1953Year Built
2Stories
A3Building Class
R1-2Zoning
4,919 sfGross Floor Area
1Units
0 Open Violations
Large suburban residence · 14,149 sf lot · 0.35 FAR built · Flood zone X
Locations of Work
ArchitectureMechanical
Cellar2p · 1 filing · 20 docs
Basement1p · 1 filing · 20 docs
▾Sales History (ACRIS)
DatePriceUnitSeller → Buyer$/sf
07/21/2021$2.4M—Private party → Private party$493/sf building
11/21/2016$1.9M—Private party → Private party$376/sf building
▾Design Consultants (Architect / Engineer of Record)
FirmFilingsMost Recent
MICHAEL DERUVO & ASSOC. ARCHITECTS102/22/2023
COLOMBO ARCHITECTURAL STUDIO PC808/11/2022
▾Filing Representatives (Expediters)
RepresentativeFilingsMost Recent
PATRICIA L. GASS203/21/2026
▾Contractors (License-Anchored)
FirmTradeRolesMost Recent
AMAX BUILDERS INCGeneral Contractor407/08/2026
KCM PLUMBING & HEATING COPlumbing207/08/2026
JOSEPH SIGNAElectrical103/21/2026
DNA PLUMBING CONTR. INCPlumbing107/08/2026
▾Special Inspection Agencies
AgencyLicense #FilingsMost Recent
JOSE A SANTOS PE, PC3292708/11/2022
Building Lifecycle
All (54)Filed (9)Permit Issued (5)Signed Off (4)Violation (2)Inspection (9)Special Inspection (25)
03/21/2024
Signed off — Alteration
APPLICATION FILED HEREWITH TO INSTALL NEW GAS FIRED ELECTRIC GENERATOR AT SIDE OF EXISTING RESIDENCE.
X00832526-I1
08/01/2023
Inspection — Pass-Final PL - Up to 3 Requested Floors
Pass
View inspection ↗
06/26/2023
Inspection — Pass-Final PL - Up to 3 Requested Floors
Pass
View inspection ↗
03/27/2023
Inspection — Pass-Final PL - Up to 3 Requested Floors
Pass
View inspection ↗
03/10/2023
Inspection — Certified Gas-Gas-Piping-Roughing
Certified
View inspection ↗
02/28/2023
Permit issued — Plumbing
X00832526-I1-PL
02/22/2023
Filed — Alteration
APPLICATION FILED HEREWITH TO INSTALL NEW GAS FIRED ELECTRIC GENERATOR AT SIDE OF EXISTING RESIDENCE.
X00832526-I1
12/16/2022
Signed off — Alteration
X00774380-I1
12/16/2022
Signed off — Alteration
Installation/ replacement of plumbing fixtures in connection with General Construction Application X00564146-S1. No change in use, egress or occupancy.
X00564146-S1
09/23/2022
Permit issued — General Construction
X00774380-I1-GC
08/11/2022
Filed — Alteration
Installation/ replacement of plumbing fixtures in connection with General Construction Application X00564146-S1. No change in use, egress or occupancy.
X00564146-P5
08/11/2022
Special inspection requirement — HVAC-R and service water heating equipment
Jose Santos
08/11/2022
Special inspection requirement — Maintenance information
Jose Santos
08/11/2022
Special inspection requirement — Fire-Resistant Penetrations and Joints
Jose Santos
08/11/2022
Special inspection requirement — HVAC-R and service water piping design and insulation
Jose Santos
08/11/2022
Special inspection requirement — HVAC-R and service water heating system controls
Jose Santos
08/10/2022
Inspection — Certified Water and Sanitary-WS-Fixtures-Finish
Certified
View inspection ↗
08/10/2022
Special inspection requirement — Fire-Resistant Penetrations and Joints
Jose Santos
08/10/2022
Special inspection requirement — Maintenance information
Jose Santos
08/10/2022
Special inspection requirement — HVAC-R and service water heating equipment
Jose Santos
08/10/2022
Special inspection requirement — HVAC-R and service water heating system controls
Jose Santos
08/10/2022
Special inspection requirement — HVAC-R and service water piping design and insulation
Jose Santos
07/29/2022
Filed — Alteration
X00774380-I1
05/29/2022
Inspection — Certified Remove/Cap - work done in accordance with code
Certified
View inspection ↗
05/19/2022
Inspection — Pass-Final PL - Up to 3 Requested Floors
Pass
View inspection ↗
04/26/2022
Signed off — Alteration
Installation/ replacement of plumbing fixtures in connection with General Construction Application X00564146-S1. No change in use, egress or occupancy.
X00564146-I1
04/22/2022
Special inspection requirement — Final
Yahaira Volquez Colombo
04/22/2022
Special inspection requirement — Structural Stability – Alterations of existing buildings
Jose Santos
04/22/2022
Special inspection requirement — Fire-Resistant Penetrations and Joints
Jose Santos
04/21/2022
Filed — Alteration
Installation/ replacement of plumbing fixtures in connection with General Construction Application X00564146-S1. No change in use, egress or occupancy.
X00564146-P3
04/04/2022
Filed — Alteration
Installation/ replacement of plumbing fixtures in connection with General Construction Application X00564146-S1. No change in use, egress or occupancy.
X00564146-P4
03/31/2022
Special inspection requirement — Fire-Resistant Penetrations and Joints
Jose Santos
03/31/2022
Special inspection requirement — Structural Stability – Alterations of existing buildings
Jose Santos
03/31/2022
Special inspection requirement — Final
Yahaira Volquez Colombo
03/31/2022
Special inspection requirement — Fenestration areas
Jose Santos
03/31/2022
Special inspection requirement — Fenestration and door U-factor and product ratings
Jose Santos
03/31/2022
Special inspection requirement — Fenestration air leakage
Jose Santos
03/31/2022
Special inspection requirement — Interior lighting power
Jose Santos
01/12/2022
Inspection — Pass-Final PL - Up to 3 Requested Floors
Pass
View inspection ↗
12/29/2021
Inspection — Fail-Final PL - Up to 3 Requested Floors
Fail
View inspection ↗
12/18/2021
Filed — Alteration
Installation/ replacement of plumbing fixtures in connection with General Construction Application X00564146-S1. No change in use, egress or occupancy.
X00564146-P2
12/14/2021
Special inspection requirement — Fire-Resistant Penetrations and Joints
Jose Santos
12/14/2021
Special inspection requirement — HVAC-R and service water heating equipment
Jose Santos
12/14/2021
Special inspection requirement — HVAC-R and service water piping design and insulation
Jose Santos
12/14/2021
Special inspection requirement — Maintenance information
Jose Santos
12/14/2021
Special inspection requirement — HVAC-R and service water heating system controls
Jose Santos
11/20/2021
Filed — Alteration
Installation/ replacement of plumbing fixtures in connection with General Construction Application X00564146-S1. No change in use, egress or occupancy.
X00564146-P1
10/21/2021
Permit issued — General Construction
X00564146-I1-GC
09/27/2021
Permit issued — Plumbing
X00564146-S1-PL
09/15/2021
Filed — Alteration
Installation/ replacement of plumbing fixtures in connection with General Construction Application X00564146-S1. No change in use, egress or occupancy.
X00564146-S1
08/03/2021
Permit issued — General Construction
X00564146-I1-GC
07/26/2021
Filed — Alteration
Installation/ replacement of plumbing fixtures in connection with General Construction Application X00564146-S1. No change in use, egress or occupancy.
X00564146-I1
12/08/2016
Violation issued (DOB, closed)
V*-DOB VIOLATION - DISMISSED
12/08/2016
Violation issued (DOB, closed)
V*-DOB VIOLATION - DISMISSED
Permit / Filing Register
SourceWork TypeStatusApplicantIssued
DOB NOWPlumbingSigned-offKCM PLUMBING & HEATING CO02/28/2023
DOB NOWGeneral ConstructionSigned-offAMAX BUILDERS INC09/23/2022
DOB NOWGeneral ConstructionSigned-offAMAX BUILDERS INC10/21/2021
DOB NOWPlumbingSigned-offDNA PLUMBING CONTR. INC09/27/2021
DOB NOWGeneral ConstructionSigned-offAMAX BUILDERS INC08/03/2021
BISPLISSUEDAQUA PLUMBING & HTNG CORP07/09/2004
BISPLISSUEDNATIONWIDE MECHANICAL INC05/25/2004
BISOTISSUEDZENON_CONSTRUCTION05/06/2004
BISMHISSUEDZENON_CONSTRUCTION05/05/2004
1 project · most recent 03/03/2023
FiledStatusContractorScope
03/03/2023CompleteAQUATECH MECH,PLBG & ELEC1 meters
▾Field Inspections (DOB CAP) — 9
DateTypeResultReport
08/01/2023Pass-Final PL - Up to 3 Requested FloorsPassView ↗
06/26/2023Pass-Final PL - Up to 3 Requested FloorsPassView ↗
03/27/2023Pass-Final PL - Up to 3 Requested FloorsPassView ↗
03/10/2023Certified Gas-Gas-Piping-RoughingCertifiedView ↗
08/10/2022Certified Water and Sanitary-WS-Fixtures-FinishCertifiedView ↗
05/29/2022Certified Remove/Cap - work done in accordance with codeCertifiedView ↗
05/19/2022Pass-Final PL - Up to 3 Requested FloorsPassView ↗
01/12/2022Pass-Final PL - Up to 3 Requested FloorsPassView ↗
12/29/2021Fail-Final PL - Up to 3 Requested FloorsFailView ↗
▾Special Inspection Requirements (DOB NOW) — 25
DateRequirementInspectorRole
08/11/2022HVAC-R and service water heating equipmentJose Santosenergy_progress
08/11/2022Maintenance informationJose Santosenergy_progress
08/11/2022Fire-Resistant Penetrations and JointsJose Santosspecial
08/11/2022HVAC-R and service water piping design and insulationJose Santosenergy_progress
08/11/2022HVAC-R and service water heating system controlsJose Santosenergy_progress
08/10/2022Fire-Resistant Penetrations and JointsJose Santosspecial
08/10/2022Maintenance informationJose Santosenergy_progress
08/10/2022HVAC-R and service water heating equipmentJose Santosenergy_progress
08/10/2022HVAC-R and service water heating system controlsJose Santosenergy_progress
08/10/2022HVAC-R and service water piping design and insulationJose Santosenergy_progress
04/22/2022FinalYahaira Volquez Colomboprogress
04/22/2022Structural Stability – Alterations of existing buildingsJose Santosspecial
04/22/2022Fire-Resistant Penetrations and JointsJose Santosspecial
03/31/2022Fire-Resistant Penetrations and JointsJose Santosspecial
03/31/2022Structural Stability – Alterations of existing buildingsJose Santosspecial
03/31/2022FinalYahaira Volquez Colomboprogress
03/31/2022Fenestration areasJose Santosenergy_progress
03/31/2022Fenestration and door U-factor and product ratingsJose Santosenergy_progress
03/31/2022Fenestration air leakageJose Santosenergy_progress
03/31/2022Interior lighting powerJose Santosenergy_progress
12/14/2021Fire-Resistant Penetrations and JointsJose Santosspecial
12/14/2021HVAC-R and service water heating equipmentJose Santosenergy_progress
12/14/2021HVAC-R and service water piping design and insulationJose Santosenergy_progress
12/14/2021Maintenance informationJose Santosenergy_progress
12/14/2021HVAC-R and service water heating system controlsJose Santosenergy_progress
▾Documents — 51 on file (BIS + DOB NOW)
▸Plans & Drawings9
▸DOB NOWPlans/Sketch9
08/24/2026X00564146-P1Request digital key ↗
08/24/2026X00564146-S1Request digital key ↗
08/24/2026X00564146-I1Request digital key ↗
Showing 3 of 9 on file for this type
▸Applications & Permits9
▸DOB NOWLPC Approval/Permit9
08/13/2026X00564146-I1Open ↗
08/13/2026X00774380-I1Open ↗
08/13/2026X00564146-S1Open ↗
Showing 3 of 9 on file for this type
▸Seals & Professional Certifications23
▸DOB NOWDPL-1: Design Professional Seal & Signature9
08/24/2026X00564146-S1Open ↗
08/24/2026X00564146-I1Open ↗
08/24/2026X00564146-P5Open ↗
Showing 3 of 9 on file for this type
▸DOB NOWSpecial Inspector Seal & Signature7
09/30/2026X00564146-P5Open ↗
09/01/2026X00564146-P3Open ↗
09/01/2026X00564146-P3Open ↗
Showing 3 of 7 on file for this type
▸DOB NOWProgress Inspector Seal & Signature7
09/30/2026X00564146-P5Open ↗
09/01/2026X00564146-P3Open ↗
09/01/2026X00564146-P3Open ↗
Showing 3 of 7 on file for this type
▸Environmental & Asbestos8
▸DOB NOWDEP ACP-5: Asbestos Assessment Report8
08/24/2026X00564146-S1Open ↗
08/24/2026X00564146-I1Open ↗
08/24/2026X00564146-P5Open ↗
Showing 3 of 8 on file for this type
▸Energy Compliance2
▸DOB NOWEN2: As Built Energy Analysis.2
08/13/2026X00564146-I1Open ↗