← Back
Condo, residential tower (mixed-use, multi-family elevator) [derived]
450 GRAND AVENUE
BROOKLYN · BIN 3429328
💬 Discuss this project
2022Year Built
7Stories
RMBuilding Class
R7AZoning
42,454 sfGross Floor Area
64Units
2 Open Violations ▸FDNY Report ↗
Condo, residential tower (mixed-use, multi-family elevator) [derived] · Owner of record: 450 GRAND AVENUE OWNER LLC · 9,000 sf lot · 4.72 FAR built · Flood zone X
Locations of Work
ArchitectureStructuralElectricalMechanicalPlumbingFire ProtectionGeneral
Permit Issued — active, not yet Signed-off
RoofUnder Construction39p · 3 filings · 20 docs
Floor 72p · 2 filings · 10 docs
Floor 6Under Construction41p · 1 filing · 20 docs
Floor 5Under Construction40p · 2 filings · 20 docs
Floor 4Under Construction38p · 1 filing · 20 docs
Floor 3Under Construction39p · 2 filings · 20 docs
Floor 2Under Construction43p · 4 filings · 20 docs
Floor 1Under Construction46p · 7 filings · 20 docs
CellarUnder Construction42p · 4 filings · 20 docs
▾Owner History (Filing Record)
Companies and organizations named on filings. Individual owners are not shown.
OwnerFilingsMost Recent
450 GRAND AVENUE OWNERS6607/08/2026
TOPLINE NYC CONTRACTING1607/08/2026
CITI BUILDERS NYC LLC3103/22/2026
CITY BUILDERS NY LLC503/22/2026
450 GRAND AVE REALTY1003/22/2026
CITI BUILDINGERS NY LLC103/22/2026
▾Design Consultants (Architect / Engineer of Record)
▾Filing Representatives (Expediters)
RepresentativeFilingsMost Recent
ADVANCED BUILDERS SERVICES1703/21/2026
CAVALRY803/21/2026
EXPEDIENT CONSULTING203/21/2026
AE DESIGN SOLUTION203/21/2026
▾Contractors (License-Anchored)
FirmTradeRolesMost Recent
CITI BUILDERS NY LLCGeneral Contractor1407/08/2026
TOPLINE NYC CONTRACTINGGeneral Contractor707/08/2026
BEST MECHANICAL SVCS INCPlumbing507/08/2026
UNIVERSAL CONSTRUCTIONGeneral Contractor207/08/2026
AMC PLBG, HTG & CLNG, INCPlumbing207/08/2026
WEN BIN CENElectrical103/21/2026
RIGHTWAY PLBG AND HTG INCFire Protection107/08/2026
XOLLE DEMO LLCGeneral Contractor107/08/2026
RICHARD NEUElectrical103/22/2026
TOMCHRIS CONTRACTING CORPGeneral Contractor107/08/2026
▾Special Inspection Agencies
AgencyLicense #FilingsMost Recent
CITY BUILDING NY ARCHITEC1394501/12/2026
SIMON7555111/03/2025
OUTSOURCE SPECIAL INSPECT2827108/09/2025
BIG APPLE GROUP NY A RMA91681409/18/2023
SYED ENGINEERING, P.C.7054205/17/2023
LEO Y LEE ASSOCIATES2481110/11/2022
Building Lifecycle
All (260)Filed (31)Permit Issued (29)Signed Off (12)Violation (60)Inspection (25)Objection (73)Special Inspection (30)
05/27/2026
Signed off — Alteration
To file PL plumbing work in conjunction with DOB Now Application job#B01312029. Replace 2 existing plumbing fixtures at existing rough-in. Propose 9 new plumbing fixtures. No change in use, egress or occupancy under this application.
B01312057-I1
04/22/2026
Inspection — Certified Water and Sanitary-WS-Fixtures-Finish
Certified
View inspection ↗
04/17/2026
Signed off — Alteration
Renovation of an existing store at the 1st floor. No change in use, egress or occupancy under this application.
B01322433-I1
03/23/2026
Inspection — Pass-Final General Construction Non-Directive 14
Pass
View inspection ↗
03/13/2026
Inspection — Certified Water and Sanitary-WS-Sanitary Piping-Roughing
Certified
View inspection ↗
02/17/2026
Inspection — Fail-Final General Construction Non-Directive 14
Fail
View inspection ↗
02/02/2026
Inspection — Certified Water and Sanitary-WS-Sanitary Piping-Roughing
Certified
View inspection ↗
01/27/2026
Special inspection requirement — Tenant Protection Plan Compliance
YING HAO LI
01/27/2026
Special inspection requirement — Fire-Resistant Penetrations and Joints
YING HAO LI
01/12/2026
Filed — Alteration
Renovation of an existing store at the 1st floor. No change in use, egress or occupancy under this application.
B01322433-P1
01/12/2026
Special inspection requirement — Insulation placement and R values
YING HAO LI
01/12/2026
Special inspection requirement — Fire-Resistance Rated Construction
YING HAO LI
01/12/2026
Special inspection requirement — Energy Code Compliance Inspections
YING HAO LI
01/12/2026
Special inspection requirement — Fire-Resistant Penetrations and Joints
YING HAO LI
01/12/2026
Special inspection requirement — Interior lighting power
YING HAO LI
01/12/2026
Special inspection requirement — Tenant Protection Plan Compliance
YING HAO LI
01/08/2026
Filed — Alteration
To file PL plumbing work in conjunction with DOB Now Application job#B01312029. Replace 2 existing plumbing fixtures at existing rough-in. Propose 9 new plumbing fixtures. No change in use, egress or occupancy under this application.
B01312057-P1
01/05/2026
Permit issued — Plumbing
B01312057-I1-PL
01/05/2026
Special inspection requirement — Energy Code Compliance Inspections
YING HAO LI
01/05/2026
Special inspection requirement — Tenant Protection Plan Compliance
01/05/2026
Special inspection requirement — Fire-Resistant Penetrations and Joints
YING HAO LI
01/05/2026
Special inspection requirement — Fire-Resistant Penetrations and Joints
YING HAO LI
01/05/2026
Special inspection requirement — Fire-Resistance Rated Construction
YING HAO LI
01/05/2026
Special inspection requirement — Insulation placement and R values
YING HAO LI
01/05/2026
Special inspection requirement — Tenant Protection Plan Compliance
01/05/2026
Special inspection requirement — Interior lighting power
YING HAO LI
12/30/2025
Permit issued — Mechanical Systems
B01312068-I1-MS
12/15/2025
Objection resolved — Addressed
12/15/2025
Special inspection requirement — Post-installed Anchors
SIMON JIANG
12/12/2025
Objection raised — Inspections
12/10/2025
Permit issued — General Construction
B01322433-I1-GC
12/03/2025
Objection resolved — Addressed
12/03/2025
Objection resolved — Addressed
11/21/2025
Filed — Alteration
Renovation of an existing store at the 1st floor. No change in use, egress or occupancy under this application.
B01322433-I1
11/21/2025
Objection resolved — Addressed
11/21/2025
Objection resolved — Addressed
11/21/2025
Objection resolved — Addressed
11/21/2025
Objection resolved — Addressed
11/21/2025
Special inspection requirement — HVAC-R and service water piping design and insulation
YING HAO LI
11/21/2025
Special inspection requirement — Fire-Resistant Penetrations and Joints
YING HAO LI
11/17/2025
Objection raised — Mechanical
11/17/2025
Objection raised — Mechanical
11/17/2025
Objection raised — Cost
11/17/2025
Objection raised — Energy
11/17/2025
Objection raised — Mechanical
11/17/2025
Objection raised — Mechanical
11/03/2025
Filed — Alteration
To file PL plumbing work in conjunction with DOB Now Application job#B01312029. Replace 2 existing plumbing fixtures at existing rough-in. Propose 9 new plumbing fixtures. No change in use, egress or occupancy under this application.
B01312057-I1
11/03/2025
Filed — Alteration
B01312029-I1
11/03/2025
Filed — Alteration
To file MS mechanical work in conjunction with DOB Now Build application job#B01312029. No change in use, egress or occupancy under this application.
B01312068-I1
10/31/2025
Special inspection requirement — Final
YING HAO LI
10/31/2025
Special inspection requirement — Mechanical Systems
YING HAO LI
09/17/2025
Violation issued (ECB, open)
Construction
08/27/2025
Permit issued — General Construction
B01263266-I1-GC
08/09/2025
Filed — Alteration
RENOVATION OF COMMERCIAL RETAIL SPACE (718 DANCE COLLECTIVE) ON 1ST FLOOR. INSTALLATION OF NON-BEARING PARTITIONS, NEW LIGHTING FINISHES AND MILLWORK. NO EXTERIOR EORK. NO CHANGE TO USE, EGRESS OR OCCUPANCY.
B01263266-I1
08/08/2025
Special inspection requirement — Lighting in dwelling units
Winter D'Angelillo
07/29/2025
Special inspection requirement — Final
Winter D'Angelillo
07/29/2025
Special inspection requirement — Tenant Protection Plan Compliance
JONAR MADRIAGA
06/06/2025
Inspection — Certified Remove/Cap - work done in accordance with code
Certified
View inspection ↗
03/28/2025
Inspection — Certified Water and Sanitary-WS-Sanitary Piping-Roughing
Certified
View inspection ↗
02/19/2025
Inspection — Certified Water and Sanitary-WS-Sanitary Piping-Roughing
Certified
View inspection ↗
Latest 60 of 260 events.
Permit / Filing Register
SourceWork TypeStatusApplicantIssued
DOB NOWPlumbingSigned-offAMC PLBG, HTG & CLNG, INC01/05/2026
DOB NOWMechanical SystemsPermit IssuedUNIVERSAL CONSTRUCTION12/30/2025
DOB NOWGeneral ConstructionSigned-offUNIVERSAL CONSTRUCTION12/10/2025
DOB NOWGeneral ConstructionSigned-offTOMCHRIS CONTRACTING CORP08/27/2025
DOB NOWGeneral ConstructionPermit IssuedCITI BUILDERS NY LLC10/12/2023
DOB NOWSidewalk ShedSigned-offTOPLINE NYC CONTRACTING10/03/2023
DOB NOWStandpipeSigned-offBEST MECHANICAL SVCS INC08/15/2023
DOB NOWPlumbingSigned-offBEST MECHANICAL SVCS INC07/19/2023
DOB NOWGeneral ConstructionPermit IssuedCITI BUILDERS NY LLC06/27/2023
DOB NOWConstruction FenceSigned-offCITI BUILDERS NY LLC04/25/2023
DOB NOWSprinklersSigned-offRIGHTWAY PLBG AND HTG INC01/24/2023
DOB NOWStandpipeSigned-offBEST MECHANICAL SVCS INC01/24/2023
DOB NOWProtection and Mechanical MethodsPermit IssuedTOPLINE NYC CONTRACTING10/25/2022
DOB NOWSidewalk ShedSigned-offTOPLINE NYC CONTRACTING10/12/2022
DOB NOWStructuralSigned-offCITI BUILDERS NY LLC09/20/2022
DOB NOWSupported ScaffoldPermit IssuedTOPLINE NYC CONTRACTING09/15/2022
DOB NOWMechanical SystemsSigned-offCITI BUILDERS NY LLC09/03/2022
DOB NOWStructuralSigned-offCITI BUILDERS NY LLC08/12/2022
DOB NOWStructuralSigned-offCITI BUILDERS NY LLC08/04/2022
DOB NOWGeneral ConstructionPermit IssuedCITI BUILDERS NY LLC07/13/2022
DOB NOWPlumbingSigned-offBEST MECHANICAL SVCS INC06/15/2022
DOB NOWStandpipeSigned-offBEST MECHANICAL SVCS INC06/15/2022
DOB NOWFoundationSigned-offCITI BUILDERS NY LLC06/10/2022
DOB NOWSupport of ExcavationSigned-offCITI BUILDERS NY LLC06/09/2022
DOB NOWFoundationPermit IssuedCITI BUILDERS NY LLC04/12/2022
DOB NOWConstruction FenceSigned-offCITI BUILDERS NY LLC04/12/2022
DOB NOWConstruction FenceSigned-offCITI BUILDERS NY LLC02/24/2022
DOB NOWConstruction FenceSigned-offXOLLE DEMO LLC10/28/2021
DOB NOWSidewalk ShedSigned-offTOPLINE NYC CONTRACTING10/20/2020
BISOTISSUEDPCCM MANAGEMENT CORP01/10/2020
1 project · most recent 11/03/2025
Ventilation Systems
FiledStatusContractorScopeMake / Model / Capacity
11/03/2025Permit IssuedUNIVERSAL CONSTRUCTIONVentilation Systems
Ventilation
Naks 10D-DBFF-600 600 CFM · Exhaust Fan ×1
1 project · most recent 09/18/2023
Sprinkler System
FiledStatusContractorScope
09/18/2023Signed-offRIGHTWAY PLBG AND HTG INCSprinkler System
1 project · most recent 09/18/2023
Gas Storm Water/Sanitary
FiledStatusContractorScope
09/18/2023Signed-offBEST MECHANICAL SVCS INCGas, Storm, Water/Sanitary
7 projects · most recent 11/24/2025
General Wiring Lighting
FiledStatusContractorScope
11/24/2025CompleteR & T ELECTRICAL CORPGeneral Wiring
03/16/2023CompleteDYNAMIC ELEC'L CONTRS INCGeneral Wiring
09/27/2022Permit IssuedSTAR ELEC'L CONTRACTORS C—
10/06/2020Permit IssuedRICHARD NEU—
02/11/2020Permit IssuedWCK ELECTRIC CORP.4 meters, 2 new_meters
10/03/2019Permit IssuedWCK ELECTRIC CORP.General Wiring
04/18/2019Permit IssuedLIPPOLIS ELECTRIC, INC.Lighting
1 project · most recent 09/18/2023
Concrete
FiledStatusContractorScope
09/18/2023Permit IssuedCITI BUILDERS NY LLCConcrete
1 project · most recent 05/17/2023
Scaffold
FiledStatusContractorScope
05/17/2023Permit IssuedTOPLINE NYC CONTRACTINGScaffold
1 project · most recent 08/09/2025
Tenant Protection Plan 72 Hour
FiledStatusContractorScope
08/09/2025Signed-offTOMCHRIS CONTRACTING CORPTenant Protection Plan 72 Hour
▾Field Inspections (DOB CAP) — 25
DateTypeResultReport
04/22/2026Certified Water and Sanitary-WS-Fixtures-FinishCertifiedView ↗
03/23/2026Pass-Final General Construction Non-Directive 14PassView ↗
03/13/2026Certified Water and Sanitary-WS-Sanitary Piping-RoughingCertifiedView ↗
02/17/2026Fail-Final General Construction Non-Directive 14FailView ↗
02/02/2026Certified Water and Sanitary-WS-Sanitary Piping-RoughingCertifiedView ↗
06/06/2025Certified Remove/Cap - work done in accordance with codeCertifiedView ↗
03/28/2025Certified Water and Sanitary-WS-Sanitary Piping-RoughingCertifiedView ↗
02/19/2025Certified Water and Sanitary-WS-Sanitary Piping-RoughingCertifiedView ↗
02/06/2025Certified Water and Sanitary-WS-Sanitary Piping-RoughingCertifiedView ↗
01/06/2025Certified Water and Sanitary-WS-Sanitary Piping-RoughingCertifiedView ↗
09/27/2024Pass-Final CND-Occupancy InspectionPassView ↗
08/22/2024Fail-Final CND-Occupancy InspectionFailView ↗
01/25/2024Pass-Final CND-Occupancy InspectionPassView ↗
11/27/2023Certified Sprinkler-SP-Fixtures-FinishCertifiedView ↗
11/20/2023Pass-Final CND-Occupancy InspectionPassView ↗
11/15/2023Certified Sprinkler (SP) - Booster Pump TestCertifiedView ↗
11/15/2023Certified Sprinkler-SP-Piping Dry/Wet-Hydrostatic TestCertifiedView ↗
08/14/2023Certified StandPipe-SD-Piping-Hydrostatic TestCertifiedView ↗
08/10/2023Certified StandPipe-SD-Fixtures-Finish-SDCertifiedView ↗
02/01/2023Certified Gas-Gas-Piping-RoughingCertifiedView ↗
02/01/2023Certified Storm Drainage-ST-Piping-RoughingCertifiedView ↗
08/30/2022Pass-Final House ConnectionPassView ↗
08/02/2022Certified Water and Sanitary-WS-Sanitary Piping-UndergroundCertifiedView ↗
07/14/2022Certified Storm Drainage-ST-Piping-UndergroundCertifiedView ↗
06/14/2022Pass-Final Fence Non-Directive 14PassView ↗
▾Special Inspection Requirements (DOB NOW) — 116
DateRequirementInspectorRole
01/27/2026Fire-Resistant Penetrations and JointsYING HAO LIspecial
01/27/2026Tenant Protection Plan ComplianceYING HAO LIspecial
01/12/2026Energy Code Compliance InspectionsYING HAO LIprogress
01/12/2026Fire-Resistant Penetrations and JointsYING HAO LIspecial
01/12/2026Tenant Protection Plan ComplianceYING HAO LIspecial
01/12/2026Insulation placement and R valuesYING HAO LIenergy_progress
01/12/2026Interior lighting powerYING HAO LIenergy_progress
01/12/2026Fire-Resistance Rated ConstructionYING HAO LIprogress
01/05/2026Tenant Protection Plan Compliance—special
01/05/2026Interior lighting powerYING HAO LIenergy_progress
01/05/2026Insulation placement and R valuesYING HAO LIenergy_progress
01/05/2026Fire-Resistance Rated ConstructionYING HAO LIprogress
01/05/2026Energy Code Compliance InspectionsYING HAO LIprogress
01/05/2026Fire-Resistant Penetrations and JointsYING HAO LIspecial
01/05/2026Tenant Protection Plan Compliance—special
01/05/2026Fire-Resistant Penetrations and JointsYING HAO LIspecial
12/15/2025Post-installed AnchorsSIMON JIANGspecial
11/21/2025HVAC-R and service water piping design and insulationYING HAO LIenergy_progress
11/21/2025Fire-Resistant Penetrations and JointsYING HAO LIspecial
10/31/2025Mechanical SystemsYING HAO LIspecial
10/31/2025FinalYING HAO LIprogress
08/08/2025Lighting in dwelling unitsWinter D'Angelilloenergy_progress
07/29/2025FinalWinter D'Angelilloprogress
07/29/2025Tenant Protection Plan ComplianceJONAR MADRIAGAspecial
11/02/2023Fenestration air leakageSoorjbally Harilallenergy_progress
Latest 25 of 116.
▾Documents — 183 on file (BIS + DOB NOW)
▸Plans & Drawings31
▸DOB NOWPlans/Sketch28
08/31/2026B00617912-I1Request digital key ↗
08/29/2026B00750779-I1Request digital key ↗
08/29/2026B00750770-I1Request digital key ↗
Showing 3 of 28 on file for this type
▸DOB NOWPlans/Sketch - Sidewalk Shed3
09/02/2026B00408725-P1Request digital key ↗
09/02/2026B00408725-I1Request digital key ↗
09/02/2026B00408725-P2Request digital key ↗
▸Applications & Permits13
▸BISPLAN / WORK APPROVAL APPLICATION11
01/14/2025340836411Open ↗
09/28/2023340836411Open ↗
07/25/2023322113592Open ↗
Showing 3 of 11 on file for this type
▸BISBPP-5 - Authorization to the Department of Transportation1
03/01/2022340836411Open ↗
▸BISWORK PERMIT APPLICATION1
01/16/2020321603822Open ↗
▸Zoning, Tax Lot & Property Records5
▸DOB NOWZD1: DOB Zoning Diagram2
08/13/2026B00580210-P3Open ↗
08/13/2026B00580210-I1Open ↗
▸DOB NOWZoning Exhibit form (1-5)2
08/13/2026B00580210-P3Open ↗
08/13/2026B00580210-I1Open ↗
▸DOB NOWHouse Number Verification: TOPO Stamp1
08/13/2026B00580210-I1Open ↗
▸Seals & Professional Certifications83
▸DOB NOWDPL-1: Design Professional Seal & Signature31
09/02/2026B00408725-P2Open ↗
09/02/2026B00408725-P1Open ↗
09/02/2026B00408725-I1Open ↗
Showing 3 of 31 on file for this type
▸DOB NOWProgress Inspector Seal & Signature24
09/23/2026B01312068-I1Open ↗
09/23/2026B01312068-I1Open ↗
09/02/2026B00580210-S6Open ↗
Showing 3 of 24 on file for this type
▸DOB NOWSpecial Inspector Seal & Signature22
09/28/2026B00750770-I1Open ↗
09/23/2026B01312068-I1Open ↗
09/23/2026B00756872-I1Open ↗
Showing 3 of 22 on file for this type
▸BISTECHNICAL REPORT: RESPONSIBILITY/CERTIFICATION3
11/12/2019321603822Open ↗
11/12/2019321603822Open ↗
04/17/2009320008451Open ↗
▸BISAPPLICANT OWNER SIGNATURE1
03/01/2022340836411Open ↗
▸BISPROFESSIONAL CERTIFIED CHECKLIST1
04/17/2009320008451Open ↗
▸BISPROFESSIONAL CERTIFICATION STATEMENT FORM1
04/17/2009320008451Open ↗
▸Trade Schedules & Equipment3
▸DOB NOWDEP: Sewer Certification (Sanitary/Storm)2
08/13/2026B00580210-P3Open ↗
08/13/2026B00580210-I1Open ↗
▸DOB NOWStandpipe Alarms Drawings1
08/14/2026B00580210-I1—
▸Safety & Tenant Protection11
▸DOB NOWTenant Protection Plan3
09/02/2026B00408725-P1Open ↗
09/02/2026B00408725-P2Open ↗
09/02/2026B00408725-I1Open ↗
▸DOB NOWStreet Tree Checklist2
08/14/2026B00580210-I1Open ↗
08/14/2026B00580210-P3Open ↗
▸BISBPP: STREET TREES SITE PLAN1
03/01/2022340836411Open ↗
▸BISSTREET TREE CHECKLIST1
10/12/2023340836411Open ↗
▸BISTenant Protection Plan and Notes1
11/12/2019321603822Open ↗
▸BISSTREET TREES: RECEIPT OF STREET TREES SITE PLAN1
10/23/2023340836411Open ↗
▸DOB NOWStreet Trees Site Plan1
08/13/2026B00580210-I1Open ↗
▸DOB NOWParks Department Acknowledgment Letter for Street Trees Plan1
08/13/2026B00580210-I1Open ↗
▸Environmental & Asbestos2
▸BISASBESTOS EXEMPTION CERTIFICATION LETTER1
04/17/2009320008451Open ↗
▸BISASBESTOS: CERTIFICATION (DEP ACP5)1
01/02/2020321603822Open ↗
▸Energy Compliance5
▸DOB NOWPreliminary Commissioning Report Certification3
08/13/2026B00580210-S4Open ↗
08/13/2026B00580210-S3Open ↗
08/13/2026B00580210-I1Open ↗
▸BISTECHNICAL REPORT: ENERGY CODE PROGRESS INSPS1
11/12/2019321603822Open ↗
▸DOB NOWEN2: As Built Energy Analysis.1
08/13/2026B00580210-I1Open ↗
▸Approvals, Objections & Sign-offs4
▸BISLETTERS - SUPPORTING DOCUMENTATION3
01/14/2025340836411Open ↗
11/22/2023340836411Open ↗
08/07/2023322113592Open ↗
▸BISADMINISTRATIVE OBJECTIONS1
04/17/2009320008451Open ↗
▸Cost, Insurance & Ownership2
▸BISCOST AFFIDAVIT2
11/12/2019321603822Open ↗
04/17/2009320008451Open ↗
▸Filing & Intake Forms8
▸BISADDITIONAL INFORMATION5
01/17/2025340836411Open ↗
11/20/2023340836411Open ↗
11/17/2023340836411Open ↗
Showing 3 of 5 on file for this type
▸BISEFILING COVER SHEET2
11/12/2019321603822Open ↗
04/17/2009320008451Open ↗
▸BISEFILING JOB APPLICATION COVER SHEET1
03/01/2022340836411Open ↗
▸Other Documents16
▸BISEXTERNAL FORMS - SUPPORTING DOCUMENTATION3
07/25/2023322113592Open ↗
07/25/2023322113592Open ↗
07/25/2023322113592Open ↗
▸DOB NOWProperty Ownership Certification3
08/29/2026B00580210-P1Open ↗
08/14/2026B00580210-I1Open ↗
08/14/2026B00580210-P3Open ↗
▸BISRECORDS MGMT FEE PAYMENT RECEIPT2
08/07/2023322113592Open ↗
03/01/2022340836411Open ↗
▸DOB NOWSite Survey: Initial2
08/13/2026B00580210-P3Open ↗
08/13/2026B00580210-I1Open ↗
▸DOB NOWLocal Law 92/94 of 2019 Sustainable Roof Zone2
08/13/2026B00580210-P3Open ↗
08/13/2026B00580210-I1Open ↗
▸BISPLOT DIAGRAM1
07/25/2023322113592Open ↗
▸BISBPP - SUPPORTING DOCUMENTATION1
03/01/2022340836411Open ↗
▸DOB NOWAdjoining Owners Notification1
08/13/2026B00750770-I1Open ↗
▸DOB NOWProject Specific General Liability (PGL1)1
08/13/2026B00580210-I1Open ↗