← Back
BuildNYC
Primarily 2 family with 1 store or office
4509 5TH AVENUE
BROOKLYN · BIN 3011589
💬 Discuss this project
1934Year Built
3Stories
S2Building Class
R6AZoning
3,569 sfGross Floor Area
3Units
2 Active Violations ▸FDNY Report ↗
Primarily 2 family with 1 store or office · Owner of record: Empire 4509 · 1,503 sf lot · 2.37 FAR built · Flood zone X
Locations of Work
ArchitectureMechanicalPlumbingGeneral
Names shown beside floors are taken automatically from the text of filed documents and may be incomplete or wrong.
RoofBakery store kitchen exhaust system installation1p · 1 filing · 8 docs
Floor 1Install new gas valve and cooking equipment14p · 4 filings · 20 docs
CellarInstall new gas valve and cooking equipment13p · 3 filings · 20 docs
BasementRestroom and sink installation at 1st floor2p · 1 filing · 14 docs
▾Owner History (Filing Record)
Companies and organizations named on filings. Individual owners are not shown.
OwnerFilingsMost Recent
Ming Siu103/22/2026
▾Design Consultants (Architect / Engineer of Record)
FirmFilingsMost Recent
J&R Design and Inspection212/11/2023
Chun Feng, Architect110/10/2023
H G Lee Architect509/21/2021
▾Filing Representatives (Expediters)
RepresentativeFilingsMost Recent
High Quality 338603/21/2026
▾Contractors (License-Anchored)
FirmTradeRolesMost Recent
High Quality ConstructionGeneral Contractor403/21/2026
American Standard P&H CororpPlumbing307/08/2026
CJ Heating & MechanicalPlumbing207/08/2026
American Standard P HGeneral Contractor103/22/2026
KJK ElectricElectrical103/21/2026
Versatile RenovationsGeneral Contractor107/08/2026
Riviera ElectricElectrical103/22/2026
KJK ElectricElectrical103/21/2026
▾Special Inspection Agencies
AgencyLicense #FilingsMost Recent
NKM Engineering6244210/10/2023
HG Lee Architect2554509/21/2021
Building Lifecycle
All (61)Filed (8)Permit Issued (6)Signed Off (4)Violation (14)Inspection (4)Objection (6)Special Inspection (19)
07/26/2024
Signed off — Alteration
GENERAL RENOVATION OF MIX-USED BUILDING WITH REPAIRING PARTITION, REPAIRING EXISTING FLOOR, CEILING, NEW PARTITION AND PAINTING & MECHANICAL WORK ON CELLAR & 1ST FL, ALSO INSTALL NEW KITCHEN EXHAUST SYSTEM, HOOD AND DUCTWORK FOR BAKERY STORE AS PER PLAN.
B00940582-I1
07/25/2024
Signed off — Alteration
THE PLUMBING JOB IS FILED TO CONJUNCT WITH DOB NOW JOB# B00940582, INSTALL A NEW GAS VALVE AND COOKING EQUIPMENTS AS PER PLANS . NO CHANGE IN USE, EGRESS OR OCCUPANCY. NO CHANGE IN USE, EGRESS OR OCCUPANCY.
B00941780-I1
05/20/2024
Inspection — Certified Water and Sanitary-WS-Fixtures-Finish
Certified
View inspection ↗
12/20/2023
Inspection — Pass-Final PL - Up to 3 Requested Floors
Pass
View inspection ↗
12/12/2023
Special inspection requirement — Tenant Protection Plan Compliance
NARESH MAHANGU
12/11/2023
Filed — Alteration
THE PLUMBING JOB IS FILED TO CONJUNCT WITH DOB NOW JOB# B00940582, INSTALL A NEW GAS VALVE AND COOKING EQUIPMENTS AS PER PLANS . NO CHANGE IN USE, EGRESS OR OCCUPANCY. NO CHANGE IN USE, EGRESS OR OCCUPANCY.
B00941780-P1
11/06/2023
Inspection — Certified Gas-Gas-Piping-Roughing
Certified
View inspection ↗
11/06/2023
Inspection — Certified Water and Sanitary-WS-Sanitary Piping-Roughing
Certified
View inspection ↗
10/16/2023
Permit issued — Plumbing
B00941780-I1-PL
10/13/2023
Permit issued — Mechanical Systems
B00940582-I1-MS
10/13/2023
Permit issued — General Construction
B00940582-I1-GC
10/10/2023
Filed — Alteration
GENERAL RENOVATION OF MIX-USED BUILDING WITH REPAIRING PARTITION, REPAIRING EXISTING FLOOR, CEILING, NEW PARTITION AND PAINTING & MECHANICAL WORK ON CELLAR & 1ST FL, ALSO INSTALL NEW KITCHEN EXHAUST SYSTEM, HOOD AND DUCTWORK FOR BAKERY STORE AS PER PLAN.
B00940582-I1
10/10/2023
Filed — Alteration
THE PLUMBING JOB IS FILED TO CONJUNCT WITH DOB NOW JOB# B00940582, INSTALL A NEW GAS VALVE AND COOKING EQUIPMENTS AS PER PLANS . NO CHANGE IN USE, EGRESS OR OCCUPANCY. NO CHANGE IN USE, EGRESS OR OCCUPANCY.
B00941780-I1
10/06/2023
Special inspection requirement — Fenestration areas
Chun Feng
10/06/2023
Special inspection requirement — Fenestration air leakage
Chun Feng
10/06/2023
Special inspection requirement — Insulation placement and R values
Chun Feng
10/06/2023
Special inspection requirement — Fenestration and door U-factor and product ratings
Chun Feng
10/06/2023
Special inspection requirement — Tenant Protection Plan Compliance
NARESH MAHANGU
10/06/2023
Special inspection requirement — Energy Code Compliance Inspections
Chun Feng
10/06/2023
Special inspection requirement — Fire-Resistance Rated Construction
Chun Feng
09/29/2023
Special inspection requirement — Fire-Resistant Penetrations and Joints
NARESH MAHANGU
09/27/2023
Special inspection requirement — Final
Chun Feng
09/27/2023
Special inspection requirement — Mechanical Systems
NARESH MAHANGU
06/30/2023
Violation issued (DOB, closed)
V*-DOB VIOLATION - DISMISSED
06/20/2023
Violation issued (DOB, closed)
V*-DOB VIOLATION - DISMISSED
06/20/2023
Violation issued (DOB, closed)
V*-DOB VIOLATION - DISMISSED
04/25/2022
Signed off — Alteration
NO CHANGE IN USE, EGRESS OR OCCUPANCY. NEW HVAC AIR CONDITIONER ON EACH DOCTOR'S OFFICE ON THE FIRST FLOOR
B00370112-I1
03/10/2022
Signed off — Alteration
PROPOSED ONE NEW 2-PC RESTROOM AND 5 LAV. SINKS AT 1ST FLOOR; NO CHANGE OF USE, EGRESS, OR OCCUPANCY. PLEASE SEE COMMENTS.
B00370131-I1
01/10/2022
Special inspection requirement — Final
He Gin Lee
01/10/2022
Special inspection requirement — Mechanical Systems
He Gin Lee
01/07/2022
Objection raised — Other
01/07/2022
Objection resolved — Addressed
01/04/2022
Objection resolved — Addressed
12/20/2021
Objection resolved — Addressed
09/27/2021
Objection raised — Other
09/27/2021
Objection raised — Other
09/21/2021
Filed — Alteration
NO CHANGE IN USE, EGRESS OR OCCUPANCY. NEW HVAC AIR CONDITIONER ON EACH DOCTOR'S OFFICE ON THE FIRST FLOOR
B00370112-P1
09/21/2021
Filed — Alteration
PROPOSED ONE NEW 2-PC RESTROOM AND 5 LAV. SINKS AT 1ST FLOOR; NO CHANGE OF USE, EGRESS, OR OCCUPANCY. PLEASE SEE COMMENTS.
B00370131-P2
09/21/2021
Special inspection requirement — Fire-Resistant Penetrations and Joints
He Gin Lee
09/21/2021
Special inspection requirement — Energy Code Compliance Inspections
He Gin Lee
09/16/2021
Special inspection requirement — Fire-Resistant Penetrations and Joints
He Gin Lee
09/16/2021
Special inspection requirement — Energy Code Compliance Inspections
He Gin Lee
09/16/2021
Special inspection requirement — Mechanical Systems
He Gin Lee
09/16/2021
Special inspection requirement — Final
He Gin Lee
09/02/2021
Permit issued — Mechanical Systems
B00370112-I1-MS
06/17/2021
Permit issued — Plumbing
B00370131-I1-PL
02/17/2021
Permit issued — Plumbing
B00370131-I1-PL
01/28/2021
Filed — Alteration
PROPOSED ONE NEW 2-PC RESTROOM AND 5 LAV. SINKS AT 1ST FLOOR; NO CHANGE OF USE, EGRESS, OR OCCUPANCY. PLEASE SEE COMMENTS.
B00370131-P1
07/16/2020
Filed — Alteration
NO CHANGE IN USE, EGRESS OR OCCUPANCY. NEW HVAC AIR CONDITIONER ON EACH DOCTOR'S OFFICE ON THE FIRST FLOOR
B00370112-I1
07/16/2020
Filed — Alteration
PROPOSED ONE NEW 2-PC RESTROOM AND 5 LAV. SINKS AT 1ST FLOOR; NO CHANGE OF USE, EGRESS, OR OCCUPANCY. PLEASE SEE COMMENTS.
B00370131-I1
11/22/2019
Violation issued (DOB, closed)
V*-DOB VIOLATION - DISMISSED
11/22/2019
Violation issued (DOB, closed)
V*-DOB VIOLATION - DISMISSED
11/08/2019
Violation issued (DOB, closed)
V*-DOB VIOLATION - DISMISSED
09/22/2019
Violation issued (DOB, closed)
V*-DOB VIOLATION - DISMISSED
09/22/2019
Violation issued (DOB, closed)
V*-DOB VIOLATION - DISMISSED
04/11/2019
Violation issued (DOB, closed)
V*-DOB VIOLATION - DISMISSED
01/01/2009
Violation issued (DOB, closed)
V*-DOB VIOLATION - DISMISSED
09/16/2005
Violation issued (HPD, open)
A
09/16/2005
Violation issued (HPD, open)
C
02/07/2000
Violation issued (DOB, closed)
V*-DOB VIOLATION - DISMISSED
Latest 60 of 61 events.
Permit / Filing Register
SourceWork TypeStatusApplicantIssued
DOB NOWPlumbingSigned-offAmerican Standard P&H Cororp10/16/2023
DOB NOWMechanical SystemsSigned-offHigh Quality Construction10/13/2023
DOB NOWGeneral ConstructionSigned-offHigh Quality Construction10/13/2023
DOB NOWMechanical SystemsSigned-offVersatile Renovations09/02/2021
DOB NOWPlumbingSigned-offCJ Heating & Mechanical06/17/2021
DOB NOWPlumbingSigned-offCJ Heating & Mechanical02/17/2021
BIS—ISSUEDVersatile Renovations11/01/2021
BIS—ISSUEDVersatile Renovations03/31/2021
BISOTISSUEDVersatile Renovations02/05/2021
BISPLISSUEDCJ Heating & Mechanical08/27/2020
BIS—ISSUEDVersatile Renovations07/29/2020
BISPLISSUEDL&J PLG & Heating Co of NY03/03/2020
BIS—ISSUEDFlawless Edge Home Impro10/02/2019
BISEQISSUEDFlawless Edge Home Impro10/02/2019
BISPLISSUEDL&J PLG & Heating Co of NY08/24/2018
BISEQISSUEDFlawless Edge Home Impro08/01/2018
BIS—ISSUEDFlawless Edge Home Impro08/01/2018
3 projects · most recent 11/03/2023
General Wiring
FiledStatusContractorScope
11/03/2023CompleteKJK ElectricGeneral Wiring
11/25/2020CompleteRiviera ElectricGeneral Wiring
06/08/2020CompleteRiviera ElectricGeneral Wiring
▾Field Inspections (DOB CAP) — 4
DateTypeResultReport
05/20/2024Certified Water and Sanitary-WS-Fixtures-FinishCertifiedView ↗
12/20/2023Pass-Final PL - Up to 3 Requested FloorsPassView ↗
11/06/2023Certified Gas-Gas-Piping-RoughingCertifiedView ↗
11/06/2023Certified Water and Sanitary-WS-Sanitary Piping-RoughingCertifiedView ↗
▾Special Inspection Requirements (DOB NOW) — 19
DateRequirementInspectorRole
12/12/2023Tenant Protection Plan ComplianceNARESH MAHANGUspecial
10/06/2023Fenestration areasChun Fengenergy_progress
10/06/2023Fenestration air leakageChun Fengenergy_progress
10/06/2023Insulation placement and R valuesChun Fengenergy_progress
10/06/2023Fenestration and door U-factor and product ratingsChun Fengenergy_progress
10/06/2023Tenant Protection Plan ComplianceNARESH MAHANGUspecial
10/06/2023Energy Code Compliance InspectionsChun Fengprogress
10/06/2023Fire-Resistance Rated ConstructionChun Fengprogress
09/29/2023Fire-Resistant Penetrations and JointsNARESH MAHANGUspecial
09/27/2023FinalChun Fengprogress
09/27/2023Mechanical SystemsNARESH MAHANGUspecial
01/10/2022FinalHe Gin Leeprogress
01/10/2022Mechanical SystemsHe Gin Leespecial
09/21/2021Fire-Resistant Penetrations and JointsHe Gin Leespecial
09/21/2021Energy Code Compliance InspectionsHe Gin Leeprogress
09/16/2021Fire-Resistant Penetrations and JointsHe Gin Leespecial
09/16/2021Energy Code Compliance InspectionsHe Gin Leeprogress
09/16/2021Mechanical SystemsHe Gin Leespecial
09/16/2021FinalHe Gin Leeprogress
▾Documents — 131 on file (BIS + DOB NOW)
▸Plans & Drawings8
▸DOB NOWPlans/Sketch3
08/26/2026B00940582-I1Request digital key ↗
08/26/2026B00941780-P1Request digital key ↗
08/26/2026B00941780-I1Request digital key ↗
▸DOB NOWPlans/Sketch - Plumbing3
09/01/2026B00370131-I1Request digital key ↗
08/15/2026B00370131-P1Request digital key ↗
08/15/2026B00370131-P2Request digital key ↗
▸DOB NOWPlans/Sketch - Mechanical Systems2
09/02/2026B00370112-I1Request digital key ↗
08/15/2026B00370112-P1Request digital key ↗
▸Applications & Permits22
▸BISPLAN / WORK APPROVAL APPLICATION12
05/16/2022321193114Open ↗
01/14/2022340744797Open ↗
12/08/2021340744797Open ↗
Showing 3 of 12 on file for this type
▸BISWORK PERMIT APPLICATION9
02/05/2021340744797Open ↗
10/28/2020321193114Open ↗
08/10/2020321193114Open ↗
Showing 3 of 9 on file for this type
▸BISCERTIFICATE OF OCCUPANCY: APPLICATION1
12/29/2020321193114Open ↗
▸Zoning, Tax Lot & Property Records6
▸BISZONING EXHIBIT III:DESC. & OWNRSHP.STMNT1
10/13/2017321193114Open ↗
▸BISVERIFY TAX LOT1
08/29/2022321193114Open ↗
▸BISADDRESS: NEW HOUSE NUMBER APPROVED1
10/13/2017321193114Open ↗
▸BISCO OBJ: VERIFY ADDRESS-TOPO STAMP1
06/21/2022321193114Open ↗
▸BISZONING DIAGRAM1
10/13/2017321193114Open ↗
▸BISZONING EXHIBIT I: CERTIFICATION1
10/13/2017321193114Open ↗
▸Seals & Professional Certifications23
▸DOB NOWDPL-1: Design Professional Seal & Signature8
08/26/2026B00940582-I1Open ↗
08/26/2026B00941780-I1Open ↗
08/13/2026B00370131-P2Open ↗
Showing 3 of 8 on file for this type
▸DOB NOWSpecial Inspector Seal & Signature8
09/01/2026B00370112-I1Open ↗
08/27/2026B00370112-P1Open ↗
08/27/2026B00370131-P2Open ↗
Showing 3 of 8 on file for this type
▸DOB NOWProgress Inspector Seal & Signature6
09/01/2026B00370112-I1Open ↗
08/27/2026B00370112-P1Open ↗
08/27/2026B00370131-P2Open ↗
Showing 3 of 6 on file for this type
▸BISAPPLICANT OWNER SIGNATURE1
09/22/2020340744797Open ↗
▸Trade Schedules & Equipment2
▸BISSCHEDULE B - PLUMBING2
07/15/2020321193114Open ↗
08/20/2019321193114Open ↗
▸Safety & Tenant Protection9
▸DOB NOWTenant Protection Plan5
08/13/2026B00370131-P2Open ↗
08/13/2026B00370112-P1Open ↗
08/13/2026B00370131-I1Open ↗
Showing 3 of 5 on file for this type
▸BISSTREET TREE CHECKLIST2
08/20/2019321193114Open ↗
12/05/2017321193114Open ↗
▸BISSTREET TREE SIGNOFF1
07/14/2021321193114Open ↗
▸BISTenant Protection Plan and Notes1
09/22/2020340744797Open ↗
▸Environmental & Asbestos5
▸DOB NOWDEP ACP-5: Asbestos Assessment Report3
08/26/2026B00940582-I1Open ↗
08/26/2026B00941780-I1Open ↗
08/13/2026B00941780-P1Open ↗
▸BISASBESTOS: CERTIFICATION (DEP ACP5)1
03/14/2018321193114Open ↗
▸BISASBESTOS: COMPLETION OR CLOSEOUT (ACP20/21/5)1
09/22/2020340744797Open ↗
▸Energy Compliance9
▸BISTECHNICAL REPORT: ENERGY CODE - RESPONSIBILITY5
07/14/2021321193114Open ↗
02/03/2021340744797Open ↗
08/20/2019321193114Open ↗
Showing 3 of 5 on file for this type
▸BISENERGY CODE COMPLIANCE INSPECTIONS2
05/02/2022321193114Open ↗
02/07/2022340744797Open ↗
▸BISAS-BUILT ENERGY ANALYSIS (EN2)2
02/07/2022340744797Open ↗
07/14/2021321193114Open ↗
▸Inspections & Test Reports20
▸BISTECHNICAL REPORT: RESPONSIBILITY7
03/04/2022340744797Open ↗
02/03/2021340744797Open ↗
08/20/2019321193114Open ↗
Showing 3 of 7 on file for this type
▸BISMECHANICAL SYSTEMS2
05/02/2022321193114Open ↗
02/07/2022340744797Open ↗
▸BISFIRE-RESISTIVE RATED CONSTRUCTION2
05/02/2022321193114Open ↗
02/07/2022340744797Open ↗
▸BISFIRE-RESISTANT PENETRATIONS AND JOINTS (FIRESTOP)1
05/02/2022321193114Open ↗
▸BISFOOTING AND FOUNDATION INSPECTION1
05/02/2022321193114Open ↗
▸BISMASONRY1
05/02/2022321193114Open ↗
▸BISSOIL REPORT1
10/13/2017321193114Open ↗
▸BISTECHNICAL REPORT: CONCRETE/TEST CYLINDER1
03/30/2018321193114Open ↗
▸BISTECHNICAL REPORT: SOIL INSPECTION1
10/13/2017321193114Open ↗
▸BISTECHNICAL REPORT: CONCRETE DESIGN MIX1
03/30/2018321193114Open ↗
▸BISCONCRETE - CAST-IN-PLACE1
05/02/2022321193114Open ↗
▸BISTR2: CONCRETE FIELD TESTING TECHNICAL REPORT1
08/03/2022321193114Open ↗
▸Approvals, Objections & Sign-offs5
▸BISSCHEDULE A - OCCUPANCY / USE2
08/20/2019321193114Open ↗
11/28/2017321193114Open ↗
▸BISCERTIFICATE OF OCCUPANCY/LOC: REQUEST1
03/08/2022340744797Open ↗
▸BISLETTERS - SUPPORTING DOCUMENTATION1
10/13/2017321193114Open ↗
▸BISSUPERSEDING LETTER1
10/28/2020321193114Open ↗
▸Cost, Insurance & Ownership5
▸BISCOST AFFIDAVIT3
09/22/2020340744797Open ↗
08/20/2019321193114Open ↗
12/05/2017321193114Open ↗
▸BISCOST AFFIDAVIT (FINAL): PW32
06/21/2022321193114Open ↗
02/22/2022340744797Open ↗
▸Filing & Intake Forms14
▸BISADDITIONAL INFORMATION12
08/29/2022321193114Open ↗
01/25/2022340744797Open ↗
12/14/2021340744797Open ↗
Showing 3 of 12 on file for this type
▸BISEFILING JOB APPLICATION COVER SHEET1
02/03/2021340744797Open ↗
▸BISBOROUGH INTAKE FORM1
05/07/2019321193114Open ↗
▸Other Documents3
▸BISSupporting Document: Fee Exempt2
03/07/2022340744797Open ↗
03/04/2022340744797Open ↗
▸BISPLOT DIAGRAM1
10/13/2017321193114Open ↗