← Back
Two family frame
4574 MATILDA AVENUE
BRONX · BIN 2071014
💬 Discuss this project
1910Year Built
2Stories
B2Building Class
R4AZoning
1,898 sfGross Floor Area
2Units
Two family frame · 5,625 sf lot · 0.34 FAR built · Flood zone X
Locations of Work
No floor-level scope or drawing coverage on file for this building.
▾Design Consultants (Architect / Engineer of Record)
FirmFilingsMost Recent
JBA101/24/2024
▾Contractors (License-Anchored)
FirmTradeRolesMost Recent
WILLIAM JAMES BUSHELL CORGeneral Contractor303/21/2026
▾Special Inspection Agencies
AgencyLicense #FilingsMost Recent
WORLD DESIGN ARCHITECTURE9323101/24/2024
Building Lifecycle
All (7)Filed (1)Permit Issued (1)Special Inspection (5)
01/26/2024
Permit issued — Solar
X00995115-I1-SL
01/24/2024
Filed — Alteration
INSTALLATION OF SOLAR PANELS ON EXISTING ROOF. NO CHANGE IN USE, OCCUPANCY OR EGRESS. NO CHANGE IN BULK
X00995115-I1
01/24/2024
Special inspection requirement — Fire-Resistant Penetrations and Joints
William Alicea
01/24/2024
Special inspection requirement — Structural Stability – Alterations of existing buildings
William Alicea
01/24/2024
Special inspection requirement — Energy Code Compliance Inspections
JEFFREY BELL
01/24/2024
Special inspection requirement — Final
JEFFREY BELL
01/24/2024
Special inspection requirement — Air barrier - visual inspection
JEFFREY BELL
Permit / Filing Register
SourceWork TypeStatusApplicantIssued
DOB NOWSolarSigned-offWILLIAM JAMES BUSHELL COR01/26/2024
1 project · most recent 01/24/2024
FiledStatusContractorScope
01/24/2024Permit IssuedD.R.P. ELEC'L CONTRG INC1 meters
1 project · most recent 01/24/2024
FiledStatusContractorScope
01/24/2024Signed-offWILLIAM JAMES BUSHELL COR16 panels, 8.8 kw, 1,070.4 roof_area_sqft
▾Special Inspection Requirements (DOB NOW) — 5
DateRequirementInspectorRole
01/24/2024Fire-Resistant Penetrations and JointsWilliam Aliceaspecial
01/24/2024Structural Stability – Alterations of existing buildingsWilliam Aliceaspecial
01/24/2024Energy Code Compliance InspectionsJEFFREY BELLprogress
01/24/2024FinalJEFFREY BELLprogress
01/24/2024Air barrier - visual inspectionJEFFREY BELLenergy_progress
▾Documents — 8 on file (BIS + DOB NOW)
▸Plans & Drawings1
▸DOB NOWPlans/Sketch1
08/21/2026X00995115-I1Request digital key ↗
▸Seals & Professional Certifications5
▸DOB NOWProgress Inspector Seal & Signature3
08/28/2026X00995115-I1Open ↗
08/28/2026X00995115-I1Open ↗
08/28/2026X00995115-I1Open ↗
▸DOB NOWDPL-1: Design Professional Seal & Signature1
08/13/2026X00995115-I1Open ↗
▸DOB NOWSpecial Inspector Seal & Signature1
08/28/2026X00995115-I1Open ↗
▸Environmental & Asbestos1
▸DOB NOWDEP ACP-5: Asbestos Assessment Report1
08/13/2026X00995115-I1Open ↗
▸Approvals, Objections & Sign-offs1
▸DOB NOWUtility Company Final Acceptance Letter1
08/13/2026X00995115-I1Open ↗