← Back
BuildNYC
Elevator cooperative
45 GREAT JONES STREET
MANHATTAN · Greenwich Village · BIN 1008482
💬 Discuss this project
2014Year Built
7Stories
D4Building Class
M1-5/R7XZoning
15,758 sfGross Floor Area
6Units
Rent Stabilized1 Active Violation 0 unresolved · 1 paperwork only 1 old, status unconfirmed ▸FISP: No Report Filed
Elevator cooperative · Owner of record: 45 Great Jones Street · 2,700 sf lot · 5.84 FAR built · Flood zone X
Locations of Work
Architecture
Names shown beside floors are taken automatically from the text of filed documents and may be incomplete or wrong.
Floor 6Bfc Partners3p · 1 filing · 4 docs
Floor 5
Floor 4
Floor 3
Floor 2
Floor 1
▾Owner History (Filing Record)
Companies and organizations named on filings. Individual owners are not shown.
OwnerFilingsMost Recent
45 Great Jones Street3003/22/2026
Design District 451203/21/2026
BFC Partners303/22/2026
DAC 47303/21/2026
▾Design Consultants (Architect / Engineer of Record)
FirmFilingsMost Recent
Archinet NY108/18/2023
▾Filing Representatives (Expediters)
RepresentativeFilingsMost Recent
Codeworx203/21/2026
▾Contractors (License-Anchored)
FirmTradeRolesMost Recent
Cypress Green Construction CoGeneral Contractor303/21/2026
Five Borough FPPlumbing203/22/2026
Denmar ElectricElectrical103/21/2026
Building Lifecycle
02/20/2028
Facade inspection report due (FISP Cycle 9, sub-cycle B)
The filing window opened 02/21/2026. No Cycle 9 filing on record yet
07/23/2026
Elevator Category 1 inspection report filed
08/01/2025
Elevator Category 5 inspection report filed
04/17/2024
Signed off — Alteration
DEMOLITION AND CONSTRUCTION OF NON-BEARING PARTITIONS REDUCING THE SIZE OF THE CLOSET AND BEDROOM CREATING A HALLWAY TO ACCESS AN EXISTING BATHROOM. ALL WORK CONFINED TO BUILDING INTERIOR. ALL WORK PER PLANS SUBMITTED.
M00918623-I1
04/11/2024
Failure to submit an acceptable required cycle 9B report of critical examination documenting condition of exterior wall and appurtenances required…
ECB violation · open
39 history events on file for this building. Sign in free to see the full history. Sign in · Create account
Permit / Filing Register
SourceWork TypeStatusApplicantIssued
DOB NOWGeneral ConstructionSigned-offCypress Green Construction Co11/03/2023
BISOTISSUEDCypress Green Construction Co02/22/2017
BISOTISSUEDCypress Green Construction Co11/22/2016
BISSPISSUEDSteve Belsito Sons01/22/2016
BISMHISSUEDSt3 Management12/01/2015
BIS—ISSUEDCypress Green Construction Co09/17/2015
BIS—ISSUEDCypress Green Construction Co06/17/2015
BISEQISSUEDCypress Green Construction Co06/17/2015
BISPLISSUEDNaf Pak Plumbing & Heating06/15/2015
BISEQISSUEDColgate Enterprise04/28/2015
BISEQISSUEDColgate Enterprise03/13/2015
BIS—ISSUEDCypress Green Construction Co03/10/2015
BISEQISSUEDCypress Green Construction Co03/10/2015
BISSDISSUEDAlltype Fire Protection02/03/2015
BISEQISSUEDColgate Enterprise08/13/2014
BISPLISSUEDNaf Pak Plumbing & Heating06/18/2014
BISEQISSUEDColgate Enterprise05/07/2014
BISEQISSUEDColgate Enterprise03/18/2014
BIS—ISSUEDCypress Green Construction Co03/07/2014
BIS—ISSUEDCypress Green Construction Co03/07/2014
BISEQISSUEDCypress Green Construction Co03/07/2014
BISSDISSUEDAlltype Fire Protection02/04/2014
BIS—ISSUEDNortheast Interiors Speci11/25/2013
BIS—RE-ISSUEDNortheast Service Interio11/19/2013
BISEQISSUEDNortheast Interiors Speci11/19/2013
BISOTISSUEDCypress Restoration10/23/2013
BIS—RE-ISSUEDNortheast Service Interio10/17/2013
BISEQRE-ISSUEDNortheast Service Interio10/17/2013
BIS—ISSUEDNortheast Service Interio10/09/2013
BISEQISSUEDNortheast Service Interio10/03/2013
BIS—ISSUEDGreat Jones Lumber10/24/2008
2 projects · most recent 09/23/2020
General Wiring
FiledStatusContractorScope
09/23/2020CompleteDenmar ElectricGeneral Wiring
09/09/2019CancelledRedline ElectricGeneral Wiring
▾Special Inspection Requirements (DOB NOW) — 1
DateRequirementInspectorRole
08/13/2023FinalJOHN MCMONAGLEprogress
362 filed documents on file for this building. Sign in free to see the full history. Sign in · Create account