← Back
Miscellaneous warehouse
4505 WHITE PLAINS ROAD
BRONX · Wakefield-Woodlawn · BIN 2129509
💬 Discuss this project
1925Year Built
2Stories
E9Building Class
R6Zoning
2,313 sfGross Floor Area
2Units
4 Open Violations ▸
Miscellaneous warehouse · Owner of record: D CHAMBERS & COMPANY LLC · 1,884 sf lot · 1.23 FAR built · Flood zone X
Locations of Work
MechanicalPlumbing
Floor 21 filing · 3 docs
Floor 11 filing · 3 docs
Cellar1p · 2 filings · 9 docs
▾Owner History (Filing Record)
Companies and organizations named on filings. Individual owners are not shown.
OwnerFilingsMost Recent
GALAXY GEN CONTRACTING1207/08/2026
▾Sales History (ACRIS)
DatePriceUnitSeller → Buyer$/sf
12/19/2019$542K—— → —$235/sf building
▾Design Consultants (Architect / Engineer of Record)
FirmFilingsMost Recent
CRICKET ARCHITECTS NJ LLC209/29/2020
▾Filing Representatives (Expediters)
RepresentativeFilingsMost Recent
NAGAN EX CONSULTANTS403/21/2026
▾Contractors (License-Anchored)
FirmTradeRolesMost Recent
AJC PLUMBING & HTG CORPPlumbing407/08/2026
▾Special Inspection Agencies
AgencyLicense #FilingsMost Recent
CERTIFIED TESTING LABORAT396102/05/2020
Building Lifecycle
All (15)Filed (2)Permit Issued (4)Signed Off (2)Violation (4)Special Inspection (3)
11/14/2025
Violation issued (DOB, open)
V-DOB VIOLATION - ACTIVE
09/23/2024
Violation issued (DOB, open)
V-DOB VIOLATION - ACTIVE
08/28/2023
Signed off — Alteration
Install new water service. Cut and cap water supply from 4503 White Plains Road (Lot 99). Register existing fixtures. All work as shownon plans
X00405851-I1
06/30/2023
Violation issued (DOB, open)
V-DOB VIOLATION - ACTIVE
04/25/2023
Violation issued (DOB, open)
V-DOB VIOLATION - ACTIVE
02/16/2023
Permit issued — Plumbing
X00405851-I1-PL
10/15/2021
Permit issued — Plumbing
X00405851-I1-PL
10/15/2020
Permit issued — Plumbing
X00405851-I1-PL
09/29/2020
Filed — Alteration
Install new water service. Cut and cap water supply from 4503 White Plains Road (Lot 99). Register existing fixtures. All work as shownon plans
X00405851-I1
06/01/2020
Signed off — Alteration
Replacement of boiler in cellar connect to existing piping and flues.
X00307784-I1
02/12/2020
Permit issued — Boiler Equipment
X00307784-I1-BE
02/05/2020
Filed — Alteration
Replacement of boiler in cellar connect to existing piping and flues.
X00307784-I1
01/31/2020
Special inspection requirement — Heating Systems
KIRT DOBBINS
01/31/2020
Special inspection requirement — HVAC and service water heating system controls
KIRT DOBBINS
01/31/2020
Special inspection requirement — HVAC and service water heating equipment
KIRT DOBBINS
Permit / Filing Register
SourceWork TypeStatusApplicantIssued
DOB NOWPlumbingSigned-offAJC PLUMBING & HTG CORP02/16/2023
DOB NOWPlumbingSigned-offAJC PLUMBING & HTG CORP10/15/2021
DOB NOWPlumbingSigned-offAJC PLUMBING & HTG CORP10/15/2020
DOB NOWBoiler EquipmentPermit IssuedAJC PLUMBING & HTG CORP02/12/2020
Nothing on file for this building.
▾Special Inspection Requirements (DOB NOW) — 3
DateRequirementInspectorRole
01/31/2020Heating SystemsKIRT DOBBINSspecial
01/31/2020HVAC and service water heating system controls KIRT DOBBINSenergy_progress
01/31/2020HVAC and service water heating equipment KIRT DOBBINSenergy_progress
▾Documents — 9 on file (BIS + DOB NOW)
▸Plans & Drawings2
▸DOB NOWPlans/Sketch - Boiler Equipment1
08/15/2026X00307784-I1Request digital key ↗
▸DOB NOWPlans/Sketch - Plumbing1
08/25/2026X00405851-I1Request digital key ↗
▸Seals & Professional Certifications5
▸DOB NOWDPL-1: Design Professional Seal & Signature2
08/26/2026X00307784-I1Open ↗
08/25/2026X00405851-I1Open ↗
▸DOB NOWProgress Inspector Seal & Signature2
09/23/2026X00307784-I1Open ↗
09/23/2026X00307784-I1Open ↗
▸DOB NOWSpecial Inspector Seal & Signature1
09/23/2026X00307784-I1Open ↗
▸Safety & Tenant Protection1
▸DOB NOWTenant Protection Plan1
08/13/2026X00307784-I1Open ↗
▸Environmental & Asbestos1
▸DOB NOWDEP ACP-5: Asbestos Assessment Report1
08/25/2026X00405851-I1Open ↗