← Back
Zoned residential, not Manhattan
4525 FLATLANDS AVENUE
BROOKLYN · Flatlands · BIN 3217471
💬 Discuss this project
0Year Built
—Stories
V0Building Class
R4Zoning
0 sfGross Floor Area
0Units
30 Open Violations ▸FDNY Report ↗
Zoned residential, not Manhattan · Owner of record: SAIF REALTY LLC · 4,260 sf lot · 0 FAR built · Flood zone X500
Locations of Work
ArchitectureStructural
Roof3p · 2 filings · 20 docs
Floor 21p · 1 filing · 20 docs
Floor 11p · 1 filing · 5 docs
Cellar1p · 1 filing · 20 docs
▾Owner History (Filing Record)
Companies and organizations named on filings. Individual owners are not shown.
OwnerFilingsMost Recent
SAIF REALTY LLC903/22/2026
▾Sales History (ACRIS)
DatePriceUnitSeller → Buyer$/sf
09/29/2016$320K—— → —— not available
▾Design Consultants (Architect / Engineer of Record)
FirmFilingsMost Recent
BAYSIDE ENGINEERING PC105/02/2025
BANJI AWOSIKA ARCHITECT P.C.312/19/2023
▾Filing Representatives (Expediters)
RepresentativeFilingsMost Recent
BANJI ARCHITECT PC603/21/2026
▾Contractors (License-Anchored)
FirmTradeRolesMost Recent
HOME AWAY FROM HOME COMMERCIALGeneral Contractor107/08/2026
▾Special Inspection Agencies
AgencyLicense #FilingsMost Recent
BANJI AWOSIKA ARCHITECT P2721212/19/2023
Building Lifecycle
All (73)Filed (4)Permit Issued (1)Violation (33)Inspection (2)Objection (3)Special Inspection (30)
03/24/2026
Violation issued (ECB, open)
Construction
11/24/2025
Violation issued (HPD, open)
I
09/30/2025
Objection raised — Other
09/12/2025
Objection resolved — Resolved
09/11/2025
Special inspection requirement — Demolition
09/11/2025
Special inspection requirement — Structural Stability – Alterations of existing Buildings
08/13/2025
Violation issued (ECB, open)
Construction
08/13/2025
Violation issued (ECB, open)
Construction
08/12/2025
Violation issued (ECB, open)
Construction
05/15/2025
Objection raised — Structural
05/02/2025
Filed — Full Demolition
PROPOSED FULL DEMOLITION OF EXISTING 1 STORY BUILDING WITH CELLAR. FOUNDATION & FOUNDATION WALLS TO BE RETAINED.
B01219854-I1
04/09/2025
Violation issued (ECB, closed)
Construction
04/09/2025
Violation issued (ECB, closed)
Construction
04/04/2025
Violation issued (DOB, open)
V-DOB VIOLATION - ACTIVE
04/03/2025
Violation issued (DOB, open)
V-DOB VIOLATION - ACTIVE
04/01/2025
Violation issued (ECB, open)
Construction
03/29/2025
Violation issued (DOB, open)
V-DOB VIOLATION - ACTIVE
12/04/2024
Violation issued (HPD, open)
I
09/12/2024
Special inspection requirement — Fire-Resistant Penetrations and Joints
OLABANJI AWOSIKA
09/12/2024
Special inspection requirement — Excavations - Sheeting, Shoring, and Bracing
OLABANJI AWOSIKA
09/12/2024
Special inspection requirement — Energy Code Compliance Inspections
OLABANJI AWOSIKA
09/12/2024
Special inspection requirement — Footing and Foundation
OLABANJI AWOSIKA
09/12/2024
Special inspection requirement — Final
OLABANJI AWOSIKA
09/12/2024
Special inspection requirement — Fire-Resistance Rated Construction
OLABANJI AWOSIKA
09/12/2024
Special inspection requirement — HVAC-R and service water piping design and insulation
OLABANJI AWOSIKA
09/12/2024
Special inspection requirement — Air barrier — testing
OLABANJI AWOSIKA
09/12/2024
Special inspection requirement — Protection of exposed foundation insulation
OLABANJI AWOSIKA
09/12/2024
Special inspection requirement — Insulation placement and R values
OLABANJI AWOSIKA
09/12/2024
Special inspection requirement — Lighting controls
OLABANJI AWOSIKA
09/12/2024
Special inspection requirement — Air barrier - visual inspection
OLABANJI AWOSIKA
09/12/2024
Special inspection requirement — HVAC-R and service water heating system controls
OLABANJI AWOSIKA
09/12/2024
Special inspection requirement — Fenestration air leakage
OLABANJI AWOSIKA
09/12/2024
Special inspection requirement — Fenestration and door U-factor and product ratings
OLABANJI AWOSIKA
09/12/2024
Special inspection requirement — Electric vehicle service equipment requirements
OLABANJI AWOSIKA
09/12/2024
Special inspection requirement — Interior lighting power
OLABANJI AWOSIKA
09/12/2024
Special inspection requirement — Maintenance information
OLABANJI AWOSIKA
09/12/2024
Special inspection requirement — Structural Stability – Alterations of existing buildings
OLABANJI AWOSIKA
09/12/2024
Special inspection requirement — Permanent certificate
OLABANJI AWOSIKA
09/12/2024
Special inspection requirement — Fenestration areas
OLABANJI AWOSIKA
09/12/2024
Special inspection requirement — Metering
OLABANJI AWOSIKA
09/12/2024
Special inspection requirement — Lighting in dwelling units
OLABANJI AWOSIKA
09/12/2024
Special inspection requirement — HVAC-R and service water heating equipment
OLABANJI AWOSIKA
09/12/2024
Special inspection requirement — Concrete - Cast-In-Place
OLABANJI AWOSIKA
09/12/2024
Special inspection requirement — Private On-Site Storm Water Disposal Systems-, and Detention Facilities, Installation
OLABANJI AWOSIKA
09/12/2024
Special inspection requirement — Masonry
OLABANJI AWOSIKA
09/12/2024
Special inspection requirement — Subgrade Inspections
OLABANJI AWOSIKA
01/17/2024
Permit issued — Construction Fence
B00686638-S3-FN
12/19/2023
Filed — ALT-CO - New Building with Existing Elements to Remain
B00686638-P1
12/19/2023
Filed — ALT-CO - New Building with Existing Elements to Remain
B00686638-S3
11/28/2023
Violation issued (HPD, open)
I
03/30/2023
Inspection — Certified Water and Sanitary-WS-Sanitary Piping-Roughing
Certified
View inspection ↗
03/28/2023
Inspection — Certified Remove/Cap - work done in accordance with code
Certified
View inspection ↗
03/22/2023
Violation issued (ECB, open)
Construction
03/22/2023
Violation issued (ECB, open)
Construction
11/17/2022
Violation issued (HPD, open)
I
09/14/2022
Violation issued (DOB, open)
V-DOB VIOLATION - ACTIVE
04/08/2022
Filed — ALT-CO - New Building with Existing Elements to Remain
B00686638-I1
03/16/2022
Violation issued (HPD, open)
I
04/21/2021
Violation issued (HPD, open)
I
11/07/2019
Violation issued (HPD, open)
I
Latest 60 of 73 events.
Permit / Filing Register
SourceWork TypeStatusApplicantIssued
DOB NOWConstruction FencePermit IssuedHOME AWAY FROM HOME COMME01/17/2024
1 project · most recent 04/04/2025
General Wiring
FiledStatusContractorScope
04/04/2025Permit IssuedWCK ELECTRIC CORP.General Wiring
▾Field Inspections (DOB CAP) — 2
DateTypeResultReport
03/30/2023Certified Water and Sanitary-WS-Sanitary Piping-RoughingCertifiedView ↗
03/28/2023Certified Remove/Cap - work done in accordance with codeCertifiedView ↗
▾Special Inspection Requirements (DOB NOW) — 58
DateRequirementInspectorRole
09/11/2025Demolition—special
09/11/2025Structural Stability – Alterations of existing Buildings—special
09/12/2024Fire-Resistant Penetrations and JointsOLABANJI AWOSIKAspecial
09/12/2024Excavations - Sheeting, Shoring, and BracingOLABANJI AWOSIKAspecial
09/12/2024Energy Code Compliance InspectionsOLABANJI AWOSIKAprogress
09/12/2024Footing and FoundationOLABANJI AWOSIKAprogress
09/12/2024FinalOLABANJI AWOSIKAprogress
09/12/2024Fire-Resistance Rated ConstructionOLABANJI AWOSIKAprogress
09/12/2024HVAC-R and service water piping design and insulationOLABANJI AWOSIKAenergy_progress
09/12/2024Air barrier — testing OLABANJI AWOSIKAenergy_progress
09/12/2024Protection of exposed foundation insulationOLABANJI AWOSIKAenergy_progress
09/12/2024Insulation placement and R valuesOLABANJI AWOSIKAenergy_progress
09/12/2024Lighting controlsOLABANJI AWOSIKAenergy_progress
09/12/2024Air barrier - visual inspectionOLABANJI AWOSIKAenergy_progress
09/12/2024HVAC-R and service water heating system controlsOLABANJI AWOSIKAenergy_progress
09/12/2024Fenestration air leakageOLABANJI AWOSIKAenergy_progress
09/12/2024Fenestration and door U-factor and product ratingsOLABANJI AWOSIKAenergy_progress
09/12/2024Electric vehicle service equipment requirementsOLABANJI AWOSIKAenergy_progress
09/12/2024Interior lighting powerOLABANJI AWOSIKAenergy_progress
09/12/2024Maintenance informationOLABANJI AWOSIKAenergy_progress
09/12/2024Structural Stability – Alterations of existing buildingsOLABANJI AWOSIKAspecial
09/12/2024Permanent certificateOLABANJI AWOSIKAenergy_progress
09/12/2024Fenestration areasOLABANJI AWOSIKAenergy_progress
09/12/2024MeteringOLABANJI AWOSIKAenergy_progress
09/12/2024Lighting in dwelling unitsOLABANJI AWOSIKAenergy_progress
Latest 25 of 58.
▾Documents — 40 on file (BIS + DOB NOW)
▸Plans & Drawings4
▸DOB NOWPlans/Sketch4
08/26/2026B00686638-P1Request digital key ↗
08/26/2026B00686638-S3Request digital key ↗
08/26/2026B00686638-I1Request digital key ↗
Showing 3 of 4 on file for this type
▸Zoning, Tax Lot & Property Records8
▸DOB NOWRestrictive Declaration/Easement 13
08/13/2026B00686638-P1Open ↗
08/13/2026B00686638-I1Open ↗
08/13/2026B00686638-S3Open ↗
▸DOB NOWRestrictive Declaration/Easement 23
08/13/2026B00686638-I1Open ↗
08/13/2026B00686638-S3Open ↗
08/13/2026B00686638-P1Open ↗
▸DOB NOWZD1: DOB Zoning Diagram2
08/13/2026B00686638-P1Open ↗
08/13/2026B00686638-I1Open ↗
▸Seals & Professional Certifications12
▸DOB NOWProgress Inspector Seal & Signature6
08/29/2026B00686638-I1Open ↗
08/29/2026B00686638-I1Open ↗
08/29/2026B00686638-I1Open ↗
Showing 3 of 6 on file for this type
▸DOB NOWDPL-1: Design Professional Seal & Signature4
08/26/2026B00686638-S3Open ↗
08/26/2026B00686638-I1Open ↗
08/26/2026B00686638-P1Open ↗
Showing 3 of 4 on file for this type
▸DOB NOWSpecial Inspector Seal & Signature2
08/29/2026B00686638-I1Open ↗
08/29/2026B00686638-P1Open ↗
▸Trade Schedules & Equipment2
▸DOB NOWDEP: Sewer Certification (Sanitary/Storm)2
08/13/2026B00686638-P1Open ↗
08/13/2026B00686638-I1Open ↗
▸Safety & Tenant Protection1
▸DOB NOWParks Department Acknowledgment Letter for Street Trees Plan1
08/13/2026B00686638-I1Open ↗
▸Environmental & Asbestos4
▸DOB NOWDEP ACP-5: Asbestos Assessment Report4
08/26/2026B00686638-S3Open ↗
08/26/2026B00686638-I1Open ↗
08/26/2026B00686638-P1Open ↗
Showing 3 of 4 on file for this type
▸Other Documents9
▸DOB NOWProperty Ownership Certification3
08/26/2026B00686638-I1Open ↗
08/26/2026B00686638-P1Open ↗
08/13/2026B01219854-I1Open ↗
▸DOB NOWSite Survey: Initial2
08/13/2026B00686638-P1Open ↗
08/13/2026B00686638-I1Open ↗
▸DOB NOWLocal Law 92/94 of 2019 Sustainable Roof Zone2
08/13/2026B00686638-P1Open ↗
08/13/2026B00686638-I1Open ↗
▸DOB NOWStructure Photographs1
08/13/2026B01219854-I1Open ↗
▸DOB NOWAdjoining Owners Notification1
08/13/2026B00686638-I1Open ↗