← Back
Single or multiple dwelling with stores or offices
4501 4 AVENUE
BROOKLYN · BIN 3011533
💬 Discuss this project
1909Year Built
4Stories
S9Building Class
R7AZoning
—Gross Floor Area
10Units
27 Open Violations ▸FDNY Report ↗
Single or multiple dwelling with stores or offices · 2.58 FAR built · Flood zone X
Locations of Work
ArchitecturePlumbing
Floor 13p · 1 filing · 6 docs
▾Owner History (Filing Record)
Companies and organizations named on filings. Individual owners are not shown.
OwnerFilingsMost Recent
45TH STREET HOLDINGS203/22/2026
4TH AVENUE HOLDING403/21/2026
▾Design Consultants (Architect / Engineer of Record)
FirmFilingsMost Recent
DANIEL GERDES ARCHITECT206/09/2026
▾Contractors (License-Anchored)
FirmTradeRolesMost Recent
BERWEN CONTRACTING CO.INCElectrical103/21/2026
RYAN, DENNISElectrical103/21/2026
Building Lifecycle
All (95)Filed (2)Violation (60)Objection (26)Special Inspection (7)
08/03/2026
Objection resolved — Addressed
08/03/2026
Objection resolved — Addressed
08/03/2026
Objection resolved — Addressed
08/03/2026
Objection resolved — Addressed
08/03/2026
Objection resolved — Addressed
08/03/2026
Objection resolved — Addressed
07/30/2026
Objection resolved — Addressed
07/30/2026
Objection resolved — Addressed
07/30/2026
Objection resolved — Addressed
07/30/2026
Objection resolved — Addressed
07/30/2026
Objection resolved — Addressed
07/30/2026
Objection resolved — Addressed
07/30/2026
Objection resolved — Addressed
07/30/2026
Special inspection requirement — Energy Code Compliance Inspections
07/30/2026
Special inspection requirement — Fire-Resistant Penetrations and Joints
07/17/2026
Special inspection requirement — Energy Code Compliance Inspections
06/26/2026
Objection raised — Structural
06/26/2026
Objection raised — Other
06/26/2026
Objection raised — Other
06/26/2026
Objection raised — Cost
06/26/2026
Objection raised — Other
06/26/2026
Objection raised — Other
06/26/2026
Objection raised — Other
06/25/2026
Objection raised — Other
06/25/2026
Objection raised — Other
06/25/2026
Objection raised — Other
06/25/2026
Objection raised — Other
06/25/2026
Objection raised — Other
06/25/2026
Objection raised — Other
06/22/2026
Violation issued (HPD, open)
B
06/22/2026
Violation issued (HPD, open)
C
06/22/2026
Violation issued (HPD, open)
C
06/22/2026
Violation issued (HPD, open)
C
06/13/2026
Violation issued (HPD, closed)
C
06/11/2026
Violation issued (HPD, open)
B
06/11/2026
Violation issued (HPD, open)
B
06/11/2026
Violation issued (HPD, open)
B
06/09/2026
Filed — Alteration
THIS IS A FILING TO REMOVE EXISTING NON BEARING WALL AND NEW OPENING TO AN EXISTING EATING AND DRINKING ESTABILSHMENT AS PER DRAWINGS.
B01409798-I1
06/09/2026
Filed — Alteration
THIS IS A FILING TO REMOVE EXISTING NON BEARING WALL AND NEW OPENING TO AN EXISTING EATING AND DRINKING ESTABILSHMENT AS PER DRAWINGS.
B01409798-S1
06/08/2026
Special inspection requirement — Tenant Protection Plan Compliance
06/08/2026
Special inspection requirement — Tenant Protection Plan Compliance
06/08/2026
Special inspection requirement — Fire-Resistant Penetrations and Joints
06/01/2026
Special inspection requirement — Structural Stability – Alterations of existing buildings
04/30/2026
Violation issued (HPD, closed)
A
01/14/2025
Violation issued (FDNY_ORDER, closed)
11/27/2024
Violation issued (HPD, closed)
I
11/25/2024
Violation issued (HPD, open)
C
11/25/2024
Violation issued (HPD, closed)
C
11/25/2024
Violation issued (HPD, closed)
C
08/30/2024
Violation issued (HPD, open)
C
08/30/2024
Violation issued (HPD, closed)
A
08/30/2024
Violation issued (HPD, open)
C
04/03/2024
Violation issued (HPD, closed)
A
03/17/2023
Violation issued (HPD, closed)
A
11/10/2022
Violation issued (HPD, closed)
I
08/12/2022
Violation issued (HPD, closed)
B
08/12/2022
Violation issued (HPD, open)
C
08/12/2022
Violation issued (HPD, closed)
B
07/06/2022
Violation issued (HPD, open)
C
07/06/2022
Violation issued (HPD, open)
C
Latest 60 of 95 events.
Permit / Filing Register
SourceWork TypeStatusApplicantIssued
BISFPISSUEDNY BUSINESS FIRE04/10/2007
BISPLISSUEDLI SHING LAM CORP.02/09/2007
BISOTISSUEDHOP WOR GROUP INC.01/17/2007
BISFBISSUEDJACK PICCINI, INC11/29/2004
BISMHISSUEDDORF CONSTR. CO.04/29/1994
BISFPISSUEDCITY FIRE CONTROL11/29/1991
1 project · most recent 06/09/2026
Water/Sanitary
FiledStatusContractorScope
06/09/2026——Water/Sanitary
2 projects · most recent 08/26/2026
General Wiring
FiledStatusContractorScope
08/26/2026CompleteTMF ELEC'L CONTR. INC.—
09/05/2024Permit IssuedR.C.M. ELECTRIC CORP.General Wiring
▾Special Inspection Requirements (DOB NOW) — 7
DateRequirementInspectorRole
07/30/2026Energy Code Compliance Inspections—progress
07/30/2026Fire-Resistant Penetrations and Joints—special
07/17/2026Energy Code Compliance Inspections—progress
06/08/2026Tenant Protection Plan Compliance—special
06/08/2026Tenant Protection Plan Compliance—special
06/08/2026Fire-Resistant Penetrations and Joints—special
06/01/2026Structural Stability – Alterations of existing buildings—special
▾Documents — 6 on file (BIS + DOB NOW)
▸Plans & Drawings2
▸DOB NOWPlans/Sketch2
08/15/2026B01409798-I1Request digital key ↗
08/14/2026B01409798-S1Request digital key ↗
▸Seals & Professional Certifications2
▸DOB NOWDPL-1: Design Professional Seal & Signature2
08/16/2026B01409798-S1Open ↗
08/16/2026B01409798-I1Open ↗
▸Environmental & Asbestos2
▸DOB NOWDEP ACP-5: Asbestos Assessment Report2
08/15/2026B01409798-I1Open ↗
08/14/2026B01409798-S1Open ↗