026X00773370-I1Open ↗
08/27/2026X00764913-I1Open ↗
▸BISPROFESSIONAL CERTIFIED CHECKLIST1
02/03/2012220165096Open ↗
▸BISPROFESSIONAL CERTIFICATION STATEMENT FORM1
02/03/2012220165096Open ↗
▸Trade Schedules & Equipment7
▸BISSCHEDULE B - PLUMBING7
10/19/2023220534072Open ↗
10/11/2023220534072Open ↗
06/22/2023220534072Open ↗
Showing 3 of 7 on file for this type
▸Safety & Tenant Protection3
▸BISSTREET TREE CHECKLIST2
07/25/2017220534072Open ↗
02/03/2012220165096Open ↗
▸BISSTREET TREE SIGNOFF1
04/20/2023220534072Open ↗
▸Environmental & Asbestos4
▸DOB NOWDEP ACP-5: Asbestos Assessment Report2
08/24/2026X00555322-I1Open ↗
08/13/2026X08009926-I1Open ↗
▸BISTHIS IS 'NOT AN ASBESTOS PROJECT'1
02/03/2012220165096Open ↗
▸BISASBESTOS: CERTIFICATION (DEP ACP5)1
03/28/2018220534072Open ↗
▸Energy Compliance15
▸BISTECHNICAL REPORT: ENERGY CODE PROGRESS INSPS3
08/09/2018220534072Open ↗
03/28/2018220534072Open ↗
07/25/2017220534072Open ↗
▸BISFENESTRATION U-FACTOR & PRODUCT RATING1
04/19/2023220534072Open ↗
▸BISFENESTRATION AREAS1
04/19/2023220534072Open ↗
▸BISTECHNICAL REPORT: ENERGY CODE - RESPONSIBILITY1
09/25/2022220534072Open ↗
▸BISAS-BUILT ENERGY ANALYSIS (EN2)1
04/19/2023220534072Open ↗
▸BISINSULATION PLACEMENT & R VALUES1
04/19/2023220534072Open ↗
▸BISENERGY CODE COMPLIANCE INSPECTIONS1
04/19/2023220534072Open ↗
▸BISELECTRIC MOTORS1
04/19/2023220534072Open ↗
▸BISTECHNICAL REPORT: ENERGY1
02/03/2012220165096Open ↗
▸BISELECTRICAL ENERGY CONSUMPTION1
04/19/2023220534072Open ↗
▸BISFENESTRATION AIR LEAKAGE1
04/19/2023220534072Open ↗
▸BISAIR SEALING AND INSULATION - VISUAL1
04/19/2023220534072Open ↗
▸BISAS-BUILT ENERGY ANALYSIS1
09/25/2022220534072Open ↗
▸Inspections & Test Reports8
▸BISSTRUCTURAL STABILITY - ALTERATIONS OF EXISTING BUILDINGS1
04/19/2023220534072Open ↗
▸BISFIRE-RESISTANT PENETRATIONS AND JOINTS (FIRESTOP)1
04/19/2023220534072Open ↗
▸BISFIRE-RESISTIVE RATED CONSTRUCTION1
04/19/2023220534072Open ↗
▸BISMASONRY1
01/25/2024220534072Open ↗
▸BISTECHNICAL REPORT: RESPONSIBILITY1
09/25/2022220534072Open ↗
▸BISBORINGS / TEST PITS (TR-4) 27-7201
04/04/2018220534072Open ↗
▸BISWALL PANELS, CURTAIN WALLS, AND VENEERS1
04/19/2023220534072Open ↗
▸BISTECHNICAL REPORT: SOIL INSPECTION1
04/03/2018220534072Open ↗
▸Approvals, Objections & Sign-offs16
▸DOB NOWFee Exempt Supporting Document - DOF ACRIS report or BIB letter10
08/26/2026X00160663-I1Open ↗
08/24/2026X00555322-I1Open ↗
08/13/2026X00773355-I1Open ↗
Showing 3 of 10 on file for this type
▸BISADMINISTRATIVE OBJECTIONS4
02/03/2012220165096Open ↗
02/03/2012220163178Open ↗
02/03/2012220163622Open ↗
Showing 3 of 4 on file for this type
▸BISSCHEDULE A - OCCUPANCY / USE2
08/13/2012220165096Open ↗
02/03/2012220165096Open ↗
▸Cost, Insurance & Ownership2
▸BISPROJECT-SPECIFIC GL INSURANCE2
09/13/2022220534072Open ↗
12/15/2021220534072Open ↗
▸Filing & Intake Forms3
▸BISEFILING COVER SHEET2
07/25/2017220534072Open ↗
02/03/2012220165096Open ↗
▸BISADDITIONAL INFORMATION1
04/11/2023220534072Open ↗
▸Other Documents6
▸BISEXTERIOR INSULATION AND FINISH SYSTEMS (EIFS)1
04/19/2023220534072Open ↗
▸BISMAINTENANCE INFORMATION1
04/19/2023220534072Open ↗
▸BISPERMANENT CERTIFICATE1
04/19/2023220534072Open ↗
▸BISPlot Diagram1
02/03/2012220165096Open ↗
▸BISSHUTOFF DAMPERS1
04/19/2023220534072Open ↗
▸DOB NOWAlternate Plan 11
08/24/2026X00764913-I1Open ↗