← Back
BuildNYC
Three families
457 LINCOLN AVENUE
BROOKLYN · BIN 3429022
💬 Discuss this project
2022Year Built
3Stories
C0Building Class
R5Zoning
3,487 sfGross Floor Area
3Units
Three families · 2,202 sf lot · 1.58 FAR built · Flood zone X
Locations of Work
ArchitectureStructuralElectricalMechanicalPlumbingFire ProtectionGeneral
Names shown beside floors are taken automatically from the text of filed documents and may be incomplete or wrong.
RoofProposed (3) Three Story, (3) Three Family Dwelling24p · 1 filing · 20 docs
Floor 2Proposed (3) Three Story, (3) Three Family Dwelling27p · 2 filings · 20 docs
Floor 1Proposed (3) Three Story, (3) Three Family Dwelling29p · 2 filings · 20 docs
BasementProposed (3) Three Story, (3) Three Family Dwelling26p · 1 filing · 20 docs
Sub-BasementNYC Water Meter Control Inlet Valve4p · 1 filing · 2 docs
Site & exteriorProposed (3) Three Story, (3) Three Family Dwelling24p · 2 filings · 20 docs
▾Owner History (Filing Record)
Companies and organizations named on filings. Individual owners are not shown.
OwnerFilingsMost Recent
Fazs Builder2307/08/2026
Fianzhin Builders203/21/2026
▾Sales History (ACRIS)
DatePriceUnitSeller → Buyer$/sf
02/07/2023$1.2M—SAINT GEORGE HOUSES CORP. → Private party$354/sf building
09/22/2020$250K—Private party → SAINT GEORGE HOUSES CORP.— not available
▾Filing Representatives (Expediters)
RepresentativeFilingsMost Recent
Design Studio Associates503/21/2026
▾Contractors (License-Anchored)
FirmTradeRolesMost Recent
NY Dynamic ConstructionGeneral Contractor903/21/2026
NY Dynamic ConstructionScaffold107/08/2026
Prime Piping & HeatingFire Protection107/08/2026
Zone Plumbing & HeatingPlumbing107/08/2026
▾Special Inspection Agencies
AgencyLicense #FilingsMost Recent
HRF Services5616410/12/2022
Building Lifecycle
01/09/2023
Signed off — New Building
PROPOSED THREE (3) STORY, THREE (3) FAMILY DWELLING.
B00502042-I1
12/22/2022
Signed off — Alteration
B00607349-I1
12/01/2022
Inspection — Pass-Final CND-Occupancy Inspection
Pass
View inspection ↗
11/28/2022
Permit issued — Structural
B00502042-I1-ST
11/25/2022
Inspection — Certified Sprinkler-SP-Fixtures-Finish
Certified
View inspection ↗
62 history events on file for this building. Sign in free to see the full history. Sign in · Create account
Permit / Filing Register
SourceWork TypeStatusApplicantIssued
DOB NOWStructuralPermit IssuedNY Dynamic Construction11/28/2022
DOB NOWSprinklersSigned-offAmb Mechanical11/16/2022
DOB NOWGeneral ConstructionPermit IssuedNY Dynamic Construction09/23/2022
DOB NOWPlumbingSigned-offZone Plumbing & Heating05/24/2022
DOB NOWGeneral ConstructionPermit IssuedNY Dynamic Construction10/22/2021
DOB NOWConstruction FenceSigned-offNY Dynamic Construction09/08/2021
1 project · most recent 01/10/2022
General Wiring
FiledStatusContractorScope
01/10/2022CompleteSafeway ConstructionGeneral Wiring
1 project · most recent 10/12/2022
Steel Masonry
FiledStatusContractorScope
10/12/2022Permit IssuedNY Dynamic ConstructionSteel, Masonry
▾Field Inspections (DOB CAP) — 10
DateTypeResultReport
12/01/2022Pass-Final CND-Occupancy InspectionPassView ↗
11/25/2022Certified Sprinkler-SP-Fixtures-FinishCertifiedView ↗
11/22/2022Certified Sprinkler-SP-Piping Dry/Wet-Hydrostatic TestCertifiedView ↗
10/07/2022Pass-Final PL - Up to 3 Requested FloorsPassView ↗
10/03/2022Fail-Final CND-Occupancy InspectionFailView ↗
09/22/2022Pass-Final Fence Non-Directive 14PassView ↗
06/03/2022Certified Gas-Gas-Piping-RoughingCertifiedView ↗
06/03/2022Certified Storm Drainage-ST-Piping-RoughingCertifiedView ↗
06/03/2022Certified Water and Sanitary-WS-Sanitary Piping-RoughingCertifiedView ↗
06/03/2022Certified Water and Sanitary-WS-Sanitary Piping-UndergroundCertifiedView ↗
▾Special Inspection Requirements (DOB NOW) — 46
DateRequirementInspectorRole
10/11/2022Exterior lighting powerFAHAD FATEHenergy_progress
10/11/2022Concrete - Cast-In-PlaceFAHAD FATEHspecial
10/11/2022Exterior Insulation and Finish Systems (EIFS)FAHAD FATEHspecial
10/11/2022Fire-Resistant Penetrations and JointsFAHAD FATEHspecial
10/11/2022MasonryFAHAD FATEHspecial
10/11/2022Structural Cold-Formed SteelFAHAD FATEHspecial
10/11/2022Structural Steel - DetailsFAHAD FATEHspecial
10/11/2022Subgrade InspectionsFAHAD FATEHspecial
10/11/2022Subsurface Investigations (Borings/Test Pits)FAHAD FATEHspecial
10/11/2022Energy Code Compliance InspectionsFAHAD FATEHprogress
10/11/2022FinalFAHAD FATEHprogress
10/11/2022Fire-Resistance Rated ConstructionFAHAD FATEHprogress
10/11/2022Air barrier - visual inspectionFAHAD FATEHenergy_progress
10/11/2022Maintenance informationFAHAD FATEHenergy_progress
10/11/2022Fenestration and door U-factor and product ratingsFAHAD FATEHenergy_progress
10/11/2022Permanent certificateFAHAD FATEHenergy_progress
10/11/2022Air barrier — testing FAHAD FATEHenergy_progress
10/11/2022Protection of exposed foundation insulationFAHAD FATEHenergy_progress
10/11/2022Lighting in dwelling unitsFAHAD FATEHenergy_progress
10/11/2022HVAC-R and service water piping design and insulationFAHAD FATEHenergy_progress
10/11/2022Fenestration areasFAHAD FATEHenergy_progress
10/11/2022Fenestration air leakageFAHAD FATEHenergy_progress
10/11/2022Insulation placement and R valuesFAHAD FATEHenergy_progress
08/11/2022Concrete - Cast-In-PlaceFAHAD FATEHspecial
08/11/2022Exterior Insulation and Finish Systems (EIFS)FAHAD FATEHspecial
Latest 25 of 46.
62 filed documents on file for this building. Sign in free to see the full history. Sign in · Create account