45 WEST 10 STREET
MANHATTAN · BIN 1009558
💬 Discuss this project
1959Year Built
11Stories
D4Building Class
R6Zoning
77,829 sfGross Floor Area
90Units
LL97 CoveredRent Stabilized85 Open Violations ▸FISP: SAFEFDNY Report ↗
Elevator cooperative · Owner of record: 45 W 10 TENANTS CORP · 11,315 sf lot · 6.88 FAR built · Flood zone X
Locations of Work
ArchitectureMechanicalPlumbing
Permit Issued — active, not yet Signed-off
Floor 114p · 1 filing · 10 docs
Floor 105p · 2 filings · 20 docs
Floor 91p · 1 filing · 17 docs
Floor 8Under Construction6p · 2 filings · 16 docs
Floor 71p · 1 filing · 17 docs
Floor 64p · 1 filing · 14 docs
Floor 51p · 1 filing · 17 docs
Floor 4
Floor 31p · 1 filing · 17 docs
Floor 2
Floor 17p · 2 filings · 20 docs
Cellar1p · 1 filing · 17 docs
1 job · most recent 08/08/2023
Ventilation Systems
FiledStatusContractorScopeMake / Model / Capacity
08/08/2023Permit IssuedARK DESIGN & BUILD INCVentilation Systems
Ventilation
__Junk__ TBD 50 CFM · Kitchen Exhaust ×1
7 jobs · most recent 08/13/2026
Water/Sanitary Gas
FiledStatusContractorScope
08/13/2026——Water/Sanitary
06/11/2026Signed-offSYSTEMS 2000 PLBG SVCS LLGas
06/04/2026Permit IssuedVRISI PLBG & HTG LLCGas, Water/Sanitary
09/10/2025——Water/Sanitary
09/12/2023——Gas, Water/Sanitary
08/08/2023Permit IssuedAAA TOTAL PLUMBING, INCGas, Water/Sanitary
07/25/2023Permit IssuedAP PLUMBING & HVAC LLCGas, Water/Sanitary
23 jobs · most recent 06/25/2026
General Wiring
FiledStatusContractorScope
06/25/2026Permit IssuedOFF SHORE ELECTRIC CORPGeneral Wiring
08/29/2025Permit IssuedJOSEPH WEINSTEIN ELECTRICGeneral Wiring
08/26/2023Permit IssuedCLAIRMONT ELEC'L CONTR'GGeneral Wiring
08/24/2023Permit IssuedACCURATE ELEC'L CORP.General Wiring
08/17/2023Permit IssuedHECMAR ELECTRICGeneral Wiring
02/27/2023CompleteECNY ELEC'L CONTR'S, INC—
02/25/2023Permit IssuedCRESCO ELECTRICAL CORPGeneral Wiring
01/11/2023Permit IssuedTOP NOTCH ELECTRIC INCGeneral Wiring
03/01/2022CompletePATERNY ELECTRIC INCGeneral Wiring
01/29/2022CompleteDESUZE ELECTRIC CORPGeneral Wiring
12/17/2021Permit IssuedSMART ELECTRIC SERVICESGeneral Wiring
11/10/2021Permit IssuedTRIPLE D ELECTRIC INCGeneral Wiring
08/17/2021Permit IssuedSMART ELECTRIC SERVICESGeneral Wiring
05/17/2021CompletePOWERONE ELECT'L CONTRG13 meters, 1 new_meters
05/05/2021CompleteMLS ELECTRIC LLCGeneral Wiring
Building Lifecycle
All (287)Filed (45)Permit Issued (34)Signed Off (18)Facade (FISP) (15)Violation (60)Inspection (29)Objection (56)Special Inspection (30)
08/13/2026
Filed — Alteration
REPLACE AND INSTALL FIXTURES FOR APT PHC AS PER PLANS FILED HEREWITH. NO CHANGE TO USE, EGRESS OR OCCUPANCY
M01444224-I1
08/13/2026
Filed — Alteration
REPLACE AND INSTALL FIXTURES FOR APT PHC AS PER PLANS FILED HEREWITH. NO CHANGE TO USE, EGRESS OR OCCUPANCY
M01444224-S1
07/14/2026
Special inspection requirement — Post-installed Anchors
Jon Colatrella
07/14/2026
Special inspection requirement — Fire-Resistant Penetrations and Joints
Jon Colatrella
07/14/2026
Special inspection requirement — Tenant Protection Plan Compliance
06/24/2026
Permit issued — Plumbing
M01399337-S1-PL
06/22/2026
Permit issued — General Construction
M01399337-I1-GC
06/17/2026
Objection resolved — Addressed
06/17/2026
Objection resolved — Addressed
06/11/2026
Filed — Alteration
Replacement of existing building gas risers and new connections to existing apartment stoves per plans. No change in use, egress or occupancy.
M01058096-P2
06/10/2026
Objection raised — Scope
06/10/2026
Objection raised — Other
06/04/2026
Filed — Alteration
COMBINATION OF APTS FILED IN CONJUNCTION WITH DDB NOW GC. NO CHANGE TO USE, OCCUPANCY OR EGRESS.
M01399337-I1
06/04/2026
Filed — Alteration
COMBINATION OF APTS FILED IN CONJUNCTION WITH DDB NOW GC. NO CHANGE TO USE, OCCUPANCY OR EGRESS.
M01399337-S1
05/04/2026
Permit issued — Plumbing
M01058096-I1-PL
01/20/2026
Signed off — Alteration
Replaced plumbing fixtures of the existing 3-pc bathroom in APT#6D as per submitted drawings.
M01211831-I1
01/06/2026
Permit issued — General Construction
M01211831-I1-GC
12/16/2025
Signed off — Alteration
INSTALLATION OF TEMPORARY PIPE SCAFFOLD AS PER PLANS. NO CHANGE IN USE, EGRESS OR OCCUPANCY.
M01254220-I1
11/25/2025
Permit issued — Plumbing
M01058096-I1-PL
10/06/2025
Objection resolved — Addressed
10/06/2025
Objection resolved — Addressed
09/24/2025
Objection raised — Scope
09/24/2025
Objection raised — Scope
09/10/2025
Filed — Alteration
Replaced plumbing fixtures of the existing 3-pc bathroom in APT#6D as per submitted drawings.
M01211831-I1
09/10/2025
Filed — Alteration
Replaced plumbing fixtures of the existing 3-pc bathroom in APT#6D as per submitted drawings.
M01211831-S2
09/10/2025
Special inspection requirement — Tenant Protection Plan Compliance
GLEN LANGER
07/31/2025
Filed — Alteration
INSTALLATION OF TEMPORARY PIPE SCAFFOLD AS PER PLANS. NO CHANGE IN USE, EGRESS OR OCCUPANCY.
M01254220-I1
07/31/2025
Permit issued — Supported Scaffold
M01254220-I1-SF
06/13/2025
Inspection — Certified Gas-Gas-Piping-Roughing
Certified
View inspection ↗
04/16/2025
Special inspection requirement — Final
GLEN LANGER
04/16/2025
Special inspection requirement — Tenant Protection Plan Compliance
GLEN LANGER
03/28/2025
Filed — Alteration
Replacement of existing building gas risers and new connections to existing apartment stoves per plans. No change in use, egress or occupancy.
M01058096-P1
03/26/2025
Special inspection requirement — Fire-Resistant Penetrations and Joints
Jon Colatrella
03/26/2025
Special inspection requirement — Post-installed Anchors
Jon Colatrella
03/26/2025
Special inspection requirement — Tenant Protection Plan Compliance
03/24/2025
Inspection — Certified Gas-Gas-Piping-Roughing
Certified
View inspection ↗
10/24/2024
Permit issued — Plumbing
M01058096-I1-PL
10/15/2024
Objection raised — Scope
10/15/2024
Objection resolved — Addressed
10/07/2024
Objection resolved — Addressed
10/07/2024
Objection resolved — Addressed
08/29/2024
Signed off — Alteration
Renovate the existing kitchen and 3-pc bathroom.
M00889537-I1
08/22/2024
Inspection — Pass-Final General Construction Non-Directive 14
Pass
View inspection ↗
08/02/2024
Objection raised — Mechanical
08/02/2024
Objection raised — Fire_Protection
07/25/2024
Filed — Alteration
Replacement of existing building gas risers and new connections to existing apartment stoves per plans. No change in use, egress or occupancy.
M01058096-I1
07/10/2024
Signed off — Alteration
Garage Repairs as per plans filed herewith. No change to use, egress, or occupancy.
M00910966-I1
07/10/2024
Special inspection requirement — Tenant Protection Plan Compliance
Eric Cowley
07/10/2024
Special inspection requirement — Structural Stability – Alterations of existing buildings
Eric Cowley
07/10/2024
Special inspection requirement — Concrete - Cast-In-Place
Eric Cowley
07/10/2024
Special inspection requirement — Final
Eric Cowley
07/10/2024
Special inspection requirement — Post-installed Anchors
Eric Cowley
07/08/2024
Filed — Alteration
Garage Repairs as per plans filed herewith. No change to use, egress, or occupancy.
M00910966-P1
05/31/2024
Inspection — Fail-Final General Construction Non-Directive 14
Fail
View inspection ↗
02/14/2024
Signed off — Alteration
MODIFICATION OF PLUMBING FIXTURES ASSOCIATED WITH COMBINATION OF APARTMENTS. REMOVE 1 KITCHENETTE. NO CHANGE IN USE, EGRESS OR OCCUPANCY.
M00325275-I1
02/05/2024
Inspection — Certified Remove/Cap - work done in accordance with code
Certified
View inspection ↗
02/05/2024
Inspection — Certified Water and Sanitary-WS-Fixtures-Finish
Certified
View inspection ↗
01/24/2024
Permit issued — General Construction
M00910966-I1-GC
01/19/2024
Filed — Alteration
Garage Repairs as per plans filed herewith. No change to use, egress, or occupancy.
M00910966-I1
01/19/2024
Special inspection requirement — Fire-Resistant Penetrations and Joints
RICHARD LEMANSKY
Latest 60 of 287 events.
▾Owner History (Filing Record)
Companies and organizations named on filings. Individual owners are not shown.
OwnerFilingsMost Recent
KINGS GROUP NY807/08/2026
45 W 10 TENANTS1503/22/2026
AKAM ASSOCIATES103/22/2026
VERIZON WIRELESS103/21/2026
45 WEST 10TH TENANTS1703/21/2026
45 WEST 10TH STREET TENANTS1203/21/2026
45 WEST 10 TENANTS2503/21/2026
ARTISAN RESTORATION GROUP103/21/2026
45 WEST 10TH STREET OWNER S203/21/2026
LAWRENCE PROPERTIES103/21/2026
▾Filing Representatives (Expediters)
▾Contractors (License-Anchored)
FirmTradeRolesMost Recent
SAWERA INTERIORS CORPGeneral Contractor603/21/2026
CREO PROJECTS LLCGeneral Contractor507/08/2026
EMPIRE REST & MGMT CORPGeneral Contractor403/21/2026
KINGS GROUP NY CORPGeneral Contractor407/08/2026
EMPIRE NY INSTALLATIONS INCGeneral Contractor303/21/2026
DOLA CONTRACTING CORPGeneral Contractor303/21/2026
SYSTEMS 2000 PLBG SVCS LLPlumbing307/08/2026
MBQ CONTRACTING CORPGeneral Contractor303/21/2026
L&J PLG & HTG CO OF NY INPlumbing207/08/2026
ARK DESIGN & BUILD INCGeneral Contractor207/08/2026
INNOVATIVE HEATING SOLUTIPlumbing207/08/2026
VIVID HOME FINISHES LLCGeneral Contractor106/28/2026
AAA TOTAL PLUMBING, INCPlumbing107/08/2026
AP PLUMBING & HVAC LLCPlumbing107/08/2026
CBB PLUMBING CORPPlumbing107/08/2026
ORBIT PLBG & HTG INCPlumbing107/08/2026
PROCORE MECHANICAL CORPPlumbing107/08/2026
VILLAGE P & H NY INCPlumbing107/08/2026
CAMENZULI, CARMINEElectrical103/21/2026
VRISI PLBG & HTG LLCPlumbing106/27/2026
CLAIRMONT ELEC'L CONTR'GElectrical103/22/2026
MCGOVERN, THOMASElectrical103/21/2026
METROPOLITAN OPERA ASSOCIElectrical103/21/2026
NYC DISTRICT COUNCIL OF CElectrical103/21/2026
TIMOTHY COLEMANElectrical103/21/2026
▾Special Inspection Agencies
AgencyLicense #FilingsMost Recent
METRIC CONSULTING AND INS1803208/13/2026
HOWARD L ZIMMERMAN ARCHIT1712306/11/2026
WINTON GROUP ARCHITECTURE4343106/04/2026
S&S CONCRETE & SOIL TESTI1008409/10/2025
COWLEY ENGINEERING186207/08/2024
RICHMOND TESTING LAB263301/02/2024
MICHAEL TOWER ARCHITECTUR8029511/30/2023
ARCHITECTURE+CONSTRUCTION1326308/08/2023
JAJ ENGINEERING PLLC930108/07/2023
AA BUILDING & INSPECTION1519107/25/2023
Permit / Filing Register
SourceWork TypeStatusApplicantIssued
DOB NOWPlumbingPermit IssuedVRISI PLBG & HTG LLC06/24/2026
DOB NOWGeneral ConstructionPermit IssuedVIVID HOME FINISHES LLC06/22/2026
DOB NOWPlumbingSigned-offSYSTEMS 2000 PLBG SVCS LL05/04/2026
DOB NOWGeneral ConstructionSigned-offKAIETEUR CONSTRUCTION INC01/06/2026
DOB NOWPlumbingSigned-offSYSTEMS 2000 PLBG SVCS LL11/25/2025
DOB NOWSupported ScaffoldSigned-offEMPIRE NY INSTALLATIONS I07/31/2025
DOB NOWPlumbingSigned-offSYSTEMS 2000 PLBG SVCS LL10/24/2024
DOB NOWGeneral ConstructionSigned-offDEMARI SERVICES INC01/24/2024
DOB NOWPlumbingPermit IssuedAAA TOTAL PLUMBING, INC10/30/2023
DOB NOWMechanical SystemsPermit IssuedARK DESIGN & BUILD INC09/15/2023
DOB NOWGeneral ConstructionPermit IssuedARK DESIGN & BUILD INC09/06/2023
DOB NOWPlumbingPermit IssuedCROSSFIELD PLBG.&HTG08/30/2023
DOB NOWGeneral ConstructionPermit IssuedMBQ CONTRACTING CORP08/14/2023
DOB NOWGeneral ConstructionSigned-offHOPE HOME IMPROVEMENT INC07/26/2023
DOB NOWGeneral ConstructionSigned-offDOLA CONTRACTING CORP06/01/2023
DOB NOWGeneral ConstructionSigned-offSAWERA INTERIORS CORP03/06/2023
DOB NOWPlumbingSigned-offCBB PLUMBING CORP03/06/2023
DOB NOWPlumbingSigned-offMITIE PLUMBING & HTG CORP03/03/2023
DOB NOWGeneral ConstructionSigned-offLEWIS CONSTRUCTION NYC IN02/27/2023
DOB NOWPlumbingSigned-offORBIT PLBG & HTG INC01/09/2023
DOB NOWGeneral ConstructionSigned-offSAWERA INTERIORS CORP01/06/2023
DOB NOWPlumbingPermit IssuedVILLAGE P & H NY INC08/10/2022
DOB NOWPlumbingSigned-offMITIE PLUMBING & HTG CORP03/29/2022
DOB NOWPlumbingPermit IssuedL&J PLG & HTG CO OF NY IN12/16/2021
DOB NOWGeneral ConstructionSigned-offEMPIRE REST MGMT12/09/2021
DOB NOWPlumbingSigned-offL&J PLG & HTG CO OF NY IN09/07/2021
DOB NOWGeneral ConstructionSigned-offEMPIRE REST MGMT07/09/2021
DOB NOWGeneral ConstructionSigned-offCREO PROJECTS LLC06/30/2021
DOB NOWPlumbingSigned-offPROCORE MECHANICAL CORP05/03/2021
DOB NOWGeneral ConstructionSigned-offCREO PROJECTS LLC04/29/2021
DOB NOWMechanical SystemsSigned-offCREO PROJECTS LLC04/29/2021
DOB NOWSupported ScaffoldSigned-offMICHAEL DELLAVECCHIA&SONS03/25/2021
DOB NOWSidewalk ShedSigned-offKINGS GROUP NY CORP10/27/2020
DOB NOWSupported ScaffoldSigned-offKINGS GROUP NY CORP10/21/2020
BISOTISSUEDNICK VILLANI AND CO., INC08/15/2022
BISOTISSUEDNICK VILLANI AND CO., INC01/21/2022
BISOTISSUEDL & Z RESTORATION CORP02/18/2021
BISOTISSUEDL & Z RESTORATION CORP12/30/2020
BISOTISSUEDDESIGN PROCURE BUILD LLC09/04/2019
BISPLISSUEDARCON PLBG SOLUTIONS06/27/2019
+ 44 more permits on file
▾Field Inspections (DOB CAP) — 29
DateTypeResultReport
06/13/2025Certified Gas-Gas-Piping-RoughingCertifiedView ↗
03/24/2025Certified Gas-Gas-Piping-RoughingCertifiedView ↗
08/22/2024Pass-Final General Construction Non-Directive 14PassView ↗
05/31/2024Fail-Final General Construction Non-Directive 14FailView ↗
02/05/2024Certified Remove/Cap - work done in accordance with codeCertifiedView ↗
02/05/2024Certified Water and Sanitary-WS-Fixtures-FinishCertifiedView ↗
11/16/2023Certified Remove/Cap - work done in accordance with codeCertifiedView ↗
11/16/2023Certified Water and Sanitary-WS-Sanitary Piping-RoughingCertifiedView ↗
11/14/2023Certified Remove/Cap - work done in accordance with codeCertifiedView ↗
10/12/2023Pass-Final PL - Up to 3 Requested FloorsPassView ↗
10/03/2023Pass-Final PL - Up to 9 Requested FloorsPassView ↗
09/29/2023Pass-Final Scaffold WithdrawalPassView ↗
09/13/2023Fail-Final Scaffold WithdrawalFailView ↗
05/30/2023Fail-Final PL - Up to 9 Requested FloorsFailView ↗
05/25/2023Pass-Final PL - Up to 3 Requested FloorsPassView ↗
04/24/2023Pass-Final PL - Up to 3 Requested FloorsPassView ↗
04/20/2023Pass-Final PL - Up to 3 Requested FloorsPassView ↗
04/14/2023Fail-Final PL - Up to 3 Requested FloorsFailView ↗
03/22/2023Certified Gas-Gas-Piping-RoughingCertifiedView ↗
03/22/2023Certified Water and Sanitary-WS-Sanitary Piping-RoughingCertifiedView ↗
03/20/2023Certified Remove/Cap - work done in accordance with codeCertifiedView ↗
02/14/2023Certified Water and Sanitary-WS-Fixtures-FinishCertifiedView ↗
11/10/2022Fail-Final PL - Up to 9 Requested FloorsFailView ↗
09/09/2022Certified Water and Sanitary-WS-Sanitary Piping-RoughingCertifiedView ↗
03/02/2022Certified Water and Sanitary-WS-Sanitary Piping-RoughingCertifiedView ↗
Latest 25 of 29.
▾Special Inspection Requirements (DOB NOW) — 81
DateRequirementInspectorRole
07/14/2026Post-installed AnchorsJon Colatrellaspecial
07/14/2026Tenant Protection Plan Compliance—special
07/14/2026Fire-Resistant Penetrations and JointsJon Colatrellaspecial
09/10/2025Tenant Protection Plan ComplianceGLEN LANGERspecial
04/16/2025FinalGLEN LANGERprogress
04/16/2025Tenant Protection Plan ComplianceGLEN LANGERspecial
03/26/2025Tenant Protection Plan Compliance—special
03/26/2025Fire-Resistant Penetrations and JointsJon Colatrellaspecial
03/26/2025Post-installed AnchorsJon Colatrellaspecial
07/10/2024FinalEric Cowleyprogress
07/10/2024Post-installed AnchorsEric Cowleyspecial
07/10/2024Structural Stability – Alterations of existing buildingsEric Cowleyspecial
07/10/2024Tenant Protection Plan ComplianceEric Cowleyspecial
07/10/2024Concrete - Cast-In-PlaceEric Cowleyspecial
01/19/2024Fire-Resistant Penetrations and JointsRICHARD LEMANSKYspecial
11/28/2023Fire-Resistant Penetrations and JointsMichael Towerspecial
10/25/2023Fire-Resistant Penetrations and JointsMichael Towerspecial
09/17/2023Fire-Resistant Penetrations and JointsGLEN LANGERspecial
09/17/2023FinalGLEN LANGERprogress
09/17/2023Fire-Resistance Rated ConstructionGLEN LANGERprogress
09/17/2023Tenant Protection Plan ComplianceGLEN LANGERspecial
09/15/2023Tenant Protection Plan Compliance—special
09/15/2023Fire-Resistant Penetrations and Joints—special
09/11/2023Tenant Protection Plan Compliance—special
09/11/2023Fire-Resistant Penetrations and Joints—special
Latest 25 of 81.
▾Documents — 726 on file (BIS + DOB NOW)
▸Plans & Drawings45
▸DOB NOWPlans/Sketch35
09/03/2026M00530626-I1Contact architect ↗
09/03/2026M00612646-I1Contact architect ↗
09/03/2026M00612646-S1Contact architect ↗
Showing 3 of 35 on file for this type
▸DOB NOWPlans/Sketch - Plumbing5
09/04/2026M00471174-I1Contact architect ↗
09/04/2026M00471174-P1Contact architect ↗
09/02/2026M00325275-P1Contact architect ↗
Showing 3 of 5 on file for this type
▸DOB NOWPlans/Sketch - General Construction2
09/03/2026M00465199-P1Contact architect ↗
08/15/2026M00465199-I1Contact architect ↗
▸DOB NOWPlans/Sketch - Mechanical Systems1
09/04/2026M00474283-I1Contact architect ↗
▸DOB NOWPlans/Sketch - Supported Scaffold1
09/04/2026M00405182-I1Contact architect ↗
▸DOB NOWPlans/Sketch - Sidewalk Shed1
09/04/2026M00405165-I1Contact architect ↗
▸Applications & Permits135
▸BISWORK PERMIT APPLICATION47
01/21/2022140972008Open ↗
12/30/2020123794126Open ↗
09/24/2019123775708Open ↗
Showing 3 of 47 on file for this type
▸BISPLAN / WORK APPROVAL APPLICATION42
06/14/2024101337064Open ↗
05/02/2023122359857Open ↗
05/02/2023122359857Open ↗
Showing 3 of 42 on file for this type
▸DOB NOWLPC Approval/Permit41
09/04/2026M00474283-I1Open ↗
09/03/2026M00465199-P1Open ↗
08/24/2026M01058096-I1Open ↗
Showing 3 of 41 on file for this type
▸BISLL114/19 PERMIT RESTRICTION3
01/21/2022140972008Open ↗
07/22/2021123794126Open ↗
12/30/2020123794126Open ↗
▸BISSIDEWALK SHED APPLICATION & PERMIT1
11/12/2020123794126Open ↗
▸BISSCAFFOLD APPLICATION & PERMIT1
11/12/2020123794126Open ↗
▸Seals & Professional Certifications196
▸BISTECHNICAL REPORT: RESPONSIBILITY/CERTIFICATION65
02/13/2020123794126Open ↗
02/12/2020123890968Open ↗
02/12/2020123890968Open ↗
Showing 3 of 65 on file for this type
▸DOB NOWDPL-1: Design Professional Seal & Signature45
09/04/2026M00405182-I1Open ↗
09/04/2026M00474283-I1Open ↗
09/03/2026M00465199-I1Open ↗
Showing 3 of 45 on file for this type
▸DOB NOWSpecial Inspector Seal & Signature28
09/29/2026M01211831-I1Open ↗
09/25/2026M00530626-I1Open ↗
09/17/2026M08033262-P1Open ↗
Showing 3 of 28 on file for this type
▸DOB NOWProgress Inspector Seal & Signature26
09/29/2026M01211831-I1Open ↗
09/25/2026M00530626-I1Open ↗
09/25/2026M00530626-I1Open ↗
Showing 3 of 26 on file for this type
▸BISPROFESSIONAL CERTIFIED CHECKLIST11
11/20/2019123110212Open ↗
08/12/2019123775708Open ↗
08/07/2019123775708Open ↗
Showing 3 of 11 on file for this type
▸BISPROFESSIONAL CERTIFICATION STATEMENT8
07/05/2019123775708Open ↗
Showing 1 of 8 on file for this type
▸BISTECHNICAL REPORT STATEMENT OF RESPONSIBILITY4
11/19/2020140972008Open ↗
Showing 1 of 4 on file for this type
▸BISPROFESSIONAL CERTIFICATION STATEMENT FORM3
On file, but not among the 200 most recently loaded documents for this source.
Showing 0 of 3 on file for this type
▸BISREQUIRED ITEMS CHECKLIST FOR PROFESSIONAL CERTIFICATION3
On file, but not among the 200 most recently loaded documents for this source.
Showing 0 of 3 on file for this type
▸BISProfessional and Owner Certification (POC3)1
On file, but not among the 200 most recently loaded documents for this source.
Showing 0 of 1 on file for this type
▸BISPC FULL REPORT1
On file, but not among the 200 most recently loaded documents for this source.
Showing 0 of 1 on file for this type
▸BISAPPLICANT OWNER SIGNATURE1
11/19/2020140972008Open ↗
▸Trade Schedules & Equipment22
▸BISSCHEDULE B - PLUMBING/SPRINKLER/STANDPIPE10
07/05/2019123775708Open ↗
04/26/2019123890968Open ↗
03/05/2019123676307Open ↗
Showing 3 of 10 on file for this type
▸BISSCHEDULE B - PLUMBING7
On file, but not among the 200 most recently loaded documents for this source.
Showing 0 of 7 on file for this type
▸BISSELF-CERT PLUMBING NOTICE5
On file, but not among the 200 most recently loaded documents for this source.
Showing 0 of 5 on file for this type
▸Safety & Tenant Protection18
▸BISTenant Protection Plan and Notes12
01/21/2021140972008Open ↗
07/05/2019123775708Open ↗
04/26/2019123890968Open ↗
Showing 3 of 12 on file for this type
▸DOB NOWTenant Protection Plan4
08/13/2026M00325275-P1Open ↗
08/13/2026M00325275-P2Open ↗
Showing 2 of 4 on file for this type
▸BISDEMOLITION SUBMITTAL CERTIFICATION FORM2
08/21/2020123794126Open ↗
Showing 1 of 2 on file for this type
▸Environmental & Asbestos59
▸DOB NOWDEP ACP-5: Asbestos Assessment Report31
09/03/2026M00612646-I1Open ↗
09/03/2026M00612646-S1Open ↗
09/01/2026M08038901-I1Open ↗
Showing 3 of 31 on file for this type
▸BISASBESTOS: CERTIFICATION (DEP ACP5)19
11/19/2020140972008Open ↗
02/13/2020123794126Open ↗
08/07/2019123775708Open ↗
Showing 3 of 19 on file for this type
▸DOB NOWDEP ACP-20/ACP-21: Asbestos Project Conditional Completion Form/Asbestos Project Completion Form5
09/04/2026M00474283-I1Open ↗
08/15/2026M00868223-S2Open ↗
08/15/2026M00868223-S1Open ↗
Showing 3 of 5 on file for this type
▸BISTHIS IS 'NOT AN ASBESTOS PROJECT'3
On file, but not among the 200 most recently loaded documents for this source.
Showing 0 of 3 on file for this type
▸BISDEP ASBESTOS PROJECT COMPLETION FORM1
06/27/2019123890968Open ↗
▸Energy Compliance48
▸BISTECHNICAL REPORT: ENERGY CODE PROGRESS INSPS26
02/04/2020123075215Open ↗
11/20/2019123110212Open ↗
11/19/2019123110212Open ↗
Showing 3 of 26 on file for this type
▸BISAS-BUILT ENERGY ANALYSIS9
02/04/2020123075215Open ↗
11/19/2019123110212Open ↗
02/16/2018123056691Open ↗
Showing 3 of 9 on file for this type
▸BISTECHNICAL REPORT: ENERGY CODE - RESPONSIBILITY4
05/26/2023122359857Open ↗
03/12/2021123775708Open ↗
01/25/2021123676307Open ↗
Showing 3 of 4 on file for this type
▸BISAS-BUILT ENERGY ANALYSIS (EN2)3
05/26/2023122359857Open ↗
01/18/2022123775708Open ↗
01/25/2021123676307Open ↗
▸DOB NOWEN2: As Built Energy Analysis.2
On file, but not among the 200 most recently loaded documents for this source.
Showing 0 of 2 on file for this type
▸BISNYCECC EXEMPTION1
11/19/2020140972008Open ↗
▸BISLIGHTING IN DWELLING UNITS1
05/26/2023122359857Open ↗
▸BISENERGY CODE COMPLIANCE INSPECTIONS1
05/26/2023122359857Open ↗
▸BISENERGY CODE 1ST REVIEW COMPLETE1
05/20/2019123890968Open ↗
▸Inspections & Test Reports21
▸BISTECHNICAL REPORT: RESPONSIBILITY20
06/17/2024101337064Open ↗
12/04/2023140972008Open ↗
12/04/2023140972008Open ↗
Showing 3 of 20 on file for this type
▸BISINSPECTION REPORT - SUPPORTING DOCUMENTATION1
01/17/2019123071497Open ↗
▸Approvals, Objections & Sign-offs67
▸BISLANDMARKS APPROVAL28
01/21/2021140972008Open ↗
08/21/2020123794126Open ↗
02/12/2020123890968Open ↗
Showing 3 of 28 on file for this type
▸BISCERTIFICATE OF OCCUPANCY/LOC: REQUEST26
12/05/2023140972008Open ↗
08/15/2023122359857Open ↗
01/18/2022123775708Open ↗
Showing 3 of 26 on file for this type
▸BISLANDMARKS SIGNOFF4
12/05/2023140972008Open ↗
08/15/2023122359857Open ↗
01/18/2022123775708Open ↗
Showing 3 of 4 on file for this type
▸BISADMINISTRATIVE OBJECTIONS4
On file, but not among the 200 most recently loaded documents for this source.
Showing 0 of 4 on file for this type
▸BISLETTERS - SUPPORTING DOCUMENTATION2
02/12/2020123890968Open ↗
Showing 1 of 2 on file for this type
▸BISFINAL2
05/26/2023122359857Open ↗
01/18/2022123775708Open ↗
▸BISSUPERSEDING LETTER1
On file, but not among the 200 most recently loaded documents for this source.
Showing 0 of 1 on file for this type
▸Cost, Insurance & Ownership49
▸BISCOST AFFIDAVIT43
06/17/2024101337064Open ↗
06/17/2024101337064Open ↗
05/03/2023122359857Open ↗
Showing 3 of 43 on file for this type
▸BISCOST AFFIDAVIT (FINAL): PW35
12/04/2023140972008Open ↗
05/26/2023122359857Open ↗
01/18/2022123775708Open ↗
Showing 3 of 5 on file for this type
▸BISHIC LICENSE OR AFFIDAVIT1
05/16/2019123676307Open ↗
▸Filing & Intake Forms60
▸BISEFILING COVER SHEET22
02/13/2020123794126Open ↗
07/05/2019123775708Open ↗
04/26/2019123890968Open ↗
Showing 3 of 22 on file for this type
▸BISADDITIONAL INFORMATION20
08/04/2022140972008Open ↗
01/21/2021140972008Open ↗
12/08/2020140972008Open ↗
Showing 3 of 20 on file for this type
▸BISBOROUGH INTAKE FORM14
12/23/2020123794126Open ↗
02/12/2020123890968Open ↗
02/12/2020123890968Open ↗
Showing 3 of 14 on file for this type
▸BISEFILING JOB APPLICATION COVER SHEET4
11/19/2020140972008Open ↗
Showing 1 of 4 on file for this type
▸Other Documents6
▸BISEXTERNAL FORMS - SUPPORTING DOCUMENTATION3
On file, but not among the 200 most recently loaded documents for this source.
Showing 0 of 3 on file for this type
▸DOB NOWProof of Historic Building3
08/24/2026M01058096-P1Open ↗
08/24/2026M01058096-I1Open ↗
08/13/2026M01058096-P2Open ↗