HPD11/06/2020§ 27-2013 ADMIN. CODE: PAINT WITH LIGHT COLORED PAINT TO THE SATISFACTION OF THIS DEPARTMENT CEILING IN THE BATHROOM LOCATED AT APT 1FLOOR, 1st STORY, 1st APARTMENT FROM EAST AT SOUTH
ECB11/07/2019AT TIME OF INSPECTION, OBSERVED PERIMETER WALL TO BE APPROXIMATELY 10' IN HEIGHT ERECTED OUT OF MASONRY. MASONRY WALL HAS EXTENSIVE CRACKING AT ALL FACES (EXPOSURE #1, 2, & 3) OF WALL CREATING A SAFETY HAZARD FNothing owed — awaiting certificate of correction
Two family frame · 5,000 sf lot · 0.41 FAR built · Flood zone X
Locations of Work
No floor-level scope or drawing coverage on file for this building.