Two family frame
4563 FURMAN AVENUE
BRONX · Wakefield-Woodlawn · BIN 2071142
💬 Discuss this project
1899Year Built
2Stories
B2Building Class
R7DZoning
1,897 sfGross Floor Area
2Units
9 Open Violations ▸
Two family frame · Owner of record: B & B 19 LLC · 5,650 sf lot · 0.34 FAR built · Flood zone X
Locations of Work
ArchitectureStructuralMechanicalPlumbingFire Protection
Permit Issued — active, not yet Signed-off
RoofUnder Construction42p · 1 filing · 20 docs
Floor 9Under Construction34p · 1 filing · 20 docs
Floor 8Under Construction33p · 1 filing · 20 docs
Floor 7Under Construction32p · 1 filing · 20 docs
Floor 6Under Construction31p · 1 filing · 20 docs
Floor 5Under Construction31p · 1 filing · 20 docs
Floor 4Under Construction34p · 2 filings · 20 docs
Floor 3Under Construction41p · 1 filing · 20 docs
Floor 2Under Construction38p · 1 filing · 20 docs
Floor 1Under Construction41p · 1 filing · 20 docs
CellarUnder Construction39p · 1 filing · 20 docs
▾Owner History (Filing Record)
Companies and organizations named on filings. Individual owners are not shown.
OwnerFilingsMost Recent
PLATINUM SERVICES NY1309/13/2026
NEW LINE CONSTRUCTION203/22/2026
▾Sales History (ACRIS)
DatePriceUnitSeller → Buyer$/sf
08/19/2024$990K—Private party → B & B 19 LLC$522/sf building
▾Design Consultants (Architect / Engineer of Record)
FirmFilingsMost Recent
ARMIR TARAJ PE608/20/2026
BECALL ENGINEERING SERVICES INC.504/21/2026
TOHFAZ UDDIN PE PC103/23/2026
BITOPI CONSULTANTS LLC201/14/2026
ASHRAF CORP111/20/2025
AUTOMATED DESIGN ENGINEERING, PLLC309/02/2025
▾Filing Representatives (Expediters)
RepresentativeFilingsMost Recent
NEW LINE CONSTRUCTION503/21/2026
▾Contractors (License-Anchored)
FirmTradeRolesMost Recent
NEW LINE CONSTRUCTION LLCGeneral Contractor1007/08/2026
PLATINUM SERVICES NY LLCGeneral Contractor407/08/2026
J&H ELECTRICAL CONT INCElectrical103/22/2026
DOUG'S PLBG & HTG SERV COFire Protection107/08/2026
DOUG'S PLBG & HTG SERV COPlumbing107/08/2026
▾Special Inspection Agencies
AgencyLicense #FilingsMost Recent
REGIONAL TESTING CORP.3941108/20/2026
PLUS355 INTEGRATED SOLUTI9026110/03/2024
Building Lifecycle
All (130)Filed (18)Permit Issued (14)Signed Off (2)Violation (13)Inspection (6)Objection (44)Special Inspection (30)Tax Incentive (3)
01/01/2027
485-x construction completed
08/20/2026
Filed — New Building
Install fire sprinkler system subsequent to GC (-I1) job. The system is hydraulically calculated.
X01094721-P5
08/19/2026
Special inspection requirement — Footing and Foundation
Paul Raymond
08/19/2026
Special inspection requirement — Final
Paul Raymond
08/19/2026
Special inspection requirement — Concrete - Cast-In-Place
Paul Raymond
08/19/2026
Special inspection requirement — Subsurface Investigations (Borings/Test Pits)
Paul Raymond
08/19/2026
Special inspection requirement — Subgrade Inspections
Paul Raymond
07/02/2026
Violation issued (ECB, open)
Unknown
05/18/2026
Objection raised — Other
05/18/2026
Objection raised — Energy
04/25/2026
Violation issued (ECB, closed)
Unknown
04/24/2026
Permit issued — Mechanical Systems
X01094721-S3-MS
04/21/2026
Filed — New Building
Install fire sprinkler system subsequent to GC (-I1) job. The system is hydraulically calculated.
X01094721-P3
04/15/2026
Special inspection requirement — Insulation placement and R values
Paul Raymond
04/15/2026
Special inspection requirement — Fenestration air leakage
Paul Raymond
04/15/2026
Special inspection requirement — Air barrier — testing
Paul Raymond
04/15/2026
Special inspection requirement — Lighting in dwelling units
Paul Raymond
04/15/2026
Special inspection requirement — Exterior lighting power
Paul Raymond
04/15/2026
Special inspection requirement — Lighting controls
Paul Raymond
04/15/2026
Special inspection requirement — Fenestration areas
Paul Raymond
04/15/2026
Special inspection requirement — Fenestration and door U-factor and product ratings
Paul Raymond
04/15/2026
Special inspection requirement — Interior lighting power
Paul Raymond
04/15/2026
Special inspection requirement — Maintenance information
Paul Raymond
04/15/2026
Special inspection requirement — Air barrier - visual inspection
Paul Raymond
04/15/2026
Special inspection requirement — Metering
Paul Raymond
04/15/2026
Special inspection requirement — Electrical motors and elevators
Paul Raymond
04/15/2026
Special inspection requirement — Fire-Resistant Penetrations and Joints
Paul Raymond
04/15/2026
Special inspection requirement — Fire-Resistance Rated Construction
Paul Raymond
04/15/2026
Special inspection requirement — Energy Code Compliance Inspections
Paul Raymond
03/23/2026
Filed — Alteration
INSTALLATION OF 2100 LB SINGLE PERSONNEL HOIST CAR AS PER PLANS DURING CONSTRUCTION. HOIST SHALL COMPLY WITH CHAPTER #33 OF THE 2022 CODE. NO CHANGE IN USE, EGRESS, OR OCCUPANCY UNDER THIS APPLICATION.
X01376205-I1
03/23/2026
Permit issued — Protection and Mechanical Methods
X01376205-I1-PMM
03/23/2026
Permit issued — Construction Fence
X01163452-I1-FN
02/12/2026
Permit issued — Sprinklers
X01094721-S5-EW-SP
02/02/2026
Special inspection requirement — Post-installed Anchors
Paul Raymond
02/02/2026
Special inspection requirement — Masonry
Paul Raymond
02/02/2026
Special inspection requirement — Structural Cold-Formed Steel
Paul Raymond
02/02/2026
Special inspection requirement — Final
Paul Raymond
02/02/2026
Special inspection requirement — Concrete - Cast-In-Place
Paul Raymond
02/02/2026
Special inspection requirement — Structural Steel - Welding
Paul Raymond
02/02/2026
Special inspection requirement — Structural Steel - Details
Paul Raymond
02/02/2026
Special inspection requirement — Structural Steel - High Strength Bolting
Paul Raymond
01/17/2026
Violation issued (ECB, closed)
Construction
01/16/2026
Filed — New Building
Install fire sprinkler system subsequent to GC (-I1) job. The system is hydraulically calculated.
X01094721-P2
01/15/2026
Signed off — Alteration
Support of Excavation work associated with new building under application #X01094721
X01183218-I1
01/15/2026
Permit issued — Protection and Mechanical Methods
X01345255-I1-PMM
01/15/2026
Permit issued — Supported Scaffold
X01345240-I1-SF
01/14/2026
Filed — Alteration
INSTALLATION OF TEMPORARY NEEDLE BEAM AS PER PLANS. NO CHANGE IN USE, EGRESS OR OCCUPANCY SHALL COMPLY WITH CHAPTER#33 OF 2022 THE NY BUILDING CODE.
X01345255-I1
01/14/2026
Filed — Alteration
PROPOSED INSTALLATION OF TEMPORARY PIPE SCAFFOLD STAIR TOWER AS PER PLANS. WORK SHALL COMPLY WITH CHAPTER #33 OF 2022 THE NYC BUILDING CODE. NO CHANGE IN USE, OCCUPANCY, OR EGRESS UNDER THIS APPLICATION.
X01345240-I1
01/14/2026
Violation issued (ECB, closed)
Construction
12/22/2025
Inspection — Pass-Final PL - Up to 3 Requested Floors
Pass
View inspection ↗
12/15/2025
Violation issued (ECB, closed)
Construction
12/15/2025
Special inspection requirement — Final
Paul Raymond
11/21/2025
Permit issued — Sidewalk Shed
X01321567-I1-SH
11/20/2025
Filed — Alteration
INSTALLATION OF TEMPORARY HEAVY DUTY SIDEWALK SHED AS PER PLANS. NO CHANGE IN USE, EGRESS OR OCCUPANCY. SIDEWALK SHED SHALL COMPLY WITH CHAPTER #33 OF 2022 THE NYC BUILDING CODE. LIVE LOAD 300PSF.
X01321567-I1
11/20/2025
Inspection — Certified Water and Sanitary-WS-Sanitary Piping-Roughing
Certified
View inspection ↗
11/14/2025
Permit issued — General Construction
X01094721-I1-GC
11/13/2025
Inspection — Certified Storm Drainage-ST-Piping-Underground
Certified
View inspection ↗
11/13/2025
Inspection — Certified Water and Sanitary-WS-Sanitary Piping-Underground
Certified
View inspection ↗
11/12/2025
Inspection — Certified Water and Sanitary-WS-Sanitary Piping-Underground
Certified
View inspection ↗
11/06/2025
Filed — New Building
Install fire sprinkler system subsequent to GC (-I1) job. The system is hydraulically calculated.
X01094721-P1
Latest 60 of 130 events.
Permit / Filing Register
SourceWork TypeStatusApplicantIssued
DOB NOWMechanical SystemsPermit IssuedNEW LINE CONSTRUCTION LLC04/24/2026
DOB NOWProtection and Mechanical MethodsPermit IssuedPLATINUM SERVICES NY LLC03/23/2026
DOB NOWConstruction FencePermit IssuedNEW LINE CONSTRUCTION LLC03/23/2026
DOB NOWSprinklersPermit IssuedDOUG'S PLBG & HTG SERV CO02/12/2026
DOB NOWProtection and Mechanical MethodsPermit IssuedPLATINUM SERVICES NY LLC01/15/2026
DOB NOWSupported ScaffoldPermit IssuedPLATINUM SERVICES NY LLC01/15/2026
DOB NOWSidewalk ShedPermit IssuedPLATINUM SERVICES NY LLC11/21/2025
DOB NOWGeneral ConstructionPermit IssuedNEW LINE CONSTRUCTION LLC11/14/2025
DOB NOWStructuralPermit IssuedNEW LINE CONSTRUCTION LLC11/03/2025
DOB NOWPlumbingPermit IssuedDOUG'S PLBG & HTG SERV CO10/17/2025
DOB NOWFoundationPermit IssuedNEW LINE CONSTRUCTION LLC09/18/2025
DOB NOWSupport of ExcavationSigned-offNEW LINE CONSTRUCTION LLC07/30/2025
DOB NOWFull DemolitionSigned-offNEW LINE CONSTRUCTION LLC03/11/2025
DOB NOWConstruction FencePermit IssuedNEW LINE CONSTRUCTION LLC02/28/2025
1 project · most recent 08/20/2026
Heating and Air Conditioning Systems Ventilation Systems
FiledStatusContractorScopeMake / Model / Capacity
08/20/2026Permit IssuedNEW LINE CONSTRUCTION LLCHeating and Air Conditioning Systems, Ventilation Systems
Heat / Cool
Islandaire EZLT07A2B1S45AD 6,800 BTU · Ptac ×51
EZLT12A3D1S45AD 11,800 BTU · Ptac ×44
Ventilation
Broan 463001 150 CFM · Kitchen Exhaust ×46
Fantech FG 4 60 CFM · Exhaust Fan ×46
Greenheck MINI-VENT 450 380 CFM · Erv ×2
1 project · most recent 08/20/2026
Sprinkler System
FiledStatusContractorScope
08/20/2026Permit IssuedDOUG'S PLBG & HTG SERV COSprinkler System
1 project · most recent 08/20/2026
Gas Storm Water/Sanitary
FiledStatusContractorScope
08/20/2026Permit IssuedDOUG'S PLBG & HTG SERV COGas, Storm, Water/Sanitary
3 projects · most recent 04/20/2026
General Wiring
FiledStatusContractorScope
04/20/2026Permit IssuedRICHARD NEU—
12/20/2025Permit IssuedJ&H ELECTRICAL CONT INCGeneral Wiring
11/20/2025Permit IssuedRICHARD NEU—
1 project · most recent 08/20/2026
Steel Concrete Masonry
FiledStatusContractorScope
08/20/2026Permit IssuedNEW LINE CONSTRUCTION LLCSteel, Concrete, Masonry
3 projects · most recent 01/14/2026
Scaffold Sidewalk Shed Fence
FiledStatusContractorScope
01/14/2026Permit IssuedPLATINUM SERVICES NY LLCScaffold
11/20/2025Permit IssuedPLATINUM SERVICES NY LLCSidewalk Shed
01/08/2025Permit IssuedNEW LINE CONSTRUCTION LLCFence
▾Field Inspections (DOB CAP) — 6
DateTypeResultReport
12/22/2025Pass-Final PL - Up to 3 Requested FloorsPassView ↗
11/20/2025Certified Water and Sanitary-WS-Sanitary Piping-RoughingCertifiedView ↗
11/13/2025Certified Storm Drainage-ST-Piping-UndergroundCertifiedView ↗
11/13/2025Certified Water and Sanitary-WS-Sanitary Piping-UndergroundCertifiedView ↗
11/12/2025Certified Water and Sanitary-WS-Sanitary Piping-UndergroundCertifiedView ↗
10/31/2025Fail-Final PL - UndergroundFailView ↗
▾Special Inspection Requirements (DOB NOW) — 62
DateRequirementInspectorRole
08/19/2026FinalPaul Raymondprogress
08/19/2026Subsurface Investigations (Borings/Test Pits)Paul Raymondspecial
08/19/2026Subgrade InspectionsPaul Raymondspecial
08/19/2026Concrete - Cast-In-PlacePaul Raymondspecial
08/19/2026Footing and FoundationPaul Raymondprogress
04/15/2026Maintenance informationPaul Raymondenergy_progress
04/15/2026Fenestration and door U-factor and product ratingsPaul Raymondenergy_progress
04/15/2026Fire-Resistant Penetrations and JointsPaul Raymondspecial
04/15/2026Lighting in dwelling unitsPaul Raymondenergy_progress
04/15/2026Air barrier — testing Paul Raymondenergy_progress
04/15/2026Exterior lighting powerPaul Raymondenergy_progress
04/15/2026Air barrier - visual inspectionPaul Raymondenergy_progress
04/15/2026Fenestration air leakagePaul Raymondenergy_progress
04/15/2026Electrical motors and elevatorsPaul Raymondenergy_progress
04/15/2026MeteringPaul Raymondenergy_progress
04/15/2026Insulation placement and R valuesPaul Raymondenergy_progress
04/15/2026Lighting controlsPaul Raymondenergy_progress
04/15/2026Fenestration areasPaul Raymondenergy_progress
04/15/2026Interior lighting powerPaul Raymondenergy_progress
04/15/2026Energy Code Compliance InspectionsPaul Raymondprogress
04/15/2026Fire-Resistance Rated ConstructionPaul Raymondprogress
02/02/2026MasonryPaul Raymondspecial
02/02/2026Structural Steel - DetailsPaul Raymondspecial
02/02/2026Structural Cold-Formed SteelPaul Raymondspecial
02/02/2026Structural Steel - WeldingPaul Raymondspecial
Latest 25 of 62.
▾Documents — 105 on file (BIS + DOB NOW)
▸Plans & Drawings18
▸DOB NOWPlans/Sketch18
08/26/2026X01376205-I1Request digital key ↗
08/21/2026X01094721-P5Request digital key ↗
08/20/2026X01119978-I1Request digital key ↗
Showing 3 of 18 on file for this type
▸Applications & Permits1
▸DOB NOWHPD - Permit Notice1
08/13/2026X01094721-I1Open ↗
▸Zoning, Tax Lot & Property Records8
▸DOB NOWZoning Exhibit form (1-5)3
08/13/2026X01094721-P3Open ↗
08/13/2026X01094721-I1Open ↗
08/13/2026X01094721-P1Open ↗
▸DOB NOWZD1: DOB Zoning Diagram3
08/13/2026X01094721-I1Open ↗
08/13/2026X01094721-P1Open ↗
08/13/2026X01094721-P3Open ↗
▸DOB NOWHouse Number Verification: TOPO Stamp2
08/13/2026X01094721-I1Open ↗
08/13/2026X01094721-P1Open ↗
▸Seals & Professional Certifications41
▸DOB NOWDPL-1: Design Professional Seal & Signature18
08/26/2026X01376205-I1Open ↗
08/20/2026X01094721-P5Open ↗
08/20/2026X01119978-I1Open ↗
Showing 3 of 18 on file for this type
▸DOB NOWSpecial Inspector Seal & Signature13
09/23/2026X01094721-S5Open ↗
09/01/2026X01094721-P5Open ↗
09/01/2026X01094721-P5Open ↗
Showing 3 of 13 on file for this type
▸DOB NOWProgress Inspector Seal & Signature10
09/01/2026X01094721-P5Open ↗
08/28/2026X01094721-P1Open ↗
08/28/2026X01094721-P1Open ↗
Showing 3 of 10 on file for this type
▸Trade Schedules & Equipment6
▸DOB NOWDEP: Sewer Certification (Sanitary/Storm)2
08/13/2026X01094721-I1Open ↗
08/13/2026X01094721-P1Open ↗
▸DOB NOWElectric Cut-Off1
08/13/2026X01119978-I1Open ↗
▸DOB NOWGas Cut-Off1
08/13/2026X01119978-I1Open ↗
▸DOB NOWWater Cut-Off1
08/13/2026X01119978-I1Open ↗
▸DOB NOWSewer Cut-Off1
08/13/2026X01119978-I1Open ↗
▸Safety & Tenant Protection4
▸DOB NOWStreet Tree Checklist3
08/13/2026X01094721-P1Open ↗
08/13/2026X01094721-I1Open ↗
08/13/2026X01094721-P3Open ↗
▸DOB NOWParks Department Acknowledgment Letter for Street Trees Plan1
08/13/2026X01094721-I1Open ↗
▸Environmental & Asbestos10
▸DOB NOWOER: Notice to Proceed6
08/13/2026X01183218-I1Open ↗
08/13/2026X01094721-S1Open ↗
08/13/2026X01094721-S3Open ↗
Showing 3 of 6 on file for this type
▸DOB NOWOER: Notice of Satisfaction2
08/13/2026X01183218-I1Open ↗
08/13/2026X01094721-S1Open ↗
▸DOB NOWRodent Control1
08/13/2026X01119978-I1Open ↗
▸DOB NOWDEP ACP-5: Asbestos Assessment Report1
08/20/2026X01119978-I1Open ↗
▸Inspections & Test Reports3
▸DOB NOWSOIL REPORT2
08/20/2026X01094721-P5Open ↗
08/13/2026X01094721-S1Open ↗
▸DOB NOWTR4 Test Report and Plot Diagram1
08/13/2026X01094721-S1Open ↗
▸Other Documents14
▸DOB NOWProperty Ownership Certification4
08/20/2026X01119978-I1Open ↗
08/17/2026X01094721-P1Open ↗
08/17/2026X01094721-I1Open ↗
Showing 3 of 4 on file for this type
▸DOB NOWLocal Law 92/94 of 2019 Sustainable Roof Zone3
08/13/2026X01094721-I1Open ↗
08/13/2026X01094721-P1Open ↗
08/13/2026X01094721-P3Open ↗
▸DOB NOWSite Survey: Initial3
08/13/2026X01094721-P3Open ↗
08/13/2026X01094721-I1Open ↗
08/13/2026X01094721-P1Open ↗
▸DOB NOWFull Demo: 10-Day Notice1
08/13/2026X01119978-I1Open ↗
▸DOB NOWCommunity Board Notification1
08/13/2026X01119978-I1Open ↗
▸DOB NOWAdjoining Owners Notification1
08/13/2026X01183218-I1Open ↗
▸DOB NOWStructure Photographs1
08/13/2026X01119978-I1Open ↗