LL97 Covered0 Open ViolationsFDNY Report ↗
General warehouse · Owner of record: CDM REALTY LLC · 38,171 sf lot · 1 FAR built · Flood zone X
Locations of Work
ArchitectureMechanical
Permit Issued — active, not yet Signed-off
Roof3p · 2 filings · 20 docs
Floor 1Under Construction3p · 1 filing · 3 docs
▾Owner History (Filing Record)
Companies and organizations named on filings. Individual owners are not shown.
OwnerFilingsMost Recent
CDM REALTY2307/08/2026
▾Design Consultants (Architect / Engineer of Record)
FirmFilingsMost Recent
SYNC ARCHITECTURE P.C404/16/2026
CONCEPT DESIGN GROUP404/16/2021
▾Filing Representatives (Expediters)
RepresentativeFilingsMost Recent
CONCEPT DESIGN GROUP403/21/2026
MUNICIPAL BUILDING CONSULTANTS103/21/2026
▾Contractors (License-Anchored)
FirmTradeRolesMost Recent
AC PENGUIN PRESTIGE CORPGeneral Contractor407/08/2026
TCE PRESENTS LLCGeneral Contractor207/08/2026
CARMINE IPPOLITOElectrical103/21/2026
RONALD STEWARTElectrical103/21/2026
▾Special Inspection Agencies
AgencyLicense #FilingsMost Recent
CDG ARCHITECTS LLC /DBA:1327404/16/2021
Building Lifecycle
All (40)Filed (8)Permit Issued (4)Signed Off (3)Violation (6)Objection (2)Special Inspection (17)
04/22/2026
Permit issued — General Construction
B01386904-I1-GC
04/16/2026
Filed — Alteration
Temporary structures for TCE events at Studio B. Removed at the end of the programing. No changes to existing structures, use or egress.
B01386904-I1
04/15/2026
Objection raised — Other
04/15/2026
Objection resolved — Addressed
04/14/2026
Filed — No Work
B01386488-I1
04/14/2026
Special inspection requirement — Final
ANDY ENGLER ROTH
08/27/2025
Signed off — Alteration
Temporary structures for TCE events at Gum studios. Removed at the end of the programing. No changes to existing structures, use or egress.
B01171963-I1
02/05/2025
Permit issued — General Construction
B01171963-I1-GC
01/28/2025
Filed — Alteration
Temporary structures for TCE events at Gum studios. Removed at the end of the programing. No changes to existing structures, use or egress.
B01171963-I1
01/27/2025
Special inspection requirement — Final
ANDY ENGLER ROTH
01/17/2025
Filed — No Work
B01168458-I1
10/05/2023
Violation issued (ECB, closed)
Construction
06/10/2022
Violation issued (FDNY_NOV, closed)
06/10/2022
Violation issued (FDNY_NOV, closed)
04/19/2021
Signed off — Alteration
installation of a new HVAC split system, ductwork as per plans.
B00403636-I1
04/16/2021
Filed — Alteration
installation of a new HVAC split system, ductwork as per plans.
B00403636-P1
04/16/2021
Filed — Alteration
installation of a new HVAC split system, ductwork as per plans.
B00396946-P1
04/16/2021
Signed off — Alteration
installation of a new HVAC split system, ductwork as per plans.
B00396946-I1
04/16/2021
Special inspection requirement — HVAC and service water heating equipment
Yongho Kim
04/16/2021
Special inspection requirement — HVAC and service water heating system controls
Yongho Kim
04/16/2021
Special inspection requirement — Maintenance information
Yongho Kim
04/16/2021
Special inspection requirement — Mechanical Systems
Yongho Kim
04/16/2021
Special inspection requirement — Final
Yongho Kim
04/16/2021
Special inspection requirement — Mechanical Systems
Yongho Kim
04/16/2021
Special inspection requirement — HVAC and service water heating equipment
Yongho Kim
04/16/2021
Special inspection requirement — HVAC and service water heating system controls
Yongho Kim
04/16/2021
Special inspection requirement — Maintenance information
Yongho Kim
04/16/2021
Special inspection requirement — Final
Yongho Kim
01/13/2021
Special inspection requirement — Final
Yongho Kim
01/13/2021
Special inspection requirement — HVAC and service water heating equipment
Yongho Kim
01/13/2021
Special inspection requirement — HVAC and service water heating system controls
Yongho Kim
01/13/2021
Special inspection requirement — Maintenance information
Yongho Kim
01/13/2021
Special inspection requirement — Mechanical Systems
Yongho Kim
09/25/2020
Filed — Alteration
installation of a new HVAC split system, ductwork as per plans.
B00403636-I1
09/25/2020
Permit issued — Mechanical Systems
B00396946-I1-MS
09/25/2020
Permit issued — Mechanical Systems
B00403636-I1-MS
09/24/2020
Filed — Alteration
installation of a new HVAC split system, ductwork as per plans.
B00396946-I1
05/02/2019
Violation issued (DOB, closed)
V*-DOB VIOLATION - DISMISSED
02/17/2016
Violation issued (FDNY_NOV, closed)
10/16/2000
Violation issued (FDNY_NOV, closed)
Permit / Filing Register
SourceWork TypeStatusApplicantIssued
DOB NOWGeneral ConstructionPermit IssuedTCE PRESENTS LLC04/22/2026
DOB NOWGeneral ConstructionSigned-offTCE PRESENTS LLC02/05/2025
DOB NOWMechanical SystemsSigned-offAC PENGUIN PRESTIGE CORP09/25/2020
DOB NOWMechanical SystemsSigned-offAC PENGUIN PRESTIGE CORP09/25/2020
BISPLISSUEDWALTER J.GRANDE P & H INC02/18/2011
BISMHISSUEDP. S. COOLING CO09/01/2005
1 project · most recent 08/06/2020
General Wiring
FiledStatusContractorScope
08/06/2020Permit IssuedRONART ELECTRIC COGeneral Wiring
▾Special Inspection Requirements (DOB NOW) — 17
DateRequirementInspectorRole
04/14/2026FinalANDY ENGLER ROTHprogress
01/27/2025FinalANDY ENGLER ROTHprogress
04/16/2021HVAC and service water heating equipment Yongho Kimenergy_progress
04/16/2021HVAC and service water heating system controls Yongho Kimenergy_progress
04/16/2021Maintenance informationYongho Kimenergy_progress
04/16/2021Mechanical SystemsYongho Kimspecial
04/16/2021FinalYongho Kimprogress
04/16/2021Mechanical SystemsYongho Kimspecial
04/16/2021HVAC and service water heating equipment Yongho Kimenergy_progress
04/16/2021HVAC and service water heating system controls Yongho Kimenergy_progress
04/16/2021Maintenance informationYongho Kimenergy_progress
04/16/2021FinalYongho Kimprogress
01/13/2021FinalYongho Kimprogress
01/13/2021HVAC and service water heating equipment Yongho Kimenergy_progress
01/13/2021HVAC and service water heating system controls Yongho Kimenergy_progress
01/13/2021Maintenance informationYongho Kimenergy_progress
01/13/2021Mechanical SystemsYongho Kimspecial
▾Documents — 77 on file (BIS + DOB NOW)
▸Plans & Drawings8
▸DOB NOWPlans/Sketch - Mechanical Systems4
09/02/2026B00396946-I1Request digital key ↗
09/02/2026B00403636-I1Request digital key ↗
08/15/2026B00403636-P1Request digital key ↗
Showing 3 of 4 on file for this type
▸DOB NOWPlans/Sketch - Temporary Place of Assembly2
08/23/2026B01168458-I1Request digital key ↗
08/17/2026B01386488-I1Request digital key ↗
▸DOB NOWPlans/Sketch2
08/23/2026B01171963-I1Request digital key ↗
08/17/2026B01386904-I1Request digital key ↗
▸Applications & Permits7
▸BISPLAN / WORK APPROVAL APPLICATION4
12/30/2010320254087Open ↗
11/30/2010320244008Open ↗
08/05/2010320196328Open ↗
Showing 3 of 4 on file for this type
▸BISWORK PERMIT APPLICATION3
02/24/2011320254087Open ↗
12/03/2010320244008Open ↗
12/19/2008310230666Open ↗
▸Seals & Professional Certifications37
▸DOB NOWProgress Inspector Seal & Signature14
09/02/2026B01171963-I1Open ↗
09/02/2026B00403636-I1Open ↗
09/02/2026B00403636-I1Open ↗
Showing 3 of 14 on file for this type
▸DOB NOWDPL-1: Design Professional Seal & Signature8
08/23/2026B01168458-I1Open ↗
08/23/2026B01171963-I1Open ↗
08/17/2026B01386488-I1Open ↗
Showing 3 of 8 on file for this type
▸BISTECHNICAL REPORT: RESPONSIBILITY/CERTIFICATION6
02/28/2012320244008Open ↗
12/30/2010320254087Open ↗
11/30/2010320244008Open ↗
Showing 3 of 6 on file for this type
▸BISPROFESSIONAL CERTIFICATION STATEMENT FORM3
12/30/2010320254087Open ↗
11/30/2010320244008Open ↗
12/12/2008310230666Open ↗
▸BISPROFESSIONAL CERTIFIED CHECKLIST3
12/30/2010320254087Open ↗
11/30/2010320244008Open ↗
12/12/2008310230666Open ↗
▸DOB NOWSpecial Inspector Seal & Signature3
09/02/2026B00403636-I1Open ↗
08/23/2026B00396946-P1Open ↗
08/23/2026B00396946-I1Open ↗
▸Trade Schedules & Equipment2
▸BISSCHEDULE B - PLUMBING2
12/30/2010320254087Open ↗
08/05/2010320196328Open ↗
▸Safety & Tenant Protection2
▸BISSTREET TREE CHECKLIST2
08/05/2010320196328Open ↗
12/12/2008310230666Open ↗
▸Environmental & Asbestos3
▸BISTHIS IS 'NOT AN ASBESTOS PROJECT'2
11/30/2010320244008Open ↗
12/12/2008310230666Open ↗
▸BISASBESTOS EXEMPTION CERTIFICATION LETTER1
12/30/2010320254087Open ↗
▸Approvals, Objections & Sign-offs7
▸BISADMINISTRATIVE OBJECTIONS4
12/30/2010320254087Open ↗
11/30/2010320244008Open ↗
08/05/2010320196328Open ↗
Showing 3 of 4 on file for this type
▸BISCERTIFICATE OF OCCUPANCY/LOC: REQUEST2
02/28/2012320244008Open ↗
01/30/2009310230666Open ↗
▸BISSCHEDULE A - OCCUPANCY / USE1
08/05/2010320196328Open ↗
▸Cost, Insurance & Ownership6
▸BISCOST AFFIDAVIT6
02/28/2012320244008Open ↗
12/30/2010320254087Open ↗
11/30/2010320244008Open ↗
Showing 3 of 6 on file for this type
▸Filing & Intake Forms4
▸BISEFILING COVER SHEET4
12/30/2010320254087Open ↗
11/30/2010320244008Open ↗
08/05/2010320196328Open ↗
Showing 3 of 4 on file for this type
▸Other Documents1
▸BISPLOT DIAGRAM1
08/05/2010320196328Open ↗