BuildNYC
Office with commercial, 7-19 stories
45 WEST 36TH STREET
MANHATTAN · BIN 1015923
💬 Discuss this project
1917Year Built
12Stories
O6Building Class
M1-9A/R12Zoning
108,875 sfGross Floor Area
13Units
LL97 Covered2 Active Violations 0 unresolved · 2 paperwork only 3 old, status unconfirmed ▸FISP: SAFE
Office with commercial, 7-19 stories · Owner of record: 45 West 36th Street · 9,890 sf lot · 11.01 FAR built · Flood zone X
Locations of Work
ArchitectureStructuralElectricalMechanicalPlumbingFire ProtectionEquipmentGeneral
Names shown beside floors are taken automatically from the text of filed documents and may be incomplete or wrong.
Permit Issued — active, not yet Signed-off
Floor 7Majesty BrandsUnder Construction63p · 8 filings · 20 docs
Floor 6Majesty Brands, LenflashUnder Construction31p · 5 filings · 20 docs
Floor 5
Floor 4Majesty Brands33p · 3 filings · 20 docs
Floor 3Majesty BrandsUnder Construction8p · 1 filing · 11 docs
Floor 2Samco Properties24p · 5 filings · 20 docs
Floor 1Samco Properties8p · 1 filing · 14 docs
CellarSamco Properties8p · 2 filings · 18 docs
Site & exteriorSafco Properties11p · 4 filings · 15 docs
▾Owner History (Filing Record)
Companies and organizations named on filings. Individual owners are not shown.
OwnerFilingsMost Recent
Samco Properties8510/04/2026
45 West 36 Street Realty1803/21/2026
45 West 36 St1003/21/2026
45W 36th St Realty Co903/21/2026
45 West 36th Street803/22/2026
F&G Associates103/21/2026
Figurina103/21/2026
▾Design Consultants (Architect / Engineer of Record)
FirmFilingsMost Recent
M. Chetrit Consulting Engineers909/23/2026
Env Architects1506/24/2026
M. Chetrit Consulting Engineers410/10/2025
Bicaluro Associates212/21/2022
MDG Design Group312/20/2022
P&L Associates411/10/2022
Chon Engineering208/10/2022
KZ Engineering105/13/2021
Lane Engineering Consulting104/14/2021
Ashraf104/05/2021
Green Design104/25/2020
▾Filing Representatives (Expediters)
RepresentativeFilingsMost Recent
Codegreen2303/21/2026
DI Dio Architecture403/21/2026
PM Architecture1203/21/2026
M-Dis Design Group303/21/2026
Municipal Building Consultants103/21/2026
Synergy Building Consultants103/21/2026
▾Contractors (License-Anchored)
FirmTradeRolesMost Recent
Arista Electricspecialty_contractor1908/26/2026
Triple Crown Plumbing & HeatingPlumbing1007/08/2026
Phoenix Sutton STRScaffold1007/08/2026
Eastern IronGeneral Contractor603/21/2026
Cercone Exterior RestorationGeneral Contractor507/08/2026
Cercone Exterior RestorationScaffold507/08/2026
TechnocraftGeneral Contractor203/21/2026
Frandal Electric CoElectrical203/21/2026
CKC Contracting Corp DbaElectrical103/22/2026
The Professionals-GeneralGeneral Contractor107/08/2026
2360 Amsterdam NYGeneral Contractor107/08/2026
Star Electrical ContractorsElectrical103/22/2026
Access PlumbingPlumbing107/08/2026
Buckmiller Automatic SprinklerFire Protection107/08/2026
Precision Sprinkler ServicesFire Protection107/08/2026
Arista ElectricElectrical103/21/2026
▾Special Inspection Agencies
AgencyLicense #FilingsMost Recent
Milrose Consultants20031409/23/2026
Prudigm Engineering Llcu4304412/21/2022
Sead Engineering2665312/20/2022
Lane Engineering Consulting2967104/14/2021
Building Lifecycle
All (267)Filed (43)Permit Issued (44)Signed Off (10)Facade (FISP) (15)Violation (60)Inspection (19)Objection (46)Special Inspection (30)
10/14/2026
Signed off — Alteration
Mechanical modifications to include HVAC installation to the 2nd floor as per plans filed herewith. No change in use, egress or occupancy.
M00781451-I1
10/14/2026
Signed off — Alteration
Plumbing modification to the 2nd floor as per plans filed herewith. No change in use, egress or occupancy.
M00781311-I1
09/23/2026
Filed — Alteration
Mechanical modifications to include HVAC installation to the 2nd floor as per plans filed herewith. No change in use, egress or occupancy.
M00781451-P1
09/23/2026
Filed — Alteration
Plumbing modification to the 2nd floor as per plans filed herewith. No change in use, egress or occupancy.
M00781311-P1
09/22/2026
Signed off — Alteration
General construction modifications to the 2nd floor as per plans filed herewith. No change to use, egress or occupancy.
M00781300-I1
08/25/2026
Special inspection requirement — Final
Christopher Drutjons
08/25/2026
Special inspection requirement — Maintenance information
Christopher Drutjons
08/25/2026
Special inspection requirement — Mechanical Systems
Christopher Drutjons
08/25/2026
Special inspection requirement — Maintenance information
Christopher Drutjons
08/25/2026
Special inspection requirement — HVAC-R and service water piping design and insulation
Christopher Drutjons
08/25/2026
Special inspection requirement — Energy Code Compliance Inspections
Christopher Drutjons
08/25/2026
Special inspection requirement — HVAC-R and service water heating system controls
Christopher Drutjons
08/25/2026
Special inspection requirement — Lighting controls
Christopher Drutjons
08/25/2026
Special inspection requirement — HVAC-R and service water heating equipment
Christopher Drutjons
08/25/2026
Special inspection requirement — HVAC-R and service water heating equipment
Christopher Drutjons
08/25/2026
Special inspection requirement — Energy Code Compliance Inspections
Christopher Drutjons
08/25/2026
Special inspection requirement — Shutoff dampers
Christopher Drutjons
08/25/2026
Special inspection requirement — Interior lighting power
Christopher Drutjons
08/25/2026
Special inspection requirement — HVAC-R and service water heating system controls
Christopher Drutjons
08/25/2026
Special inspection requirement — HVAC-R and service water piping design and insulation
Christopher Drutjons
08/06/2026
Permit issued — General Construction
M01406483-I1-GC
07/29/2026
Objection resolved — Addressed
07/29/2026
Special inspection requirement — Maintenance information
Benjamin Plotnick
07/29/2026
Special inspection requirement — Lighting controls
Benjamin Plotnick
07/07/2026
Objection raised — Other
06/30/2026
Objection resolved — Addressed
06/30/2026
Objection resolved — Addressed
06/30/2026
Objection resolved — Addressed
06/30/2026
Objection resolved — Addressed
06/29/2026
Objection raised — Scope
06/29/2026
Objection raised — Other
06/29/2026
Objection raised — Other
06/29/2026
Objection raised — Other
06/24/2026
Filed — Alteration CO
GENERAL CONSTRUCTION OF THE INTERIOR ON THE PARTIAL 3RD FLOOR, INCLUDING A CHANGE IN OCCUPANCY CLASSIFICATION FROM FACTORY TO OFFICE, AS PER PLANS FILED HEREIN.
M01406483-I1
06/11/2026
Special inspection requirement — Fire-Resistant Penetrations and Joints
Benjamin Plotnick
06/11/2026
Special inspection requirement — Energy Code Compliance Inspections
Benjamin Plotnick
06/11/2026
Special inspection requirement — Interior lighting power
Benjamin Plotnick
02/03/2026
Inspection — Certified Water and Sanitary-WS-Fixtures-Finish
Certified
View inspection ↗
12/12/2025
Permit issued — General Construction
M01269019-I1-GC
12/10/2025
Inspection — Certified Water and Sanitary-WS-Sanitary Piping-Roughing
Certified
View inspection ↗
12/02/2025
Objection raised — Scope
12/01/2025
Objection resolved — Addressed
12/01/2025
Special inspection requirement — HVAC-R and service water heating equipment
Christopher Drutjons
12/01/2025
Special inspection requirement — HVAC-R and service water piping design and insulation
Christopher Drutjons
12/01/2025
Special inspection requirement — HVAC-R and service water heating system controls
Christopher Drutjons
12/01/2025
Special inspection requirement — Energy Code Compliance Inspections
Christopher Drutjons
12/01/2025
Special inspection requirement — Maintenance information
Christopher Drutjons
11/25/2025
Objection resolved — Addressed
11/13/2025
Permit issued — Plumbing
M01012480-S2-PL
11/12/2025
Inspection — Certified Water and Sanitary-WS-Fixtures-Finish
Certified
View inspection ↗
11/12/2025
Objection resolved — Addressed
11/10/2025
Objection resolved — Addressed
11/10/2025
Objection resolved — Addressed
11/10/2025
Objection resolved — Addressed
11/10/2025
Special inspection requirement — Fire-Resistance Rated Construction
Christopher Drutjons
11/03/2025
Objection raised — Scope
10/31/2025
Special inspection requirement — HVAC-R and service water heating equipment
Christopher Drutjons
10/31/2025
Special inspection requirement — Maintenance information
Christopher Drutjons
10/31/2025
Special inspection requirement — HVAC-R and service water piping design and insulation
Christopher Drutjons
10/31/2025
Special inspection requirement — Lighting controls
Christopher Drutjons
Latest 60 of 267 events.
Permit / Filing Register
SourceWork TypeStatusApplicantIssued
DOB NOWGeneral ConstructionPermit IssuedArista Electric08/06/2026
DOB NOWGeneral ConstructionPermit IssuedArista Electric12/12/2025
DOB NOWPlumbingSigned-offTriple Crown Plumbing & Heating11/13/2025
DOB NOWPlumbingSigned-offTriple Crown Plumbing & Heating10/16/2025
DOB NOWMechanical SystemsPermit IssuedArista Electric10/09/2025
DOB NOWGeneral ConstructionPermit IssuedArista Electric09/10/2025
DOB NOWPlumbingSigned-offTriple Crown Plumbing & Heating07/22/2025
DOB NOWGeneral ConstructionSigned-offArista Electric07/21/2025
DOB NOWPlumbingSigned-offTriple Crown Plumbing & Heating04/04/2025
DOB NOWMechanical SystemsPermit IssuedArista Electric04/02/2025
DOB NOWPlumbingPermit IssuedTriple Crown Plumbing & Heating01/10/2025
DOB NOWGeneral ConstructionSigned-offArista Electric01/09/2025
DOB NOWPlumbingPermit IssuedTriple Crown Plumbing & Heating08/01/2024
DOB NOWPlumbingSigned-offTriple Crown Plumbing & Heating07/25/2024
DOB NOWMechanical SystemsPermit IssuedArista Electric05/24/2024
DOB NOWGeneral ConstructionSigned-offArista Electric01/18/2024
DOB NOWSprinklersPermit IssuedTriple Crown Plumbing & Heating07/12/2023
DOB NOWProtection and Mechanical MethodsPermit IssuedCercone Exterior Restoration04/24/2023
DOB NOWGeneral ConstructionPermit IssuedCercone Exterior Restoration04/15/2023
DOB NOWSidewalk ShedSigned-offPhoenix Sutton STR04/13/2023
DOB NOWSupported ScaffoldSigned-offPhoenix Sutton STR03/30/2023
DOB NOWGeneral ConstructionSigned-offEastern Iron12/29/2022
DOB NOWSprinklersPermit IssuedTriple Crown Plumbing & Heating12/13/2022
DOB NOWPlumbingSigned-offTriple Crown Plumbing & Heating11/25/2022
DOB NOWStructuralSigned-offEastern Iron11/23/2022
DOB NOWGeneral ConstructionPermit IssuedArista Electric10/28/2022
DOB NOWMechanical SystemsSigned-offArista Electric10/18/2022
DOB NOWMechanical SystemsSigned-off2360 Amsterdam NY10/14/2022
DOB NOWGeneral ConstructionSigned-offArista Electric09/30/2022
DOB NOWSprinklersPermit IssuedPrecision Sprinkler Services09/27/2022
DOB NOWStructuralSigned-offThe Professionals-General09/22/2022
DOB NOWPlumbingSigned-offAccess Plumbing08/29/2022
DOB NOWSprinklersSigned-offBuckmiller Automatic Sprinkler08/10/2022
DOB NOWGeneral ConstructionSigned-offTechnocraft06/15/2022
DOB NOWProtection and Mechanical MethodsPermit IssuedCercone Exterior Restoration04/28/2022
DOB NOWGeneral ConstructionPermit IssuedCercone Exterior Restoration04/27/2022
DOB NOWSidewalk ShedSigned-offPhoenix Sutton STR04/18/2022
DOB NOWSupported ScaffoldSigned-offPhoenix Sutton STR04/04/2022
DOB NOWGeneral ConstructionPermit IssuedArista Electric11/03/2021
DOB NOWProtection and Mechanical MethodsPermit IssuedCercone Exterior Restoration05/13/2021
+ 35 more permits on file
3 projects · most recent 09/23/2026
Air Conditioning Systems
FiledStatusContractorScopeMake / Model / Capacity
09/23/2026Signed-offArista ElectricAir Conditioning Systems
Cooling
Mitsubishi Electric MXZ-SM48NAM2-U1 48,000 BTU · Condensing Unit ×1
PUHY-EP120TNU-A1 120,000 BTU · Vrf Outdoor ×1
PUHY-EP72TNU-A1 72,000 BTU · Vrf Outdoor ×1
PUHY-EP96TNU-A1 96,000 BTU · Vrf Outdoor ×1
10/10/2025Permit IssuedArista ElectricAir Conditioning Systems
Cooling
Sigma SDSV-C.3-180-2-C-2-DS-H-A-S-A-2-L-A-S-0-0-0-0-0-0 6,000 CFM · Packaged Unit ×2
03/27/2025Permit IssuedArista ElectricAir Conditioning Systems
Cooling
Sigma J104831P1S1 7,200 CFM ×2
1 project · most recent 12/20/2022
Sprinkler System
FiledStatusContractorScope
12/20/2022Permit IssuedPrecision Sprinkler ServicesSprinkler System
8 projects · most recent 09/23/2026
Water/Sanitary
FiledStatusContractorScope
09/23/2026Signed-offTriple Crown Plumbing & HeatingWater/Sanitary
10/22/2025Signed-offTriple Crown Plumbing & HeatingWater/Sanitary
10/10/2025Signed-offTriple Crown Plumbing & HeatingWater/Sanitary
07/17/2025Signed-offTriple Crown Plumbing & HeatingWater/Sanitary
03/27/2025Signed-offTriple Crown Plumbing & HeatingWater/Sanitary
12/20/2022Permit IssuedTriple Crown Plumbing & Heating—
08/10/2022Signed-offTriple Crown Plumbing & HeatingWater/Sanitary
11/08/2021——Water/Sanitary
5 projects · most recent 07/27/2022
General Wiring
FiledStatusContractorScope
07/27/2022Permit IssuedMartinez Electrical ContGeneral Wiring
03/27/2020CompleteElpo Electrical Contg—
11/18/2019CompleteCKC Contracting Corp DbaGeneral Wiring
04/11/2019Permit IssuedStar Electrical Contractors—
11/30/2018CompleteWilldan Electrical of NYGeneral Wiring
1 project · most recent 12/20/2022
Steel Concrete
FiledStatusContractorScope
12/20/2022Permit IssuedTriple Crown Plumbing & HeatingSteel, Concrete
▾Field Inspections (DOB CAP) — 19
DateTypeResultReport
02/03/2026Certified Water and Sanitary-WS-Fixtures-FinishCertifiedView ↗
12/10/2025Certified Water and Sanitary-WS-Sanitary Piping-RoughingCertifiedView ↗
11/12/2025Certified Water and Sanitary-WS-Fixtures-FinishCertifiedView ↗
10/22/2025Certified Water and Sanitary-WS-Sanitary Piping-RoughingCertifiedView ↗
10/20/2025Certified Remove/Cap - work done in accordance with codeCertifiedView ↗
10/20/2025Certified Water and Sanitary-WS-Fixtures-FinishCertifiedView ↗
10/01/2025Certified Water and Sanitary-WS-Sanitary Piping-RoughingCertifiedView ↗
05/16/2025Certified Water and Sanitary-WS-Sanitary Piping-RoughingCertifiedView ↗
01/16/2025Certified Remove/Cap - work done in accordance with codeCertifiedView ↗
12/12/2024Certified Water and Sanitary-WS-Fixtures-FinishCertifiedView ↗
10/11/2024Certified Water and Sanitary-WS-Sanitary Piping-RoughingCertifiedView ↗
04/18/2023Pass-Final General Construction Non-Directive 14PassView ↗
04/11/2023Fail-Final General Construction Non-Directive 14FailView ↗
03/24/2023Certified Water and Sanitary-WS-Sanitary Piping-RoughingCertifiedView ↗
03/14/2023Certified Water and Sanitary-WS-Fixtures-FinishCertifiedView ↗
12/14/2022Certified Water and Sanitary-WS-Fixtures-FinishCertifiedView ↗
12/02/2022Certified Water and Sanitary-WS-Sanitary Piping-RoughingCertifiedView ↗
11/23/2022Certified Sprinkler-SP-Piping Dry/Wet-Hydrostatic TestCertifiedView ↗
11/17/2022Certified Sprinkler-SP-Fixtures-FinishCertifiedView ↗
▾Special Inspection Requirements (DOB NOW) — 149
DateRequirementInspectorRole
08/25/2026Mechanical SystemsChristopher Drutjonsspecial
08/25/2026HVAC-R and service water piping design and insulationChristopher Drutjonsenergy_progress
08/25/2026HVAC-R and service water heating system controlsChristopher Drutjonsenergy_progress
08/25/2026Maintenance informationChristopher Drutjonsenergy_progress
08/25/2026HVAC-R and service water heating equipmentChristopher Drutjonsenergy_progress
08/25/2026Energy Code Compliance InspectionsChristopher Drutjonsprogress
08/25/2026HVAC-R and service water heating system controlsChristopher Drutjonsenergy_progress
08/25/2026Interior lighting powerChristopher Drutjonsenergy_progress
08/25/2026Lighting controlsChristopher Drutjonsenergy_progress
08/25/2026FinalChristopher Drutjonsprogress
08/25/2026Energy Code Compliance InspectionsChristopher Drutjonsprogress
08/25/2026HVAC-R and service water piping design and insulationChristopher Drutjonsenergy_progress
08/25/2026HVAC-R and service water heating equipmentChristopher Drutjonsenergy_progress
08/25/2026Shutoff dampersChristopher Drutjonsenergy_progress
08/25/2026Maintenance informationChristopher Drutjonsenergy_progress
07/29/2026Lighting controlsBenjamin Plotnickenergy_progress
07/29/2026Maintenance informationBenjamin Plotnickenergy_progress
06/11/2026Interior lighting powerBenjamin Plotnickenergy_progress
06/11/2026Energy Code Compliance InspectionsBenjamin Plotnickprogress
06/11/2026Fire-Resistant Penetrations and JointsBenjamin Plotnickspecial
12/01/2025HVAC-R and service water piping design and insulationChristopher Drutjonsenergy_progress
12/01/2025Maintenance informationChristopher Drutjonsenergy_progress
12/01/2025HVAC-R and service water heating equipmentChristopher Drutjonsenergy_progress
12/01/2025HVAC-R and service water heating system controlsChristopher Drutjonsenergy_progress
12/01/2025Energy Code Compliance InspectionsChristopher Drutjonsprogress
Latest 25 of 149.
▾Tenants in the building
TenantSpaceFloorsRenovation projects
Majesty BrandsOfficeFloors 3, 4, 6, 7
Project M01406483 Alteration CO · Permit Entire · 06/24/2026
Project M01012480 Alteration · Permit Entire · 04/04/2024
LenflashOfficeFloor 6
Project M01220871 Alteration CO · Permit Entire · 05/28/2025
Project M01197562 Alteration · Permit Entire · 03/27/2025
Names are taken automatically from the text of each project’s filed documents (title blocks and cover sheets) and screened to exclude owners, landlords and designers. They may be incomplete or wrong; check the filing.
▾Documents — 471 on file (BIS + DOB NOW)
▸Plans & Drawings43
▸DOB NOWPlans/Sketch41
09/03/2026M00498232-I1Request digital key ↗
09/03/2026M00485235-I1Request digital key ↗
09/03/2026M00509325-I1Request digital key ↗
Showing 3 of 41 on file for this type
▸DOB NOWPlans/Sketch - Plumbing1
09/04/2026M00346804-I1Request digital key ↗
▸DOB NOWPlans/Sketch - Sidewalk Shed1
09/05/2026M00344411-I1Request digital key ↗
▸Applications & Permits47
▸BISPLAN / WORK APPROVAL APPLICATION26
10/16/2020140966319Open ↗
09/15/2020140945912Open ↗
06/21/2019102943665Open ↗
Showing 3 of 26 on file for this type
▸BISWORK PERMIT APPLICATION21
10/22/2020140966319Open ↗
09/16/2020140945912Open ↗
04/09/2019123678635Open ↗
Showing 3 of 21 on file for this type
▸Seals & Professional Certifications185
▸DOB NOWProgress Inspector Seal & Signature60
10/05/2026M00781311-P1Open ↗
10/05/2026M00781311-P1Open ↗
10/05/2026M00781451-P1Open ↗
Showing 3 of 60 on file for this type
▸DOB NOWDPL-1: Design Professional Seal & Signature43
09/05/2026M00344411-I1Open ↗
09/04/2026M00346804-I1Open ↗
09/03/2026M00498232-I1Open ↗
Showing 3 of 43 on file for this type
▸BISTECHNICAL REPORT: RESPONSIBILITY/CERTIFICATION28
02/20/2019123678635Open ↗
02/20/2019123678635Open ↗
02/19/2019123678635Open ↗
Showing 3 of 28 on file for this type
▸DOB NOWSpecial Inspector Seal & Signature22
10/05/2026M00781451-P1Open ↗
10/01/2026M01282750-S1Open ↗
09/23/2026M00689778-S1Open ↗
Showing 3 of 22 on file for this type
▸BISPROFESSIONAL CERTIFICATION STATEMENT13
10/16/2020140966319Open ↗
09/15/2020140945912Open ↗
02/19/2019123678635Open ↗
Showing 3 of 13 on file for this type
▸BISPROFESSIONAL CERTIFIED CHECKLIST11
02/19/2019123678635Open ↗
07/30/2018123469317Open ↗
03/30/2018123274036Open ↗
Showing 3 of 11 on file for this type
▸BISREQUIRED ITEMS CHECKLIST FOR PROFESSIONAL CERTIFICATION3
10/16/2020140966319Open ↗
09/15/2020140945912Open ↗
03/25/2015140313211Open ↗
▸BISTECHNICAL REPORT STATEMENT OF RESPONSIBILITY3
10/16/2020140966319Open ↗
09/15/2020140945912Open ↗
03/25/2015140313211Open ↗
▸BISPROFESSIONAL CERTIFICATION STATEMENT FORM2
On file, but not among the 200 most recently loaded documents for this source.
Showing 0 of 2 on file for this type
▸Trade Schedules & Equipment16
▸BISEQUIPMENT USE PERMITS6
10/21/2020123678635Open ↗
10/21/2020123678635Open ↗
11/28/2018123274045Open ↗
Showing 3 of 6 on file for this type
▸BISEQUIPMENT USE APPLICATION/PERMIT4
10/21/2020123678635Open ↗
11/28/2018123274045Open ↗
Showing 2 of 4 on file for this type
▸BISSCHEDULE B - PLUMBING/SPRINKLER/STANDPIPE4
02/19/2019123678635Open ↗
11/06/2017123274036Open ↗
06/09/2017122890210Open ↗
Showing 3 of 4 on file for this type
▸BISSCHEDULE C - HEATING & COMBUSTION EQUIPMENT2
10/04/2016122890210Open ↗
Showing 1 of 2 on file for this type
▸Safety & Tenant Protection11
▸DOB NOWStreet Tree Checklist3
08/23/2026M01220871-I1Open ↗
08/15/2026M01406483-I1Open ↗
08/13/2026M01269019-I1Open ↗
▸DOB NOWParks Department Acknowledgment Letter for Street Trees Plan3
08/15/2026M01406483-I1Open ↗
08/13/2026M01220871-I1Open ↗
Showing 2 of 3 on file for this type
▸BISTenant Protection Plan and Notes2
07/30/2018123469317Open ↗
05/15/2018123394950Open ↗
▸DOB NOWStreet Tree Sign Off1
08/15/2026M01406483-I1Open ↗
▸DOB NOWTenant Protection Plan1
09/05/2026M00344411-I1Open ↗
▸DOB NOWStreet Trees Site Plan1
08/15/2026M01406483-I1Open ↗
▸Environmental & Asbestos52
▸DOB NOWDEP ACP-5: Asbestos Assessment Report38
09/04/2026M00346804-I1Open ↗
09/02/2026M00720089-P1Open ↗
09/02/2026M00720089-I1Open ↗
Showing 3 of 38 on file for this type
▸BISASBESTOS: CERTIFICATION (DEP ACP5)13
10/16/2020140966319Open ↗
09/15/2020140945912Open ↗
02/19/2019123678635Open ↗
Showing 3 of 13 on file for this type
▸BISASBESTOS EXEMPTION CERTIFICATION LETTER1
On file, but not among the 200 most recently loaded documents for this source.
Showing 0 of 1 on file for this type
▸Energy Compliance33
▸BISTECHNICAL REPORT: ENERGY CODE PROGRESS INSPS17
02/19/2019123678635Open ↗
02/19/2019123678635Open ↗
11/29/2018123274045Open ↗
Showing 3 of 17 on file for this type
▸BISAS-BUILT ENERGY ANALYSIS6
10/13/2020123678635Open ↗
11/29/2018123274045Open ↗
11/20/2018123469317Open ↗
Showing 3 of 6 on file for this type
▸BISTECHNICAL REPORT: ENERGY CODE - RESPONSIBILITY5
10/22/2020140966319Open ↗
10/16/2020140966319Open ↗
10/13/2020123678635Open ↗
Showing 3 of 5 on file for this type
▸BISTECHNICAL REPORT STATEMENT OF RESPONSIBILITY FOR ENERGY CODE PROGRESS INSPECTIONS3
10/16/2020140966319Open ↗
09/15/2020140945912Open ↗
03/25/2015140313211Open ↗
▸DOB NOWEN2: As Built Energy Analysis2
On file, but not among the 200 most recently loaded documents for this source.
Showing 0 of 2 on file for this type
▸Inspections & Test Reports9
▸BISTECHNICAL REPORT: RESPONSIBILITY6
10/22/2020140966319Open ↗
10/16/2020140966319Open ↗
10/13/2020123678635Open ↗
Showing 3 of 6 on file for this type
▸BISTECHNICAL REPORT: CONCRETE/TEST CYLINDER2
04/02/2015140313211Open ↗
03/25/2015140313211Open ↗
▸BISTECHNICAL REPORT: CONCRETE DESIGN MIX1
04/02/2015140313211Open ↗
▸Approvals, Objections & Sign-offs13
▸BISCERTIFICATE OF OCCUPANCY/LOC: REQUEST8
10/13/2020123678635Open ↗
11/29/2018123274045Open ↗
11/20/2018123469317Open ↗
Showing 3 of 8 on file for this type
▸BISADMINISTRATIVE OBJECTIONS3
On file, but not among the 200 most recently loaded documents for this source.
Showing 0 of 3 on file for this type
▸BISLETTERS - SUPPORTING DOCUMENTATION2
12/22/2017122890210Open ↗
10/04/2017121950736Open ↗
▸Cost, Insurance & Ownership25
▸BISCOST AFFIDAVIT25
10/16/2020140966319Open ↗
09/15/2020140945912Open ↗
02/19/2019123678635Open ↗
Showing 3 of 25 on file for this type
▸Filing & Intake Forms34
▸BISEFILING COVER SHEET15
02/19/2019123678635Open ↗
02/19/2019123678635Open ↗
07/30/2018123469317Open ↗
Showing 3 of 15 on file for this type
▸BISBOROUGH INTAKE FORM9
06/21/2019102943665Open ↗
11/29/2018123274045Open ↗
11/20/2018123469317Open ↗
Showing 3 of 9 on file for this type
▸BISADDITIONAL INFORMATION7
05/06/2019123678635Open ↗
05/01/2019123678635Open ↗
03/02/2018123274045Open ↗
Showing 3 of 7 on file for this type
▸BISEFILING JOB APPLICATION COVER SHEET3
10/16/2020140966319Open ↗
09/15/2020140945912Open ↗
03/25/2015140313211Open ↗
▸Other Documents3
▸DOB NOWProperty Ownership Certification3
08/23/2026M01220871-I1Open ↗
08/15/2026M01406483-I1Open ↗
Showing 2 of 3 on file for this type