Office with commercial, 7-19 stories
Taystee Life Science Building
450 WEST 126 STREET · Morningside Heights · BIN 1090163
💬 Discuss this project
2019Year Built
11Stories
O6Building Class
M1-5/R7-2Zoning
260,965 sfGross Floor Area
3Units
LL97 Covered0 Open Violations
Office with commercial, 7-19 stories · Owner of record: TSTY OWNER LLC · 39,419 sf lot · 6.62 FAR built · Flood zone X
Locations of Work
StructuralMechanicalPlumbingFire ProtectionGeneral
Roof6p · 1 filing · 16 docs
Bulkhead2p · 1 filing · 16 docs
Floor 11p · 1 filing · 2 docs
Cellar1p · 1 filing · 16 docs
▾Owner History (Filing Record)
Companies and organizations named on filings. Individual owners are not shown.
OwnerFilingsMost Recent
WEST 112TH STREET2707/08/2026
LENDLEASEUSCONSTRUCTION1703/22/2026
ARSENAI SCAFFOLD INC103/22/2026
LENDLEASE9US CONSTRUCTION103/22/2026
MIKOT CONSTRUCTION103/22/2026
DORIA203/21/2026
HARLEM REALTY ESTATE103/21/2026
▾Sales History (ACRIS)
DatePriceUnitSeller → Buyer$/sf
12/20/2018$20.1M—— → —— not available
▾Design Consultants (Architect / Engineer of Record)
FirmFilingsMost Recent
LOMBARDO PROFESSIONAL ENGINEERING109/17/2025
BR+A CONSULTING ENGINEERS412/10/2024
DE NARDIS ENGINEERING, LLC211/25/2024
SEBASTIAN QUINN211/22/2024
MCLAREN111/05/2021
THE RBA GROUP102/25/2020
PATUXENT ENGINEERING LLC101/27/2020
KZ ENGINEERING, P.C310/18/2019
ANDREW FORMICHELLA104/30/2019
▾Filing Representatives (Expediters)
RepresentativeFilingsMost Recent
LOMBARDO BUILDING CONSULTANTS103/21/2026
M HASHAS2003/21/2026
HS DESIGN STUDIO203/21/2026
PATUXENT ENGINEERING203/21/2026
MUNICIPAL BUILDING CONSULTANTS103/21/2026
SYNERGY BUILDING CONSULTANTS303/21/2026
▾Contractors (License-Anchored)
FirmTradeRolesMost Recent
ARSENAL SCAFFOLD INCGeneral Contractor2207/08/2026
LENDLEASE(US)CONSTRUCTIONGeneral Contractor803/22/2026
RBA GROUPGeneral Contractor203/22/2026
NASH ELECTRIC SERVICES INElectrical103/22/2026
FSG ELECTRIC INC 004420General Contractor103/22/2026
BUNLIN LLCGeneral Contractor107/08/2026
RICKY TRIPODOElectrical103/21/2026
VALENTIS ELECTRIC, INC.Electrical103/22/2026
▾Special Inspection Agencies
AgencyLicense #FilingsMost Recent
DOMANI INSPECTION SERVICE843111/05/2021
Building Lifecycle
All (118)Filed (17)Permit Issued (19)Signed Off (7)Violation (31)Inspection (1)Objection (13)Special Inspection (30)
01/29/2026
Signed off — Alteration
Application for the installation and use of material hoist as per plans filed herein. No change in egress, use, or occupancy.
M01283379-I1
09/18/2025
Permit issued — Suspended Scaffold
M01283379-I1-SC
09/17/2025
Filed — Alteration
Application for the installation and use of material hoist as per plans filed herein. No change in egress, use, or occupancy.
M01283379-I1
05/08/2025
Special inspection requirement — Final
05/08/2025
Special inspection requirement — Fire-Resistant Penetrations and Joints
05/08/2025
Special inspection requirement — Emergency and Standby Power Systems (Generator)
05/08/2025
Special inspection requirement — Post-installed Anchors
05/08/2025
Special inspection requirement — Mechanical Systems
05/08/2025
Special inspection requirement — Exhaust and Vent Systems in Plenums and Ducts
05/08/2025
Special inspection requirement — Alternative Materials - OTCR Buildings Bulletin Number
05/08/2025
Special inspection requirement — Energy Code Compliance Inspections
05/02/2025
Objection resolved — Addressed
12/26/2024
Objection raised — Admin
12/13/2024
Special inspection requirement — Final
12/13/2024
Special inspection requirement — Post-installed Anchors
12/10/2024
Filed — Alteration
Filing for minor modification of the existing system in conjunction with the proposed mechanical rooms.
M00955447-P3
11/25/2024
Filed — Alteration
Filing for minor modification of the existing system in conjunction with the proposed mechanical rooms.
M00955447-P2
11/22/2024
Filed — Alteration
Filing for minor modification of the existing system in conjunction with the proposed mechanical rooms.
M00955447-P1
11/20/2024
Special inspection requirement — Designated Seismic System
11/19/2024
Special inspection requirement — Energy Code Compliance Inspections
11/19/2024
Special inspection requirement — Final
11/19/2024
Special inspection requirement — Fire-Resistant Penetrations and Joints
11/19/2024
Special inspection requirement — Exhaust and Vent Systems in Plenums and Ducts
11/19/2024
Special inspection requirement — Emergency and Standby Power Systems (Generator)
11/19/2024
Special inspection requirement — Alternative Materials - OTCR Buildings Bulletin Number
11/19/2024
Special inspection requirement — Post-installed Anchors
11/19/2024
Special inspection requirement — Mechanical Systems
11/09/2024
Special inspection requirement — Structural Steel - Details
11/09/2024
Special inspection requirement — Structural Steel - High Strength Bolting
11/09/2024
Special inspection requirement — Structural Steel - Welding
11/09/2024
Special inspection requirement — Final
11/09/2024
Special inspection requirement — Post-installed Anchors
11/09/2024
Special inspection requirement — Final
08/02/2024
Permit issued — Suspended Scaffold
M01086056-I1-SC
07/25/2024
Filed — Alteration
M01086056-I1
01/08/2024
Filed — Alteration
Filing for minor modification of the existing system in conjunction with the proposed mechanical rooms.
M00955447-S3
01/04/2024
Special inspection requirement — Post-installed Anchors
01/04/2024
Special inspection requirement — Fire-Resistant Penetrations and Joints
01/03/2024
Objection resolved — Addressed
01/03/2024
Objection resolved — Addressed
12/29/2023
Objection raised — Admin
12/29/2023
Objection raised — Scope
12/14/2023
Filed — Alteration
Filing for minor modification of the existing system in conjunction with the proposed mechanical rooms.
M00955447-S2
12/12/2023
Filed — Alteration
Filing for minor modification of the existing system in conjunction with the proposed mechanical rooms.
M00955447-S1
12/04/2023
Filed — Alteration
Filing for minor modification of the existing system in conjunction with the proposed mechanical rooms.
M00955447-I1
12/04/2023
Filed — Alteration
Filing for minor modification of the existing system in conjunction with the proposed mechanical rooms.
M00955447-S4
11/03/2023
Special inspection requirement — Sprinkler Systems
07/12/2023
Signed off — Alteration
Installation of temporary sidewalk shed and sidewalk shed on the roadway (Shed legs to be on the roadway) per plan submitted. Work shall comply with 2014 building codes chapter 33. No change in use, egress and/or occupancy with this application.
M00127564-I1
03/07/2023
Signed off — Alteration
M00623178-I1
02/02/2023
Permit issued — General Construction
M00623178-I1-GC-CX
01/17/2023
Signed off — Alteration
M00074301-I1
01/10/2023
Signed off — Alteration
FILING FOR CURB CUT IN CONJUNCTION WITH NB#121643043.
M00296081-I1
01/06/2023
Inspection — Pass-Final Curb Cut Non-Directive 14
Pass
View inspection ↗
10/18/2022
Signed off — Alteration
INSTALLATION OF SUPPORT SCAFFOLD IN ACCORDANCE WITH NYCC 2014 CHAPTER 33. NO CHANGE IN EGRESS, USE, OR OCCUPANCY.
M00300512-I1
04/06/2022
Violation issued (ECB, closed)
Unknown
04/06/2022
Violation issued (ECB, closed)
Construction
03/02/2022
Permit issued — Sidewalk Shed
M00127564-I1-SH
03/02/2022
Permit issued — Construction Fence
M00074301-I1-FN
02/28/2022
Violation issued (ECB, closed)
Unknown
02/28/2022
Violation issued (ECB, closed)
Unknown
Latest 60 of 118 events.
Permit / Filing Register
SourceWork TypeStatusApplicantIssued
DOB NOWSuspended ScaffoldSigned-offPALLADIUM WINDOW SOLUTION09/18/2025
DOB NOWSuspended ScaffoldPermit IssuedELM SUSPENSION SYSTEMS08/02/2024
DOB NOWGeneral ConstructionSigned-offLENDLEASE(US)CONSTRUCTION02/02/2023
DOB NOWSidewalk ShedSigned-offARSENAL SCAFFOLD INC03/02/2022
DOB NOWConstruction FenceSigned-offARSENAL SCAFFOLD INC03/02/2022
DOB NOWFoundationSigned-offLENDLEASE(US)CONSTRUCTION02/01/2022
DOB NOWCurb CutSigned-offLENDLEASE(US)CONSTRUCTION10/25/2021
DOB NOWConstruction FenceSigned-offARSENAL SCAFFOLD INC03/03/2021
DOB NOWSidewalk ShedSigned-offARSENAL SCAFFOLD INC03/03/2021
DOB NOWSupported ScaffoldSigned-offARSENAL SCAFFOLD INC03/25/2020
DOB NOWSidewalk ShedSigned-offARSENAL SCAFFOLD INC03/06/2020
DOB NOWConstruction FenceSigned-offARSENAL SCAFFOLD INC03/05/2020
DOB NOWSupported ScaffoldSigned-offARSENAL SCAFFOLD INC03/05/2020
DOB NOWSupported ScaffoldSigned-offBUNLIN LLC01/28/2020
DOB NOWSupported ScaffoldSigned-offARSENAL SCAFFOLD INC10/23/2019
DOB NOWSidewalk ShedSigned-offARSENAL SCAFFOLD INC03/11/2019
DOB NOWConstruction FenceSigned-offARSENAL SCAFFOLD INC03/11/2019
DOB NOWConstruction FenceSigned-offARSENAL SCAFFOLD INC02/06/2019
DOB NOWSidewalk ShedSigned-offARSENAL SCAFFOLD INC02/06/2019
BISEQISSUEDGREG LOGISTICS LLC11/07/2022
BISEQISSUEDLENDLEASE(US)CONSTRUCTION10/03/2022
BIS—ISSUEDLENDLEASE(US)CONSTRUCTION09/29/2022
BISPLISSUEDARCON PLBG SOLUTIONS03/01/2022
BISFSISSUEDJACK PICCINI, INC10/19/2021
BIS—ISSUEDLENDLEASE(US)CONSTRUCTION10/01/2021
BIS—ISSUEDLENDLEASE(US)CONSTRUCTION10/01/2021
BISEQISSUEDLENDLEASE(US)CONSTRUCTION10/01/2021
BISSPISSUEDKG SPRINKLER CORP08/30/2021
BISPLISSUEDARCON PLBG SOLUTIONS03/01/2021
BISEQISSUEDC & H RENTALS & LEASING,11/24/2020
BISFSISSUEDJACK PICCINI, INC10/08/2020
BISEQISSUEDDORIA, INC10/06/2020
BIS—ISSUEDLENDLEASE(US)CONSTRUCTION10/01/2020
BISEQISSUEDLENDLEASE(US)CONSTRUCTION10/01/2020
BIS—ISSUEDLENDLEASE(US)CONSTRUCTION10/01/2020
BISSDISSUEDKG SPRINKLER CORP09/30/2020
BISSPISSUEDKG SPRINKLER CORP09/23/2020
BIS—ISSUEDLENDLEASE(US)CONSTRUCTION06/26/2020
BISEQISSUEDARSENAL SCAFFOLD INC06/26/2020
BISEQISSUEDLENDLEASE(US)CONSTRUCTION06/25/2020
+ 29 more permits on file
1 project · most recent 12/10/2024
Associated Ducts and Piping Generators Heating and Air Conditioning Systems Refrigeration Systems Ventilation Systems
FiledStatusContractorScopeMake / Model / Capacity
12/10/2024——Associated Ducts and Piping, Generators, Heating and Air Conditioning Systems, Refrigeration Systems
Heat / Cool
Bard W24LB-C 2 tons · Fan Coil Indoor ×4
W72-AC0Z 6 tons · Fan Coil Indoor ×2
W72AC-C-05 6 tons · Fan Coil Indoor ×2
Refrigeration
Aermec Model# WWM0500 29 tons ×36
Generators
Kohler KG50 50 kW · Generator ×12
KG100 100 kW · Generator ×4
1 project · most recent 12/10/2024
Sprinkler System
FiledStatusContractorScope
12/10/2024——Sprinkler System
1 project · most recent 12/10/2024
Gas Water/Sanitary
FiledStatusContractorScope
12/10/2024——Gas, Water/Sanitary
9 projects · most recent 06/30/2023
General Wiring
FiledStatusContractorScope
06/30/2023CompleteFSG ELECTRIC INCGeneral Wiring
06/14/2022CompleteDIFALZO ELECTRIC NY, INCGeneral Wiring
06/14/2022CompleteDIFALZO ELECTRIC NY, INCGeneral Wiring
06/14/2022CompleteDIFALZO ELECTRIC NY, INCGeneral Wiring
12/03/2021CompleteVALENTIS ELECTRIC, INC.General Wiring
07/10/2020CompleteNASH ELECTRIC SERVICES IN—
02/04/2020CompleteNEWBRIDGE ELECTL CONTNG—
02/06/2019CompleteNASH ELECTRIC SERVICES IN—
10/18/2018CompleteFSG ELECTRIC INC1 meters, 1 new_meters
1 project · most recent 12/10/2024
Steel
FiledStatusContractorScope
12/10/2024——Steel
▾Field Inspections (DOB CAP) — 1
DateTypeResultReport
01/06/2023Pass-Final Curb Cut Non-Directive 14PassView ↗
▾Special Inspection Requirements (DOB NOW) — 30
DateRequirementInspectorRole
05/08/2025Final—progress
05/08/2025Fire-Resistant Penetrations and Joints—special
05/08/2025Emergency and Standby Power Systems (Generator)—special
05/08/2025Post-installed Anchors—special
05/08/2025Mechanical Systems—special
05/08/2025Exhaust and Vent Systems in Plenums and Ducts—special
05/08/2025Alternative Materials - OTCR Buildings Bulletin Number—special
05/08/2025Energy Code Compliance Inspections—progress
12/13/2024Final—progress
12/13/2024Post-installed Anchors—special
11/20/2024Designated Seismic System—special
11/19/2024Energy Code Compliance Inspections—progress
11/19/2024Final—progress
11/19/2024Fire-Resistant Penetrations and Joints—special
11/19/2024Exhaust and Vent Systems in Plenums and Ducts—special
11/19/2024Emergency and Standby Power Systems (Generator)—special
11/19/2024Alternative Materials - OTCR Buildings Bulletin Number—special
11/19/2024Post-installed Anchors—special
11/19/2024Mechanical Systems—special
11/09/2024Structural Steel - Details—special
11/09/2024Structural Steel - High Strength Bolting—special
11/09/2024Structural Steel - Welding—special
11/09/2024Final—progress
11/09/2024Post-installed Anchors—special
11/09/2024Final—progress
Latest 25 of 30.
▾Documents — 593 on file (BIS + DOB NOW)
▸Plans & Drawings16
▸DOB NOWPlans/Sketch11
09/05/2026M00074301-I1Request digital key ↗
08/26/2026M01086056-I1Request digital key ↗
08/25/2026M00955447-S4Request digital key ↗
Showing 3 of 11 on file for this type
▸DOB NOWPlans/Sketch - Supported Scaffold2
09/05/2026M00248658-I1Request digital key ↗
09/05/2026M00300512-I1Request digital key ↗
▸DOB NOWPlans/Sketch - Sidewalk Shed1
09/05/2026M00127564-I1Request digital key ↗
▸DOB NOWPlans/Sketch - Curb Cut1
08/15/2026M00296081-I1Request digital key ↗
▸DOB NOWPlans/Sketch - Temporary Place of Assembly1
09/05/2026M00159822-I1Request digital key ↗
▸Applications & Permits120
▸BISPLAN / WORK APPROVAL APPLICATION83
04/25/2023140795708Open ↗
02/01/2023121643043Open ↗
12/14/2022141021338Open ↗
Showing 3 of 83 on file for this type
▸BISWORK PERMIT APPLICATION37
11/07/2022141021338Open ↗
05/23/2022121643043Open ↗
05/23/2022121643043Open ↗
Showing 3 of 37 on file for this type
▸Zoning, Tax Lot & Property Records6
▸BISZONING DIAGRAM3
On file, but not among the 200 most recently loaded documents for this source.
Showing 0 of 3 on file for this type
▸BISZONING RESOLUTION DETERMINATION2
On file, but not among the 200 most recently loaded documents for this source.
Showing 0 of 2 on file for this type
▸BISCO OBJ: VERIFY ADDRESS-TOPO STAMP1
12/07/2022121643043Open ↗
▸Seals & Professional Certifications76
▸BISTECHNICAL REPORT: RESPONSIBILITY/CERTIFICATION31
On file, but not among the 200 most recently loaded documents for this source.
Showing 0 of 31 on file for this type
▸DOB NOWDPL-1: Design Professional Seal & Signature15
09/05/2026M00127564-I1Open ↗
09/05/2026M00159822-I1Open ↗
09/05/2026M00248658-I1Open ↗
Showing 3 of 15 on file for this type
▸BISPROFESSIONAL CERTIFICATION STATEMENT8
11/04/2022141021338Open ↗
11/18/2020140980972Open ↗
Showing 2 of 8 on file for this type
▸BISREQUIRED ITEMS CHECKLIST FOR PROFESSIONAL CERTIFICATION7
11/04/2022141021338Open ↗
11/18/2020140980972Open ↗
Showing 2 of 7 on file for this type
▸BISTECHNICAL REPORT STATEMENT OF RESPONSIBILITY7
11/04/2022141021338Open ↗
11/18/2020140980972Open ↗
Showing 2 of 7 on file for this type
▸BISPROFESSIONAL CERTIFICATION STATEMENT FORM3
On file, but not among the 200 most recently loaded documents for this source.
Showing 0 of 3 on file for this type
▸BISPROFESSIONAL CERTIFIED CHECKLIST3
On file, but not among the 200 most recently loaded documents for this source.
Showing 0 of 3 on file for this type
▸DOB NOWProgress Inspector Seal & Signature2
09/01/2026M00300512-I1Open ↗
08/23/2026M00248658-I1Open ↗
▸Trade Schedules & Equipment42
▸BISEQUIPMENT USE PERMITS16
10/20/2022121643043Open ↗
10/20/2022121643043Open ↗
10/20/2022121643043Open ↗
Showing 3 of 16 on file for this type
▸BISSCHEDULE B - PLUMBING10
12/10/2021121643043Open ↗
12/08/2021121643043Open ↗
09/09/2021121643043Open ↗
Showing 3 of 10 on file for this type
▸BISSCHEDULE B - PLUMBING/SPRINKLER/STANDPIPE4
On file, but not among the 200 most recently loaded documents for this source.
Showing 0 of 4 on file for this type
▸BISEQUIPMENT USE APPLICATION/PERMIT4
10/20/2022121643043Open ↗
10/20/2022121643043Open ↗
10/20/2022121643043Open ↗
Showing 3 of 4 on file for this type
▸BISSCHEDULE C - HEATING & COMBUSTION EQUIPMENT3
On file, but not among the 200 most recently loaded documents for this source.
Showing 0 of 3 on file for this type
▸BISSCHEDULE C - HEATING & COMBUSTION EQUIPMENT2
09/08/2023121643043Open ↗
12/22/2021121643043Open ↗
▸BISSTANDPIPE SYSTEMS2
03/30/2022123396627Open ↗
03/04/2022123807363Open ↗
▸BISSPRINKLER (SP) SIGNOFF1
09/08/2023121643043Open ↗
▸Safety & Tenant Protection4
▸BISSTREET TREE CHECKLIST3
On file, but not among the 200 most recently loaded documents for this source.
Showing 0 of 3 on file for this type
▸BISSTREET TREE SUPPORTING DOCUMENT1
On file, but not among the 200 most recently loaded documents for this source.
Showing 0 of 1 on file for this type
▸Environmental & Asbestos23
▸BISENVIRONMENTAL RESTRICTIONS - OER NOTICE TO PROCEED9
11/18/2020140980972Open ↗
Showing 1 of 9 on file for this type
▸DOB NOWOER: Notice to Proceed5
09/05/2026M00248658-I1Open ↗
09/05/2026M00300512-I1Open ↗
08/15/2026M00296081-I1Open ↗
Showing 3 of 5 on file for this type
▸BISENVIRONMENTAL RESTRICTIONS - OER NOTICE OF SATISFACTION4
07/12/2023122208716Open ↗
07/05/2023140960789Open ↗
06/22/2022123823942Open ↗
Showing 3 of 4 on file for this type
▸DOB NOWOER: Notice of Satisfaction3
09/05/2026M00248658-I1Open ↗
08/13/2026M00074301-I1Open ↗
08/13/2026M00623178-I1Open ↗
▸BISASBESTOS-EXEMPTION (ASB4)2
On file, but not among the 200 most recently loaded documents for this source.
Showing 0 of 2 on file for this type
▸Energy Compliance16
▸BISTECHNICAL REPORT: ENERGY CODE PROGRESS INSPS6
On file, but not among the 200 most recently loaded documents for this source.
Showing 0 of 6 on file for this type
▸BISTR8: Energy Code Progress Inspections4
On file, but not among the 200 most recently loaded documents for this source.
Showing 0 of 4 on file for this type
▸BISTECHNICAL REPORT: ENERGY CODE - RESPONSIBILITY2
05/11/2022121643043Open ↗
Showing 1 of 2 on file for this type
▸BISENERGY CODE COMPLIANCE INSPECTIONS2
07/01/2022123396627Open ↗
05/11/2022121643043Open ↗
▸BISINSULATION PLACEMENT & R VALUES1
04/01/2022121643043Open ↗
▸BISELECTRIC MOTORS1
07/20/2022121643043Open ↗
▸Inspections & Test Reports43
▸BISTECHNICAL REPORT: RESPONSIBILITY19
07/20/2022121643043Open ↗
07/20/2022121643043Open ↗
04/18/2022140980972Open ↗
Showing 3 of 19 on file for this type
▸BISTECHNICAL REPORT: CONCRETE DESIGN MIX7
On file, but not among the 200 most recently loaded documents for this source.
Showing 0 of 7 on file for this type
▸BISTECHNICAL REPORT: CONCRETE/TEST CYLINDER6
07/07/2022121643043Open ↗
07/07/2022121643043Open ↗
07/07/2022121643043Open ↗
Showing 3 of 6 on file for this type
▸BISFIRE-RESISTIVE RATED CONSTRUCTION3
04/14/2022123823942Open ↗
04/14/2022123396627Open ↗
04/14/2022121643043Open ↗
▸BISDIR-14 ID OF RESPONSIBILITY (TR1)3
11/07/2022141021338Open ↗
11/04/2022141021338Open ↗
Showing 2 of 3 on file for this type
▸BISFIRE-RESISTANT PENETRATIONS AND JOINTS (FIRESTOP)2
04/14/2022123823942Open ↗
04/14/2022121643043Open ↗
▸BISFUEL-GAS PIPING (WELDING)2
06/13/2022121643043Open ↗
03/30/2022123823942Open ↗
▸BISWALL PANELS, CURTAIN WALLS, AND VENEERS1
05/12/2022121643043Open ↗
▸Approvals, Objections & Sign-offs52
▸BISLETTERS - SUPPORTING DOCUMENTATION17
09/08/2023121643043Open ↗
Showing 1 of 17 on file for this type
▸BISCERTIFICATE OF OCCUPANCY/LOC: REQUEST10
07/06/2023140960789Open ↗
04/25/2023140795708Open ↗
01/25/2023141021338Open ↗
Showing 3 of 10 on file for this type
▸BISSCHEDULE A - OCCUPANCY / USE9
11/05/2021121643043Open ↗
11/01/2021121643043Open ↗
10/13/2021121643043Open ↗
Showing 3 of 9 on file for this type
▸BISFINAL6
07/05/2023140960789Open ↗
01/25/2023141021338Open ↗
06/01/2022123807363Open ↗
Showing 3 of 6 on file for this type
▸BISADMINISTRATIVE OBJECTIONS3
On file, but not among the 200 most recently loaded documents for this source.
Showing 0 of 3 on file for this type
▸BISSUPERSEDING LETTER3
On file, but not among the 200 most recently loaded documents for this source.
Showing 0 of 3 on file for this type
▸BISCONSTRUCTION CODE DETERMINATION2
On file, but not among the 200 most recently loaded documents for this source.
Showing 0 of 2 on file for this type
▸BISFUEL STORAGE (FS) SIGNOFF1
06/22/2022123823942Open ↗
▸BISLETTERS - APPRVD FAB CERT-INTENT1
On file, but not among the 200 most recently loaded documents for this source.
Showing 0 of 1 on file for this type
▸Cost, Insurance & Ownership18
▸BISCOST AFFIDAVIT13
11/04/2022141021338Open ↗
Showing 1 of 13 on file for this type
▸BISCOST AFFIDAVIT (FINAL): PW33
01/25/2023141021338Open ↗
07/11/2022123396627Open ↗
04/18/2022140980972Open ↗
▸BISPROJECT-SPECIFIC GL INSURANCE2
On file, but not among the 200 most recently loaded documents for this source.
Showing 0 of 2 on file for this type
▸Filing & Intake Forms97
▸BISADDITIONAL INFORMATION60
02/17/2023121643043Open ↗
12/14/2022141021338Open ↗
05/09/2022121643043Open ↗
Showing 3 of 60 on file for this type
▸BISEFILING COVER SHEET17
On file, but not among the 200 most recently loaded documents for this source.
Showing 0 of 17 on file for this type
▸BISBOROUGH INTAKE FORM12
On file, but not among the 200 most recently loaded documents for this source.
Showing 0 of 12 on file for this type
▸BISEFILING JOB APPLICATION COVER SHEET7
11/04/2022141021338Open ↗
Showing 1 of 7 on file for this type
▸DOB NOWAI1 Form1
08/13/2026M00623178-I1Open ↗
▸Other Documents20
▸BISEXTERNAL FORMS - SUPPORTING DOCUMENTATION8
04/05/2022121643043Open ↗
01/20/2021140877077Open ↗
01/20/2021140877077Open ↗
Showing 3 of 8 on file for this type
▸BIS* ENVIRONMENTAL 'E' DEP NOTICE TO PROCEED2
On file, but not among the 200 most recently loaded documents for this source.
Showing 0 of 2 on file for this type
▸BISEMERGENCY & STANDBY POWER SYSTEMS (GENERATORS)2
03/30/2022123823942Open ↗
03/30/2022121643043Open ↗
▸BISFUEL-OIL STORAGE AND FUEL-OIL PIPING SYSTEMS2
04/14/2022121643043Open ↗
03/30/2022123823942Open ↗
▸BISPlot Diagram2
On file, but not among the 200 most recently loaded documents for this source.
Showing 0 of 2 on file for this type
▸DOB NOWCalculations2
08/13/2026M01283379-I1Open ↗
08/13/2026M01086056-I1Open ↗
▸DOB NOWManufacturer's Specifications2
08/13/2026M01283379-I1Open ↗
08/13/2026M01086056-I1Open ↗