← Back
BuildNYC
Two family converted from one family
457 HOME AVENUE
STATEN ISLAND · BIN 5043140
💬 Discuss this project
1965Year Built
1Stories
B3Building Class
R3AZoning
3,149 sfGross Floor Area
2Units
Two family converted from one family · 5,400 sf lot · 0.58 FAR built · Flood zone X
Locations of Work
ArchitectureMechanicalPlumbingFire ProtectionEquipmentCivilGeneral
Names shown beside floors are taken automatically from the text of filed documents and may be incomplete or wrong.
Roof2p · 1 filing · 20 docs
Floor 219p · 1 filing · 20 docs
Floor 1Traffic protection, sidewalk bridges, barriers, and signage19p · 3 filings · 20 docs
Basement19p · 1 filing · 20 docs
Site & exteriorNew temporary construction fence4p · 2 filings · 20 docs
▾Design Consultants (Architect / Engineer of Record)
FirmFilingsMost Recent
C&P Design Consultants506/14/2024
Chris Ponisi, Architect506/05/2024
▾Filing Representatives (Expediters)
RepresentativeFilingsMost Recent
Expedia Consulting203/21/2026
Dawn Ponisi303/21/2026
▾Contractors (License-Anchored)
FirmTradeRolesMost Recent
Our Island Property ManagementGeneral Contractor707/08/2026
Our Island Property ManagementScaffold203/21/2026
Fine MechanicalPlumbing207/08/2026
Mercury Fire SuppFire Protection107/08/2026
▾Special Inspection Agencies
AgencyLicense #FilingsMost Recent
SRA Planning & Expediting5677706/14/2024
Building Lifecycle
07/01/2024
Signed off — Alteration
APPLICATION FILED FOR NEW TEMPORARY CONSTRUCTION FENCE
S00825344-I1
07/01/2024
Signed off — Alteration CO
Installation of New HVAC System associated with I1 Application
S00830106-S1
06/14/2024
Signed off — Alteration CO
Installation of New HVAC System associated with I1 Application
S00830106-S2
06/14/2024
Filed — Alteration CO
Installation of New HVAC System associated with I1 Application
S00830106-P4
06/14/2024
Special inspection requirement — Heating Systems
WILLIAM MONTAGUE
68 history events on file for this building. Sign in free to see the full history. Sign in · Create account
Permit / Filing Register
SourceWork TypeStatusApplicantIssued
DOB NOWCurb CutSigned-offOur Island Property Management02/15/2024
DOB NOWMechanical SystemsSigned-offOur Island Property Management02/15/2024
DOB NOWCurb CutSigned-offOur Island Property Management02/15/2024
DOB NOWSprinklersSigned-offMercury Fire Supp01/22/2024
DOB NOWPlumbingSigned-offFine Mechanical11/16/2023
DOB NOWPlumbingSigned-offFine Mechanical11/16/2023
DOB NOWGeneral ConstructionPermit IssuedOur Island Property Management03/15/2023
DOB NOWConstruction FenceSigned-offOur Island Property Management02/14/2023
1 project · most recent 06/14/2024
Air Conditioning Systems Associated Ducts and Piping Heating Systems
FiledStatusContractorScope
06/14/2024Signed-offOur Island Property ManagementAir Conditioning Systems, Associated Ducts and Piping, Heating Systems
1 project · most recent 06/14/2024
Sprinkler System
FiledStatusContractorScope
06/14/2024Signed-offMercury Fire SuppSprinkler System
1 project · most recent 06/14/2024
Gas Storm Water/Sanitary
FiledStatusContractorScope
06/14/2024Signed-offFine MechanicalGas, Storm, Water/Sanitary
1 project · most recent 12/15/2023
General Wiring
FiledStatusContractorScope
12/15/2023CompleteD and H Electrical ConstructionGeneral Wiring
1 project · most recent 06/14/2024
Wood
FiledStatusContractorScope
06/14/2024Signed-offOur Island Property ManagementWood
▾Field Inspections (DOB CAP) — 11
DateTypeResultReport
05/28/2024Pass-Final CND-Occupancy InspectionPassView ↗
05/28/2024Pass-Final Curb Cut Non-Directive 14PassView ↗
04/15/2024Certified Sprinkler (PL)-Sprinkler-HydroCertifiedView ↗
03/28/2024No Access-Final PL - Up to 3 Requested FloorsNo AccessView ↗
03/26/2024Certified Sprinkler-SP-Fixtures-FinishCertifiedView ↗
03/24/2024Certified Water and Sanitary-WS-Fixtures-FinishCertifiedView ↗
03/21/2024Certified Sprinkler-SP-Piping Dry/Wet-Hydrostatic TestCertifiedView ↗
03/19/2024Certified Water and Sanitary-WS-Fixtures-FinishCertifiedView ↗
01/11/2024Certified Gas-Gas-Piping-RoughingCertifiedView ↗
01/11/2024Certified Water and Sanitary-WS-Sanitary Piping-RoughingCertifiedView ↗
12/06/2023Certified Water and Sanitary-WS-Sanitary Piping-UndergroundCertifiedView ↗
▾Special Inspection Requirements (DOB NOW) — 65
DateRequirementInspectorRole
06/14/2024Maintenance informationWILLIAM MONTAGUEenergy_progress
06/14/2024Duct leakage testing, insulation and designWILLIAM MONTAGUEenergy_progress
06/14/2024Permanent certificateWILLIAM MONTAGUEenergy_progress
06/14/2024HVAC-R and service water heating system controlsWILLIAM MONTAGUEenergy_progress
06/14/2024HVAC-R and service water heating equipmentWILLIAM MONTAGUEenergy_progress
06/14/2024HVAC-R and service water piping design and insulationWILLIAM MONTAGUEenergy_progress
06/14/2024Ventilation and air distribution systemWILLIAM MONTAGUEenergy_progress
06/14/2024Energy Code Compliance InspectionsWILLIAM MONTAGUEprogress
06/14/2024FinalWILLIAM MONTAGUEprogress
06/14/2024Heating SystemsWILLIAM MONTAGUEspecial
06/14/2024Chimneys and ventsWILLIAM MONTAGUEspecial
06/14/2024Fire-Resistant Penetrations and JointsWILLIAM MONTAGUEspecial
06/14/2024Mechanical SystemsWILLIAM MONTAGUEspecial
06/14/2024Structural Stability – Alterations of existing buildingsWILLIAM MONTAGUEspecial
06/13/2024MeteringWILLIAM MONTAGUEenergy_progress
06/13/2024Fire-Resistant Penetrations and JointsWILLIAM MONTAGUEspecial
06/13/2024Structural Stability – Alterations of existing buildingsWILLIAM MONTAGUEspecial
06/13/2024Wood – Prefabricated I-JoistsWILLIAM MONTAGUEspecial
06/13/2024Fire-Resistance Rated ConstructionWILLIAM MONTAGUEprogress
06/13/2024Construction Operations Influencing Adjacent StructuresWILLIAM MONTAGUEspecial
06/13/2024FinalWILLIAM MONTAGUEprogress
06/13/2024Energy Code Compliance InspectionsWILLIAM MONTAGUEprogress
06/13/2024Structural Wood FrameWILLIAM MONTAGUEprogress
06/13/2024Insulation placement and R valuesWILLIAM MONTAGUEenergy_progress
06/13/2024Interior lighting powerWILLIAM MONTAGUEenergy_progress
Latest 25 of 65.
77 filed documents on file for this building. Sign in free to see the full history. Sign in · Create account