← Back
Office only, 2-6 stories
45 WEST 14 STREET
MANHATTAN · Midtown South-Flatiron-Union Square · BIN 1015286
💬 Discuss this project
1915Year Built
5Stories
O2Building Class
C6-2MZoning
12,825 sfGross Floor Area
1Units
2 Open Violations ▸
Office only, 2-6 stories · 2,582 sf lot · 4.97 FAR built · Flood zone X
Locations of Work
ArchitectureStructuralMechanical
Roof5p · 2 filings · 17 docs
Floor 52p · 1 filing · 13 docs
Floor 4
Floor 3
Floor 2
Floor 1
▾Owner History (Filing Record)
Companies and organizations named on filings. Individual owners are not shown.
OwnerFilingsMost Recent
PAINTING INDUSTRY FUND BLDG2103/22/2026
PAINT INDUSTRY FUND103/22/2026
D C 9 PAINTING INDUSTRY INSURAN1303/21/2026
▾Design Consultants (Architect / Engineer of Record)
▾Filing Representatives (Expediters)
RepresentativeFilingsMost Recent
DI DIO ARCHITECTURE, PC203/21/2026
MP DESIGN AND CONSTRUCTION403/21/2026
AE DESIGN SOLUTION203/21/2026
▾Contractors (License-Anchored)
FirmTradeRolesMost Recent
BNF CONTRACTORS INCGeneral Contractor603/21/2026
AINSWORTH INCGeneral Contractor303/21/2026
ROBERT MARCHISOTTOElectrical203/21/2026
EUSEBIO MCQUEENElectrical103/21/2026
MCQUEEN EUSEBIOElectrical103/21/2026
▾Special Inspection Agencies
AgencyLicense #FilingsMost Recent
PIRO STUDIO LLC7503111/20/2023
ACTIVE DESIGN GROUP ENGIN6666105/26/2021
CONCESSI ENGINEERING, P.C540105/26/2021
Building Lifecycle
All (38)Filed (4)Permit Issued (4)Signed Off (4)Violation (17)Special Inspection (9)
01/11/2024
Signed off — Alteration
M00945898-I1
01/10/2024
Permit issued — Mechanical Systems
M00945898-I1-MS
11/20/2023
Filed — Alteration
M00945898-I1
06/30/2022
Signed off — Alteration
Install structural supports for mechanical equipment
M00521461-I1
06/13/2022
Signed off — Alteration
REPLACEMENT OF EXISTING ROOF SYSTEM, HVAC SYSTEM/UNITS IN THE ROOF. NO CHANGE OF USE, EGRESS OR OCCUPANCY.
M00521442-I1
03/11/2022
Signed off — Alteration
INSTALLATION OF TEMPORARY SIDEWALK SHED AS PER PLANS. NO CHANGE IN USE, EGRESS OR OCCUPANCY.
M00565630-I1
07/29/2021
Filed — Alteration
INSTALLATION OF TEMPORARY SIDEWALK SHED AS PER PLANS. NO CHANGE IN USE, EGRESS OR OCCUPANCY.
M00565630-I1
07/28/2021
Permit issued — Structural
M00521461-I1-ST
07/27/2021
Special inspection requirement — Final
Paul Perdek
07/21/2021
Permit issued — Mechanical Systems
M00521442-I1-MS
07/21/2021
Permit issued — General Construction
M00521442-I1-GC
05/26/2021
Filed — Alteration
Install structural supports for mechanical equipment
M00521461-I1
05/26/2021
Filed — Alteration
REPLACEMENT OF EXISTING ROOF SYSTEM, HVAC SYSTEM/UNITS IN THE ROOF. NO CHANGE OF USE, EGRESS OR OCCUPANCY.
M00521442-I1
05/13/2021
Special inspection requirement — Fire-Resistant Penetrations and Joints
Robert Concessi
05/13/2021
Special inspection requirement — Heating Systems
Robert Concessi
05/13/2021
Special inspection requirement — Final
Robert Concessi
05/13/2021
Special inspection requirement — Mechanical Systems
Robert Concessi
05/13/2021
Special inspection requirement — HVAC-R and service water heating equipment
Robert Concessi
05/13/2021
Special inspection requirement — HVAC-R and service water heating system controls
Robert Concessi
05/13/2021
Special inspection requirement — HVAC-R and service water piping design and insulation
Robert Concessi
05/13/2021
Special inspection requirement — Maintenance information
Robert Concessi
08/07/2018
Violation issued (DOB, closed)
V*-DOB VIOLATION - Resolved
08/07/2018
Violation issued (DOB, closed)
V*-DOB VIOLATION - Resolved
06/14/2016
Violation issued (DOB, closed)
V*-DOB VIOLATION - Resolved
12/13/2011
Violation issued (DOB, open)
V-DOB VIOLATION - ACTIVE
11/21/2011
Violation issued (ECB, closed)
Elevators
06/13/2011
Violation issued (DOB, closed)
V*-DOB VIOLATION - Resolved
12/08/2010
Violation issued (ECB, closed)
Elevators
07/22/2009
Violation issued (DOB, closed)
V*-DOB VIOLATION - Resolved
06/03/2008
Violation issued (DOB, closed)
V*-DOB VIOLATION - Resolved
07/10/2007
Violation issued (DOB, closed)
V*-DOB VIOLATION - Resolved
09/28/2006
Violation issued (DOB, closed)
V*-DOB VIOLATION - Resolved
03/16/2005
Violation issued (DOB, closed)
V*-DOB VIOLATION - Resolved
06/26/2003
Violation issued (ECB, closed)
Elevators
06/06/2002
Violation issued (DOB, closed)
V*-DOB VIOLATION - Resolved
02/07/2000
Violation issued (DOB, open)
V-DOB VIOLATION - ACTIVE
06/24/1998
Violation issued (ECB, closed)
Elevators
10/30/1990
Violation issued (ECB, closed)
Boilers
Permit / Filing Register
SourceWork TypeStatusApplicantIssued
DOB NOWMechanical SystemsSigned-offAINSWORTH INC01/10/2024
DOB NOWStructuralSigned-offBNF CONTRACTORS INC07/28/2021
DOB NOWMechanical SystemsSigned-offBNF CONTRACTORS INC07/21/2021
DOB NOWGeneral ConstructionSigned-offBNF CONTRACTORS INC07/21/2021
BISOTISSUEDCROSS CONSULTING INC05/20/2015
BISOTISSUEDCROSS CONSULTING INC09/25/2014
BISOTISSUEDCROSS CONSULTING INC09/25/2014
BISOTISSUEDADELHARDT CONST CORP04/01/2014
BISEQISSUEDJTG SCAFFOLDING & HOISTIN12/02/2013
BISOTISSUEDADELHARDT CONST CORP07/23/2013
BISEQISSUEDJTG SCAFFOLDING & HOISTIN07/22/2013
BISEQISSUEDJTG SCAFFOLDING & HOISTIN07/22/2013
BISOTISSUEDPRP MECHANICAL CONTRACTOR INC.02/05/1998
BISOTISSUEDPAINTING INDUSTRY BLDG. FOUND06/11/1997
BISMHISSUEDSTANDARD REFRIGERATIORS02/16/1996
1 project · most recent 08/03/2021
FiledStatusContractorScope
08/03/2021CompleteCORPORATE ELEC. GROUP INC—
▾Special Inspection Requirements (DOB NOW) — 9
DateRequirementInspectorRole
07/27/2021FinalPaul Perdekprogress
05/13/2021Fire-Resistant Penetrations and JointsRobert Concessispecial
05/13/2021Heating SystemsRobert Concessispecial
05/13/2021FinalRobert Concessiprogress
05/13/2021Mechanical SystemsRobert Concessispecial
05/13/2021HVAC-R and service water heating equipmentRobert Concessienergy_progress
05/13/2021HVAC-R and service water heating system controlsRobert Concessienergy_progress
05/13/2021HVAC-R and service water piping design and insulationRobert Concessienergy_progress
05/13/2021Maintenance informationRobert Concessienergy_progress
▾Documents — 103 on file (BIS + DOB NOW)
▸Plans & Drawings4
▸DOB NOWPlans/Sketch4
09/03/2026M00521442-I1Request digital key ↗
09/03/2026M00521461-I1Request digital key ↗
09/03/2026M00565630-I1Request digital key ↗
Showing 3 of 4 on file for this type
▸Applications & Permits22
▸BISPLAN / WORK APPROVAL APPLICATION14
10/18/2016122870517Open ↗
08/17/2015121934265Open ↗
06/29/2015121934265Open ↗
Showing 3 of 14 on file for this type
▸BISWORK PERMIT APPLICATION8
06/10/2015121934265Open ↗
09/29/2014121934265Open ↗
09/29/2014121934265Open ↗
Showing 3 of 8 on file for this type
▸Seals & Professional Certifications33
▸BISTECHNICAL REPORT: RESPONSIBILITY-CERTIFICATION10
09/19/2014121934265Open ↗
09/19/2014121934265Open ↗
03/05/2014121934265Open ↗
Showing 3 of 10 on file for this type
▸DOB NOWProgress Inspector Seal & Signature6
09/02/2026M00565630-I1Open ↗
08/26/2026M00521442-I1Open ↗
08/26/2026M00521442-I1Open ↗
Showing 3 of 6 on file for this type
▸DOB NOWDPL-1: Design Professional Seal & Signature4
09/03/2026M00521461-I1Open ↗
08/28/2026M00945898-I1Open ↗
08/13/2026M00565630-I1Open ↗
Showing 3 of 4 on file for this type
▸BISPROFESSIONAL CERTIFICATION STATEMENT FORM3
07/18/2013140096223Open ↗
07/18/2013140096358Open ↗
05/06/2013121608723Open ↗
▸DOB NOWSpecial Inspector Seal & Signature3
08/26/2026M00521442-I1Open ↗
08/26/2026M00521442-I1Open ↗
08/26/2026M00521442-I1Open ↗
▸BISTECHNICAL REPORT STATEMENT OF RESPONSIBILITY2
07/17/2013140096223Open ↗
07/17/2013140096358Open ↗
▸BISPROFESSIONAL CERTIFICATION STATEMENT2
07/17/2013140096223Open ↗
07/17/2013140096358Open ↗
▸BISREQUIRED ITEMS CHECKLIST FOR PROFESSIONAL CERTIFICATION2
07/17/2013140096223Open ↗
07/17/2013140096358Open ↗
▸BISPROFESSIONAL CERTIFIED CHECKLIST1
05/06/2013121608723Open ↗
▸Trade Schedules & Equipment1
▸BISFA - FDNY APPROVAL : FD-FAA1
01/03/2018122870517Open ↗
▸Environmental & Asbestos7
▸BISASBESTOS: CERTIFICATION (DEP ACP5)5
10/18/2016122870517Open ↗
09/15/2014121934265Open ↗
07/25/2014121934265Open ↗
Showing 3 of 5 on file for this type
▸DOB NOWDEP ACP-20/ACP-21: Asbestos Project Conditional Completion Form/Asbestos Project Completion Form2
09/03/2026M00521461-I1Open ↗
08/13/2026M00521442-I1Open ↗
▸Energy Compliance8
▸BISTECHNICAL REPORT: ENERGY CODE PROGRESS INSPS4
09/15/2014121934265Open ↗
07/25/2014121934265Open ↗
03/05/2014121934265Open ↗
Showing 3 of 4 on file for this type
▸BISAS-BUILT ENERGY ANALYSIS1
10/20/2015121934265Open ↗
▸BISTR8: Energy Code Progress Inspections1
09/19/2014121934265Open ↗
▸BISELECTRICAL APPLICATION FOR SIDEWALK SHED LIGHTING1
07/17/2013140096358Open ↗
▸DOB NOWEN2: As Built Energy Analysis.1
08/13/2026M00521442-I1Open ↗
▸Inspections & Test Reports2
▸BISTECHNICAL REPORT: RESPONSIBILITY2
07/17/2013140096223Open ↗
07/17/2013140096358Open ↗
▸Approvals, Objections & Sign-offs6
▸BISCERTIFICATE OF OCCUPANCY/LOC: REQUEST2
03/20/2018122870517Open ↗
10/20/2015121934265Open ↗
▸DOB NOWDEP Variance (V5) letter2
09/03/2026M00521461-I1Open ↗
08/13/2026M00521442-I1Open ↗
▸BISSHED LETTER1
12/26/2013140096358Open ↗
▸BISADMINISTRATIVE OBJECTIONS1
05/06/2013121608723Open ↗
▸Cost, Insurance & Ownership7
▸BISCOST AFFIDAVIT7
03/20/2018122870517Open ↗
10/18/2016122870517Open ↗
10/20/2015121934265Open ↗
Showing 3 of 7 on file for this type
▸Filing & Intake Forms13
▸BISADDITIONAL INFORMATION5
08/31/2015121934265Open ↗
07/24/2014121608723Open ↗
03/31/2014121608723Open ↗
Showing 3 of 5 on file for this type
▸BISEFILING COVER SHEET4
10/18/2016122870517Open ↗
07/25/2014121934265Open ↗
03/05/2014121934265Open ↗
Showing 3 of 4 on file for this type
▸BISEFILING JOB APPLICATION COVER SHEET3
07/17/2013140096223Open ↗
07/17/2013140096358Open ↗
09/03/2014121934265Open ↗
▸BISBOROUGH INTAKE FORM1
03/20/2018122870517Open ↗