← Back
One story - permanent living quarter
4528 MURDOCK AVENUE
BRONX · Wakefield-Woodlawn · BIN 2072148
💬 Discuss this project
1920Year Built
1.5Stories
A2Building Class
R4AZoning
1,180 sfGross Floor Area
1Units
One story - permanent living quarter · Owner of record: BABAKAMA 119 LLC · 3,300 sf lot · 0.36 FAR built · Flood zone X
Locations of Work
Architecture
Floor 28p · 1 filing · 20 docs
Floor 19p · 1 filing · 20 docs
Cellar9p · 1 filing · 20 docs
▾Owner History (Filing Record)
Companies and organizations named on filings. Individual owners are not shown.
OwnerFilingsMost Recent
ZMIROT1404/09/2026
▾Sales History (ACRIS)
DatePriceUnitSeller → Buyer$/sf
08/28/2025$1.2M—BABAKAMA 119 LLC → Private party$1,017/sf building
11/07/2024$498K—Private party → BABAKAMA 119 LLC$422/sf building
▾Design Consultants (Architect / Engineer of Record)
FirmFilingsMost Recent
J.K.DESIGN505/11/2025
▾Contractors (License-Anchored)
FirmTradeRolesMost Recent
26 BONIM LLCGeneral Contractor204/09/2026
PLBG P HGeneral Contractor104/09/2026
▾Special Inspection Agencies
AgencyLicense #FilingsMost Recent
AA BUILDING & INSPECTION1519405/11/2025
Building Lifecycle
All (42)Filed (5)Permit Issued (2)Signed Off (2)Inspection (3)Special Inspection (30)
07/28/2025
Signed off — Alteration
X01171805-I1
07/10/2025
Inspection — Pass-Final CND-Occupancy Inspection
Pass
View inspection ↗
06/30/2025
Inspection — Fail-Final CND-Occupancy Inspection
Fail
View inspection ↗
05/16/2025
Inspection — Pass-Final CND-Occupancy Inspection
Pass
View inspection ↗
05/11/2025
Filed — Alteration
X01171805-P1
05/09/2025
Special inspection requirement — Fire-Resistant Penetrations and Joints
Younes Abouyaala
05/09/2025
Special inspection requirement — Energy Code Compliance Inspections
Younes Abouyaala
05/09/2025
Special inspection requirement — Maintenance information
Younes Abouyaala
05/09/2025
Special inspection requirement — HVAC-R and service water heating system controls
Younes Abouyaala
05/09/2025
Special inspection requirement — HVAC-R and service water piping design and insulation
Younes Abouyaala
05/09/2025
Special inspection requirement — HVAC-R and service water heating equipment
Younes Abouyaala
04/08/2025
Special inspection requirement — Energy Code Compliance Inspections
Younes Abouyaala
04/08/2025
Special inspection requirement — Footing and Foundation
Younes Abouyaala
04/08/2025
Special inspection requirement — Structural Wood Frame
Younes Abouyaala
04/08/2025
Special inspection requirement — Final
NAVEEN KUMAR
04/08/2025
Special inspection requirement — Fire-Resistance Rated Construction
Younes Abouyaala
04/08/2025
Special inspection requirement — Insulation placement and R values
Younes Abouyaala
04/08/2025
Special inspection requirement — Fire-Resistant Penetrations and Joints
Younes Abouyaala
04/08/2025
Special inspection requirement — Interior lighting power
Younes Abouyaala
04/08/2025
Special inspection requirement — Fenestration and door U-factor and product ratings
Younes Abouyaala
04/08/2025
Special inspection requirement — Metering
Younes Abouyaala
04/08/2025
Special inspection requirement — Fenestration areas
Younes Abouyaala
04/08/2025
Special inspection requirement — Maintenance information
Younes Abouyaala
04/08/2025
Special inspection requirement — Permanent certificate
Younes Abouyaala
04/08/2025
Special inspection requirement — Fenestration air leakage
Younes Abouyaala
04/08/2025
Special inspection requirement — Electric vehicle service equipment requirements
Younes Abouyaala
04/08/2025
Special inspection requirement — Air barrier - visual inspection
Younes Abouyaala
04/08/2025
Special inspection requirement — Protection of exposed foundation insulation
Younes Abouyaala
04/08/2025
Special inspection requirement — Concrete - Cast-In-Place
Younes Abouyaala
04/08/2025
Special inspection requirement — Chimneys and vents
Younes Abouyaala
04/08/2025
Special inspection requirement — Structural Stability – Alterations of existing buildings
Younes Abouyaala
04/08/2025
Special inspection requirement — Subgrade Inspections
Younes Abouyaala
04/08/2025
Special inspection requirement — Subsurface Investigations (Borings/Test Pits)
BRIAN FLYNN
04/03/2025
Signed off — Alteration
Installation of new construction fence filed in conjunction with ALT CO #X01143408-I1.
X01182007-I1
03/31/2025
Filed — Alteration CO
EXIST 1.5 STORIES (1) ONE FAMILY DWELLING UNIT TO BE HORIZONTALLY AND VERTICALLY ENLARGE, FULLY RENOVATED AND CONVERTED INTO A (2) TWO FAMILY DWELLING UNITS. New drywall partitions and plumbing fixtures as per plans.
X01143408-P1
03/28/2025
Special inspection requirement — Chimneys and vents
Younes Abouyaala
03/28/2025
Special inspection requirement — Concrete - Cast-In-Place
Younes Abouyaala
02/19/2025
Permit issued — Construction Fence
X01182007-I1-FN
02/17/2025
Filed — Alteration
Installation of new construction fence filed in conjunction with ALT CO #X01143408-I1.
X01182007-I1
01/28/2025
Permit issued — General Construction
X01143408-I1-GC-CX
01/27/2025
Filed — Alteration
X01171805-I1
12/15/2024
Filed — Alteration CO
EXIST 1.5 STORIES (1) ONE FAMILY DWELLING UNIT TO BE HORIZONTALLY AND VERTICALLY ENLARGE, FULLY RENOVATED AND CONVERTED INTO A (2) TWO FAMILY DWELLING UNITS. New drywall partitions and plumbing fixtures as per plans.
X01143408-I1
Permit / Filing Register
SourceWork TypeStatusApplicantIssued
DOB NOWConstruction FenceSigned-off26 BONIM02/19/2025
DOB NOWGeneral ConstructionPermit Issued26 BONIM01/28/2025
1 project · most recent 02/18/2025
General Wiring
FiledStatusContractorScope
02/18/2025CompletePOWER SURGE ELECTRIC, INCGeneral Wiring
1 project · most recent 03/31/2025
Concrete Wood
FiledStatusContractorScope
03/31/2025Permit Issued26 BONIM LLCConcrete, Wood
▾Field Inspections (DOB CAP) — 3
DateTypeResultReport
07/10/2025Pass-Final CND-Occupancy InspectionPassView ↗
06/30/2025Fail-Final CND-Occupancy InspectionFailView ↗
05/16/2025Pass-Final CND-Occupancy InspectionPassView ↗
▾Special Inspection Requirements (DOB NOW) — 50
DateRequirementInspectorRole
05/09/2025Fire-Resistant Penetrations and JointsYounes Abouyaalaspecial
05/09/2025Energy Code Compliance InspectionsYounes Abouyaalaprogress
05/09/2025Maintenance informationYounes Abouyaalaenergy_progress
05/09/2025HVAC-R and service water heating system controlsYounes Abouyaalaenergy_progress
05/09/2025HVAC-R and service water piping design and insulationYounes Abouyaalaenergy_progress
05/09/2025HVAC-R and service water heating equipmentYounes Abouyaalaenergy_progress
04/08/2025Energy Code Compliance InspectionsYounes Abouyaalaprogress
04/08/2025Footing and FoundationYounes Abouyaalaprogress
04/08/2025Structural Wood FrameYounes Abouyaalaprogress
04/08/2025FinalNAVEEN KUMARprogress
04/08/2025Fire-Resistance Rated ConstructionYounes Abouyaalaprogress
04/08/2025Insulation placement and R valuesYounes Abouyaalaenergy_progress
04/08/2025Fire-Resistant Penetrations and JointsYounes Abouyaalaspecial
04/08/2025Interior lighting powerYounes Abouyaalaenergy_progress
04/08/2025Fenestration and door U-factor and product ratingsYounes Abouyaalaenergy_progress
04/08/2025MeteringYounes Abouyaalaenergy_progress
04/08/2025Fenestration areasYounes Abouyaalaenergy_progress
04/08/2025Maintenance informationYounes Abouyaalaenergy_progress
04/08/2025Permanent certificateYounes Abouyaalaenergy_progress
04/08/2025Fenestration air leakageYounes Abouyaalaenergy_progress
04/08/2025Electric vehicle service equipment requirementsYounes Abouyaalaenergy_progress
04/08/2025Air barrier - visual inspectionYounes Abouyaalaenergy_progress
04/08/2025Protection of exposed foundation insulationYounes Abouyaalaenergy_progress
04/08/2025Concrete - Cast-In-PlaceYounes Abouyaalaspecial
04/08/2025Chimneys and ventsYounes Abouyaalaspecial
Latest 25 of 50.
▾Documents — 45 on file (BIS + DOB NOW)
▸Plans & Drawings5
▸DOB NOWPlans/Sketch5
08/20/2026X01171805-I1Request digital key ↗
08/20/2026X01171805-P1Request digital key ↗
08/20/2026X01182007-I1Request digital key ↗
Showing 3 of 5 on file for this type
▸Zoning, Tax Lot & Property Records4
▸DOB NOWZD1: DOB Zoning Diagram2
08/13/2026X01143408-I1Open ↗
08/13/2026X01143408-P1Open ↗
▸DOB NOWZoning Exhibit form (1-5)2
08/13/2026X01143408-P1Open ↗
08/13/2026X01143408-I1Open ↗
▸Seals & Professional Certifications18
▸DOB NOWProgress Inspector Seal & Signature8
09/01/2026X01143408-P1Open ↗
09/01/2026X01143408-P1Open ↗
09/01/2026X01143408-P1Open ↗
Showing 3 of 8 on file for this type
▸DOB NOWSpecial Inspector Seal & Signature5
09/01/2026X01143408-P1Open ↗
09/01/2026X01143408-P1Open ↗
08/26/2026X01171805-P1Open ↗
Showing 3 of 5 on file for this type
▸DOB NOWDPL-1: Design Professional Seal & Signature5
08/20/2026X01171805-P1Open ↗
08/20/2026X01171805-I1Open ↗
08/19/2026X01143408-I1Open ↗
Showing 3 of 5 on file for this type
▸Safety & Tenant Protection2
▸DOB NOWStreet Tree Checklist2
08/13/2026X01143408-P1Open ↗
08/13/2026X01143408-I1Open ↗
▸Environmental & Asbestos4
▸DOB NOWDEP ACP-5: Asbestos Assessment Report4
08/20/2026X01171805-I1Open ↗
08/20/2026X01171805-P1Open ↗
08/19/2026X01143408-P1Open ↗
Showing 3 of 4 on file for this type
▸Inspections & Test Reports3
▸DOB NOWSOIL REPORT2
08/13/2026X01143408-I1Open ↗
08/13/2026X01143408-P1Open ↗
▸DOB NOWTR4 Test Report and Plot Diagram1
08/13/2026X01143408-I1Open ↗
▸Other Documents9
▸DOB NOWSite Survey: Initial2
08/13/2026X01143408-P1Open ↗
08/13/2026X01143408-I1Open ↗
▸DOB NOWLocal Law 92/94 of 2019 Sustainable Roof Zone2
08/13/2026X01143408-I1Open ↗
08/13/2026X01143408-P1Open ↗
▸DOB NOWPlot Diagram2
08/13/2026X01143408-I1Open ↗
08/13/2026X01143408-P1Open ↗
▸DOB NOWProperty Ownership Certification2
08/19/2026X01143408-P1Open ↗
08/19/2026X01143408-I1Open ↗
▸DOB NOWFinal Survey1
08/13/2026X01143408-I1Open ↗