← Back
BuildNYC
Multi-story retail building (2+)
4519 13TH AVENUE
BROOKLYN · Borough Park · BIN 3328601
💬 Discuss this project
1985Year Built
2Stories
K2Building Class
C4-3Zoning
15,800 sfGross Floor Area
6Units
1 Active Violation 0 unresolved · 1 paperwork only ▸FDNY Report ↗
Multi-story retail building (2+) · Owner of record: 4509-4523 Realty · 12,000 sf lot · 1.32 FAR built · Flood zone X
Locations of Work
Architecture
Names shown beside floors are taken automatically from the text of filed documents and may be incomplete or wrong.
Site & exteriorApple Bank2p · 2 filings · 8 docs
▾Design Consultants (Architect / Engineer of Record)
FirmFilingsMost Recent
Shaaban Engineering212/22/2021
▾Filing Representatives (Expediters)
RepresentativeFilingsMost Recent
National Maintenance403/21/2026
▾Contractors (License-Anchored)
FirmTradeRolesMost Recent
National MaintenanceSign hanger207/08/2026
Home Run ElectricElectrical103/22/2026
Building Lifecycle
All (7)Filed (2)Permit Issued (2)Signed Off (2)Special Inspection (1)
02/24/2023
Signed off — Alteration
B00625557-I1
02/24/2023
Signed off — Alteration
ERECT ACCESSORY BUSINESS WALL SIGN FOR APPLE BANK, NO CHANGE IN EGRESS, USE OR OCCUPANCY.
B00625555-I1
12/29/2021
Permit issued — Sign
B00625557-I1-SG
12/27/2021
Permit issued — Sign
B00625555-I1-SG
12/22/2021
Filed — Alteration
B00625557-I1
12/22/2021
Filed — Alteration
ERECT ACCESSORY BUSINESS WALL SIGN FOR APPLE BANK, NO CHANGE IN EGRESS, USE OR OCCUPANCY.
B00625555-I1
12/10/2021
Special inspection requirement — Final
AHMED SHAABAN
Permit / Filing Register
SourceWork TypeStatusApplicantIssued
DOB NOWSignSigned-offNational Maintenance12/29/2021
DOB NOWSignSigned-offNational Maintenance12/27/2021
BIS—ISSUEDUltimate Signs & Designs Co06/08/1999
BIS—ISSUEDUltimate Signs & Designs Co06/08/1999
BIS—ISSUEDGoing Sign & Servicing Co07/22/1997
BISMHISSUEDInter-County Maintenance12/06/1996
BISEQISSUEDJ.a.r.constr. & Maintenance Co10/23/1996
BISOTISSUEDJ.a.r.constr. & Maintenance Co10/23/1996
BISOTISSUEDJ.a.r.constr. & Maintenance Co10/23/1996
4 projects · most recent 06/13/2024
FiledStatusContractorScope
06/13/2024Permit IssuedHome Run Electric—
06/13/2024Permit IssuedHome Run Electric—
01/11/2022Permit IssuedNational Maintenance—
01/11/2022Permit IssuedNational Maintenance—
▾Special Inspection Requirements (DOB NOW) — 1
DateRequirementInspectorRole
12/10/2021FinalAHMED SHAABANprogress
▾Tenants in the building
TenantSpaceFloorsRenovation projects
Apple BankBank / Financial branchFloor 2
Project B00625557 Alteration · LOC Issued · 12/22/2021
Names are taken automatically from the text of each project’s filed documents (title blocks and cover sheets) and screened to exclude owners, landlords and designers. They may be incomplete or wrong; check the filing.
▾Documents — 7 on file (BIS + DOB NOW)
▸Plans & Drawings2
▸DOB NOWPlans/Sketch2
08/31/2026B00625555-I1Request digital key ↗
08/31/2026B00625557-I1Request digital key ↗
▸Seals & Professional Certifications3
▸DOB NOWDPL-1: Design Professional Seal & Signature2
08/31/2026B00625557-I1Open ↗
08/13/2026B00625555-I1Open ↗
▸DOB NOWProgress Inspector Seal & Signature1
09/01/2026B00625555-I1Open ↗
▸Environmental & Asbestos2
▸DOB NOWDEP ACP-5: Asbestos Assessment Report2
08/31/2026B00625557-I1Open ↗
08/13/2026B00625555-I1Open ↗