← Back
Elevator cooperative
45 Plaza Street West
45 PLAZA ST WEST · Park Slope · BIN 3024626
💬 Discuss this project
1941Year Built
6Stories
D4Building Class
R8XZoning
46,200 sfGross Floor Area
46Units
LL97 CoveredRent Stabilized3 Open Violations 2 unresolved · 1 paperwork only ▸FISP: SWARMPFDNY Report ↗
Elevator cooperative · Owner of record: 45 PLAZA OWNERS CORP · 11,069 sf lot · 4.17 FAR built · Flood zone X
Locations of Work
Architecture
Permit Issued — active, not yet Signed-off
RoofUnder Construction1p · 1 filing · 9 docs
▾Owner History (Filing Record)
Companies and organizations named on filings. Individual owners are not shown.
OwnerFilingsMost Recent
KINGS GROUP NY309/16/2026
AKAM ASSOCIATES1208/29/2026
PLATINUM SERVICES NY607/08/2026
45 PLAZA OWNERS3903/22/2026
NAS ELECTRIC CORP303/22/2026
NAS ELECTRICAL CORP103/22/2026
45 PLAZA ST OWNERS COR103/22/2026
PL VN TENANTS CORP103/22/2026
PL UN TENANTS CORP103/22/2026
43-45 PLAZA ST WEST103/22/2026
▾Design Consultants (Architect / Engineer of Record)
FirmFilingsMost Recent
KMA DESIGNS LLC106/17/2026
LAWLESS AND MANGIONE ARCHITECTS AND111/24/2025
AZHAR DESIGN207/08/2023
NICHOLAS AGNETA AIA111/15/2022
ASHRAF CORP103/18/2022
INCA ARCHITECTURE PLLC107/21/2020
▾Filing Representatives (Expediters)
RepresentativeFilingsMost Recent
GREEN STUDIO203/21/2026
G PEROTTO ASSOCIATES403/21/2026
MUNICIPAL BUILDING CONSULTANTS103/21/2026
PS ENGINEERS203/21/2026
▾Contractors (License-Anchored)
FirmTradeRolesMost Recent
PLATINUM SERVICES NY LLCGeneral Contractor407/08/2026
MODERN SERVICES SOLUTIONSGeneral Contractor303/21/2026
KINGS GROUP NY CORPGeneral Contractor209/16/2026
GUIDA, SALVATOREElectrical103/21/2026
KURT EBINGERElectrical103/21/2026
ZITO, ROCCOElectrical103/21/2026
C N M CONSTRUCTION INCGeneral Contractor107/08/2026
TWO-TONE CONTRACTING CORP.General Contractor104/09/2026
JNR PLUMBING INC DBAPlumbing107/08/2026
ARNOTT.JR, ROBERTElectrical103/21/2026
ORBIT PLBG & HTG INCPlumbing107/08/2026
BORIS NASIMOVElectrical103/21/2026
GLENDALE ELECTL CONTNG INElectrical103/22/2026
▾Special Inspection Agencies
AgencyLicense #FilingsMost Recent
AMKA & ASSOCIATES LLC8239111/24/2025
GREGORY V. PEROTTO, P.E.947207/08/2023
AK CONSULTING SERVICES, I6198111/15/2022
Building Lifecycle
All (92)Filed (9)Permit Issued (10)Signed Off (4)Facade (FISP) (12)Violation (33)Inspection (4)Objection (6)Special Inspection (14)
09/15/2026
Permit issued — Sidewalk Shed
B01306489-S1-SH
07/01/2026
Special inspection requirement — Alternative Materials - OTCR Buildings Bulletin Number
FRANCISCO PEREZ
06/23/2026
Filed — Alteration
FILE SUSPENDED SCAFFOLD OUTRIGGER SYSTEMS FOR FACADE RESTORATION AND INSPECTION.
B01360164-P1
06/17/2026
Filed — Alteration
Filing for facade repairs as per plans filed herewith. No change in use, occupancy or egress.
B01306489-S1
06/17/2026
Permit issued — Sidewalk Shed
B01306489-S1-SH
05/05/2026
Violation issued (HPD, closed)
A
02/20/2026
Permit issued — Suspended Scaffold
B01360164-I1-SC
02/16/2026
Filed — Alteration
FILE SUSPENDED SCAFFOLD OUTRIGGER SYSTEMS FOR FACADE RESTORATION AND INSPECTION.
B01360164-I1
01/15/2026
Violation issued (ECB, open)
Construction
01/09/2026
Permit issued — General Construction
B01306489-I1-GC
12/03/2025
Objection resolved — Addressed
11/25/2025
Objection raised — Admin
11/25/2025
Objection raised — Scope
11/25/2025
Objection resolved — Addressed
11/24/2025
Filed — Alteration
Filing for facade repairs as per plans filed herewith. No change in use, occupancy or egress.
B01306489-I1
11/19/2025
Violation issued (HPD, closed)
I
10/21/2025
Special inspection requirement — Structural Steel - Details
AHMAD KHANZADA
10/21/2025
Special inspection requirement — Structural Steel - Welding
AHMAD KHANZADA
10/21/2025
Special inspection requirement — Tenant Protection Plan Compliance
AHMAD KHANZADA
10/21/2025
Special inspection requirement — Energy Code Compliance Inspections
William Struth
10/21/2025
Special inspection requirement — Final
William Struth
10/21/2025
Special inspection requirement — Air barrier - visual inspection
William Struth
10/21/2025
Special inspection requirement — Masonry
AHMAD KHANZADA
10/21/2025
Special inspection requirement — Structural Stability – Alterations of existing buildings
AHMAD KHANZADA
06/10/2025
Violation issued (HPD, closed)
A
01/23/2025
Signed off — Alteration
B00744349-I1
11/27/2024
Violation issued (HPD, closed)
I
08/01/2024
Signed off — Alteration
INTERIOR RENOVATION REFURBISH AND UPDATE APARTMENT
B08013482-I1
08/01/2024
Signed off — Alteration
INTERIOR RENOVATION UPDATING AND REPLACING PLUMBING FIXTURES
B08013492-I1
06/24/2024
Violation issued (ECB, closed)
Construction
06/04/2024
Signed off — Alteration
B00304071-I1
05/22/2024
Inspection — Certified Water and Sanitary-WS-Fixtures-Finish
Certified
View inspection ↗
05/20/2024
Inspection — Pass-Final PL - Up to 3 Requested Floors
Pass
View inspection ↗
03/20/2024
Violation issued (DOB, open)
V-DOB VIOLATION - ACTIVE
11/01/2023
Violation issued (ECB, closed)
Construction
11/01/2023
Violation issued (ECB, open)
Unknown
10/02/2023
Permit issued — Plumbing
B08013492-I1-PL
09/11/2023
Permit issued — General Construction
B08013482-I1-GC
07/11/2023
Objection raised — Scope
07/11/2023
Objection resolved — Addressed
07/08/2023
Filed — Alteration
INTERIOR RENOVATION REFURBISH AND UPDATE APARTMENT
B08013482-I1
07/08/2023
Filed — Alteration
INTERIOR RENOVATION UPDATING AND REPLACING PLUMBING FIXTURES
B08013492-I1
07/06/2023
Special inspection requirement — Final
Gregory Perotto
06/28/2023
Special inspection requirement — Fire-Resistant Penetrations and Joints
Gregory Perotto
06/28/2023
Special inspection requirement — Fire-Resistant Penetrations and Joints
Gregory Perotto
05/17/2023
Permit issued — General Construction
B00744349-I1-GC
03/08/2023
Permit issued — Sidewalk Shed
B00698180-I1-SH
01/10/2023
Inspection — Certified Water and Sanitary-WS-Fixtures-Finish
Certified
View inspection ↗
11/15/2022
Filed — Alteration
B00744349-I1
11/15/2022
Special inspection requirement — Tenant Protection Plan Compliance
MAHFUZAR RAHMAN
05/27/2022
Cycle 9 facade report signed — SWARMP
05/24/2022
Special inspection requirement — Final
NICHOLAS AGNETA
03/21/2022
Permit issued — Sidewalk Shed
B00698180-I1-SH
03/18/2022
Filed — Alteration
B00698180-I1
03/01/2022
Violation issued (HPD, closed)
A
03/01/2022
Violation issued (HPD, closed)
I
02/17/2022
Cycle 9 facade report submitted
01/24/2022
Cycle 9 facade inspection completed
08/25/2021
Inspection — Certified Water and Sanitary-WS-Sanitary Piping-Roughing
Certified
View inspection ↗
08/10/2021
Permit issued — Plumbing
B00304071-I1-PL
Latest 60 of 92 events.
Permit / Filing Register
SourceWork TypeStatusApplicantIssued
DOB NOWSidewalk ShedPermit IssuedKINGS GROUP NY CORP09/15/2026
DOB NOWSidewalk ShedPermit IssuedKINGS GROUP NY CORP06/17/2026
DOB NOWSuspended ScaffoldPermit IssuedTWO-TONE CONTRACTING CORP02/20/2026
DOB NOWGeneral ConstructionPermit IssuedTWO-TONE CONTRACTING CORP01/09/2026
DOB NOWPlumbingSigned-offJNR PLUMBING INC DBA10/02/2023
DOB NOWGeneral ConstructionSigned-offC N M CONSTRUCTION INC09/11/2023
DOB NOWGeneral ConstructionSigned-offMODERN SERVICES SOLUTIONS05/17/2023
DOB NOWSidewalk ShedPermit IssuedPLATINUM SERVICES NY LLC03/08/2023
DOB NOWSidewalk ShedPermit IssuedPLATINUM SERVICES NY LLC03/21/2022
DOB NOWPlumbingSigned-offORBIT PLBG & HTG INC08/10/2021
BISPLISSUEDSAFETY PLMBG & HTG LLC04/11/2018
BISOTISSUEDFORM FACTORY CONSTRUCTION04/04/2018
BISOTISSUEDC & M HOME IMPROVEMENT INC03/08/2017
BISPLISSUEDJNR PLUMBING INC DBA01/25/2017
BISPLISSUEDSTELLMAR PLBG & MECH.CORP01/18/2017
BISOTISSUEDWULFING CONSTRUCTION LLC12/19/2016
BISOTISSUEDC & M HOME IMPROVEMENT INC10/27/2016
BISOTISSUEDTWO-TONE CONTRACTING CORP.08/29/2016
BISEQISSUEDROCK GROUP NY CORP07/06/2016
BISEQISSUEDTWO-TONE CONTRACTING CORP.07/06/2016
BISOTISSUEDTWO-TONE CONTRACTING CORP.05/11/2016
BISPLISSUEDCM PLUMBING INC06/24/2015
BISOTISSUEDDMC BUILDERS INC06/19/2015
BISOTISSUEDLOTUS METROPOLITAN CONSTRUCTION08/21/2014
BISOTISSUEDV & G CUSTOM BUILDERS02/27/2014
BISOTISSUEDCADENA CONSTRUCTION INC09/06/2013
BISOTISSUEDCAMPBELL CONSTRUCTION NYC07/22/2013
BISPLISSUEDHYDROKINETIC PLBG & HTG I06/04/2013
BISEQISSUEDCADENA CONSTRUCTION INC09/12/2012
BISOTISSUEDCADENA CONSTRUCTION INC09/11/2012
BISPLISSUEDGMAK PLMBG AND HEATNG LLC05/15/2012
BISOTISSUEDPEGASUS REALTY SOLUTIONS03/09/2012
BISPLISSUEDA.M.N. CORPORATION11/06/2009
BISFBISSUEDAPPROVED OIL CO OF BKLYN07/08/2009
BISPLISSUEDSUGAR PLUMBING CORP07/08/2009
BISPLISSUEDH BRONNER & SON PLBG & HTG07/01/2009
BISOTISSUEDSASA RENOVATIONS INC06/24/2009
BISPLISSUEDA.M.N. CORPORATION02/22/2008
BISOTISSUEDAMERICAN C CONST INC02/13/2008
BISOTISSUEDJ.K. REMODELING INC02/01/2008
+ 10 more permits on file
7 projects · most recent 07/01/2026
General Wiring
FiledStatusContractorScope
07/01/2026CompleteSTANCO SYSTEM ELEC'L CONTGeneral Wiring
06/10/2026Permit IssuedHIGH QUALITY ELEC.OF NYC—
08/08/2025CompleteGEMINI ELECTRIC CO., INC.General Wiring
10/04/2023CompleteNAS ELECTRIC CORPGeneral Wiring
06/19/2023Permit IssuedSTERLING ELECTRIC INC.General Wiring
03/14/2022Permit IssuedILLUMINOUS ELECTRIC CORP.General Wiring
07/21/2021CompleteGLENDALE ELECTL CONTNG IN—
1 project · most recent 06/17/2026
Steel
FiledStatusContractorScope
06/17/2026Permit IssuedKINGS GROUP NY CORPSteel
1 project · most recent 06/17/2026
Sidewalk Shed
FiledStatusContractorScope
06/17/2026Permit IssuedKINGS GROUP NY CORPSidewalk Shed
1 project · most recent 06/23/2026
Suspended Scaffold (SC)
FiledStatusContractorScope
06/23/2026Permit IssuedTWO-TONE CONTRACTING CORPSuspended Scaffold (SC)
▾Field Inspections (DOB CAP) — 4
DateTypeResultReport
05/22/2024Certified Water and Sanitary-WS-Fixtures-FinishCertifiedView ↗
05/20/2024Pass-Final PL - Up to 3 Requested FloorsPassView ↗
01/10/2023Certified Water and Sanitary-WS-Fixtures-FinishCertifiedView ↗
08/25/2021Certified Water and Sanitary-WS-Sanitary Piping-RoughingCertifiedView ↗
▾Special Inspection Requirements (DOB NOW) — 14
DateRequirementInspectorRole
07/01/2026Alternative Materials - OTCR Buildings Bulletin NumberFRANCISCO PEREZspecial
10/21/2025Structural Steel - DetailsAHMAD KHANZADAspecial
10/21/2025Structural Steel - WeldingAHMAD KHANZADAspecial
10/21/2025Tenant Protection Plan ComplianceAHMAD KHANZADAspecial
10/21/2025Energy Code Compliance InspectionsWilliam Struthprogress
10/21/2025FinalWilliam Struthprogress
10/21/2025Air barrier - visual inspectionWilliam Struthenergy_progress
10/21/2025MasonryAHMAD KHANZADAspecial
10/21/2025Structural Stability – Alterations of existing buildingsAHMAD KHANZADAspecial
07/06/2023FinalGregory Perottoprogress
06/28/2023Fire-Resistant Penetrations and JointsGregory Perottospecial
06/28/2023Fire-Resistant Penetrations and JointsGregory Perottospecial
11/15/2022Tenant Protection Plan ComplianceMAHFUZAR RAHMANspecial
05/24/2022FinalNICHOLAS AGNETAprogress
▾Documents — 319 on file (BIS + DOB NOW)
▸Plans & Drawings9
▸DOB NOWPlans/Sketch8
08/30/2026B00698180-I1Request digital key ↗
08/28/2026B00744349-I1Request digital key ↗
08/27/2026B08013492-I1Request digital key ↗
Showing 3 of 8 on file for this type
▸DOB NOWPlans/Sketch - Plumbing1
09/02/2026B00304071-I1Request digital key ↗
▸Applications & Permits66
▸BISWORK PERMIT APPLICATION32
06/04/2021322018721Open ↗
04/12/2018321737572Open ↗
04/04/2018321737572Open ↗
Showing 3 of 32 on file for this type
▸BISPLAN / WORK APPROVAL APPLICATION26
02/27/2023301128081Open ↗
02/09/2023301128081Open ↗
02/07/2023301128081Open ↗
Showing 3 of 26 on file for this type
▸DOB NOWLPC Approval/Permit5
08/13/2026B08013492-I1Open ↗
08/13/2026B01306489-I1Open ↗
08/13/2026B00744349-I1Open ↗
Showing 3 of 5 on file for this type
▸BISPLAN - WORK & PERMITS - SUPPPORTING DOCUMENTATION3
07/16/2019321323091Open ↗
09/13/2016340392836Open ↗
09/13/2016340392836Open ↗
▸Seals & Professional Certifications70
▸BISTECHNICAL REPORT: RESPONSIBILITY/CERTIFICATION30
12/17/2019322018721Open ↗
07/25/2019321323091Open ↗
07/25/2019321323091Open ↗
Showing 3 of 30 on file for this type
▸BISPROFESSIONAL CERTIFIED CHECKLIST8
03/19/2018321737572Open ↗
10/28/2016321471484Open ↗
04/28/2016321375622Open ↗
Showing 3 of 8 on file for this type
▸DOB NOWDPL-1: Design Professional Seal & Signature7
08/30/2026B00698180-I1Open ↗
08/27/2026B08013492-I1Open ↗
08/27/2026B08013482-I1Open ↗
Showing 3 of 7 on file for this type
▸BISPROFESSIONAL CERTIFICATION STATEMENT6
03/19/2018321737572Open ↗
10/28/2016321471484Open ↗
07/04/2016340393853Open ↗
Showing 3 of 6 on file for this type
▸DOB NOWSpecial Inspector Seal & Signature5
09/01/2026B00744349-I1Open ↗
09/01/2026B08013482-I1Open ↗
08/30/2026B01360164-I1Open ↗
Showing 3 of 5 on file for this type
▸BISPROFESSIONAL CERTIFICATION STATEMENT FORM4
09/13/2012320583631Open ↗
Showing 1 of 4 on file for this type
▸DOB NOWProgress Inspector Seal & Signature4
09/01/2026B00744349-I1Open ↗
09/01/2026B08013482-I1Open ↗
08/28/2026B01306489-I1Open ↗
Showing 3 of 4 on file for this type
▸BISREQUIRED ITEMS CHECKLIST FOR PROFESSIONAL CERTIFICATION2
07/04/2016340393853Open ↗
07/02/2016340392836Open ↗
▸BISPC FULL REPORT2
On file, but not among the 200 most recently loaded documents for this source.
Showing 0 of 2 on file for this type
▸BISTECHNICAL REPORT STATEMENT OF RESPONSIBILITY2
07/04/2016340393853Open ↗
07/02/2016340392836Open ↗
▸Trade Schedules & Equipment22
▸BISSELF-CERT PLUMBING NOTICE9
06/30/2014320302150Open ↗
08/29/2013320302150Open ↗
07/27/2012320302150Open ↗
Showing 3 of 9 on file for this type
▸BISSCHEDULE B - PLUMBING/SPRINKLER/STANDPIPE5
03/19/2018321737572Open ↗
10/28/2016321471484Open ↗
07/01/2016321323091Open ↗
Showing 3 of 5 on file for this type
▸BISSCHEDULE B - PLUMBING5
12/27/2012320302150Open ↗
11/28/2011320302150Open ↗
05/03/2011320302150Open ↗
Showing 3 of 5 on file for this type
▸BISSCHEDULE C - HEATING & COMBUSTION EQUIPMENT3
On file, but not among the 200 most recently loaded documents for this source.
Showing 0 of 3 on file for this type
▸Safety & Tenant Protection7
▸BISTenant Protection Plan and Notes4
12/17/2019322018721Open ↗
10/28/2016321471484Open ↗
04/28/2016321375622Open ↗
Showing 3 of 4 on file for this type
▸BISSTREET TREE CHECKLIST1
On file, but not among the 200 most recently loaded documents for this source.
Showing 0 of 1 on file for this type
▸BISSRO MD ANTI-HARASSMENT CHECKLIST1
09/13/2012320583631Open ↗
▸DOB NOWTenant Protection Plan1
08/13/2026B00304071-I1Open ↗
▸Environmental & Asbestos23
▸BISASBESTOS: CERTIFICATION (DEP ACP5)9
12/17/2019322018721Open ↗
10/28/2016321471484Open ↗
07/04/2016340393853Open ↗
Showing 3 of 9 on file for this type
▸BISTHIS IS 'NOT AN ASBESTOS PROJECT'6
03/23/2012320450597Open ↗
Showing 1 of 6 on file for this type
▸DOB NOWDEP ACP-5: Asbestos Assessment Report5
08/27/2026B08013492-I1Open ↗
08/15/2026B08013482-I1Open ↗
08/13/2026B01306489-I1Open ↗
Showing 3 of 5 on file for this type
▸BISASBESTOS EXEMPTION CERTIFICATION LETTER2
On file, but not among the 200 most recently loaded documents for this source.
Showing 0 of 2 on file for this type
▸BISACP5 ASBESTOS: CERTIFICATION (DEP ACP5)1
09/13/2012320583631Open ↗
▸Energy Compliance11
▸BISTECHNICAL REPORT: ENERGY CODE PROGRESS INSPS8
12/17/2019322018721Open ↗
07/25/2019321323091Open ↗
10/28/2016321471484Open ↗
Showing 3 of 8 on file for this type
▸BISTECHNICAL REPORT: ENERGY2
03/23/2012320450597Open ↗
Showing 1 of 2 on file for this type
▸BISAS-BUILT ENERGY ANALYSIS1
07/25/2019321323091Open ↗
▸Inspections & Test Reports11
▸BISTECHNICAL REPORT: RESPONSIBILITY7
03/15/2023301128081Open ↗
03/15/2023301128081Open ↗
02/24/2023301128081Open ↗
Showing 3 of 7 on file for this type
▸BISDIR-14 ID OF RESPONSIBILITY (TR1)1
05/21/2021322018721Open ↗
▸BISNOTIF.-PROPOSED STEAM/HOT WATER INSPECTION1
On file, but not among the 200 most recently loaded documents for this source.
Showing 0 of 1 on file for this type
▸BISTECHNICAL REPORT: EXT. WALLS & APPURTS1
03/19/2018321737572Open ↗
▸BIS* FINAL INSPECTION DIRECTIVE 14 OF 19751
03/16/2023301128081Open ↗
▸Approvals, Objections & Sign-offs36
▸BISADMINISTRATIVE OBJECTIONS14
07/01/2016321323091Open ↗
05/13/2015321119749Open ↗
01/06/2014320872258Open ↗
Showing 3 of 14 on file for this type
▸BISLANDMARKS APPROVAL8
06/30/2020322018721Open ↗
03/19/2018321737572Open ↗
10/28/2016321471484Open ↗
Showing 3 of 8 on file for this type
▸BISCERTIFICATE OF OCCUPANCY/LOC: REQUEST8
03/17/2023301128081Open ↗
07/25/2019321323091Open ↗
05/18/2017320583631Open ↗
Showing 3 of 8 on file for this type
▸BISOIL TANK REMOVAL CERT : LETTER-FO2
On file, but not among the 200 most recently loaded documents for this source.
Showing 0 of 2 on file for this type
▸BISLETTERS - SUPPORTING DOCUMENTATION2
06/06/2013320302150Open ↗
Showing 1 of 2 on file for this type
▸BISSUPERSEDING LETTER1
08/26/2014320302150Open ↗
▸BISFINAL1
10/08/2020322018721Open ↗
▸Cost, Insurance & Ownership28
▸BISCOST AFFIDAVIT27
03/15/2023301128081Open ↗
02/24/2023301128081Open ↗
07/09/2020322018721Open ↗
Showing 3 of 27 on file for this type
▸BISCOST AFFIDAVIT (FINAL): PW31
03/16/2023301128081Open ↗
▸Filing & Intake Forms28
▸BISEFILING COVER SHEET16
12/17/2019322018721Open ↗
03/19/2018321737572Open ↗
10/28/2016321471484Open ↗
Showing 3 of 16 on file for this type
▸BISADDITIONAL INFORMATION8
02/27/2023301128081Open ↗
12/22/2016321323091Open ↗
09/15/2016340392836Open ↗
Showing 3 of 8 on file for this type
▸BISBOROUGH INTAKE FORM2
06/04/2021322018721Open ↗
07/25/2019321323091Open ↗
▸BISEFILING JOB APPLICATION COVER SHEET2
07/04/2016340393853Open ↗
07/02/2016340392836Open ↗
▸Other Documents8
▸DOB NOWCalculations3
08/18/2026B01360164-I1Open ↗
08/18/2026B01360164-P1Open ↗
08/13/2026B01360164-I1Open ↗
▸DOB NOWManufacturer's Specifications2
08/18/2026B01360164-P1Open ↗
08/13/2026B01360164-I1Open ↗
▸BISSEPTIC - SUPPORTING DOCUMENTATION1
07/02/2016340392836Open ↗
▸BISEXTERNAL FORMS - SUPPORTING DOCUMENTATION1
02/07/2023301128081Open ↗
▸BIS* FIRE STOPS 27-3451
03/16/2023301128081Open ↗