← Back
BuildNYC
Zoned commercial or Manhattan residential
4572 MANHATTAN COLLEGE PARKWAY
BRONX · BIN 2130669
💬 Discuss this project
0Year Built
—Stories
V1Building Class
R6Zoning
0 sfGross Floor Area
0Units
3 Active Violations ▸
Zoned commercial or Manhattan residential · Owner of record: Roya 329 · 6,625 sf lot · 0 FAR built · Flood zone X
Locations of Work
ArchitectureStructuralElectricalMechanicalPlumbingFire ProtectionEquipmentCivilGeneral
Names shown beside floors are taken automatically from the text of filed documents and may be incomplete or wrong.
Permit Issued — active, not yet Signed-off
RoofAida LLCUnder Construction73p · 3 filings · 20 docs
BulkheadAida LLCUnder Construction1p · 1 filing · 20 docs
Floor 6Roya 329 LLC4 filings · 18 docs
Floor 5Aida LLCUnder Construction67p · 5 filings · 20 docs
Floor 4Aida LLCUnder Construction45p · 5 filings · 20 docs
Floor 3Aida LLCUnder Construction47p · 5 filings · 20 docs
Floor 2Aida LLCUnder Construction48p · 5 filings · 20 docs
Floor 1Aida LLCUnder Construction71p · 7 filings · 20 docs
CellarAida LLCUnder Construction86p · 7 filings · 20 docs
Site & exteriorAida LLCUnder Construction91p · 5 filings · 20 docs
Filed — no permit issuedAida LLC3p · 1 filing · 2 docs
▾Owner History (Filing Record)
Companies and organizations named on filings. Individual owners are not shown.
OwnerFilingsMost Recent
Aida4210/13/2026
Roya 329603/21/2026
▾Sales History (ACRIS)
DatePriceUnitSeller → Buyer$/sf
10/13/2016$2.0M—HOME CARE PLUS, INC → ROYA 329 LLC— not available
▾Design Consultants (Architect / Engineer of Record)
▾Filing Representatives (Expediters)
RepresentativeFilingsMost Recent
Sion Consulting Engineering1403/21/2026
Xpdite Group LLC (104)203/21/2026
Eurocelt Expediting203/21/2026
Xpdite Group 103203/21/2026
▾Contractors (License-Anchored)
FirmTradeRolesMost Recent
Above Builder GroupGeneral Contractor710/09/2026
Chandrabali RamanandScaffold207/08/2026
Hartzion EnterprisesScaffold208/07/2026
Chandrabali RamanandGeneral Contractor103/21/2026
Prime Piping & HeatingFire Protection107/14/2026
Prime Piping & HeatingPlumbing107/14/2026
Above Builder GroupScaffold107/08/2026
▾Special Inspection Agencies
AgencyLicense #FilingsMost Recent
HRF Services56161308/25/2026
Joseph Martines PE1428212/12/2022
5D Arch. & Engineering2781408/23/2022
Building Lifecycle
All (150)Filed (28)Permit Issued (14)Signed Off (1)Violation (9)Objection (62)Special Inspection (30)Tax Incentive (6)
08/09/2029
421-a(16) construction completed
07/01/2027
485-x construction completed
10/07/2026
Permit issued — Foundation
X01357937-S9-FO
09/18/2026
Violation issued (ECB, open)
Construction
09/18/2026
Violation issued (ECB, open)
Unknown
09/18/2026
Objection resolved — Resolved
09/18/2026
Objection resolved — Resolved
09/18/2026
Objection resolved — Resolved
09/18/2026
Objection resolved — Resolved
09/18/2026
Objection resolved — Resolved
09/15/2026
Permit issued — General Construction
X01357937-I1-GC
09/13/2026
Objection raised — Admin
09/13/2026
Objection raised — Other
09/13/2026
Objection raised — Other
09/13/2026
Objection raised — Other
09/13/2026
Objection raised — Structural
09/08/2026
Special inspection requirement — Maintenance information
SHAHRIAR QUAYYUM
09/08/2026
Special inspection requirement — Post-installed Anchors
SHAHRIAR QUAYYUM
09/08/2026
Special inspection requirement — HVAC-R and service water heating system controls
SHAHRIAR QUAYYUM
09/08/2026
Special inspection requirement — Energy Code Compliance Inspections
SHAHRIAR QUAYYUM
09/08/2026
Special inspection requirement — HVAC-R and service water piping design and insulation
SHAHRIAR QUAYYUM
09/08/2026
Special inspection requirement — HVAC-R and service water heating equipment
SHAHRIAR QUAYYUM
09/08/2026
Special inspection requirement — Duct leakage testing, insulation and design
SHAHRIAR QUAYYUM
09/08/2026
Special inspection requirement — Final
SHAHRIAR QUAYYUM
09/08/2026
Special inspection requirement — Mechanical Systems
SHAHRIAR QUAYYUM
09/08/2026
Special inspection requirement — Shutoff dampers
SHAHRIAR QUAYYUM
09/08/2026
Special inspection requirement — Fire-Resistant Penetrations and Joints
SHAHRIAR QUAYYUM
09/03/2026
Violation issued (ECB, open)
Construction
09/02/2026
Objection resolved — Addressed
08/25/2026
Filed — New Building
SUBSEQUENT FILING FOR SUPPORT OF EXCAVATION (SOE) WORK IN-CONJUNCTION TO NB FILING #X01357937-I1
X01357937-P7
08/25/2026
Special inspection requirement — Concrete - Cast-In-Place
SHAHRIAR QUAYYUM
08/25/2026
Special inspection requirement — Footing and Foundation
SHAHRIAR QUAYYUM
08/25/2026
Special inspection requirement — Construction Operations Influencing Adjacent Structures
SHAHRIAR QUAYYUM
08/25/2026
Special inspection requirement — Subgrade Inspections
SHAHRIAR QUAYYUM
08/25/2026
Special inspection requirement — Subsurface Conditions – Fill Placement & In-Place Density
SHAHRIAR QUAYYUM
08/25/2026
Special inspection requirement — Final
SHAHRIAR QUAYYUM
08/25/2026
Special inspection requirement — Subsurface Investigations (Borings/Test Pits)
FERAS AYOUB
08/24/2026
Filed — New Building
SUBSEQUENT FILING FOR SUPPORT OF EXCAVATION (SOE) WORK IN-CONJUNCTION TO NB FILING #X01357937-I1
X01357937-S9
08/24/2026
Filed — Alteration
APPLICATION FILED HEREWITH FOR THE REMOVAL OF THE 421A FOUNDATION FOOTING
X01443607-I1
08/21/2026
Special inspection requirement — Concrete - Cast-In-Place
08/21/2026
Special inspection requirement — Subgrade Inspections
08/21/2026
Special inspection requirement — Underpinning and alternate methods of support of buildings and adjacent property
08/21/2026
Special inspection requirement — Excavations - Sheeting, Shoring, and Bracing
08/21/2026
Special inspection requirement — Structural Stability – Alterations of existing buildings
08/21/2026
Special inspection requirement — Construction Operations Influencing Adjacent Structures
08/20/2026
Special inspection requirement — Final
08/20/2026
Special inspection requirement — Footing and Foundation
08/18/2026
Objection raised — Other
08/13/2026
Filed — New Building
SUBSEQUENT FILING FOR SUPPORT OF EXCAVATION (SOE) WORK IN-CONJUNCTION TO NB FILING #X01357937-I1
X01357937-P5
08/12/2026
Permit issued — Earth Work
X01357937-S1-FO-EA
08/10/2026
Filed — New Building
SUBSEQUENT FILING FOR SUPPORT OF EXCAVATION (SOE) WORK IN-CONJUNCTION TO NB FILING #X01357937-I1
X01357937-P6
08/10/2026
Special inspection requirement — Final
SHAHRIAR QUAYYUM
08/10/2026
Special inspection requirement — Structural Stability – Alterations of existing buildings
SHAHRIAR QUAYYUM
08/10/2026
Special inspection requirement — Footing and Foundation
SHAHRIAR QUAYYUM
08/10/2026
Special inspection requirement — Fire-Resistant Penetrations and Joints
SHAHRIAR QUAYYUM
08/06/2026
Filed — New Building
SUBSEQUENT FILING FOR SUPPORT OF EXCAVATION (SOE) WORK IN-CONJUNCTION TO NB FILING #X01357937-I1
X01357937-S8
08/06/2026
Permit issued — Supported Scaffold
X01357937-S8-SH
08/06/2026
Permit issued — Supported Scaffold
X01357937-S8-SF
07/29/2026
Filed — New Building
SUBSEQUENT FILING FOR SUPPORT OF EXCAVATION (SOE) WORK IN-CONJUNCTION TO NB FILING #X01357937-I1
X01357937-P4
07/29/2026
Filed — New Building
SUBSEQUENT FILING FOR SUPPORT OF EXCAVATION (SOE) WORK IN-CONJUNCTION TO NB FILING #X01357937-I1
X01357937-P3
Latest 60 of 150 events.
Permit / Filing Register
SourceWork TypeStatusApplicantIssued
DOB NOWFoundationPermit IssuedAbove Builder Group10/07/2026
DOB NOWGeneral ConstructionPermit IssuedAbove Builder Group09/15/2026
DOB NOWEarth WorkPermit IssuedAbove Builder Group08/12/2026
DOB NOWSupported ScaffoldPermit IssuedHartzion Enterprises08/06/2026
DOB NOWSupported ScaffoldPermit IssuedHartzion Enterprises08/06/2026
DOB NOWPlumbingPermit IssuedPrime Piping & Heating07/13/2026
DOB NOWSprinklersPermit IssuedPrime Piping & Heating07/10/2026
DOB NOWMechanical SystemsPermit IssuedAbove Builder Group06/18/2026
DOB NOWStructuralPermit IssuedAbove Builder Group06/18/2026
DOB NOWGeneral ConstructionPermit IssuedAbove Builder Group06/17/2026
DOB NOWSupport of ExcavationPermit IssuedAbove Builder Group06/16/2026
DOB NOWConstruction FencePermit IssuedAbove Builder Group05/05/2026
DOB NOWConstruction FencePermit IssuedChandrabali Ramanand05/08/2025
DOB NOWConstruction FencePermit IssuedChandrabali Ramanand04/09/2024
BIS—ISSUED5D Architect and Engineering03/07/2025
BIS—ISSUED5D Architect and Engineering03/07/2025
BISFPISSUEDMaster Fire Systems11/29/2016
BISFPISSUEDMaster Fire Systems12/23/2015
BISPLISSUEDWTC Plumbing & Heating06/12/1995
BISFPISSUEDLund Fire Products Co05/24/1995
BISFPISSUEDB & J Inc. Dba/Fire Master10/28/1993
BISPLISSUEDRecine & Sons P&H10/06/1993
BISOTISSUEDCaligiuri Contractors09/09/1993
1 project · most recent 08/25/2026
Heating and Air Conditioning Systems Ventilation Systems
FiledStatusContractorScopeMake / Model / Capacity
08/25/2026Permit IssuedAbove Builder GroupHeating and Air Conditioning Systems, Ventilation Systems
Heat / Cool
Daikin RXTA36AAVJU 37,000 BTU · Vrf Outdoor ×12
RZA18AAVJU 20,000 BTU · Split System ×5
RZA24AAVJU 27,000 BTU · Split System ×1
Ventilation
Greenheck ERV-10-20L-VG 460 CFM · Erv ×1
1 project · most recent 03/18/2025
FiledStatusContractorScope
03/18/2025——257 heads
2 projects · most recent 08/25/2026
Water/Sanitary Gas Storm
FiledStatusContractorScope
08/25/2026Permit IssuedPrime Piping & HeatingGas, Storm, Water/Sanitary
04/05/2024——Water/Sanitary
4 projects · most recent 09/01/2026
General Wiring
FiledStatusContractorScope
09/01/2026Permit IssuedAbz ElectricGeneral Wiring
08/03/2026Permit IssuedHigh Quality Electric of NYC—
12/17/2025Permit IssuedHivolts ElectricalGeneral Wiring
07/26/2019Permit IssuedV. Vass Electric—
5 projects · most recent 08/25/2026
Concrete
FiledStatusContractorScope
08/25/2026Permit IssuedAbove Builder GroupConcrete
08/24/2026——2 scope_items
05/08/2024——Concrete
12/12/2022——2 scope_items
05/04/2022——1 scope_items
▾Special Inspection Requirements (DOB NOW) — 125
DateRequirementInspectorRole
09/08/2026Fire-Resistant Penetrations and JointsSHAHRIAR QUAYYUMspecial
09/08/2026Post-installed AnchorsSHAHRIAR QUAYYUMspecial
09/08/2026Mechanical SystemsSHAHRIAR QUAYYUMspecial
09/08/2026FinalSHAHRIAR QUAYYUMprogress
09/08/2026Energy Code Compliance InspectionsSHAHRIAR QUAYYUMprogress
09/08/2026HVAC-R and service water heating system controlsSHAHRIAR QUAYYUMenergy_progress
09/08/2026Shutoff dampersSHAHRIAR QUAYYUMenergy_progress
09/08/2026Maintenance informationSHAHRIAR QUAYYUMenergy_progress
09/08/2026HVAC-R and service water heating equipmentSHAHRIAR QUAYYUMenergy_progress
09/08/2026HVAC-R and service water piping design and insulationSHAHRIAR QUAYYUMenergy_progress
09/08/2026Duct leakage testing, insulation and designSHAHRIAR QUAYYUMenergy_progress
08/25/2026Construction Operations Influencing Adjacent StructuresSHAHRIAR QUAYYUMspecial
08/25/2026Footing and FoundationSHAHRIAR QUAYYUMprogress
08/25/2026FinalSHAHRIAR QUAYYUMprogress
08/25/2026Subsurface Investigations (Borings/Test Pits)FERAS AYOUBspecial
08/25/2026Subsurface Conditions – Fill Placement & In-Place DensitySHAHRIAR QUAYYUMspecial
08/25/2026Subgrade InspectionsSHAHRIAR QUAYYUMspecial
08/25/2026Concrete - Cast-In-PlaceSHAHRIAR QUAYYUMspecial
08/21/2026Construction Operations Influencing Adjacent Structures—special
08/21/2026Concrete - Cast-In-Place—special
08/21/2026Subgrade Inspections—special
08/21/2026Underpinning and alternate methods of support of buildings and adjacent property—special
08/21/2026Structural Stability – Alterations of existing buildings—special
08/21/2026Excavations - Sheeting, Shoring, and Bracing—special
08/20/2026Footing and Foundation—progress
Latest 25 of 125.
▾Documents — 190 on file (BIS + DOB NOW)
▸Plans & Drawings22
▸DOB NOWPlans/Sketch18
08/25/2026X01443607-I1Request digital key ↗
08/24/2026X00794523-P1Request digital key ↗
08/19/2026X00911803-I1Request digital key ↗
Showing 3 of 18 on file for this type
▸DOB NOWPlans/Sketch - Sidewalk Shed1
08/26/2026X00200749-I1Request digital key ↗
▸DOB NOWPlans/Sketch - Mechanical Systems1
08/24/2026X00201605-I1Request digital key ↗
▸DOB NOWPlans/Sketch - Curb Cut1
08/23/2026X00201683-I1Request digital key ↗
▸DOB NOWPlans/Sketch - Construction Fence1
08/26/2026X00216487-I1Request digital key ↗
▸Applications & Permits22
▸BISPLAN / WORK APPROVAL APPLICATION16
09/24/2024220706840Open ↗
08/10/2023220706840Open ↗
08/08/2023220706840Open ↗
Showing 3 of 16 on file for this type
▸BISWORK PERMIT APPLICATION4
03/31/2025220706840Open ↗
03/31/2025220706840Open ↗
11/29/2016220492134Open ↗
Showing 3 of 4 on file for this type
▸BISBPP-5 - Authorization to the Department of Transportation2
04/25/2023220706831Open ↗
01/28/2020220706831Open ↗
▸Zoning, Tax Lot & Property Records10
▸BISZONING DIAGRAM2
09/08/2023220706840Open ↗
01/09/2023220706840Open ↗
▸DOB NOWZD1: DOB Zoning Diagram2
08/16/2026X01357937-I1Open ↗
08/13/2026X01357937-I1Open ↗
▸BISTAX LOT: FINAL LOT NUMBER ISSUED1
04/25/2023220706831Open ↗
▸BISZONING EXHIBIT III:DESC. & OWNRSHP.STMNT1
06/17/2022220706840Open ↗
▸BISADDRESS: NEW HOUSE NUMBER APPROVED1
06/17/2022220706840Open ↗
▸BISZONING EXHIBIT I: CERTIFICATION1
06/17/2022220706840Open ↗
▸DOB NOWHouse Number Verification: TOPO Stamp1
08/16/2026X01357937-I1Open ↗
▸DOB NOWZoning Exhibit form (1-5)1
08/16/2026X01357937-I1Open ↗
▸Seals & Professional Certifications78
▸DOB NOWSpecial Inspector Seal & Signature27
09/23/2026X01357937-P7Open ↗
09/23/2026X01357937-P7Open ↗
09/02/2026X00729702-I1Open ↗
Showing 3 of 27 on file for this type
▸DOB NOWProgress Inspector Seal & Signature23
09/23/2026X01357937-P7Open ↗
09/02/2026X00729702-I1Open ↗
09/02/2026X00729702-I1Open ↗
Showing 3 of 23 on file for this type
▸DOB NOWDPL-1: Design Professional Seal & Signature22
08/25/2026X01443607-I1Open ↗
08/24/2026X00729702-I1Open ↗
08/24/2026X00794523-I1Open ↗
Showing 3 of 22 on file for this type
▸BISTECHNICAL REPORT: RESPONSIBILITY/CERTIFICATION4
03/31/2025220706840Open ↗
07/31/2019220706840Open ↗
12/24/2015220492134Open ↗
Showing 3 of 4 on file for this type
▸BISPROFESSIONAL CERTIFICATION STATEMENT1
12/10/2015220492134Open ↗
▸BISPROFESSIONAL CERTIFIED CHECKLIST1
12/10/2015220492134Open ↗
▸Trade Schedules & Equipment2
▸BIS* SEWER CONNECTION: DEP SD1 & SD21
12/22/2022220706840Open ↗
▸DOB NOWDEP: Sewer Certification (Sanitary/Storm)1
08/16/2026X01357937-I1Open ↗
▸Safety & Tenant Protection9
▸BISSTREET TREE CHECKLIST4
04/25/2023220706831Open ↗
11/19/2021220706840Open ↗
01/28/2020220706831Open ↗
Showing 3 of 4 on file for this type
▸BISSTREET TREES: RECEIPT OF STREET TREES SITE PLAN1
11/17/2022220706840Open ↗
▸BISBPP: STREET TREES SITE PLAN1
04/25/2023220706831Open ↗
▸BISEXCAVATION OR DEMOLITION: 5-DAY NOTICE1
02/10/2025220706840Open ↗
▸DOB NOWStreet Tree Checklist1
08/16/2026X01357937-I1Open ↗
▸DOB NOWParks Department Acknowledgment Letter for Street Trees Plan1
08/16/2026X01357937-I1Open ↗
▸Energy Compliance3
▸BISTECHNICAL REPORT: ENERGY CODE - RESPONSIBILITY1
11/01/2023220706840Open ↗
▸BISTECHNICAL REPORT: ENERGY CODE PROGRESS INSPS1
07/31/2019220706840Open ↗
▸BISTR8: ENERGY CODE PROGRESS INSPS TECHNICAL REPORT1
11/17/2022220706840Open ↗
▸Inspections & Test Reports12
▸DOB NOWSOIL REPORT3
08/16/2026X01357937-S1Open ↗
08/14/2026X01357937-S2Open ↗
08/13/2026X00729702-I1Open ↗
▸DOB NOWTR4 Test Report and Plot Diagram3
08/16/2026X01357937-S1Open ↗
08/14/2026X01357937-S2Open ↗
08/13/2026X00729702-I1Open ↗
▸BISTECHNICAL REPORT: RESPONSIBILITY1
11/01/2023220706840Open ↗
▸BISSOIL REPORT1
11/17/2022220706840Open ↗
▸BISTECHNICAL REPORT: SOIL INSPECTION1
11/17/2022220706840Open ↗
▸BISDEMOLITION (DM) JOB SIGNOFF1
02/10/2025220706840Open ↗
▸BISTR2: CONCRETE FIELD TESTING TECHNICAL REPORT1
02/10/2025220706840Open ↗
▸BISTR3: CONCRETE DESIGN MIX TECHNICAL REPORT1
02/10/2025220706840Open ↗
▸Approvals, Objections & Sign-offs11
▸BISSCHEDULE A - OCCUPANCY / USE8
08/10/2023220706840Open ↗
08/04/2023220706840Open ↗
07/21/2023220706840Open ↗
Showing 3 of 8 on file for this type
▸BISLETTERS - SUPPORTING DOCUMENTATION3
03/31/2025220706840Open ↗
07/31/2019220706840Open ↗
07/31/2019220706840Open ↗
▸Cost, Insurance & Ownership2
▸BISPROJECT SPECIFIC GENERAL LIABILITY INSURANCE1
03/31/2025220706840Open ↗
▸BISCOST AFFIDAVIT1
12/10/2015220492134Open ↗
▸Filing & Intake Forms7
▸BISEFILING COVER SHEET3
01/28/2020220706831Open ↗
07/31/2019220706840Open ↗
12/10/2015220492134Open ↗
▸BISBPP: CHECKLIST IN LIEU OF PLANS-ALT32
04/25/2023220706831Open ↗
01/28/2020220706831Open ↗
▸BISADDITIONAL INFORMATION2
10/10/2023220706840Open ↗
12/22/2022220706840Open ↗
▸Other Documents12
▸DOB NOWAdjoining Owners Notification4
08/16/2026X01357937-S1Open ↗
08/14/2026X01357937-S2Open ↗
08/13/2026X00729702-I1Open ↗
Showing 3 of 4 on file for this type
▸BISPLOT DIAGRAM2
01/09/2023220706840Open ↗
07/31/2019220706840Open ↗
▸BISBPP - SUPPORTING DOCUMENTATION1
04/25/2023220706831Open ↗
▸BISEXTERNAL FORMS - SUPPORTING DOCUMENTATION1
12/22/2022220706840Open ↗
▸BISBPP: PHOTOS-SIGNED/SEALED BY APPLICANT1
04/25/2023220706831Open ↗
▸DOB NOWSite Survey: Initial1
08/13/2026X01357937-I1Open ↗
▸DOB NOWLocal Law 92/94 of 2019 Sustainable Roof Zone1
08/16/2026X01357937-I1Open ↗
▸DOB NOWProperty Ownership Certification1
08/16/2026X01357937-I1Open ↗