← Back
Banking facility, with or without parking
451 MYRTLE AVENUE
BROOKLYN · BIN 3054408
💬 Discuss this project
1969Year Built
1Stories
K7Building Class
R7AZoning
—Gross Floor Area
1Units
2 Open Violations ▸FDNY Report ↗
Banking facility, with or without parking · Owner of record: 72ND STREET-BROADWAY REALTY INC. · 1.94 FAR built · Flood zone X
Locations of Work
ArchitectureStructuralMechanicalPlumbingGeneral
Roof3p · 1 filing · 13 docs
Floor 17p · 1 filing · 20 docs
▾Owner History (Filing Record)
Companies and organizations named on filings. Individual owners are not shown.
OwnerFilingsMost Recent
GC ENG & ASSOCIATES PC1407/08/2026
72ND STREET-BROADWAY REALTY1104/09/2026
449 MYRTLE AVENUE1003/21/2026
WHARTON PROPERTIES703/21/2026
▾Design Consultants (Architect / Engineer of Record)
▾Filing Representatives (Expediters)
RepresentativeFilingsMost Recent
PROJECT EXPEDITERS CONSULTING CO.603/21/2026
ULTIMATE SIGNS DESIGNS403/21/2026
A1 EXPEDITING SERVICE CORP.103/21/2026
▾Contractors (License-Anchored)
FirmTradeRolesMost Recent
CLUNE CONSTRUCTION CO LPGeneral Contractor204/09/2026
SOUND REFRIGERATION & AIRGeneral Contractor203/21/2026
ULTIMATE SIGNS DESIGNSScaffold207/08/2026
DJC CORPPlumbing107/08/2026
MAC FELDER INCPlumbing107/08/2026
▾Special Inspection Agencies
AgencyLicense #FilingsMost Recent
BAZINI ENGINEERING, P.C.1808108/25/2025
JOSEPH MARTINES PE, PLLC1428110/15/2024
Building Lifecycle
All (57)Filed (7)Permit Issued (7)Signed Off (7)Violation (21)Inspection (5)Special Inspection (10)
05/19/2026
Signed off — Alteration
Install illuminated non-advertising wall sign. No change of use, egress or occupancy
B01154861-I1
05/19/2026
Signed off — Alteration
B01153711-I1
04/17/2026
Inspection — Certified Sprinkler-SP-Fixtures-Finish
Certified
View inspection ↗
04/15/2026
Inspection — Certified Sprinkler-SP-Piping Dry/Wet-Hydrostatic Test
Certified
View inspection ↗
11/25/2025
Signed off — Alteration
CONNECT TO EXISTING GAS PIPING FOR TWO (2) REPLACEMENT ROOFTOP HVAC UNITS AS PER PLANS. NO CHANGE IN USE, EGRESS OR OCCUPANCY.
B01102847-S1
11/25/2025
Signed off — Alteration
CONNECT TO EXISTING GAS PIPING FOR TWO (2) REPLACEMENT ROOFTOP HVAC UNITS AS PER PLANS. NO CHANGE IN USE, EGRESS OR OCCUPANCY.
B01102847-I1
11/14/2025
Violation issued (DOB, open)
V-DOB VIOLATION - ACTIVE
10/17/2025
Inspection — Pass-Final PL - Up to 3 Requested Floors
Pass
View inspection ↗
09/05/2025
Permit issued — Mechanical Systems
B01102847-I1-GC-CX
08/25/2025
Filed — Alteration
CONNECT TO EXISTING GAS PIPING FOR TWO (2) REPLACEMENT ROOFTOP HVAC UNITS AS PER PLANS. NO CHANGE IN USE, EGRESS OR OCCUPANCY.
B01102847-S1
08/25/2025
Filed — Alteration
CONNECT TO EXISTING GAS PIPING FOR TWO (2) REPLACEMENT ROOFTOP HVAC UNITS AS PER PLANS. NO CHANGE IN USE, EGRESS OR OCCUPANCY.
B01102847-I1
08/25/2025
Permit issued — Plumbing
B01102847-S1-PL
08/22/2025
Signed off — Alteration
Install a drinking fountain for Bank of America.
B01121365-S2
07/21/2025
Special inspection requirement — HVAC-R and service water heating equipment
Joseph Bazini
05/23/2025
Signed off — Alteration
Install a drinking fountain for Bank of America.
B01121365-I1
05/21/2025
Signed off — Alteration
Install a drinking fountain for Bank of America.
B01121365-S1
05/15/2025
Inspection — Certified Water and Sanitary-WS-Fixtures-Finish
Certified
View inspection ↗
02/26/2025
Filed — Alteration
Install illuminated non-advertising wall sign. No change of use, egress or occupancy
B01154861-I1
02/26/2025
Filed — Alteration
B01153711-I1
02/26/2025
Permit issued — Sign
B01153711-I1-SG
02/26/2025
Permit issued — Sign
B01154861-I1-SG
01/21/2025
Inspection — Certified Water and Sanitary-WS-Sanitary Piping-Roughing
Certified
View inspection ↗
12/19/2024
Special inspection requirement — Final
BIANCA SKVIRSKY
12/12/2024
Permit issued — Plumbing
B01121365-S2-PL
10/21/2024
Filed — Alteration
Install a drinking fountain for Bank of America.
B01121365-S2
10/21/2024
Permit issued — General Construction
B01121365-I1-GC
10/21/2024
Permit issued — Structural
B01121365-S1-ST
10/15/2024
Filed — Alteration
Install a drinking fountain for Bank of America.
B01121365-I1
10/15/2024
Filed — Alteration
Install a drinking fountain for Bank of America.
B01121365-S1
10/03/2024
Special inspection requirement — Final
JOSEPH MARTINES
10/03/2024
Special inspection requirement — Structural Steel - Details
JOSEPH MARTINES
10/03/2024
Special inspection requirement — Structural Stability – Alterations of existing buildings
JOSEPH MARTINES
10/03/2024
Special inspection requirement — Final
JOSEPH MARTINES
10/03/2024
Special inspection requirement — Interior lighting power
JOSEPH MARTINES
10/03/2024
Special inspection requirement — Lighting controls
JOSEPH MARTINES
09/23/2024
Violation issued (DOB, open)
V-DOB VIOLATION - ACTIVE
08/27/2024
Special inspection requirement — Final
Joseph Bazini
08/27/2024
Special inspection requirement — Mechanical Systems
Joseph Bazini
06/30/2023
Violation issued (DOB, closed)
V*-DOB VIOLATION - DISMISSED
06/30/2023
Violation issued (DOB, closed)
V*-DOB VIOLATION - DISMISSED
06/20/2023
Violation issued (DOB, closed)
V*-DOB VIOLATION - DISMISSED
06/20/2023
Violation issued (DOB, closed)
V*-DOB VIOLATION - DISMISSED
04/25/2023
Violation issued (DOB, closed)
V*-DOB VIOLATION - DISMISSED
11/08/2019
Violation issued (DOB, closed)
V*-DOB VIOLATION - DISMISSED
04/06/2018
Violation issued (DOB, closed)
V*-DOB VIOLATION - DISMISSED
02/24/2017
Violation issued (DOB, closed)
V*-DOB VIOLATION - DISMISSED
10/01/2015
Violation issued (DOB, closed)
V*-DOB VIOLATION - DISMISSED
03/03/2015
Violation issued (DOB, closed)
V*-DOB VIOLATION - DISMISSED
05/15/2014
Violation issued (DOB, closed)
V*-DOB VIOLATION - DISMISSED
07/09/2012
Violation issued (FDNY_NOV, closed)
12/13/2011
Violation issued (DOB, closed)
V*-DOB VIOLATION - DISMISSED
12/31/2009
Violation issued (DOB, closed)
V*-DOB VIOLATION - DISMISSED
01/01/2009
Violation issued (DOB, closed)
V*-DOB VIOLATION - DISMISSED
01/03/2008
Violation issued (DOB, closed)
V*-DOB VIOLATION - DISMISSED
01/19/2007
Violation issued (DOB, closed)
V*-DOB VIOLATION - DISMISSED
03/26/2002
Violation issued (DOB, closed)
V*-DOB VIOLATION - DISMISSED
08/29/1995
Violation issued (DOB, closed)
V*-DOB VIOLATION - DISMISSED
Permit / Filing Register
SourceWork TypeStatusApplicantIssued
DOB NOWMechanical SystemsSigned-offSOUND REFRIGERATION & AIR09/05/2025
DOB NOWPlumbingSigned-offDJC CORP08/25/2025
DOB NOWSignSigned-offULTIMATE SIGNS&DESIGNS CO02/26/2025
DOB NOWSignSigned-offULTIMATE SIGNS&DESIGNS CO02/26/2025
DOB NOWPlumbingSigned-offMAC FELDER INC12/12/2024
DOB NOWGeneral ConstructionSigned-offCLUNE CONSTRUCTION CO LP10/21/2024
DOB NOWStructuralSigned-offCLUNE CONSTRUCTION CO LP10/21/2024
BISOTISSUEDVARIANT SERVICES INC01/14/2019
BISOTISSUEDVARIANT SERVICES INC11/08/2017
BISPLISSUEDM & S MECHANICAL SVCS INC10/27/2017
BISOTISSUEDWADE RAY & ASSOC CONST IN02/14/2017
BISPLISSUEDPARAMOUNT PLBG CO OF NY.I08/21/2015
BISPLISSUEDPARAMOUNT PLBG CO OF NY.I09/01/2011
BIS—ISSUEDNATIONAL MAINTENANCE INC09/25/2006
BISPLISSUEDPARAMOUNT PLBG SVC & ALTERATION07/11/2006
BISMHISSUEDSHAWMUT WOODWORKING & SUPPLY03/30/2006
BISOTISSUEDSHAWMUT WOODWORKING & SUPPLY03/30/2006
BISOTISSUEDSHAWMUT WOODWORKING & SUPPLY03/30/2006
BISEQISSUEDSHAWMUT WOODWORKING & SUPPLY03/30/2006
2 projects · most recent 05/15/2026
FiledStatusContractorScope
05/15/2026CompleteULTIMATE SIGNS & ELEC COR—
05/15/2026CompleteULTIMATE SIGNS & ELEC COR—
▾Field Inspections (DOB CAP) — 5
DateTypeResultReport
04/17/2026Certified Sprinkler-SP-Fixtures-FinishCertifiedView ↗
04/15/2026Certified Sprinkler-SP-Piping Dry/Wet-Hydrostatic TestCertifiedView ↗
10/17/2025Pass-Final PL - Up to 3 Requested FloorsPassView ↗
05/15/2025Certified Water and Sanitary-WS-Fixtures-FinishCertifiedView ↗
01/21/2025Certified Water and Sanitary-WS-Sanitary Piping-RoughingCertifiedView ↗
▾Special Inspection Requirements (DOB NOW) — 10
DateRequirementInspectorRole
07/21/2025HVAC-R and service water heating equipmentJoseph Bazinienergy_progress
12/19/2024FinalBIANCA SKVIRSKYprogress
10/03/2024FinalJOSEPH MARTINESprogress
10/03/2024Structural Steel - DetailsJOSEPH MARTINESspecial
10/03/2024Structural Stability – Alterations of existing buildingsJOSEPH MARTINESspecial
10/03/2024FinalJOSEPH MARTINESprogress
10/03/2024Interior lighting powerJOSEPH MARTINESenergy_progress
10/03/2024Lighting controlsJOSEPH MARTINESenergy_progress
08/27/2024FinalJoseph Baziniprogress
08/27/2024Mechanical SystemsJoseph Bazinispecial
▾Documents — 112 on file (BIS + DOB NOW)
▸Plans & Drawings8
▸DOB NOWPlans/Sketch8
09/03/2026B01140907-I1Request digital key ↗
08/23/2026B01121365-I1Request digital key ↗
08/23/2026B01121365-S2Request digital key ↗
Showing 3 of 8 on file for this type
▸Applications & Permits10
▸BISPLAN / WORK APPROVAL APPLICATION6
06/11/2019302095453Open ↗
04/26/2019302095453Open ↗
02/02/2018302095435Open ↗
Showing 3 of 6 on file for this type
▸BISWORK PERMIT APPLICATION3
11/06/2017340560459Open ↗
10/23/2017302095435Open ↗
02/17/2017321511002Open ↗
▸BISPLAN - WORK & PERMITS - SUPPPORTING DOCUMENTATION1
01/16/2019322023350Open ↗
▸Seals & Professional Certifications32
▸DOB NOWDPL-1: Design Professional Seal & Signature8
09/03/2026B01140907-I1Open ↗
08/23/2026B01121365-S2Open ↗
08/23/2026B01121365-I1Open ↗
Showing 3 of 8 on file for this type
▸BISTECHNICAL REPORT: RESPONSIBILITY/CERTIFICATION7
03/26/2019322023350Open ↗
03/20/2019322023350Open ↗
12/07/2018322023350Open ↗
Showing 3 of 7 on file for this type
▸DOB NOWProgress Inspector Seal & Signature7
09/17/2026B01154861-I1Open ↗
09/01/2026B01102847-I1Open ↗
09/01/2026B01102847-I1Open ↗
Showing 3 of 7 on file for this type
▸BISPROFESSIONAL CERTIFICATION STATEMENT3
12/07/2018322023350Open ↗
11/06/2017340560459Open ↗
02/15/2017321511002Open ↗
▸DOB NOWSpecial Inspector Seal & Signature3
09/01/2026B01102847-I1Open ↗
08/27/2026B01121365-S1Open ↗
08/27/2026B01121365-S1Open ↗
▸BISPROFESSIONAL CERTIFIED CHECKLIST2
12/07/2018322023350Open ↗
02/15/2017321511002Open ↗
▸BISTECHNICAL REPORT STATEMENT OF RESPONSIBILITY1
11/06/2017340560459Open ↗
▸BISREQUIRED ITEMS CHECKLIST FOR PROFESSIONAL CERTIFICATION1
11/06/2017340560459Open ↗
▸Trade Schedules & Equipment2
▸BISFA - FDNY APPROVAL : FD-FAA1
09/11/2020302095453Open ↗
▸BISSCHEDULE B - PLUMBING/SPRINKLER/STANDPIPE1
02/02/2018302095435Open ↗
▸Environmental & Asbestos24
▸DOB NOWDEP ACP-5: Asbestos Assessment Report7
08/23/2026B01121365-S2Open ↗
08/23/2026B01121365-I1Open ↗
08/23/2026B01121365-S1Open ↗
Showing 3 of 7 on file for this type
▸DOB NOWOER: Notice of Satisfaction5
08/13/2026B01102847-S1Open ↗
08/13/2026B01121365-I1Open ↗
08/13/2026B01102847-I1Open ↗
Showing 3 of 5 on file for this type
▸DOB NOWOER: Notice to Proceed5
08/13/2026B01102847-S1Open ↗
08/13/2026B01121365-I1Open ↗
08/13/2026B01121365-S2Open ↗
Showing 3 of 5 on file for this type
▸BISASBESTOS: CERTIFICATION (DEP ACP5)3
12/07/2018322023350Open ↗
11/06/2017340560459Open ↗
02/15/2017321511002Open ↗
▸BISENVIRONMENTAL RESTRICTIONS - OER NOTICE TO PROCEED3
01/14/2019322023350Open ↗
11/06/2017340560459Open ↗
02/10/2017321511002Open ↗
▸BISENVIRONMENTAL RESTRICTIONS - OER NOTICE OF SATISFACTION1
12/20/2017340560459Open ↗
▸Energy Compliance11
▸BISTECHNICAL REPORT: ENERGY CODE PROGRESS INSPS5
12/07/2018322023350Open ↗
02/15/2018340560459Open ↗
06/19/2017321511002Open ↗
Showing 3 of 5 on file for this type
▸BISAS-BUILT ENERGY ANALYSIS3
03/26/2019322023350Open ↗
03/20/2019322023350Open ↗
06/19/2017321511002Open ↗
▸BISNYCECC ANALYSIS1
11/06/2017340560459Open ↗
▸BISTECHNICAL REPORT STATEMENT OF RESPONSIBILITY FOR ENERGY CODE PROGRESS INSPECTIONS1
11/06/2017340560459Open ↗
▸BISTECHNICAL REPORT: ENERGY CODE - RESPONSIBILITY1
11/06/2017340560459Open ↗
▸Inspections & Test Reports1
▸BISTECHNICAL REPORT: RESPONSIBILITY1
11/06/2017340560459Open ↗
▸Approvals, Objections & Sign-offs7
▸BISCERTIFICATE OF OCCUPANCY/LOC: REQUEST5
09/21/2020302095453Open ↗
03/26/2019322023350Open ↗
03/20/2019322023350Open ↗
Showing 3 of 5 on file for this type
▸BISCONSTRUCTION CODE DETERMINATION1
03/26/2019322023350Open ↗
▸BISSUPERSEDING LETTER1
10/24/2017302095435Open ↗
▸Cost, Insurance & Ownership7
▸BISCOST AFFIDAVIT7
07/01/2020302095453Open ↗
03/20/2019322023350Open ↗
03/20/2019322023350Open ↗
Showing 3 of 7 on file for this type
▸Filing & Intake Forms9
▸BISBOROUGH INTAKE FORM3
03/26/2019322023350Open ↗
03/20/2019322023350Open ↗
02/15/2018340560459Open ↗
▸BISEFILING COVER SHEET3
12/07/2018322023350Open ↗
01/25/2017321511002Open ↗
01/20/2017321511002Open ↗
▸BISADDITIONAL INFORMATION2
03/25/2016302095435Open ↗
03/25/2016302095435Open ↗
▸BISEFILING JOB APPLICATION COVER SHEET1
11/06/2017340560459Open ↗
▸Other Documents1
▸BISENVIRONMENTAL "E" DEP NOTICE TO PROCEED1
01/16/2019322023350Open ↗