Elevator apt, fireproof without stores
Cambridge Hall
456 RIVERSIDE DRIVE · Name © OpenStreetMap contributors · BIN 1059829
💬 Discuss this project
1911Year Built
12Stories
D3Building Class
R8Zoning
47,327 sfGross Floor Area
45Units
LL97 CoveredRent Stabilized9 Open Violations 7 unresolved · 2 paperwork only ▸FISP: SAFE
Elevator apt, fireproof without stores · Owner of record: TRUSTEES OF COLUMBIA UNIVERSITY · 5,668 sf lot · 8.35 FAR built · Flood zone X
Locations of Work
Plumbing
Floor 124p · 1 filing · 10 docs
Floor 11
Floor 10
Floor 9
Floor 8
Floor 7
Floor 6
Floor 5
Floor 4
Floor 3
Floor 2
Floor 1
▾Owner History (Filing Record)
Companies and organizations named on filings. Individual owners are not shown.
OwnerFilingsMost Recent
COLUMBIA RESIDENTIAL1607/08/2026
COLUMBIA UNIVERSITY1703/22/2026
▾Design Consultants (Architect / Engineer of Record)
▾Filing Representatives (Expediters)
RepresentativeFilingsMost Recent
AE DESIGN SOLUTION203/21/2026
CONVERSANO ASSOCIATES, INC.1203/21/2026
FRAMEWORK CONSULTANTS1403/21/2026
▾Contractors (License-Anchored)
FirmTradeRolesMost Recent
JR CONSTRUCTION CORPGeneral Contractor1307/08/2026
ABSOLUTE PLBG & HTG CORPPlumbing807/08/2026
SPRING SCAFFOLDING LLCGeneral Contractor707/08/2026
DOUMAS ELECTRIC INC.Electrical403/22/2026
COSMOPOLITAN CONSTRUCTIO*General Contractor407/08/2026
ANDREW LIVADITISElectrical303/21/2026
TROPIC AIR INCGeneral Contractor203/21/2026
CRUGNALE, MICHAELElectrical203/21/2026
DUNN, JEREMYElectrical203/21/2026
DIFUSCO, ALFONSOElectrical203/21/2026
ALAFOGIANNIS PLBG & HTGPlumbing107/08/2026
DOMINICK CATELLOElectrical103/21/2026
DONOHUE, MICHAELElectrical103/21/2026
MAROTTA & SONS P & H CONTElectrical103/21/2026
MCCLARIN, LEROYElectrical103/21/2026
SINISCALCHI, SElectrical103/21/2026
SPERO, ADAMElectrical103/21/2026
THWAITES, ANTHONYElectrical103/21/2026
▾Special Inspection Agencies
AgencyLicense #FilingsMost Recent
ALAN MARGOLIN & ASSOC423112/27/2024
NAPACH ARCHITECTU2945712/27/2024
COLE TECHNOLOGIES/CONTROL1290303/14/2022
BENDIX ENGINEERING, P.C.4293307/21/2021
Building Lifecycle
All (153)Filed (14)Permit Issued (18)Signed Off (11)Facade (FISP) (9)Violation (56)Inspection (11)Objection (4)Special Inspection (30)
09/26/2025
Signed off — Alteration
GENERAL PLUMBING MODIFICATIONS PER PLANS FILED. THERE IS NO CHANGE IN OCCUPANCY USE OR EGRESS UNDER THIS APPLICATIONS
M01109170-S2
09/19/2025
Signed off — Alteration
GENERAL PLUMBING MODIFICATIONS PER PLANS FILED. THERE IS NO CHANGE IN OCCUPANCY USE OR EGRESS UNDER THIS APPLICATIONS
M01109170-S1
09/15/2025
Signed off — Alteration
GENERAL PLUMBING MODIFICATIONS PER PLANS FILED. THERE IS NO CHANGE IN OCCUPANCY USE OR EGRESS UNDER THIS APPLICATIONS
M01109170-I1
07/08/2025
Inspection — Certified Remove/Cap - work done in accordance with code
Certified
View inspection ↗
07/02/2025
Inspection — Certified Water and Sanitary-WS-Fixtures-Finish
Certified
View inspection ↗
03/24/2025
Permit issued — Mechanical Systems
M01109170-S2-MS
03/13/2025
Inspection — Certified Water and Sanitary-WS-Sanitary Piping-Roughing
Certified
View inspection ↗
02/21/2025
Inspection — Certified Water and Sanitary-WS-Sanitary Piping-Roughing
Certified
View inspection ↗
12/27/2024
Filed — Alteration
GENERAL PLUMBING MODIFICATIONS PER PLANS FILED. THERE IS NO CHANGE IN OCCUPANCY USE OR EGRESS UNDER THIS APPLICATIONS
M01109170-S2
12/09/2024
Permit issued — Plumbing
M01109170-S1-PL
12/02/2024
Permit issued — General Construction
M01109170-I1-GC
12/02/2024
Special inspection requirement — Post-installed Anchors
Young Suh
11/26/2024
Filed — Alteration
GENERAL PLUMBING MODIFICATIONS PER PLANS FILED. THERE IS NO CHANGE IN OCCUPANCY USE OR EGRESS UNDER THIS APPLICATIONS
M01109170-S1
11/25/2024
Special inspection requirement — Heating Systems
JOEL NAPACH
10/23/2024
Filed — Alteration
GENERAL PLUMBING MODIFICATIONS PER PLANS FILED. THERE IS NO CHANGE IN OCCUPANCY USE OR EGRESS UNDER THIS APPLICATIONS
M01109170-I1
10/22/2024
Special inspection requirement — Tenant Protection Plan Compliance
JOEL NAPACH
10/22/2024
Special inspection requirement — Tenant Protection Plan Compliance
JOEL NAPACH
10/22/2024
Special inspection requirement — Tenant Protection Plan Compliance
JOEL NAPACH
09/11/2024
Signed off — Alteration
M00874113-I1
09/10/2024
Special inspection requirement — Lighting in dwelling units
JOEL NAPACH
09/10/2024
Special inspection requirement — Final
JOEL NAPACH
09/10/2024
Special inspection requirement — Mechanical Systems
JOEL NAPACH
09/10/2024
Special inspection requirement — Final
JOEL NAPACH
09/10/2024
Special inspection requirement — Energy Code Compliance Inspections
JOEL NAPACH
09/10/2024
Special inspection requirement — Fire-Resistant Penetrations and Joints
JOEL NAPACH
09/10/2024
Special inspection requirement — Lighting controls
JOEL NAPACH
09/10/2024
Special inspection requirement — Interior lighting power
JOEL NAPACH
08/12/2024
Signed off — Alteration
GENERAL PLUMBING MODIFICATIONS TO UNITS 6A/7A AS PER PLANS. NO CHANGE IN OCCUPANCY USE OR EGRESS UNDER THIS APPLICATION
M00874232-I1
08/06/2024
Signed off — Alteration
M00874098-I1
06/06/2024
Inspection — Certified Remove/Cap - work done in accordance with code
Certified
View inspection ↗
06/06/2024
Inspection — Certified Water and Sanitary-WS-Fixtures-Finish
Certified
View inspection ↗
04/01/2024
Violation issued (HPD, closed)
A
03/22/2024
Permit issued — General Construction
M00874098-I1-GC
03/22/2024
Permit issued — Mechanical Systems
M00874113-I1-MS
02/26/2024
Inspection — Certified Water and Sanitary-WS-Sanitary Piping-Roughing
Certified
View inspection ↗
01/24/2024
Filed — Alteration
GENERAL PLUMBING MODIFICATIONS TO UNITS 6A/7A AS PER PLANS. NO CHANGE IN OCCUPANCY USE OR EGRESS UNDER THIS APPLICATION
M00874232-P1
01/24/2024
Special inspection requirement — Fire-Resistant Penetrations and Joints
JOEL NAPACH
01/09/2024
Special inspection requirement — Fire-Resistant Penetrations and Joints
JOEL NAPACH
11/17/2023
Permit issued — Plumbing
M00874232-I1-PL
11/17/2023
Permit issued — Mechanical Systems
M00874113-I1-MS
11/17/2023
Permit issued — General Construction
M00874098-I1-GC
08/31/2023
Filed — Alteration
M00874113-I1
08/31/2023
Filed — Alteration
GENERAL PLUMBING MODIFICATIONS TO UNITS 6A/7A AS PER PLANS. NO CHANGE IN OCCUPANCY USE OR EGRESS UNDER THIS APPLICATION
M00874232-I1
08/28/2023
Filed — Alteration
M00874098-I1
06/20/2023
Violation issued (DOB, closed)
V*-DOB VIOLATION - DISMISSED
05/12/2023
Special inspection requirement — Final
JOEL NAPACH
05/12/2023
Special inspection requirement — Lighting controls
JOEL NAPACH
05/12/2023
Special inspection requirement — Lighting in dwelling units
JOEL NAPACH
05/12/2023
Special inspection requirement — Interior lighting power
JOEL NAPACH
05/12/2023
Special inspection requirement — Fire-Resistant Penetrations and Joints
JOEL NAPACH
10/19/2022
Signed off — Alteration
PLUMBING WORK FOR APT 12B RENOVATIONS AS PER PLANS FILED HEREWITH.
M00572090-I1
09/09/2022
Signed off — Alteration
RENOVATIONS TO APT 12B, MINOR PARTITIONS AS PER PLANS FILED HEREWITH. NO CHANGE IN USE, EGRESS OR OCCUPANCY
M00572027-I1
06/09/2022
Inspection — Pass-Final PL - Up to 3 Requested Floors
Pass
View inspection ↗
04/22/2022
Inspection — Certified Gas-Gas-Piping-Roughing
Certified
View inspection ↗
04/22/2022
Inspection — Certified Water and Sanitary-WS-Sanitary Piping-Roughing
Certified
View inspection ↗
03/21/2022
Inspection — Certified Water and Sanitary-WS-Sanitary Piping-Roughing
Certified
View inspection ↗
03/16/2022
Special inspection requirement — Fire-Resistant Penetrations and Joints
GEORGE ANDERSEN
03/14/2022
Filed — Alteration
PLUMBING WORK FOR APT 12B RENOVATIONS AS PER PLANS FILED HEREWITH.
M00572090-P1
02/08/2022
Special inspection requirement — Fire-Resistant Penetrations and Joints
GEORGE ANDERSEN
01/11/2022
Permit issued — Plumbing
M00572090-I1-PL
Latest 60 of 153 events.
Permit / Filing Register
SourceWork TypeStatusApplicantIssued
DOB NOWMechanical SystemsSigned-offCOSMOPOLITAN CONSTRUCTIO*03/24/2025
DOB NOWPlumbingSigned-offABSOLUTE PLBG & HTG CORP12/09/2024
DOB NOWGeneral ConstructionSigned-offCOSMOPOLITAN CONSTRUCTIO*12/02/2024
DOB NOWGeneral ConstructionSigned-offJR CONSTRUCTION CORP03/22/2024
DOB NOWMechanical SystemsSigned-offJR CONSTRUCTION CORP03/22/2024
DOB NOWPlumbingSigned-offALAFOGIANNIS PLBG & HTG11/17/2023
DOB NOWMechanical SystemsSigned-offJR CONSTRUCTION CORP11/17/2023
DOB NOWGeneral ConstructionSigned-offJR CONSTRUCTION CORP11/17/2023
DOB NOWPlumbingSigned-offABSOLUTE PLBG & HTG CORP01/11/2022
DOB NOWPlumbingSigned-offABSOLUTE PLBG & HTG CORP11/26/2021
DOB NOWGeneral ConstructionSigned-offJR CONSTRUCTION CORP11/23/2021
DOB NOWSidewalk ShedSigned-offSPRING SCAFFOLDING LLC03/04/2021
DOB NOWSidewalk ShedSigned-offSPRING SCAFFOLDING LLC12/18/2020
DOB NOWMechanical SystemsSigned-offTROPIC AIR INC12/02/2020
DOB NOWPlumbingSigned-offABSOLUTE PLBG & HTG CORP08/19/2020
DOB NOWSidewalk ShedSigned-offSPRING SCAFFOLDING LLC03/03/2020
DOB NOWSidewalk ShedSigned-offSPRING SCAFFOLDING LLC12/19/2019
DOB NOWSidewalk ShedSigned-offSPRING SCAFFOLDING LLC03/04/2019
BISOTISSUEDJR CONSTRUCTION CORP03/22/2021
BISOTISSUEDHENRY RESTORATION LTD03/03/2021
BISOTISSUEDJR CONSTRUCTION CORP12/09/2020
BISOTISSUEDJR CONSTRUCTION CORP07/27/2020
BISOTISSUEDHENRY RESTORATION LTD10/01/2019
BISOTISSUEDHENRY RESTORATION LTD07/02/2019
BISPLISSUEDC JAMES PLBG & HTG INC09/23/2016
BISOTISSUEDCOLUMBIA UNIVERSITY07/19/2016
BISOTISSUEDHENRY RESTORATION LTD09/30/2015
BISOTISSUEDHENRY RESTORATION LTD04/09/2015
BISEQISSUEDEVEREST SCAFFOLDING INC03/30/2015
BISBLISSUEDCC CONTROLLED PLBG CO INC07/29/2014
BISPLISSUEDABSOLUTE PLBG & HTG CORP04/30/2014
BISOTISSUEDCOLUMBIA UNIVERSITY08/07/2013
BISPLISSUEDABSOLUTE PLBG & HTG CORP02/21/2013
BISOTISSUEDCOLUMBIA UNIVERSITY02/11/2013
BISFBISSUEDC C CONTROLLED COMBUSTION01/30/2013
BISPLISSUEDCC CONTROLLED PLBG CO INC01/30/2013
BISOTISSUEDC C CONTROLLED COMBUSTION12/18/2012
BISPLISSUEDBARGAIN PLUMBING INC03/20/2012
BISOTISSUEDCOLUMBIA UNIVERSITY11/10/2011
BISEQISSUEDS&E BRIDGE & SCAFFOLD LLC.03/31/2010
+ 19 more permits on file
8 projects · most recent 12/06/2024
General Wiring
FiledStatusContractorScope
12/06/2024CompleteDOUMAS ELECTRIC INC.—
12/06/2024Permit IssuedDOUMAS ELECTRIC INC.General Wiring
06/25/2024CompleteDOUMAS ELECTRIC INC.General Wiring
06/25/2024CompleteDOUMAS ELECTRIC INC.General Wiring
11/18/2023Permit IssuedDOUMAS ELECTRIC INC.General Wiring
12/03/2021Permit IssuedLIVE WIRE ELECTRIC 1 LLCGeneral Wiring
05/20/2021CompleteLIVE WIRE ELECTRIC 1 LLCGeneral Wiring
03/01/2019CompleteTOP SHELF ELECTRIC CORP—
▾Field Inspections (DOB CAP) — 11
DateTypeResultReport
07/08/2025Certified Remove/Cap - work done in accordance with codeCertifiedView ↗
07/02/2025Certified Water and Sanitary-WS-Fixtures-FinishCertifiedView ↗
03/13/2025Certified Water and Sanitary-WS-Sanitary Piping-RoughingCertifiedView ↗
02/21/2025Certified Water and Sanitary-WS-Sanitary Piping-RoughingCertifiedView ↗
06/06/2024Certified Remove/Cap - work done in accordance with codeCertifiedView ↗
06/06/2024Certified Water and Sanitary-WS-Fixtures-FinishCertifiedView ↗
02/26/2024Certified Water and Sanitary-WS-Sanitary Piping-RoughingCertifiedView ↗
06/09/2022Pass-Final PL - Up to 3 Requested FloorsPassView ↗
04/22/2022Certified Gas-Gas-Piping-RoughingCertifiedView ↗
04/22/2022Certified Water and Sanitary-WS-Sanitary Piping-RoughingCertifiedView ↗
03/21/2022Certified Water and Sanitary-WS-Sanitary Piping-RoughingCertifiedView ↗
▾Special Inspection Requirements (DOB NOW) — 42
DateRequirementInspectorRole
12/02/2024Post-installed AnchorsYoung Suhspecial
11/25/2024Heating SystemsJOEL NAPACHspecial
10/22/2024Tenant Protection Plan ComplianceJOEL NAPACHspecial
10/22/2024Tenant Protection Plan ComplianceJOEL NAPACHspecial
10/22/2024Tenant Protection Plan ComplianceJOEL NAPACHspecial
09/10/2024Lighting in dwelling unitsJOEL NAPACHenergy_progress
09/10/2024FinalJOEL NAPACHprogress
09/10/2024Mechanical SystemsJOEL NAPACHspecial
09/10/2024FinalJOEL NAPACHprogress
09/10/2024Energy Code Compliance InspectionsJOEL NAPACHprogress
09/10/2024Fire-Resistant Penetrations and JointsJOEL NAPACHspecial
09/10/2024Lighting controlsJOEL NAPACHenergy_progress
09/10/2024Interior lighting powerJOEL NAPACHenergy_progress
01/24/2024Fire-Resistant Penetrations and JointsJOEL NAPACHspecial
01/09/2024Fire-Resistant Penetrations and JointsJOEL NAPACHspecial
05/12/2023FinalJOEL NAPACHprogress
05/12/2023Lighting controlsJOEL NAPACHenergy_progress
05/12/2023Lighting in dwelling unitsJOEL NAPACHenergy_progress
05/12/2023Interior lighting powerJOEL NAPACHenergy_progress
05/12/2023Fire-Resistant Penetrations and JointsJOEL NAPACHspecial
03/16/2022Fire-Resistant Penetrations and JointsGEORGE ANDERSENspecial
02/08/2022Fire-Resistant Penetrations and JointsGEORGE ANDERSENspecial
08/16/2021Mechanical SystemsMatthew Bendixspecial
08/16/2021Permanent certificateMatthew Bendixenergy_progress
08/16/2021HVAC and service water heating system controls Matthew Bendixenergy_progress
Latest 25 of 42.
▾Documents — 333 on file (BIS + DOB NOW)
▸Plans & Drawings14
▸DOB NOWPlans/Sketch10
09/03/2026M00572027-I1Request digital key ↗
09/02/2026M00572090-P1Request digital key ↗
09/02/2026M00572090-I1Request digital key ↗
Showing 3 of 10 on file for this type
▸DOB NOWPlans/Sketch - Mechanical Systems2
09/03/2026M00290631-P1Request digital key ↗
08/14/2026M00290631-I1Request digital key ↗
▸DOB NOWPlans/Sketch - Plumbing1
09/05/2026M00290562-I1Request digital key ↗
▸DOB NOWPlans/Sketch - Sidewalk Shed1
09/05/2026M00135753-I1Request digital key ↗
▸Applications & Permits63
▸BISWORK PERMIT APPLICATION29
07/27/2020123695698Open ↗
07/27/2020123695698Open ↗
10/01/2019140815161Open ↗
Showing 3 of 29 on file for this type
▸BISPLAN / WORK APPROVAL APPLICATION22
06/15/2021140815161Open ↗
06/04/2021140815161Open ↗
11/09/2020123695698Open ↗
Showing 3 of 22 on file for this type
▸DOB NOWLPC Approval/Permit12
09/03/2026M00572027-I1Open ↗
09/02/2026M00572090-I1Open ↗
08/13/2026M00874232-P1Open ↗
Showing 3 of 12 on file for this type
▸Seals & Professional Certifications103
▸BISTECHNICAL REPORT: RESPONSIBILITY/CERTIFICATION27
03/11/2020123695698Open ↗
03/11/2020123695698Open ↗
11/01/2016122344310Open ↗
Showing 3 of 27 on file for this type
▸DOB NOWProgress Inspector Seal & Signature27
09/23/2026M01109170-I1Open ↗
09/23/2026M01109170-I1Open ↗
09/01/2026M00290631-P1Open ↗
Showing 3 of 27 on file for this type
▸DOB NOWSpecial Inspector Seal & Signature15
09/29/2026M00874232-I1Open ↗
09/23/2026M01109170-I1Open ↗
09/23/2026M01109170-I1Open ↗
Showing 3 of 15 on file for this type
▸DOB NOWDPL-1: Design Professional Seal & Signature14
09/05/2026M00135753-I1Open ↗
09/05/2026M00290562-I1Open ↗
09/03/2026M00572027-I1Open ↗
Showing 3 of 14 on file for this type
▸BISPROFESSIONAL CERTIFIED CHECKLIST7
03/11/2020123695698Open ↗
04/09/2015122344310Open ↗
07/31/2014122082334Open ↗
Showing 3 of 7 on file for this type
▸BISPROFESSIONAL CERTIFICATION STATEMENT5
03/11/2020123695698Open ↗
12/07/2018140815161Open ↗
04/09/2015122344310Open ↗
Showing 3 of 5 on file for this type
▸BISPROFESSIONAL CERTIFICATION STATEMENT FORM4
01/31/2013121508751Open ↗
12/19/2012121464879Open ↗
04/01/2010120305892Open ↗
Showing 3 of 4 on file for this type
▸BISTECHNICAL REPORT STATEMENT OF RESPONSIBILITY2
12/07/2018140815161Open ↗
03/25/2015140325930Open ↗
▸BISREQUIRED ITEMS CHECKLIST FOR PROFESSIONAL CERTIFICATION2
12/07/2018140815161Open ↗
03/25/2015140325930Open ↗
▸Trade Schedules & Equipment14
▸BISSCHEDULE B - PLUMBING6
01/17/2013121473379Open ↗
11/04/2011120836195Open ↗
11/14/2009120194397Open ↗
Showing 3 of 6 on file for this type
▸BISSELF-CERT PLUMBING NOTICE4
09/04/2014121508751Open ↗
05/08/2014121473379Open ↗
05/24/2013121508751Open ↗
Showing 3 of 4 on file for this type
▸BISSCHEDULE C - HEATING & COMBUSTION EQUIPMENT3
07/31/2014122082334Open ↗
01/31/2013121508751Open ↗
01/31/2013121508751Open ↗
▸BISSCHEDULE B - PLUMBING/SPRINKLER/STANDPIPE1
07/14/2016122828191Open ↗
▸Safety & Tenant Protection7
▸BISTENANT PROTECTION PLAN AND NOTES4
11/19/2020123695698Open ↗
11/05/2020123695698Open ↗
12/07/2018140815161Open ↗
Showing 3 of 4 on file for this type
▸DOB NOWTenant Protection Plan3
08/13/2026M00290631-P1Open ↗
08/13/2026M00290562-I1Open ↗
08/13/2026M00290631-I1Open ↗
▸Environmental & Asbestos32
▸DOB NOWDEP ACP-5: Asbestos Assessment Report10
09/05/2026M00290562-I1Open ↗
09/03/2026M00572027-I1Open ↗
09/02/2026M00572090-I1Open ↗
Showing 3 of 10 on file for this type
▸BISASBESTOS: CERTIFICATION (DEP ACP5)9
03/11/2020123695698Open ↗
12/07/2018140815161Open ↗
07/14/2016122828191Open ↗
Showing 3 of 9 on file for this type
▸BISTHIS IS 'NOT AN ASBESTOS PROJECT'7
11/04/2011120836195Open ↗
11/14/2009120194397Open ↗
07/08/2009120100229Open ↗
Showing 3 of 7 on file for this type
▸DOB NOWDEP ACP-20/ACP-21: Asbestos Project Conditional Completion Form/Asbestos Project Completion Form3
08/13/2026M01109170-I1Open ↗
08/13/2026M01109170-S2Open ↗
08/13/2026M01109170-S1Open ↗
▸BISASBESTOS EXEMPTION CERTIFICATION LETTER2
04/01/2010120305892Open ↗
Showing 1 of 2 on file for this type
▸BISACP5 ASBESTOS: CERTIFICATION (DEP ACP5)1
02/01/2013121473379Open ↗
▸Energy Compliance24
▸BISTECHNICAL REPORT: ENERGY CODE PROGRESS INSPS14
03/11/2020123695698Open ↗
03/11/2020123695698Open ↗
11/01/2016122344310Open ↗
Showing 3 of 14 on file for this type
▸BISAS-BUILT ENERGY ANALYSIS5
11/01/2016122344310Open ↗
12/29/2014122082334Open ↗
09/20/2013121464879Open ↗
Showing 3 of 5 on file for this type
▸BISTR8: Energy Code Progress Inspections2
11/07/2014121508751Open ↗
01/17/2013121473379Open ↗
▸BISNYCECC EXEMPTION1
12/07/2018140815161Open ↗
▸BISTECHNICAL REPORT: ENERGY1
11/04/2011120836195Open ↗
▸BISELECTRICAL APPLICATION FOR SIDEWALK SHED LIGHTING1
03/25/2015140325930Open ↗
▸Inspections & Test Reports6
▸BISTECHNICAL REPORT: RESPONSIBILITY6
08/31/2021140815161Open ↗
06/15/2021140815161Open ↗
11/05/2020123695698Open ↗
Showing 3 of 6 on file for this type
▸Approvals, Objections & Sign-offs25
▸BISADMINISTRATIVE OBJECTIONS11
01/31/2013121508751Open ↗
01/17/2013121473379Open ↗
12/19/2012121464879Open ↗
Showing 3 of 11 on file for this type
▸BISCERTIFICATE OF OCCUPANCY/LOC: REQUEST8
08/31/2021140815161Open ↗
11/01/2016122344310Open ↗
04/28/2016140325930Open ↗
Showing 3 of 8 on file for this type
▸BISLETTERS - SUPPORTING DOCUMENTATION3
11/01/2016122344310Open ↗
11/07/2014121508751Open ↗
09/20/2013121464879Open ↗
▸BISLANDMARKS APPROVAL2
03/11/2020123695698Open ↗
12/07/2018140815161Open ↗
▸BISSHED LETTER1
05/06/2010110458291Open ↗
▸Cost, Insurance & Ownership26
▸BISCOST AFFIDAVIT24
08/31/2021140815161Open ↗
03/11/2020123695698Open ↗
12/07/2018140815161Open ↗
Showing 3 of 24 on file for this type
▸BISHIC LICENSE OR AFFIDAVIT2
07/22/2016122828191Open ↗
Showing 1 of 2 on file for this type
▸Filing & Intake Forms17
▸BISEFILING COVER SHEET10
03/11/2020123695698Open ↗
07/14/2016122828191Open ↗
04/09/2015122344310Open ↗
Showing 3 of 10 on file for this type
▸BISADDITIONAL INFORMATION5
06/15/2021140815161Open ↗
11/13/2020123695698Open ↗
08/18/2014121508751Open ↗
Showing 3 of 5 on file for this type
▸BISEFILING JOB APPLICATION COVER SHEET2
12/07/2018140815161Open ↗
03/25/2015140325930Open ↗
▸Other Documents2
▸BISDHCR DOCUMENT1
03/11/2020123695698Open ↗
▸DOB NOWDHCR Document1
08/13/2026M00290631-P1Open ↗