Primarily 4 family with 1 store or office
450 6 AVENUE
BROOKLYN · BIN 3022627
💬 Discuss this project
1920Year Built
3Stories
S4Building Class
R6BZoning
5,259 sfGross Floor Area
5Units
Rent Stabilized9 Open Violations 8 unresolved · 1 paperwork only ▸
Primarily 4 family with 1 store or office · Owner of record: FINAST AUTOMOTVE MANAGEMENT CO., INC. · 1,753 sf lot · 3 FAR built · Flood zone X
Locations of Work
Mechanical
Floor 12p · 1 filing · 10 docs
Cellar3p · 1 filing · 10 docs
▾Owner History (Filing Record)
Companies and organizations named on filings. Individual owners are not shown.
OwnerFilingsMost Recent
FINAST AUTOMOTIVE MANAGEMENT1607/08/2026
VERIZON WIRELESS103/21/2026
▾Design Consultants (Architect / Engineer of Record)
FirmFilingsMost Recent
C&B CONSULTING ENGINEERS LLC402/03/2026
JAMES H. FAHEY106/23/2022
▾Filing Representatives (Expediters)
RepresentativeFilingsMost Recent
S M EXPEDITING403/21/2026
CONSTRUCTION PERMIT SERVICES103/21/2026
ADG203/21/2026
▾Contractors (License-Anchored)
FirmTradeRolesMost Recent
CARL WEISSElectrical103/21/2026
TIMOTHY COLEMANElectrical103/21/2026
CEL TECH ELECTRIC INCGeneral Contractor107/08/2026
FRANCO BELLI PLMG HTG SONGeneral Contractor103/22/2026
RAMAPO COMMUNICATION CORPGeneral Contractor107/08/2026
JOHN HLAD P & H CO., INCPlumbing107/08/2026
▾Special Inspection Agencies
AgencyLicense #FilingsMost Recent
STRUCTURAL CONSULTING SER1919106/23/2022
WILLIAM MADDEN ENGINEER C4423102/11/2021
Building Lifecycle
All (79)Filed (5)Permit Issued (3)Signed Off (1)Violation (26)Objection (36)Special Inspection (8)
03/26/2026
Special inspection requirement — Fire-Resistant Penetrations and Joints
03/26/2026
Special inspection requirement — HVAC-R and service water piping design and insulation
03/18/2026
Objection resolved — Addressed
03/18/2026
Objection resolved — Addressed
03/18/2026
Objection resolved — Addressed
03/13/2026
Objection resolved — Addressed
03/13/2026
Objection resolved — Addressed
02/18/2026
Objection raised — Structural
02/18/2026
Objection raised — Structural
02/12/2026
Objection raised — Inspections
02/12/2026
Objection raised — Admin
02/03/2026
Filed — Alteration
Scope of work will include small back flow preventer with gas piping filed in conjunction Boiler application. B00457148-I1
B00453017-P1
01/23/2026
Objection resolved — Addressed
01/23/2026
Objection resolved — Addressed
01/23/2026
Objection resolved — Addressed
07/17/2025
Violation issued (ECB, closed)
Boilers
06/24/2025
Objection raised — Other
06/24/2025
Objection raised — Scope
06/24/2025
Objection raised — Cost
06/05/2025
Violation issued (HPD, closed)
A
06/04/2025
Objection raised — Other
05/23/2025
Filed — Alteration
Revised plans filed to show correct floor and correct layout for boiler . Changes could not be submitted as a PAA. Cost did not change from I1.
B00457148-S1
04/16/2025
Special inspection requirement — Tenant Protection Plan Compliance
11/26/2024
Special inspection requirement — Heating Systems
11/26/2024
Special inspection requirement — Fire-Resistant Penetrations and Joints
04/19/2024
Signed off — Alteration
Mod of existing Verizon site. Install 5 antennas, 2 RRH units & 3 distribution boxes, replace 4 RRHs, relocate 2 GPS units, remove 1 equipment cabinet and install new platform with cabinets on roof.
B00575935-I1
03/14/2024
Violation issued (ECB, closed)
Construction
11/20/2023
Violation issued (HPD, closed)
I
06/30/2023
Violation issued (DOB, closed)
V*-DOB VIOLATION - DISMISSED
06/08/2023
Permit issued — Antenna
B00575935-I1-AN
04/25/2023
Violation issued (DOB, closed)
V*-DOB VIOLATION - DISMISSED
03/20/2023
Violation issued (HPD, closed)
A
11/18/2022
Permit issued — Antenna
B00575935-I1-AN
06/29/2022
Objection raised — Inspections
06/29/2022
Objection resolved — Addressed
06/29/2022
Objection raised — Zoning
06/29/2022
Objection resolved — Addressed
06/29/2022
Objection raised — Fire_Protection
06/29/2022
Objection resolved — Addressed
06/29/2022
Objection raised — Scope
06/29/2022
Objection resolved — Addressed
06/23/2022
Filed — Alteration
Mod of existing Verizon site. Install 5 antennas, 2 RRH units & 3 distribution boxes, replace 4 RRHs, relocate 2 GPS units, remove 1 equipment cabinet and install new platform with cabinets on roof.
B00575935-I1
02/18/2022
Violation issued (HPD, closed)
A
02/18/2022
Violation issued (HPD, closed)
I
04/05/2021
Violation issued (HPD, closed)
I
04/05/2021
Violation issued (HPD, closed)
A
04/02/2021
Permit issued — Boiler Equipment
B00457148-I1-BE
02/17/2021
Objection raised — Inspections
02/17/2021
Objection resolved — Addressed
02/17/2021
Objection raised — Inspections
02/17/2021
Objection resolved — Addressed
02/17/2021
Objection raised — Admin
02/17/2021
Objection resolved — Addressed
02/17/2021
Objection raised — Admin
02/17/2021
Objection resolved — Addressed
02/17/2021
Objection raised — Fire_Protection
02/17/2021
Objection resolved — Addressed
02/17/2021
Objection raised — Scope
02/17/2021
Objection resolved — Addressed
02/11/2021
Filed — Alteration
Revised plans filed to show correct floor and correct layout for boiler . Changes could not be submitted as a PAA. Cost did not change from I1.
B00457148-I1
Latest 60 of 79 events.
Permit / Filing Register
SourceWork TypeStatusApplicantIssued
DOB NOWAntennaSigned-offCEL TECH ELECTRIC INC06/08/2023
DOB NOWAntennaSigned-offRAMAPO COMMUNICATION CORP11/18/2022
DOB NOWBoiler EquipmentPermit IssuedJOHN HLAD P & H CO., INC04/02/2021
BISOTISSUEDVERTICAL SOLUTIONS INC08/23/2017
BISEQISSUEDPERIMETER BRIDGE & SCAFFO08/04/2009
BISPLISSUEDALLOCCA MECHANICAL LP& H12/28/1992
BISSPISSUEDALLOCCA MECHANICAL LP& H12/28/1992
BISOTISSUEDSUPER LAUNDRY EQUIP. CORP.11/20/1992
1 job · most recent 02/03/2026
Water/Sanitary
FiledStatusContractorScope
02/03/2026——Water/Sanitary
1 job · most recent 12/12/2018
FiledStatusContractorScope
12/12/2018CompleteWILLDAN ELECTRICAL OF NY—
▾Special Inspection Requirements (DOB NOW) — 8
DateRequirementInspectorRole
03/26/2026Fire-Resistant Penetrations and Joints—special
03/26/2026HVAC-R and service water piping design and insulation—energy_progress
04/16/2025Tenant Protection Plan Compliance—special
11/26/2024Heating Systems—special
11/26/2024Fire-Resistant Penetrations and Joints—special
02/11/2021HVAC-R and service water heating equipmentWILLIAM MADDENenergy_progress
02/08/2021Heating SystemsWILLIAM MADDENspecial
02/08/2021Fire-Resistant Penetrations and JointsWILLIAM MADDENspecial
▾Documents — 58 on file (BIS + DOB NOW)
▸Plans & Drawings5
▸DOB NOWPlans/Sketch2
08/15/2026B00457148-S1Request digital key ↗
08/14/2026B00575935-I1Request digital key ↗
▸DOB NOWPlans/Sketch - Plumbing2
08/18/2026B00453017-I1Request digital key ↗
08/15/2026B00453017-P1Request digital key ↗
▸DOB NOWPlans/Sketch - Boiler Equipment1
08/21/2026B00457148-I1Request digital key ↗
▸Applications & Permits7
▸BISPLAN / WORK APPROVAL APPLICATION4
06/29/2017321604439Open ↗
10/06/2009320084644Open ↗
09/03/2009320059770Open ↗
Showing 3 of 4 on file for this type
▸BISWORK PERMIT APPLICATION3
08/24/2017321604439Open ↗
10/14/2009320084644Open ↗
08/04/2009320059770Open ↗
▸Seals & Professional Certifications16
▸BISTECHNICAL REPORT: RESPONSIBILITY/CERTIFICATION6
08/22/2018321604439Open ↗
08/24/2017321604439Open ↗
08/22/2017321604439Open ↗
Showing 3 of 6 on file for this type
▸DOB NOWDPL-1: Design Professional Seal & Signature5
08/29/2026B00575935-I1Open ↗
08/21/2026B00457148-I1Open ↗
08/21/2026B00457148-S1Open ↗
Showing 3 of 5 on file for this type
▸DOB NOWSpecial Inspector Seal & Signature2
08/25/2026B00457148-I1Open ↗
08/25/2026B00457148-I1Open ↗
▸BISPROFESSIONAL CERTIFIED CHECKLIST1
08/04/2009320059770Open ↗
▸BISPROFESSIONAL CERTIFICATION STATEMENT FORM1
08/04/2009320059770Open ↗
▸DOB NOWProgress Inspector Seal & Signature1
08/25/2026B00457148-I1Open ↗
▸Safety & Tenant Protection2
▸BISTenant Protection Plan and Notes1
06/29/2017321604439Open ↗
▸DOB NOWTenant Protection Plan1
08/13/2026B00457148-I1Open ↗
▸Environmental & Asbestos8
▸DOB NOWDEP ACP-5: Asbestos Assessment Report5
08/21/2026B00457148-I1Open ↗
08/18/2026B00453017-I1Open ↗
08/18/2026B00453017-P1Open ↗
Showing 3 of 5 on file for this type
▸BISASBESTOS EXEMPTION CERTIFICATION LETTER2
10/06/2009320084644Open ↗
08/04/2009320059770Open ↗
▸BISASBESTOS: CERTIFICATION (DEP ACP5)1
06/29/2017321604439Open ↗
▸Energy Compliance6
▸BISTECHNICAL REPORT: ENERGY CODE PROGRESS INSPS4
08/22/2018321604439Open ↗
08/24/2017321604439Open ↗
08/22/2017321604439Open ↗
Showing 3 of 4 on file for this type
▸BISAS-BUILT ENERGY ANALYSIS1
08/22/2018321604439Open ↗
▸DOB NOWEN2: As Built Energy Analysis.1
08/14/2026B00575935-I1Open ↗
▸Approvals, Objections & Sign-offs3
▸BISADMINISTRATIVE OBJECTIONS2
10/06/2009320084644Open ↗
08/04/2009320059770Open ↗
▸BISCERTIFICATE OF OCCUPANCY/LOC: REQUEST1
08/22/2018321604439Open ↗
▸Cost, Insurance & Ownership3
▸BISCOST AFFIDAVIT3
08/22/2017321604439Open ↗
06/29/2017321604439Open ↗
10/06/2009320084644Open ↗
▸Filing & Intake Forms8
▸BISADDITIONAL INFORMATION4
08/24/2017321604439Open ↗
08/22/2017321604439Open ↗
09/17/2009320059770Open ↗
Showing 3 of 4 on file for this type
▸BISEFILING COVER SHEET3
06/29/2017321604439Open ↗
10/06/2009320084644Open ↗
08/04/2009320059770Open ↗
▸BISBOROUGH INTAKE FORM1
04/11/2018321604439Open ↗