← Back
BuildNYC
Over six families without stores
Ecdo Transfers To NYC Joe
452 ST NICHOLAS AVENUE · BIN 1059432
💬 Discuss this project
1901Year Built
5Stories
C1Building Class
R8Zoning
11,395 sfGross Floor Area
10Units
Rent Stabilized100 Active Violations 1 likely answered ▸
Over six families without stores · Owner of record: Joe Uptown Ecdo Housing Development Fund · 2,923 sf lot · 3.9 FAR built · Flood zone X
Locations of Work
ArchitectureStructuralElectricalPlumbingEquipmentGeneral
Names shown beside floors are taken automatically from the text of filed documents and may be incomplete or wrong.
RoofBuilding rehabilitation12p · 1 filing · 10 docs
Floor 5Building rehabilitation22p · 2 filings · 20 docs
Floor 4Building rehabilitation22p · 2 filings · 20 docs
Floor 3Building rehabilitation22p · 2 filings · 20 docs
Floor 2Building rehabilitation22p · 2 filings · 20 docs
Floor 1Heavy duty sidewalk shed installation26p · 3 filings · 20 docs
Sub-BasementBuilding rehabilitation22p · 2 filings · 20 docs
Site & exteriorBuilding rehabilitation11p · 1 filing · 10 docs
▾Owner History (Filing Record)
Companies and organizations named on filings. Individual owners are not shown.
OwnerFilingsMost Recent
NYC Department of Housing Preservation and Development303/21/2026
Ecdo Houses Associates203/21/2026
Joe Uptown Ecdo Housing Development Fund103/22/2026
▾Design Consultants (Architect / Engineer of Record)
FirmFilingsMost Recent
Collado Engineering510/22/2024
Enthink Engineers208/04/2022
Cta Architects102/08/2022
▾Filing Representatives (Expediters)
RepresentativeFilingsMost Recent
Municipal Building Consultants603/21/2026
▾Contractors (License-Anchored)
FirmTradeRolesMost Recent
Reliable EnterprisesScaffold903/21/2026
Shamas Contracting CoGeneral Contractor307/08/2026
Alafogiannis Plumbing & HeatingPlumbing107/08/2026
Ips PlumbingPlumbing107/08/2026
▾Special Inspection Agencies
AgencyLicense #FilingsMost Recent
Catalpa Special Inspectio2004510/22/2024
Autographic Co1579202/10/2022
Building Lifecycle
07/29/2026
§ 27-2005 ADM CODE PROPERLY SECURE THE LOOSE 4TH MARBLE TREAD FROM BOTTOM AND UP AT PUBLIC HALLWAY STAIRS , 2nd STORY
HPD violation · open
07/29/2026
§ 27-2005 HMC: PROPERLY REPAIR OR REPLACE THE BROKEN OR DEFECTIVE BELL BUZZER INTRECOM SYSTEM FROM THE BUILDING ENTRANCE DOOR TO THE APARTMENT…
HPD violation · open
07/29/2026
§ 27-2005 HMC: PROPERLY REPAIR OR REPLACE THE BROKEN OR DEFECTIVE CHIME DOOR BELL IN THE ENTRANCE LOCATED AT APT 5B, 5th STORY, 1st APARTMENT FROM…
HPD violation · open
07/29/2026
§ 27-2026 ADM CODE REPAIR THE LEAKY AND/OR DEFECTIVE FAUCETS AT WASH BASIN IN THE 1st BATHROOM FROM EAST LOCATED AT APT 5B, 5th STORY, 1st…
HPD violation · open
07/29/2026
§ 27-2005 ADM CODE PROPERLY REPAIR WITH SIMILAR MATERIAL THE BROKEN OR DEFECTIVE DETACHING BASEBOARD COVERING AT SOUTH WALL IN THE PRIVATE HALLWAY…
HPD violation · open
247 history events on file for this building. Sign in free to see the full history. Sign in · Create account
Permit / Filing Register
SourceWork TypeStatusApplicantIssued
DOB NOWPlumbingSigned-offAlafogiannis Plumbing & Heating05/01/2024
DOB NOWSidewalk ShedSigned-offReliable Enterprises05/17/2023
DOB NOWGeneral ConstructionSigned-offShamas Contracting Co05/16/2023
DOB NOWSupported ScaffoldSigned-offReliable Enterprises08/04/2022
DOB NOWPlumbingSigned-offIps Plumbing07/28/2022
DOB NOWSidewalk ShedSigned-offReliable Enterprises05/25/2022
DOB NOWGeneral ConstructionSigned-offShamas Contracting Co04/21/2022
BIS—ISSUEDDelight Construction10/25/2000
BISPLISSUEDFinest Mechnical07/27/2000
BISEQISSUEDDelight Construction07/06/2000
BISPLISSUEDEmpire Used Boiler Supply06/30/1999
BIS—ISSUEDDelight Construction06/23/1999
BISBLISSUEDJohn Ragoussis & Son07/02/1997
BISPLISSUEDJohn Ragoussis & Son07/02/1997
BISBLISSUEDStuyvesant Oil Burner02/08/1995
BISPLISSUEDStuyvesant Oil Burner02/08/1995
BIS—ISSUEDSuperb Tile & Masnory02/13/1991
BIS—ISSUEDSuperb Tile & Masnory07/24/1990
1 project · most recent 02/10/2022
Heating Systems Ventilation Systems
FiledStatusContractorScope
02/10/2022——Heating Systems, Ventilation Systems
1 project · most recent 10/22/2024
Water/Sanitary
FiledStatusContractorScope
10/22/2024Signed-offAlafogiannis Plumbing & HeatingWater/Sanitary
1 project · most recent 05/20/2022
FiledStatusContractorScope
05/20/2022CompleteRichard Neu—
▾Field Inspections (DOB CAP) — 1
DateTypeResultReport
09/22/2022Certified Water and Sanitary-WS-Sanitary Piping-RoughingCertifiedView ↗
▾Special Inspection Requirements (DOB NOW) — 21
DateRequirementInspectorRole
02/29/2024Fire-Resistant Penetrations and JointsERIC BERLENTspecial
02/29/2024Maintenance informationERIC BERLENTenergy_progress
02/29/2024Energy Code Compliance InspectionsERIC BERLENTprogress
02/29/2024Post-installed AnchorsERIC BERLENTspecial
10/28/2021HVAC-R and service water heating equipmentERIC BERLENTenergy_progress
10/28/2021Mechanical SystemsERIC BERLENTspecial
10/28/2021Energy Code Compliance InspectionsERIC BERLENTprogress
10/28/2021FinalERIC BERLENTprogress
10/28/2021Maintenance informationERIC BERLENTenergy_progress
10/28/2021HVAC-R and service water heating system controlsERIC BERLENTenergy_progress
10/28/2021HVAC-R and service water piping design and insulationERIC BERLENTenergy_progress
10/28/2021Chimneys and ventsERIC BERLENTspecial
10/28/2021Fire-Resistant Penetrations and JointsERIC BERLENTspecial
10/28/2021Heating SystemsERIC BERLENTspecial
10/28/2021Post-installed Anchorsasghar Ghodsispecial
10/06/2021Air barrier - visual inspectionERIC BERLENTenergy_progress
10/06/2021Energy Code Compliance InspectionsERIC BERLENTprogress
10/06/2021FinalERIC BERLENTprogress
10/06/2021Structural Stability – Alterations of existing buildingsasghar Ghodsispecial
10/06/2021Post-installed Anchorsasghar Ghodsispecial
10/06/2021Masonryasghar Ghodsispecial
43 filed documents on file for this building. Sign in free to see the full history. Sign in · Create account