| Owner | Filings | Most Recent |
|---|---|---|
| 19 BARBEY | 19 | 07/08/2026 |
| Date | Price | Unit | Seller → Buyer | $/sf |
|---|---|---|---|---|
| 05/15/2025 | $978K | — | — → — | $439/sf building |
| 05/14/2024 | $100K | — | SUITE III LLC → 451 BEACH 46 STREET LLC | $45/sf building |
| 07/26/2018 | $16K | — | Private party → SUITE III, LLC | — not available |
| Firm | Filings | Most Recent |
|---|---|---|
| CL ENGINEERING P.C. | 5 | 01/23/2025 |
| Representative | Filings | Most Recent |
|---|---|---|
| METRO DESIGN CONSULTANTS INC | 10 | 03/21/2026 |
| Firm | Trade | Roles | Most Recent |
|---|---|---|---|
| RISHON HOMES CORP | General Contractor | 7 | 07/08/2026 |
| INFINITI ESC PLUMBING COR | Plumbing | 1 | 07/08/2026 |
| Agency | License # | Filings | Most Recent |
|---|---|---|---|
| CL ENGINEERING P.C. | 6781 | 3 | 01/23/2025 |
| TRIANGLE INSPECTION & TES | 7495 | 1 | 05/29/2024 |
| Source | Work Type | Status | Applicant | Issued |
|---|---|---|---|---|
| DOB NOW | Curb Cut | Signed-off | RISHON HOMES CORP | 12/19/2024 |
| DOB NOW | Plumbing | Signed-off | INFINITI ESC PLUMBING COR | 10/21/2024 |
| DOB NOW | Construction Fence | Signed-off | RISHON HOMES CORP | 08/22/2024 |
| DOB NOW | Mechanical Systems | Signed-off | RISHON HOMES CORP | 08/21/2024 |
| DOB NOW | Foundation | Permit Issued | RISHON HOMES CORP | 08/21/2024 |
| Filed | Status | Contractor | Scope | Make / Model / Capacity |
|---|---|---|---|---|
| 01/23/2025 | Signed-off | RISHON HOMES CORP | Heating and Air Conditioning Systems, Ventilation Systems | Heat / Cool Gree 4LIV18HP230V1A0 18,000 BTU · Condensing Unit ×4 MULTI24HP230VIE0 24,000 BTU · Condensing Unit ×2 MULTI30HP230VIE0 30,000 BTU · Condensing Unit ×2 Ventilation Hampton Bay 7114-01 50 CFM · Exhaust Fan ×6 Delta Breeze SMT150 150 CFM · Exhaust Fan ×4 |
| Filed | Status | Contractor | Scope |
|---|---|---|---|
| 01/23/2025 | — | — | Sprinkler System |
| Filed | Status | Contractor | Scope |
|---|---|---|---|
| 01/23/2025 | Signed-off | INFINITI ESC PLUMBING COR | Plumbing-Sprinkler, Storm, Water/Sanitary |
| Filed | Status | Contractor | Scope |
|---|---|---|---|
| 10/17/2024 | Complete | POWER SURGE ELECTRIC, INC | General Wiring |
| Filed | Status | Contractor | Scope |
|---|---|---|---|
| 01/23/2025 | Signed-off | RISHON HOMES CORP | Steel, Wood |
| Filed | Status | Contractor | Scope |
|---|---|---|---|
| 01/23/2025 | Signed-off | RISHON HOMES CORP | Earthwork |
| Date | Type | Result | Report |
|---|---|---|---|
| 01/15/2025 | Pass-Final Curb Cut Non-Directive 14 | Pass | View ↗ |
| 01/13/2025 | Pass-Final CND-Occupancy Inspection | Pass | View ↗ |
| 01/09/2025 | Fail-Final Curb Cut Non-Directive 14 | Fail | View ↗ |
| 10/28/2024 | Certified Gas-Gas-Piping-Roughing | Certified | View ↗ |
| 10/28/2024 | Certified Storm Drainage-ST-Piping-Roughing | Certified | View ↗ |
| 10/28/2024 | Certified Storm Drainage-ST-Piping-Underground | Certified | View ↗ |
| 10/28/2024 | Certified Water and Sanitary-WS-Sanitary Piping-Roughing | Certified | View ↗ |
| 10/28/2024 | Certified Water and Sanitary-WS-Sanitary Piping-Underground | Certified | View ↗ |
| Date | Requirement | Inspector | Role |
|---|---|---|---|
| 02/25/2025 | Permanent certificate | CHRISTIAN LOZADA | energy_progress |
| 02/25/2025 | Concrete - Cast-In-Place | CHRISTIAN LOZADA | special |
| 02/25/2025 | Mechanical Systems | CHRISTIAN LOZADA | special |
| 02/25/2025 | Structural Steel - Details | CHRISTIAN LOZADA | special |
| 02/25/2025 | Subgrade Inspections | CHRISTIAN LOZADA | special |
| 02/25/2025 | Heating Systems | CHRISTIAN LOZADA | special |
| 02/25/2025 | Excavations - Sheeting, Shoring, and Bracing | CHRISTIAN LOZADA | special |
| 02/25/2025 | Subsurface Investigations (Borings/Test Pits) | Rajasekhar Sakhamuri | special |
| 02/25/2025 | Private On-Site Storm Water Disposal Systems-, and Detention Facilities, Installation | CHRISTIAN LOZADA | special |
| 02/25/2025 | Helical Piles Foundation (BB # 2014-020) | MICHAEL KARANTINIDIS, P.E. | special |
| 02/25/2025 | Masonry | CHRISTIAN LOZADA | special |
| 02/25/2025 | Structural Cold-Formed Steel | CHRISTIAN LOZADA | special |
| 02/25/2025 | Fire-Resistant Penetrations and Joints | CHRISTIAN LOZADA | special |
| 02/25/2025 | Structural Steel - High Strength Bolting | CHRISTIAN LOZADA | special |
| 02/25/2025 | Flood Zone Compliance (attach FEMA elevation/dry floodproofing certificate where applicable) | CHRISTIAN LOZADA | special |
| 02/25/2025 | Lowest Floor Elevation | CHRISTIAN LOZADA | progress |
| 02/25/2025 | Final | PETER CHO | progress |
| 02/25/2025 | Footing and Foundation | CHRISTIAN LOZADA | progress |
| 02/25/2025 | Fire-Resistance Rated Construction | CHRISTIAN LOZADA | progress |
| 02/25/2025 | Energy Code Compliance Inspections | CHRISTIAN LOZADA | progress |
| 02/25/2025 | Structural Wood Frame | CHRISTIAN LOZADA | progress |
| 02/25/2025 | Electric vehicle service equipment requirements | CHRISTIAN LOZADA | energy_progress |
| 02/25/2025 | HVAC-R and service water heating system controls | CHRISTIAN LOZADA | energy_progress |
| 02/25/2025 | Interior lighting power | CHRISTIAN LOZADA | energy_progress |
| 02/25/2025 | HVAC-R and service water heating equipment | CHRISTIAN LOZADA | energy_progress |