45 LISPENARD STREET
MANHATTAN · BIN 1002719
💬 Discuss this project
1896Year Built
9Stories
D4Building Class
C6-2AZoning
37,400 sfGross Floor Area
19Units
LL97 CoveredRent Stabilized7 Active Violations 3 unresolved · 4 paperwork only ▸FISP: SAFEFDNY Report ↗
Elevator cooperative · Owner of record: Lispenard Studio · 4,241 sf lot · 8.82 FAR built · Flood zone X500
Locations of Work
ArchitectureStructuralMechanicalPlumbingEquipmentCivilGeneralOther
Names shown beside floors are taken automatically from the text of filed documents and may be incomplete or wrong.
RoofMechanical system installation and demolition9p · 3 filings · 20 docs
Floor 9Unit 9E1 filing · 8 docs
Floor 8Unit 8E5p · 2 filings · 13 docs
Floor 7Unit 7E5p · 3 filings · 20 docs
Floor 6Unit 6W, Unit 7B25p · 4 filings · 20 docs
Floor 5Unit 5E3p · 2 filings · 16 docs
Floor 4Unit 4W1 filing · 8 docs
Floor 3
Floor 2
Floor 1Unit 1E7p · 1 filing · 11 docs
CellarLispenard Studio28p · 3 filings · 20 docs
Site & exteriorLispenard Studio46p · 6 filings · 20 docs
Filed — no permit issued25p · 1 filing · 14 docs
▾Owner History (Filing Record)
Companies and organizations named on filings. Individual owners are not shown.
OwnerFilingsMost Recent
James Sanders and Associates1007/08/2026
45 Lispenard603/22/2026
Andrews Building403/21/2026
Lispendaard Studio303/21/2026
▾Design Consultants (Architect / Engineer of Record)
▾Filing Representatives (Expediters)
RepresentativeFilingsMost Recent
Municipal Building Consultants503/21/2026
J Callahan Consulting203/21/2026
Seay-Yarbrough203/21/2026
ABC Permit Expediting203/21/2026
J A Expediting603/21/2026
Synchron Expediting203/21/2026
New York & Company203/21/2026
Code603/21/2026
Rigid Structural Design203/21/2026
Green Studio203/21/2026
▾Contractors (License-Anchored)
FirmTradeRolesMost Recent
Intersystem InstallationScaffold1007/08/2026
Sunshine Renovations Man*General Contractor407/08/2026
Rock Group NYScaffold307/08/2026
Roundtable BuildersGeneral Contractor303/21/2026
Walker Ridge Construction NYGeneral Contractor303/21/2026
N&K Plumbing and HeatingPlumbing207/08/2026
Juno ContractingGeneral Contractor204/09/2026
Procore MechanicalPlumbing107/08/2026
Champion CombustionGeneral Contractor104/09/2026
Hybrid Mechanicalspecialty_contractor107/08/2026
Pebble CraftGeneral Contractor104/09/2026
The Metro GroupGeneral Contractor107/08/2026
Poler ContractingScaffold107/08/2026
A.S.H. ElectricElectrical103/22/2026
▾Special Inspection Agencies
AgencyLicense #FilingsMost Recent
Citiscape Consulting762207/16/2026
Brian Ill Development1402101/09/2026
SWL Engineering Inspectio6912301/07/2026
SW Engineering Company, P1832110/17/2024
Prudigm Engineering Llcu4304111/15/2023
New York Engineering Associates851104/06/2022
D'Antonio Consulting Engineering931202/19/2022
Gillen - Konuk Architectu7049101/27/2021
Building Lifecycle
02/20/2028
Facade inspection report due (FISP Cycle 9, sub-cycle B)
The filing window opened 02/21/2026. No Cycle 9 filing on record yet
09/18/2026
Signed off — Alteration
remove of non-partition wall, remove cabinetry and finishes. install new cabinetry, finishes, millwork and flooring. plumbing filed under separate application. no change in use, egress or occupancy.
M01328962-I1
08/26/2026
Unable to gain access. Certificate of correction not submitted for class 1 failure to maintain violation #39168305N issued on 11/25/2025 for the…
ECB violation · open
07/30/2026
Signed off — Alteration
Replace and relocate outdoor condenser unit for apartment 5E from the apartment toilet room to the roof
M01196200-I1
07/22/2026
Objection raised — Scope
237 history events on file for this building. Sign in free to see the full history. Sign in · Create account
Permit / Filing Register
SourceWork TypeStatusApplicantIssued
DOB NOWMechanical SystemsSigned-offHybrid Mechanical05/13/2026
DOB NOWGeneral ConstructionSigned-offPebble Craft02/10/2026
DOB NOWMechanical SystemsSigned-offChampion Combustion01/16/2026
DOB NOWGeneral ConstructionSigned-offJuno Contracting03/17/2025
DOB NOWStructuralSigned-offJuno Contracting03/15/2025
DOB NOWMechanical SystemsSigned-offWalker Ridge Construction NY02/05/2024
DOB NOWConstruction FencePermit IssuedPoler Contracting08/25/2023
DOB NOWPlumbingSigned-offN&K Plumbing and Heating11/20/2022
DOB NOWMechanical SystemsSigned-offSunshine Renovations Man*11/17/2022
DOB NOWPlumbingSigned-offProcore Mechanical10/21/2022
DOB NOWSidewalk ShedSigned-offIntersystem Installation09/28/2022
DOB NOWSupported ScaffoldSigned-offIntersystem Installation09/27/2022
DOB NOWSidewalk ShedSigned-offIntersystem Installation07/08/2022
DOB NOWSupported ScaffoldSigned-offIntersystem Installation07/07/2022
DOB NOWGeneral ConstructionSigned-offRoundtable Builders06/13/2022
DOB NOWPlumbingSigned-offN&K Plumbing and Heating04/28/2022
DOB NOWMechanical SystemsPermit IssuedThe Metro Group04/19/2022
DOB NOWGeneral ConstructionSigned-offSunshine Renovations Man*04/19/2022
DOB NOWSidewalk ShedSigned-offIntersystem Installation08/05/2021
DOB NOWSupported ScaffoldSigned-offIntersystem Installation07/30/2021
DOB NOWSupported ScaffoldSigned-offIntersystem Installation12/04/2020
DOB NOWSidewalk ShedSigned-offIntersystem Installation12/02/2020
DOB NOWSidewalk ShedSigned-offRock Group NY09/29/2020
DOB NOWSidewalk ShedSigned-offRock Group NY10/10/2019
BISOTISSUEDPrat Enterprises10/12/2022
BISEQISSUEDPrat Enterprises01/21/2022
BISOTISSUEDPrat Enterprises10/20/2021
BISOTISSUEDPrat Enterprises08/23/2021
BISEQISSUEDPrat Enterprises08/18/2021
BISEQISSUEDPratt Construction & Rest12/11/2020
BISMHISSUEDNew Rising Construction09/01/2020
BISOTISSUEDNew Rising Construction09/01/2020
BISOTISSUEDNew Rising Construction01/13/2020
BISMHISSUEDNew Rising Construction01/13/2020
BISPLISSUEDQMB Plumbing & Heating04/16/2019
BISOTISSUEDNew Rising Construction04/15/2019
BISMHISSUEDNew Rising Construction04/15/2019
BISMHISSUEDWalker Ridge Construction NY03/25/2019
BISOTISSUEDWalker Ridge Construction NY03/22/2019
BISPLISSUEDAll Pro Plumbing & Heating07/10/2018
+ 34 more permits on file
1 project · most recent 07/16/2026
Air Conditioning Systems
FiledStatusContractorScope
07/16/2026Signed-offHybrid MechanicalAir Conditioning Systems
9 projects · most recent 06/11/2026
General Wiring
FiledStatusContractorScope
06/11/2026Permit IssuedMac Elect'l ContractingGeneral Wiring
04/27/2026CompleteGlendale Electl ContngGeneral Wiring
09/06/2023Permit IssuedOmd Electrical—
01/23/2023Permit IssuedThe Metro Group ElectricGeneral Wiring
07/13/2022Permit IssuedThe Metro Group ElectricGeneral Wiring
04/19/2022CompleteJ.G.C. ElectricGeneral Wiring
11/29/2020CompleteSteven Farkas—
02/22/2019CompleteTop Shelf Electric—
08/16/2018CompleteA.S.H. ElectricGeneral Wiring
1 project · most recent 08/22/2023
Fence
FiledStatusContractorScope
08/22/2023Permit IssuedPoler ContractingFence
▾Field Inspections (DOB CAP) — 5
DateTypeResultReport
06/05/2023Certified Remove/Cap - work done in accordance with codeCertifiedView ↗
06/05/2023Certified Water and Sanitary-WS-Fixtures-FinishCertifiedView ↗
11/23/2022Certified Water and Sanitary-WS-Fixtures-FinishCertifiedView ↗
10/28/2022Certified Water and Sanitary-WS-Sanitary Piping-RoughingCertifiedView ↗
08/04/2022Certified Water and Sanitary-WS-Sanitary Piping-RoughingCertifiedView ↗
▾Special Inspection Requirements (DOB NOW) — 62
DateRequirementInspectorRole
07/21/2026FinalJoe Liebermanprogress
07/21/2026Mechanical SystemsJoe Liebermanspecial
06/16/2026Interior lighting power—energy_progress
06/16/2026Fenestration areas—energy_progress
06/16/2026Air barrier - visual inspection—energy_progress
06/16/2026Fenestration and door U-factor and product ratings—energy_progress
06/16/2026Fire-Resistance Rated Construction—progress
06/16/2026Tenant Protection Plan Compliance—special
06/16/2026Fire-Resistant Penetrations and Joints—special
06/16/2026Structural Stability – Alterations of existing buildings—special
06/16/2026Fenestration air leakage—energy_progress
01/26/2026Tenant Protection Plan ComplianceJOSHUA LUCKRITZspecial
01/26/2026Post-installed AnchorsJOSHUA LUCKRITZspecial
01/26/2026FinalJOSHUA LUCKRITZprogress
01/26/2026Structural Steel - WeldingJOSHUA LUCKRITZspecial
01/26/2026Structural Stability – Alterations of existing buildingsJOSHUA LUCKRITZspecial
01/26/2026Concrete - Cast-In-PlaceJOSHUA LUCKRITZspecial
01/26/2026Sprayed fire-resistant materialsJOSHUA LUCKRITZspecial
01/26/2026Structural Steel - DetailsJOSHUA LUCKRITZspecial
01/26/2026Structural Steel - High Strength BoltingJOSHUA LUCKRITZspecial
12/19/2025Structural Steel - DetailsJOSHUA LUCKRITZspecial
12/19/2025FinalJOSHUA LUCKRITZprogress
12/19/2025Structural Steel - WeldingJOSHUA LUCKRITZspecial
12/19/2025Tenant Protection Plan ComplianceJOSHUA LUCKRITZspecial
12/19/2025Concrete - Cast-In-PlaceJOSHUA LUCKRITZspecial
Latest 25 of 62.
▾Tenants in the building
TenantSpaceFloorsRenovation projects
Lispenard StudioArts / Culture / EntertainmentCellar
Project M01116661 Alteration · LOC Issued · 10/17/2024
Project M00922839 Alteration · Permit Entire · 08/22/2023
Names are taken automatically from the text of each project’s filed documents (title blocks and cover sheets) and screened to exclude owners, landlords and designers. They may be incomplete or wrong; check the filing.
517 filed documents on file for this building. Sign in free to see the full history. Sign in · Create account