5 Open Violations 1 unresolved · 4 paperwork only▸
DOB02/05/1998V-DOB VIOLATION - ACTIVE
ECB02/20/2026UNLAWFUL ACTS. FAILURE TO COMPLY WITH THE COMMISSIONER'S ORDER. AT TIME OF INSPECTION, OBSERVED AT EXP#1 A CINDER BLOCK STRUCTURE APPROX. 25 FT BY 20 FT, WITH TWO ROLLING GATES INSTALLED APPROX. 82 IN. X 48 IN.Nothing owed — awaiting certificate of correction
ECB03/30/2023WORK WITHOUT A PERMIT. I OBSERVED A CINDER BLOCK STRUCTURE APPROXIMATELY 20 FEET BY 50 FEET CONSTRUCTED WITH NO ROOF, WITH QUESTIONABLE STRUCTURAL STABILITY AND FREE STANDING WALLS. THE WORK IS AROUND 70% COMPLNothing owed — awaiting certificate of correction
ECB11/08/1995FAILURE TO MAINTAIN DEFECT IS BROKEN & DEFECTIVE AND OUT OF PLUMB STRUCTUIAL STEEL SUPPORT AT REAR AND HOLE ON CEILING THROUGHOUT. REMEDY: MAKE ALL REPAIRS IN A SAFE AND LAWFUL MANNER. ALSO SUBMITT A ENGINEER SNothing owed — awaiting certificate of correction
ECB11/08/1995FAILURE TO PROPERLY STORE COMBUSTIBLE MATERIAL OR OTHER MATERICAL AND EQUIPMENT PAINTS CANS THROUGHOUT & SPRAY PANTIY REMEDY: STORE MATERICAL PROPERLY.Nothing owed — awaiting certificate of correction
Unlicensed parking lot · 0 FAR built · Flood zone X
Locations of Work
No floor-level scope or drawing coverage on file for this building.