← Back
City residence, one family
45 SOUTH OXFORD STREET
BROOKLYN · Fort Greene · BIN 3058939
💬 Discuss this project
1856Year Built
3Stories
A4Building Class
R6BZoning
4,040 sfGross Floor Area
1Units
Rent Stabilized0 Open ViolationsFDNY Report ↗
City residence, one family · 2,200 sf lot · 1.84 FAR built · Flood zone X
Locations of Work
ArchitectureStructuralElectricalMechanicalPlumbing
Roof79p · 3 filings · 20 docs
Floor 370p · 3 filings · 20 docs
Floor 273p · 3 filings · 20 docs
Floor 169p · 3 filings · 20 docs
Cellar88p · 4 filings · 20 docs
Sub-Basement64p · 3 filings · 20 docs
Filed — no permit issued8p · 1 filing · 11 docs
▾Sales History (ACRIS)
DatePriceUnitSeller → Buyer$/sf
02/03/2022$4.8M—— → —$1,176/sf building
▾Design Consultants (Architect / Engineer of Record)
FirmFilingsMost Recent
RAAD309/23/2024
OVERHEAD ARCHITECTURE DPC403/01/2024
KTA ENGINEERING411/21/2023
▾Filing Representatives (Expediters)
RepresentativeFilingsMost Recent
BMB BUILDING CONSULTING2203/21/2026
▾Contractors (License-Anchored)
FirmTradeRolesMost Recent
HATCHET WORKS CORPGeneral Contractor807/08/2026
JOSEPH WEINSTEIN ELECTRICElectrical103/22/2026
AJC PLUMBING & HTG CORPPlumbing107/08/2026
▾Special Inspection Agencies
AgencyLicense #FilingsMost Recent
RAAD7727309/23/2024
DEVIN MILLS ARCHITECT7906403/01/2024
INTEGRITY CONSULTING SERV666411/21/2023
Building Lifecycle
All (101)Filed (11)Permit Issued (5)Signed Off (2)Violation (14)Inspection (3)Objection (36)Special Inspection (30)
11/07/2025
Signed off — Alteration
RENOVATION OF EXISTING TOWNHOUSE, NEW FOUNDATIONS FOR REAR DECK AND REINFORCEMENT OF REAR WALL.
B00852232-I1
09/12/2025
Signed off — Alteration
Proposed work area of this existing one-family house for bathroom, kitchen works, new windows replacement and doors at rear, exterior stair for rear yard access per plans. No change in use, egress and occupancy.
B00851085-I1
11/27/2024
Violation issued (HPD, closed)
I
09/23/2024
Filed — Alteration
INSTALLATION OF NEW FIXTURES
B00851053-P1
09/23/2024
Special inspection requirement — HVAC-R and service water heating equipment
NICHOLAS AZADIAN
09/23/2024
Special inspection requirement — Fire-Resistant Penetrations and Joints
NICHOLAS AZADIAN
09/23/2024
Special inspection requirement — Energy Code Compliance Inspections
NICHOLAS AZADIAN
09/23/2024
Special inspection requirement — HVAC-R and service water piping design and insulation
NICHOLAS AZADIAN
09/23/2024
Special inspection requirement — HVAC-R and service water heating system controls
NICHOLAS AZADIAN
06/11/2024
Special inspection requirement — HVAC-R and service water heating equipment
NICHOLAS AZADIAN
06/11/2024
Special inspection requirement — HVAC-R and service water heating system controls
NICHOLAS AZADIAN
06/11/2024
Special inspection requirement — Fire-Resistant Penetrations and Joints
NICHOLAS AZADIAN
06/11/2024
Special inspection requirement — Energy Code Compliance Inspections
NICHOLAS AZADIAN
06/11/2024
Special inspection requirement — HVAC-R and service water piping design and insulation
NICHOLAS AZADIAN
06/03/2024
Permit issued — General Construction
B00851085-I1-GC
04/11/2024
Violation issued (HPD, closed)
A
03/15/2024
Special inspection requirement — Structural Steel - High Strength Bolting
ALEKSANDR LEVIN
03/15/2024
Special inspection requirement — Masonry
ALEKSANDR LEVIN
03/15/2024
Special inspection requirement — Post-installed Anchors
ALEKSANDR LEVIN
03/15/2024
Special inspection requirement — Structural Steel - Welding
ALEKSANDR LEVIN
03/15/2024
Special inspection requirement — Structural Cold-Formed Steel
ALEKSANDR LEVIN
03/15/2024
Special inspection requirement — Final
ALEKSANDR LEVIN
03/15/2024
Special inspection requirement — Structural Wood Frame
ALEKSANDR LEVIN
03/15/2024
Special inspection requirement — Structural Steel - Details
ALEKSANDR LEVIN
03/15/2024
Special inspection requirement — Structural Stability – Alterations of existing buildings
ALEKSANDR LEVIN
03/11/2024
Objection resolved — Addressed
03/08/2024
Special inspection requirement — Fire-Resistance Rated Construction
Devin Mills
03/08/2024
Special inspection requirement — Fire-Resistant Penetrations and Joints
Devin Mills
03/08/2024
Special inspection requirement — Final
Devin Mills
03/01/2024
Filed — Alteration
Proposed work area of this existing one-family house for bathroom, kitchen works, new windows replacement and doors at rear, exterior stair for rear yard access per plans. No change in use, egress and occupancy.
B00851085-P3
02/28/2024
Inspection — Pass-Final CND-Occupancy Inspection
Pass
View inspection ↗
02/21/2024
Special inspection requirement — Fire-Resistant Penetrations and Joints
Devin Mills
02/21/2024
Special inspection requirement — Final
Devin Mills
02/21/2024
Special inspection requirement — Fire-Resistance Rated Construction
Devin Mills
01/10/2024
Objection resolved — Addressed
01/09/2024
Inspection — Certified Gas-Gas-Piping-Roughing
Certified
View inspection ↗
01/09/2024
Inspection — Certified Water and Sanitary-WS-Sanitary Piping-Roughing
Certified
View inspection ↗
12/22/2023
Objection resolved — Addressed
12/22/2023
Objection resolved — Addressed
12/07/2023
Objection raised — Admin
11/30/2023
Objection raised — Scope
11/27/2023
Objection raised — Structural
11/21/2023
Filed — Alteration
RENOVATION OF EXISTING TOWNHOUSE, NEW FOUNDATIONS FOR REAR DECK AND REINFORCEMENT OF REAR WALL.
B00852232-P1
11/21/2023
Filed — Alteration
RENOVATION OF AN EXISTING TOWNHOUSE, REPAIR TO EXISTING ELEMENTS, AND MODIFICATIONS TO BEARING WALLS
B00851062-P1
11/20/2023
Violation issued (HPD, closed)
I
11/17/2023
Objection raised — Scope
11/16/2023
Special inspection requirement — Structural Steel - Details
ALEKSANDR LEVIN
11/16/2023
Special inspection requirement — Structural Steel - Welding
ALEKSANDR LEVIN
11/16/2023
Special inspection requirement — Structural Cold-Formed Steel
ALEKSANDR LEVIN
11/16/2023
Special inspection requirement — Structural Stability – Alterations of existing buildings
ALEKSANDR LEVIN
11/16/2023
Special inspection requirement — Structural Steel - High Strength Bolting
ALEKSANDR LEVIN
11/13/2023
Filed — Alteration
Proposed work area of this existing one-family house for bathroom, kitchen works, new windows replacement and doors at rear, exterior stair for rear yard access per plans. No change in use, egress and occupancy.
B00851085-P2
08/16/2023
Permit issued — Plumbing
B00851053-I1-PL
07/17/2023
Permit issued — Structural
B00851062-I1-ST
07/17/2023
Permit issued — Foundation
B00852232-I1-FO
05/24/2023
Filed — Alteration
Proposed work area of this existing one-family house for bathroom, kitchen works, new windows replacement and doors at rear, exterior stair for rear yard access per plans. No change in use, egress and occupancy.
B00851085-P1
04/28/2023
Filed — Alteration
INSTALLATION OF NEW FIXTURES
B00851053-I1
04/27/2023
Objection raised — Other
04/27/2023
Objection resolved — Addressed
04/27/2023
Objection raised — Structural
Latest 60 of 101 events.
Permit / Filing Register
SourceWork TypeStatusApplicantIssued
DOB NOWGeneral ConstructionSigned-offHATCHET WORKS CORP06/03/2024
DOB NOWPlumbingPermit IssuedAJC PLUMBING & HTG CORP08/16/2023
DOB NOWStructuralSigned-offHATCHET WORKS CORP07/17/2023
DOB NOWFoundationSigned-offHATCHET WORKS CORP07/17/2023
DOB NOWGeneral ConstructionSigned-offHATCHET WORKS CORP04/21/2023
BISPLISSUEDDJC CORP05/11/2005
BIS—ISSUEDSQUARE INDIGO INC04/05/2005
1 project · most recent 04/26/2023
Air Conditioning Systems Heating Systems
FiledStatusContractorScopeMake / Model / Capacity
04/26/2023——Air Conditioning Systems, Heating Systems
Cooling
Mitsubishi Electric TPKFYP006LM140A 6,000 BTU · Fan Coil Indoor ×4
TPEFYP008MA144A 8,000 BTU · Fan Coil Indoor ×3
NTXMSM48A182AA 48,000 BTU · Vrf Outdoor ×2
TPEFYP006MA144A 6,000 BTU · Vrf Indoor ×2
TPKFYP008LM140A 8,000 BTU · Vrf Indoor ×2
Heating
Runtal UF-3 3,080 BTU · Radiant ×5
King Electric ED3-120D 1,500 BTU · Radiant ×1
HT412 2/3 1,440 BTU · Radiant ×1
1 project · most recent 09/23/2024
Gas Storm Water/Sanitary
FiledStatusContractorScope
09/23/2024Permit IssuedAJC PLUMBING & HTG CORPGas, Storm, Water/Sanitary
1 project · most recent 06/28/2023
General Wiring
FiledStatusContractorScope
06/28/2023Permit IssuedJOSEPH WEINSTEIN ELECTRICGeneral Wiring
1 project · most recent 11/21/2023
Steel Wood
FiledStatusContractorScope
11/21/2023Signed-offHATCHET WORKS CORPSteel, Wood
▾Field Inspections (DOB CAP) — 3
DateTypeResultReport
02/28/2024Pass-Final CND-Occupancy InspectionPassView ↗
01/09/2024Certified Gas-Gas-Piping-RoughingCertifiedView ↗
01/09/2024Certified Water and Sanitary-WS-Sanitary Piping-RoughingCertifiedView ↗
▾Special Inspection Requirements (DOB NOW) — 48
DateRequirementInspectorRole
09/23/2024HVAC-R and service water heating equipmentNICHOLAS AZADIANenergy_progress
09/23/2024Fire-Resistant Penetrations and JointsNICHOLAS AZADIANspecial
09/23/2024Energy Code Compliance InspectionsNICHOLAS AZADIANprogress
09/23/2024HVAC-R and service water piping design and insulationNICHOLAS AZADIANenergy_progress
09/23/2024HVAC-R and service water heating system controlsNICHOLAS AZADIANenergy_progress
06/11/2024HVAC-R and service water heating equipmentNICHOLAS AZADIANenergy_progress
06/11/2024HVAC-R and service water heating system controlsNICHOLAS AZADIANenergy_progress
06/11/2024Fire-Resistant Penetrations and JointsNICHOLAS AZADIANspecial
06/11/2024Energy Code Compliance InspectionsNICHOLAS AZADIANprogress
06/11/2024HVAC-R and service water piping design and insulationNICHOLAS AZADIANenergy_progress
03/15/2024Structural Steel - High Strength BoltingALEKSANDR LEVINspecial
03/15/2024MasonryALEKSANDR LEVINspecial
03/15/2024Post-installed AnchorsALEKSANDR LEVINspecial
03/15/2024Structural Steel - WeldingALEKSANDR LEVINspecial
03/15/2024Structural Cold-Formed SteelALEKSANDR LEVINspecial
03/15/2024FinalALEKSANDR LEVINprogress
03/15/2024Structural Wood FrameALEKSANDR LEVINprogress
03/15/2024Structural Steel - DetailsALEKSANDR LEVINspecial
03/15/2024Structural Stability – Alterations of existing buildingsALEKSANDR LEVINspecial
03/08/2024Fire-Resistance Rated ConstructionDevin Millsprogress
03/08/2024Fire-Resistant Penetrations and JointsDevin Millsspecial
03/08/2024FinalDevin Millsprogress
02/21/2024Fire-Resistant Penetrations and JointsDevin Millsspecial
02/21/2024FinalDevin Millsprogress
02/21/2024Fire-Resistance Rated ConstructionDevin Millsprogress
Latest 25 of 48.
▾Documents — 103 on file (BIS + DOB NOW)
▸Plans & Drawings11
▸DOB NOWPlans/Sketch11
08/27/2026B00851085-P3Request digital key ↗
08/27/2026B00851085-P1Request digital key ↗
08/27/2026B00851062-P1Request digital key ↗
Showing 3 of 11 on file for this type
▸Applications & Permits18
▸DOB NOWLPC Approval/Permit11
08/24/2026B00851053-I1Open ↗
08/13/2026B00851085-P3Open ↗
08/13/2026B00851085-P2Open ↗
Showing 3 of 11 on file for this type
▸BISPLAN / WORK APPROVAL APPLICATION7
03/10/2023301672198Open ↗
03/09/2023301672198Open ↗
03/08/2023301672198Open ↗
Showing 3 of 7 on file for this type
▸Zoning, Tax Lot & Property Records2
▸BISCO OBJ: VERIFY ADDRESS-TOPO STAMP1
02/28/2023301672198Open ↗
▸BISVERIFY TAX LOT1
02/14/2023301672198Open ↗
▸Seals & Professional Certifications41
▸DOB NOWProgress Inspector Seal & Signature19
09/01/2026B00851085-I1Open ↗
08/28/2026B00851053-P1Open ↗
08/28/2026B00851053-P1Open ↗
Showing 3 of 19 on file for this type
▸DOB NOWDPL-1: Design Professional Seal & Signature11
08/27/2026B00851085-I1Open ↗
08/27/2026B00851085-P1Open ↗
08/27/2026B00851085-P2Open ↗
Showing 3 of 11 on file for this type
▸DOB NOWSpecial Inspector Seal & Signature11
09/01/2026B00851085-I1Open ↗
08/28/2026B00851053-P1Open ↗
08/25/2026B00851040-I1Open ↗
Showing 3 of 11 on file for this type
▸Environmental & Asbestos6
▸DOB NOWDEP ACP-20/ACP-21: Asbestos Project Conditional Completion Form/Asbestos Project Completion Form5
08/27/2026B00852232-I1Open ↗
08/15/2026B00851085-I1Open ↗
08/14/2026B00851062-I1Open ↗
Showing 3 of 5 on file for this type
▸DOB NOWACP5/20/21 or V51
08/15/2026B00851085-I1Open ↗
▸Inspections & Test Reports6
▸BISTECHNICAL REPORT: RESPONSIBILITY2
10/03/2022301672198Open ↗
09/28/2022301672198Open ↗
▸DOB NOWSOIL REPORT2
08/13/2026B00852232-P1Open ↗
08/13/2026B00852232-I1Open ↗
▸DOB NOWTR4 Test Report and Plot Diagram1
08/13/2026B00852232-I1Open ↗
▸DOB NOWGeotechnical Report (BC 1803.6)1
08/13/2026B00852232-I1Open ↗
▸Approvals, Objections & Sign-offs8
▸BISSCHEDULE A - OCCUPANCY / USE5
03/10/2023301672198Open ↗
03/09/2023301672198Open ↗
03/08/2023301672198Open ↗
Showing 3 of 5 on file for this type
▸BISLETTERS - SUPPORTING DOCUMENTATION2
10/28/2022301672198Open ↗
10/28/2022301672198Open ↗
▸BISLANDMARKS SIGNOFF1
02/25/2023301672198Open ↗
▸Cost, Insurance & Ownership1
▸BISCOST AFFIDAVIT1
09/28/2022301672198Open ↗
▸Filing & Intake Forms3
▸BISADDITIONAL INFORMATION3
03/09/2023301672198Open ↗
10/28/2022301672198Open ↗
10/28/2022301672198Open ↗
▸Other Documents7
▸DOB NOWProof of Historic Building4
08/13/2026B00851085-P2Open ↗
08/13/2026B00851085-P3Open ↗
08/13/2026B00851085-I1Open ↗
Showing 3 of 4 on file for this type
▸BISPLOT DIAGRAM1
09/28/2022301672198Open ↗
▸BIS* VENT. SYS.-ENGINEER/INSTALLER 27-136,7791
02/14/2023301672198Open ↗
▸BIS* FIRE STOPS 27-3451
02/14/2023301672198Open ↗