Floor 30Under Construction3 filings · 11 docs
ArchitectureFire ProtectionMechanical
Issued Permit Scope
General Construction · Mechanical Systems · Sprinklers
Sprinkler demolition as per plans filed herewith. No change in use, egress, or occupancy
On file for this job
3 documents
Interior demolition as per plans filed herewith. No change to use, egress, or occupancy.
On file for this job
3 documents
Mechanical demolition to existing duct/piping and HVAC as per plans filed herewith. No change to use, egress, or occupancy
On file for this job
5 documents
Floor 29Under Construction34p · 3 filings · 20 docs
ArchitectureFire ProtectionMechanicalPlumbing
Issued Permit Scope
General Construction · Mechanical Systems · Sprinklers
INTERIOR RENOVATIONS ON TEH 29TH FLOOR AS PER PLANS.
On file for this job
6 documents
MECHANICAL WORK AS PER PLANS TO INCLUDE INSTALLATION OF ONE WATER COOLED HEAT PUMP.
On file for this job
17 documents · 1 drawing sheet
sprinkler & plumbing work as per plans.
On file for this job
9 documents · 3 drawing sheets
Floor 28
Floor 278p · 5 filings · 20 docs
DMFire ProtectionMechanicalPlumbing
Installation of new plumbing fixtures/sprinkler system modifications with related piping and equipment as shown on plans.
On file for this job
8 documents · 2 drawing sheets
Installation of new HVAC distribution and ceiling mounted AC units throughout the premises as shown on plans
On file for this job
12 documents · 2 drawing sheets
Removal of plumbing fixtures, sprinkler heads and related piping as shown on plan.
On file for this job
3 documents · 2 drawing sheets
Latest 3 of 5 filings on this floor.
Floor 26Under Construction14p · 4 filings · 20 docs
ArchitectureDMFire ProtectionMechanicalPlumbing
Issued Permit Scope
General Construction
Alterations/modifications consisting of 2 Hour Rated, Non-Load Bearing Partition with 1 1/2 Hour Rated Doors at the 26th Floor for new assembly occupancy. No alterations to existing base building envelope.
On file for this job
8 documents
Installation of new plumbing fixtures/sprinkler system modifications with related piping and equipment as shown on plans.
On file for this job
8 documents · 2 drawing sheets
Installation of new HVAC distribution and ceiling mounted AC units throughout the premises as shown on plans
On file for this job
12 documents · 2 drawing sheets
Latest 3 of 4 filings on this floor.
Floor 256p · 3 filings · 12 docs
ArchitectureFire ProtectionMechanical
Limited HVAC modifications and addition of airside distribution within the new multi-purpose room; New Ductwork distribution in new multi-purpose room connecting to existing main distribution on the floor.
On file for this job
3 documents · 1 drawing sheet
Demolition of existing sprinkler with associated sprinkler piping and installation of new automatic sprinklers throughout the space. Scope limited to 25th floor
On file for this job
4 documents · 1 drawing sheet
Interior renovation on 25th floor; No change to use, egress or occupancy.
On file for this job
5 documents · 4 drawing sheets
Floor 24
Floor 238p · 6 filings · 20 docs
Fire ProtectionGeneralMechanicalPlumbing
Sprinkler modifications to the 23rd floor as per plans filed herewith. No change in use, egress or occupancy.
On file for this job
20 documents · 1 drawing sheet
Mechanical Modifications to include duct work to the 23rd floor as per plans filed herewith. No change in use, egress or occupancy.
On file for this job
23 documents · 1 drawing sheet
General construction modifications for interior build-out to the 23rd floor as per plans filed herewith. No change in use, egress or occupancy.
On file for this job
9 documents · 1 drawing sheet
Latest 3 of 6 filings on this floor.
Floor 2211p · 3 filings · 20 docs
Fire ProtectionMechanicalPlumbingStructural
Structural supports associated with a sliding partition on 21st floor as per plans filed. No change in use, egress, or occupancy.
On file for this job
8 documents · 1 drawing sheet
Modification to existing plumbing and sprinkler system. No change in use egress or occupancy
On file for this job
12 documents · 7 drawing sheets
Modification of existing HVAC system. No change in use, egress or occupancy
On file for this job
3 documents · 3 drawing sheets
Floor 2123p · 3 filings · 20 docs
ArchitectureFire ProtectionMechanicalPlumbing
Issued Permit Scope
Mechanical Systems
Plumbing and sprinkler demo and new installs on 21st floor as per plans filed herewith.
On file for this job
4 documents · 3 drawing sheets
Interior alteration of 21st floor. No change in use, egress, or occupancy.
On file for this job
6 documents · 9 drawing sheets
Mechanical modifications on the 21st floor as per plans filed herewith.
On file for this job
15 documents · 2 drawing sheets
Floor 20
Floor 19
Floor 18
Floor 17
Floor 16
Floor 15
Floor 1410p · 1 filing · 6 docs
ArchitectureDM
Removal of non bearing partitions and related finishes as per plans herewith. No change in use egress or occupancy.
On file for this job
6 documents · 10 drawing sheets
Floor 13
Floor 12
Floor 11Under Construction33p · 6 filings · 20 docs
ArchitectureFire ProtectionMechanicalPlumbingStructural
Issued Permit Scope
General Construction · Mechanical Systems · Plumbing · Sprinklers · Structural
Modifications to plumbing and sprinkler as per plans filed herewith. No change in use, egress, or occupancy.
On file for this job
1 document · 1 drawing sheet
Modifications to existing HVAC and ductwork as per plans filed herewith. No change to use, egress, or occupancy.
On file for this job
10 documents · 2 drawing sheets
Modifications to existing HVAC and ductwork as per plans filed herewith. No change to use, egress, or occupancy.
On file for this job
1 document
Latest 3 of 6 filings on this floor.
Floor 10Under Construction28p · 5 filings · 20 docs
ArchitectureFire ProtectionMechanicalPlumbing
Issued Permit Scope
General Construction · Mechanical Systems · Plumbing · Sprinklers
REMOVAL AND INSTALLATION OF NON LOAD BEARING PARTITIONS AS PER PLANS. NOCHANGE IN USE, EGRESS OR OCCUPANCY.
On file for this job
7 documents · 1 drawing sheet
Modifications to plumbing and sprinkler as per plans filed herewith. No change in use, egress, or occupancy.
On file for this job
1 document · 1 drawing sheet
Modifications to existing HVAC and ductwork as per plans filed herewith. No change to use, egress, or occupancy.
On file for this job
10 documents
Latest 3 of 5 filings on this floor.
Floor 9Under Construction54p · 6 filings · 20 docs
ArchitectureFire ProtectionMechanicalPlumbingStructural
Issued Permit Scope
General Construction · Mechanical Systems · Plumbing · Sprinklers · Structural
Interior slab infill as per plans filed herewith. No change in use, egress, or occupancy.
On file for this job
10 documents
suspended Scaffold installation
On file for this job
22 documents · 1 drawing sheet
Modifications to plumbing and sprinkler as per plans filed herewith. No change in use, egress, or occupancy.
On file for this job
1 document · 1 drawing sheet
Latest 3 of 6 filings on this floor.
Floor 8Under Construction36p · 6 filings · 20 docs
ArchitectureFire ProtectionMechanicalPlumbingStructural
Issued Permit Scope
General Construction · Mechanical Systems · Plumbing · Sprinklers · Structural
REMOVAL AND INSTALLATION OF NON LOAD BEARING PARTITIONS AS PER PLANS. NOCHANGE IN USE, EGRESS OR OCCUPANCY.
On file for this job
7 documents · 1 drawing sheet
Interior slab infill as per plans filed herewith. No change in use, egress, or occupancy.
On file for this job
10 documents · 1 drawing sheet
Modifications to plumbing and sprinkler as per plans filed herewith. No change in use, egress, or occupancy.
On file for this job
1 document · 1 drawing sheet
Latest 3 of 6 filings on this floor.
Floor 7Under Construction35p · 6 filings · 20 docs
ArchitectureFire ProtectionMechanicalPlumbingStructural
Issued Permit Scope
General Construction · Mechanical Systems · Plumbing · Sprinklers · Structural
REMOVAL AND INSTALLATION OF NON LOAD BEARING PARTITIONS AS PER PLANS. NOCHANGE IN USE, EGRESS OR OCCUPANCY.
On file for this job
7 documents · 1 drawing sheet
Interior slab infill as per plans filed herewith. No change in use, egress, or occupancy.
On file for this job
10 documents · 1 drawing sheet
Modifications to plumbing and sprinkler as per plans filed herewith. No change in use, egress, or occupancy.
On file for this job
1 document · 1 drawing sheet
Latest 3 of 6 filings on this floor.
Floor 6Under Construction35p · 6 filings · 20 docs
ArchitectureFire ProtectionMechanicalPlumbingStructural
Issued Permit Scope
General Construction · Mechanical Systems · Plumbing · Sprinklers · Structural
REMOVAL AND INSTALLATION OF NON LOAD BEARING PARTITIONS AS PER PLANS. NOCHANGE IN USE, EGRESS OR OCCUPANCY.
On file for this job
7 documents · 1 drawing sheet
Interior slab infill as per plans filed herewith. No change in use, egress, or occupancy.
On file for this job
10 documents
Modifications to plumbing and sprinkler as per plans filed herewith. No change in use, egress, or occupancy.
On file for this job
1 document · 1 drawing sheet
Latest 3 of 6 filings on this floor.
Floor 5Under Construction35p · 6 filings · 20 docs
ArchitectureFire ProtectionMechanicalPlumbingStructural
Issued Permit Scope
General Construction · Mechanical Systems · Plumbing · Sprinklers · Structural
REMOVAL AND INSTALLATION OF NON LOAD BEARING PARTITIONS AS PER PLANS. NOCHANGE IN USE, EGRESS OR OCCUPANCY.
On file for this job
7 documents · 1 drawing sheet
Interior slab infill as per plans filed herewith. No change in use, egress, or occupancy.
On file for this job
10 documents
Modifications to plumbing and sprinkler as per plans filed herewith. No change in use, egress, or occupancy.
On file for this job
1 document · 1 drawing sheet
Latest 3 of 6 filings on this floor.
Floor 4Under Construction35p · 6 filings · 20 docs
ArchitectureFire ProtectionMechanicalPlumbingStructural
Issued Permit Scope
General Construction · Mechanical Systems · Plumbing · Sprinklers · Structural
REMOVAL AND INSTALLATION OF NON LOAD BEARING PARTITIONS AS PER PLANS. NOCHANGE IN USE, EGRESS OR OCCUPANCY.
On file for this job
7 documents · 1 drawing sheet
Interior slab infill as per plans filed herewith. No change in use, egress, or occupancy.
On file for this job
10 documents
Modifications to plumbing and sprinkler as per plans filed herewith. No change in use, egress, or occupancy.
On file for this job
1 document · 1 drawing sheet
Latest 3 of 6 filings on this floor.
Floor 3Under Construction39p · 7 filings · 20 docs
ArchitectureFire ProtectionMechanicalPlumbingStructural
Issued Permit Scope
General Construction · Mechanical Systems · Plumbing · Sprinklers · Structural
REMOVAL AND INSTALLATION OF NON LOAD BEARING PARTITIONS AS PER PLANS. NOCHANGE IN USE, EGRESS OR OCCUPANCY.
On file for this job
7 documents · 1 drawing sheet
Interior slab infill as per plans filed herewith. No change in use, egress, or occupancy.
On file for this job
10 documents · 1 drawing sheet
Modifications to plumbing and sprinkler as per plans filed herewith. No change in use, egress, or occupancy.
On file for this job
1 document · 1 drawing sheet
Latest 3 of 7 filings on this floor.
Floor 2
Floor 1Under Construction1 filing · 2 docs
Architecture
Issued Permit Scope
General Construction
Temporary wall installation as per plans filed herewith. No change to use, egress, or occupancy.
On file for this job
2 documents
Sub-Cellar2p · 2 filings · 10 docs
ArchitectureMechanical
Interior alteration of subcellar. No change in use, egress, or occupancy.
On file for this job
5 documents · 1 drawing sheet
Installation of 2 fire smoke dampers mechanically. No change to use, egress, or occupancy
On file for this job
5 documents · 1 drawing sheet