DOB05/29/2024FAILURE TO CERTIFY CORRECTION ON IMMEDIATELY HAZARDOUS (CLASS 1) ECB VIOLATION
DOB04/17/2024FAILURE TO CERTIFY CORRECTION ON IMMEDIATELY HAZARDOUS (CLASS 1) ECB VIOLATION
ECB02/22/2024TEMPORARY FENCES AT EXPOSURE ONE, PERMIT M08016870-I1-FN, EXPIRED 10/12/2023. RESPONDENT FAILED TO COMPLY WITH CODE AND DIDN'T RENEW PERMIT. CONTRARY WITH 28-105.2 CLASSIFICATION SECTION 8 TEMPORARY CONSTRUCTIO$6K due
DOB02/08/2024REMEDY: INSTALL FENCE ALONG FULL WIDTH OF 451 CONVENT AVE. EXPOSURE 1 (16 FEET) AND EXTEND 5 FEET AT SIDEWALK IN FRONT OF ADJACENT 449 CONVE NT AVE VACNT LOT. RETURN FENCE TIGHT TO 451 CONVENT AVE EXP 1/2 BLDG AND TO EXISTING CHAIN LINK FENCE AT 449 CONVENT AVE. COORDINATE EXIST ING FENCE REMOVAL WITH PREVIOS PERMIT HOLDER. EXISTING SWS SHALL REMAI
DOB02/06/2024EMERGENCY WORK ORDER.EXP1 CORNICE@ROOF PARTIALLY DETACHED&@RISK OF CLLPSE.EXISTNG FENCE ALONG FULL WIDTH OF EXP1&FULL DEPTH OF SIDEWALK W/SIDEWALK SHED,&SCAFFOLD ERECTED@EXP1.HANGING PLATFMR CNNCTED.PRMT HLDR TO IMMED EITHER 1.RENEW PRMTS&MAKE SITE SAFE BY REINSTATNG SCAFFLD STRCT SPPRTS&REMAINING CORNICE UNDR NYSPE
ECB02/05/2024WORK WITHOUT A PERMIT. NOTED: DEMOLITION AT ROOF. REMOVAL OF ENTIRE ROOF LEAVING OPEN TO ELEMENTS. 4TH FLOOR CEILING APPROX. 60 % REMOVED AND OPEN TO ELEMENTS., OBTAIN PERMIT$12K due
ECB02/05/2024FAILURE TO COMPLY WITH COMMISSIONER'S ORDER. PREMISES HAS FULL VACATE ORDER M95/2013P FOR STRUCTURE NON COMPLIANT DUE TO PARTIAL COLLAPSE OF THE 2ND AND 3RD FLOOR AS A RESULT FROM WATER ENTERING BUILDING AT ROO$24K due
ECB01/22/2024FAILURE TO COMPLY WITH THE COMMISSIONER'S ORDER IN DOB VIOLATION VIO22-01262,DATED 4/28/2022.RESPONDENT WAS REQUIRED TO SUBMIT AN ENGINEER'SREPORT CONCERNING STRUCTURALLY DEFICIENT CONDITIONS.AS OF 10/11/2023,A$12K due
DOB10/04/2023FAILURE TO CERTIFY CORRECTION ON IMMEDIATELY HAZARDOUS (CLASS 1) ECB VIOLATION
ECB01/05/2023FAILURE TO COMPLY WITH THE COMMISSIONER'S ORDER IN DOB VIOLATION VIO22-01262 DATED 4/28/2022.RESPONDENT WAS REQUIRED TO SUBMIT AN ENGINEER'SREPORT CONCERNING STRUCTURALLY DEFICIENT CONDITIONS.AS OF 11/1/2022,AN$12K due
DOB09/14/2022FAILURE TO SUBMIT AN ACCEPTABLE INSPECTN RPT FOR STRUCTURALLY COMPROMISED BLDG.
DOB08/04/2022SEAL CELLAR LEVEL WINDOWS FORM ACCESSIBILITY
ECB08/04/2022FAILURE TO MAINTAIN BUILDING IN A CODE-COMPLIANT MANNER. AT TIME OF INSPECTION, VACANT BUILDING ENTRY DOOR IS CHAINED AND PADLOCKED, CELLAR ENTRANCE IS CEMENTED SHUT. HOWEVER, CELLAR LEVEL WINDOW OF EXPOSURE #1$6K due
DOB04/28/2022FAILURE TO COMPLY W/COMMISSIONER'S ORDER #275093(022014FEU10901PS) DATED FEB 20, 2014 W/PARTIALLY COLLAPSED FLOORS AND DETERIORATED CORNICE AT EXP1. BLDG REPAIRS WERE REQ'D TO START UNDER PERMIT BY MARCH 7, 2014. AS OF APRIL 28,2022 NO WORK HAS BEEN DONE. REMEDY: IMMED COMPLY W/COMMISSIONER'S ORDER #275093(022014FEU10901PS)
DOB04/28/2022SEAL 1ST FLOOR ENTRY DOOR EXP#1, SEAL BASEMENT ENTRY DOOR EXP#1, SEAL POINTS OF ACCESS TO BUILDING AT EXP#3 AND PROVIDE 25LF OF SIDEWALK SHE D AT EXPOSURE #1 (CONVENT AVENUE)
DOB04/28/2022FAILURE TO MAINTAIN BUILDING IN CODE COMPLIANT MANNER. 4 STORY LANDMARK BUILDING CURRENTLY UNDER FULL VACATE ORDER DUE TO INTERIOR COLLAPSE. ROOF IS IN STATE OF COLLAPSE WHICH IS DESTABILIZING SHEET-METAL CORNICE AT EXP #1. MISSING WINDOWS AT EXP #1 FOURTH FLOOR AND BUILDING IS OPEN AND UNGUARDED.
ECB04/28/2022FAILURE TO MAINTAIN BUILDING IN CODE COMPLIANT MANNER. FRONT DOOR TO BUILDING AT EXP #1 AND BASEMENT DOOR AT SAME EXP ARE OPEN TO BUILDING, NOTE BUILDING HAS UNSAFE BUILDING DESIGNATION AND IS CURRENTLY UNDER F$1K due
DOB04/13/2019V-DOB VIOLATION - ACTIVE
DOB02/20/2014SEVERELY DETERIORATED BLDG,3 SKYLIGHTS@ROOF MISSING/BROKEN,PARTIALLY COLLAPSED INTERIOR FL FRAMING,RUSTED METAL CORNICE/HOLES@EXP#1, QUESTIONABLE FOUNDATION WALL&BLDG WALL@EXP#4(TO BE CONFIRMED).OWNER TO HAVE LIC PE INSPECT/EVALUATE ENTIRE BLDG&OBTAIN PERMITS/REPAIR/REPLACE INSPECT BY DOB FEU & WORK TO START BY MARCH 7, 2014
DOB10/28/2013FAILURE TO CERTIFY CORRECTION ON IMMEDIATELY HAZARDOUS (CLASS 1) ECB VIOLATION
HPD10/08/2000SECTION 27-2026 ADM CODE REPAIR THE BROKEN OR DEFECTIVE CONNECTION AT RADIATOR IN THE KITCHEN LOCATED AT APT FL, 1st STORY, 1st APARTMENT FROM EAST AT SOUTH
ECB06/29/2026DEMOLITION OF BUILDING HAS DONE UNDER PERMIT M01005466-I1-FD EXPIRED 12/31/2024 HOWEVER FAILURE TO SUBMIT A CERTIFICATE OF CORRECTION OF VIOLATION #39061234P ISSUED ON 04-08-2022 FOR FAILURE TO MAINTAIN BUILDINHearing held — result not yet published$1K proposed
ECB06/29/2026DEMOLITION OF BUILDING HAS DONE UNDER PERMIT M01005466-I1-FD EXPIRED 12/31/2024 HOWEVER FAILURE TO SUBMIT A CERTIFICATE OF CORRECTION OF VIOLATION #37025918P ISSUED ON 10-11-2023 FOR UNLAWFUL ACTS. FAILURE TO CHearing held — result not yet published$1K proposed
ECB06/29/2026DEMOLITION OF BUILDING HAS DONE UNDER PERMIT M01005466-I1-FD EXPIRED 12/31/2024 HOWEVER FAILURE TO SUBMIT A CERTIFICATE OF CORRECTION OF VIOLATION #39105211Y ISSUED ON 02-05-2024 FOR FAILURE TO OBEY A VACATE ORHearing held — result not yet published$1K proposed
ECB06/29/2026DEMOLITION OF BUILDING HAS DONE UNDER PERMIT M01005466-I1-FD EXPIRED 12/31/2024 HOWEVER FAILURE TO SUBMIT A CERTIFICATE OF CORRECTION OF VIOLATION #39105210M ISSUED ON 02-05-2024 FOR WORK WITHOUT A PERMIT., FILHearing held — result not yet published$1K proposed
ECB06/29/2026DEMOLITION OF BUILDING HAS DONE UNDER PERMIT M01005466-I1-FD EXPIRED 12/31/2024 HOWEVER FAILURE TO SUBMIT A CERTIFICATE OF CORRECTION OF VIOLATION #39067355Z ISSUED ON 08-04-2022 FOR FAILURE TO MAINTAIN BUILDINHearing held — result not yet published$1K proposed
ECB06/29/2026DEMOLITION OF BUILDING HAS DONE UNDER PERMIT M01005466-I1-FD EXPIRED 12/31/2024 HOWEVER FAILURE TO SUBMIT A CERTIFICATE OF CORRECTION OF VIOLATION #37023273H ISSUED ON 11-01-202 FOR UNLAWFUL ACTS. FAILURE TO COHearing held — result not yet published$1K proposed
ECB10/06/2023AT TIME OF INSPECTION SCAFFOLD PERMIT #M08001125 EXPIRED 09-16-2023, RENEW PERMIT; RENEW SCAFFOLD PERMITNothing owed — awaiting certificate of correction
ECB02/18/2023INADEQUATE PEDESTRIAN PROTECTION WITH OBSTRUCTED WALKWAY AND NO MINIMUM 5 FT WIDE OF WALKWAY.Nothing owed — awaiting certificate of correction
ECB10/08/2013FAILURE TO MAINTAIN BUILDING IN A CODE COMPLIANT MANNER.DEFECT NOTED:AT TIME OF INSPECTION METAL CORNICE IS WATER DAMAGED,RUSTED AND DETERIORATED W/HOLES AND MISSING SECTIONS.SOFFIT IS ROTTED AND BUCKLED.RMDYNothing owed — awaiting certificate of correction
ECB07/29/2013FAILURE TO MAINTAIN BLDG IN A CODE COMPLIANT MANNER. DEFECTS NOTED: ATTIME OF INSPECTION FLOORS & JOINTS AT 2ND & 3RD FL HAVE COLLAPSED DUE TO ROOF OPEN & WATER DAMAGE. COMBUSTIBLE DEBRIS SCATTERED THROUGHOUTNothing owed — awaiting certificate of correction
Zoned commercial or Manhattan residential · 800 sf lot · 0 FAR built · Flood zone X