← Back
BuildNYC
Elevator apt, fireproof without stores
Ivan Shapiro House
459 WEST 46TH STREET · BIN 1088110
💬 Discuss this project
1995Year Built
6Stories
D3Building Class
R8Zoning
30,860 sfGross Floor Area
55Units
LL97 CoveredRent Stabilized61 Active Violations 56 unresolved · 5 paperwork only 10 likely answered 7 old, status unconfirmed ▸
Elevator apt, fireproof without stores · Owner of record: Urban Pathways · 7,537 sf lot · 4.09 FAR built · Flood zone X
Locations of Work
ArchitectureStructuralElectricalMechanicalPlumbingFire ProtectionEquipmentGeneral
Names shown beside floors are taken automatically from the text of filed documents and may be incomplete or wrong.
Permit Issued — active, not yet Signed-off
RoofUrban Pathways, INC.Under Construction90p · 2 filings · 20 docs
Floor 6Urban Pathways, INC.Under Construction78p · 1 filing · 20 docs
Floor 5Urban Pathways, INC.Under Construction78p · 1 filing · 20 docs
Floor 4Urban Pathways, INC.Under Construction78p · 1 filing · 20 docs
Floor 3Urban Pathways, INC.Under Construction79p · 1 filing · 20 docs
Floor 2Urban Pathways, INC.Under Construction77p · 1 filing · 20 docs
Floor 1Urban Pathways, INC.Under Construction97p · 2 filings · 20 docs
CellarUrban Pathways, INC.Under Construction90p · 1 filing · 20 docs
Site & exteriorUrban Pathways, INC.Under Construction56p · 3 filings · 20 docs
▾Owner History (Filing Record)
Companies and organizations named on filings. Individual owners are not shown.
OwnerFilingsMost Recent
Urban Pathways8410/04/2026
▾Design Consultants (Architect / Engineer of Record)
▾Filing Representatives (Expediters)
RepresentativeFilingsMost Recent
Core Consultants NYC1503/21/2026
FL M Engineering Design Inspection203/21/2026
▾Contractors (License-Anchored)
FirmTradeRolesMost Recent
FPS ContractingGeneral Contractor1107/08/2026
MC SuperstructureScaffold404/09/2026
Jam ElectricalElectrical303/21/2026
JD Masters P & HFire Protection207/08/2026
JD Masters Plumbing & HeatingPlumbing207/08/2026
Sunkeeper Solar Electricspecialty_contractor104/11/2026
Omd ElectricalElectrical103/22/2026
RJ BrunoPlumbing107/08/2026
▾Special Inspection Agencies
AgencyLicense #FilingsMost Recent
Vibranalysis Inc., Dba VT6864908/24/2026
James J Stout Architects5913206/23/2026
Building Lifecycle
All (148)Filed (24)Permit Issued (19)Signed Off (5)Violation (60)Inspection (4)Objection (6)Special Inspection (30)
10/05/2026
Violation issued (ECB, open)
Elevators
09/04/2026
Violation issued (ECB, open)
Elevators
08/24/2026
Filed — Alteration
Plumbing In Conjunction with Architectural Job Number #M00795116-I1
M00795116-P8
08/24/2026
Filed — Alteration
Plumbing In Conjunction with Architectural Job Number #M00795116-I1
M00795116-P7
08/24/2026
Violation issued (ECB, open)
Elevators
08/14/2026
Special inspection requirement — Sprinkler Systems
JUAN GOMEZ
08/06/2026
Signed off — Alteration
Plumbing In Conjunction with Architectural Job Number #M00795116-I1
M00795116-I1
08/05/2026
Inspection — Certified Sprinkler-SP-Piping Dry/Wet-Hydrostatic Test
Certified
View inspection ↗
08/03/2026
Inspection — Certified Storm Drainage-ST-Fixtures-Finish
Certified
View inspection ↗
08/03/2026
Inspection — Certified Water and Sanitary-WS-Fixtures-Finish
Certified
View inspection ↗
07/17/2026
Signed off — Alteration
INSTALLATION OF SOLAR PANELS ON EXISTING ROOF STRUCTURE. NO CHANGE IN EGRESS,USE, OR OCCUPANCY.
M01375921-I1
07/01/2026
Violation issued (HPD, open)
C
06/27/2026
Violation issued (HPD, open)
C
06/27/2026
Violation issued (HPD, open)
C
06/23/2026
Filed — Alteration
INSTALLATION OF SOLAR PANELS ON EXISTING ROOF STRUCTURE. NO CHANGE IN EGRESS,USE, OR OCCUPANCY.
M01375921-P1
06/02/2026
Special inspection requirement — Fire-Resistant Penetrations and Joints
JAMES J STOUT
06/02/2026
Special inspection requirement — Post-installed Anchors
JAMES J STOUT
06/02/2026
Special inspection requirement — Structural Stability – Alterations of existing buildings
JAMES J STOUT
06/02/2026
Special inspection requirement — Energy Code Compliance Inspections
JAMES J STOUT
06/02/2026
Special inspection requirement — Final
JAMES J STOUT
06/02/2026
Special inspection requirement — Maintenance information
JAMES J STOUT
06/02/2026
Special inspection requirement — Air barrier - visual inspection
JAMES J STOUT
05/27/2026
Violation issued (HPD, open)
C
04/09/2026
Permit issued — Solar
M01375921-I1-SL
03/26/2026
Filed — Alteration
INSTALLATION OF SOLAR PANELS ON EXISTING ROOF STRUCTURE. NO CHANGE IN EGRESS,USE, OR OCCUPANCY.
M01375921-I1
03/13/2026
Violation issued (ECB, open)
Elevators
03/09/2026
Permit issued — General Construction
M00795116-I1-GC
03/05/2026
Permit issued — General Construction
M00795116-S4-GC
02/16/2026
Signed off — Alteration
M01129393-I1
01/08/2026
Permit issued — Sprinklers
M00795116-S3-EW-SP
12/23/2025
Signed off — Alteration
Plumbing In Conjunction with Architectural Job Number #M00795116-I1
M00795116-S2
12/22/2025
Permit issued — General Construction
M00795116-S4-GC
11/24/2025
Filed — Alteration
INSTALLATION OF 300 PSF SIDEWALK SHED, DEBRIS CHUTE AND PIPE SCAFFOLD AS PER PLANS. ALL EQUIPMENT SHALL COMPLY WITH CHAPTER #33 OF THE 2022 CODE. NO CHANGE IN USE, EGRESS OR OCCUPANCY UNDER THIS APPLICATION.
M01246596-P3
11/18/2025
Permit issued — Mechanical Systems
M00795116-S2-MS
11/14/2025
Violation issued (DOB, open)
V-DOB VIOLATION - ACTIVE
11/14/2025
Violation issued (DOB, open)
V-DOB VIOLATION - ACTIVE
11/14/2025
Violation issued (DOB, open)
V-DOB VIOLATION - ACTIVE
11/14/2025
Violation issued (DOB, open)
V-DOB VIOLATION - ACTIVE
11/12/2025
Permit issued — Plumbing
M00795116-S1-PL
11/05/2025
Filed — Alteration
INSTALLATION OF 300 PSF SIDEWALK SHED, DEBRIS CHUTE AND PIPE SCAFFOLD AS PER PLANS. ALL EQUIPMENT SHALL COMPLY WITH CHAPTER #33 OF THE 2022 CODE. NO CHANGE IN USE, EGRESS OR OCCUPANCY UNDER THIS APPLICATION.
M01246596-P2
09/29/2025
Permit issued — General Construction
M00795116-I1-GC
09/25/2025
Permit issued — Sidewalk Shed
M01129393-I1-SH
08/27/2025
Filed — Alteration
INSTALLATION OF 300 PSF SIDEWALK SHED, DEBRIS CHUTE AND PIPE SCAFFOLD AS PER PLANS. ALL EQUIPMENT SHALL COMPLY WITH CHAPTER #33 OF THE 2022 CODE. NO CHANGE IN USE, EGRESS OR OCCUPANCY UNDER THIS APPLICATION.
M01246596-P1
07/25/2025
Violation issued (HPD, closed)
C
07/22/2025
Permit issued — General Construction
M00795116-S4-GC
07/17/2025
Violation issued (HPD, closed)
C
07/01/2025
Violation issued (ECB, open)
Boilers
07/01/2025
Violation issued (ECB, open)
Boilers
06/27/2025
Filed — Alteration
INSTALLATION OF 300 PSF SIDEWALK SHED, DEBRIS CHUTE AND PIPE SCAFFOLD AS PER PLANS. ALL EQUIPMENT SHALL COMPLY WITH CHAPTER #33 OF THE 2022 CODE. NO CHANGE IN USE, EGRESS OR OCCUPANCY UNDER THIS APPLICATION.
M01246596-I1
06/27/2025
Permit issued — Supported Scaffold
M01246596-I1-SH
06/27/2025
Permit issued — Sidewalk Shed
M01246596-I1-SF
06/11/2025
Violation issued (HPD, closed)
C
06/04/2025
Violation issued (HPD, closed)
A
06/04/2025
Objection resolved — Addressed
05/28/2025
Violation issued (HPD, closed)
B
05/09/2025
Objection raised — Scope
05/07/2025
Violation issued (HPD, closed)
B
05/07/2025
Violation issued (HPD, closed)
B
05/07/2025
Violation issued (HPD, closed)
B
05/07/2025
Violation issued (HPD, closed)
B
Latest 60 of 148 events.
Permit / Filing Register
SourceWork TypeStatusApplicantIssued
DOB NOWSolarSigned-offSunkeeper Solar Electric04/09/2026
DOB NOWGeneral ConstructionSigned-offFPS Contracting03/09/2026
DOB NOWGeneral ConstructionSigned-offFPS Contracting03/05/2026
DOB NOWSprinklersPermit IssuedJD Masters P & H01/08/2026
DOB NOWGeneral ConstructionSigned-offFPS Contracting12/22/2025
DOB NOWMechanical SystemsSigned-offFPS Contracting11/18/2025
DOB NOWPlumbingPermit IssuedJD Masters Plumbing & Heating11/12/2025
DOB NOWGeneral ConstructionSigned-offFPS Contracting09/29/2025
DOB NOWSidewalk ShedSigned-offMC Superstructure09/25/2025
DOB NOWGeneral ConstructionSigned-offFPS Contracting07/22/2025
DOB NOWSupported ScaffoldPermit IssuedMC Superstructure06/27/2025
DOB NOWSidewalk ShedPermit IssuedMC Superstructure06/27/2025
DOB NOWSprinklersPermit IssuedJD Masters P & H01/14/2025
DOB NOWMechanical SystemsSigned-offFPS Contracting12/18/2024
DOB NOWPlumbingPermit IssuedJD Masters Plumbing & Heating11/07/2024
DOB NOWMechanical SystemsSigned-offFPS Contracting11/06/2024
DOB NOWGeneral ConstructionSigned-offFPS Contracting10/29/2024
DOB NOWSidewalk ShedSigned-offMC Superstructure10/24/2024
DOB NOWBoiler EquipmentSigned-offRJ Bruno09/01/2023
BISPLISSUEDCloverdale Master P&H07/29/2019
BISBLISSUEDCloverdale Master P&H01/16/2019
BISPLISSUEDCloverdale Master P&H05/10/2018
BISBLISSUEDCloverdale Master P&H05/10/2018
BISBLISSUEDSmart Plumbing & Heating06/17/2014
BISPLISSUEDSmart Plumbing & Heating06/17/2014
BISMHISSUEDMarren Mechanical04/02/2014
BISBLISSUEDSmart Plumbing & Heating04/25/2013
BISPLISSUEDSmart Plumbing & Heating04/25/2013
BISBLISSUEDSmart Plumbing & Heating04/30/2012
BISPLISSUEDSmart Plumbing & Heating04/18/2012
BISFPISSUEDFire Command Co04/06/2012
BISBLISSUEDSmart Plumbing & Heating04/27/2011
BISBLISSUEDSmart Plumbing & Heating08/19/2010
BISPLISSUEDSmart Plumbing & Heating08/19/2010
BISMHISSUEDOmnibuild08/04/2009
BISPLISSUEDSmart Plumbing & Heating08/04/2009
BISFPISSUEDFire Command Co12/04/1996
BISEQISSUEDRegional Scaffold & Hoisting05/08/1996
BIS—ISSUEDJ.C.H. Delta Contracting05/03/1996
BISSPRE-ISSUEDTheodore Wagner Plumbing & Heating03/20/1996
+ 5 more permits on file
1 project · most recent 08/24/2026
Air Conditioning Systems Heating Systems Ventilation Systems
FiledStatusContractorScopeMake / Model / Capacity
08/24/2026Signed-offFPS ContractingAir Conditioning Systems, Heating Systems, Ventilation Systems
Cooling
Mitsubishi Electric MISTIBUSI MXZ-SM48NAMHZ-U1 48,000 BTU · Vrf Outdoor ×4
MISTIBUSI MXZ-SM48NAM-U1 48,000 BTU · Vrf Outdoor ×2
PUMY- P60NKMU3 66,000 BTU · Vrf Outdoor ×2
Heating
Sky-Peak SKY-SDSH024 468 BTU ×4
Ventilation
Sky-Peak SKY-SDSH060 582 BTU ×2
1 project · most recent 08/24/2026
Sprinkler System
FiledStatusContractorScope
08/24/2026Permit IssuedJD Masters P & HSprinkler System
1 project · most recent 08/24/2026
Gas Storm Water/Sanitary
FiledStatusContractorScope
08/24/2026Permit IssuedJD Masters Plumbing & HeatingGas, Storm, Water/Sanitary
5 projects · most recent 03/23/2026
General Wiring
FiledStatusContractorScope
03/23/2026CompleteSunkeeper Solar—
07/02/2025CompleteJam Electrical—
11/25/2024Permit IssuedSalvatore Campisi & SonsGeneral Wiring
10/21/2024Permit IssuedNash Electric Services—
01/31/2024Permit IssuedOmd Electrical1 meters, 1 new_meters
1 project · most recent 06/23/2026
FiledStatusContractorScope
06/23/2026Signed-offSunkeeper Solar Electric126 panels, 66.9 kw, 4,500 roof_area_sqft
1 project · most recent 11/24/2025
Scaffold Sidewalk Shed
FiledStatusContractorScope
11/24/2025Permit IssuedMC SuperstructureScaffold, Sidewalk Shed
▾Field Inspections (DOB CAP) — 4
DateTypeResultReport
08/05/2026Certified Sprinkler-SP-Piping Dry/Wet-Hydrostatic TestCertifiedView ↗
08/03/2026Certified Storm Drainage-ST-Fixtures-FinishCertifiedView ↗
08/03/2026Certified Water and Sanitary-WS-Fixtures-FinishCertifiedView ↗
10/24/2023Pass-Final Boiler Equipment InspectionPassView ↗
▾Special Inspection Requirements (DOB NOW) — 49
DateRequirementInspectorRole
08/14/2026Sprinkler SystemsJUAN GOMEZspecial
06/02/2026Fire-Resistant Penetrations and JointsJAMES J STOUTspecial
06/02/2026Post-installed AnchorsJAMES J STOUTspecial
06/02/2026Structural Stability – Alterations of existing buildingsJAMES J STOUTspecial
06/02/2026Energy Code Compliance InspectionsJAMES J STOUTprogress
06/02/2026FinalJAMES J STOUTprogress
06/02/2026Maintenance informationJAMES J STOUTenergy_progress
06/02/2026Air barrier - visual inspectionJAMES J STOUTenergy_progress
07/17/2024Sprinkler SystemsJUAN GOMEZspecial
07/15/2024Lighting in dwelling unitsJUAN GOMEZenergy_progress
07/15/2024Fenestration and door U-factor and product ratingsJUAN GOMEZenergy_progress
07/15/2024Interior lighting powerJUAN GOMEZenergy_progress
07/15/2024Insulation placement and R valuesJUAN GOMEZenergy_progress
07/15/2024Fire-Resistant Penetrations and JointsJUAN GOMEZspecial
07/15/2024Fire-Resistance Rated ConstructionJUAN GOMEZprogress
07/15/2024FinalJUAN GOMEZprogress
07/15/2024Exterior lighting powerJUAN GOMEZenergy_progress
07/15/2024Fenestration areasJUAN GOMEZenergy_progress
07/15/2024Fenestration air leakageJUAN GOMEZenergy_progress
07/15/2024Air barrier - visual inspectionJUAN GOMEZenergy_progress
07/15/2024Lighting controlsJUAN GOMEZenergy_progress
07/15/2024Mechanical SystemsJUAN GOMEZspecial
07/15/2024Heating SystemsJUAN GOMEZspecial
07/15/2024Energy Code Compliance InspectionsJUAN GOMEZprogress
07/15/2024FinalJUAN GOMEZprogress
Latest 25 of 49.
▾Documents — 189 on file (BIS + DOB NOW)
▸Plans & Drawings24
▸DOB NOWPlans/Sketch24
08/29/2026M00689697-P3Request digital key ↗
08/29/2026M00689697-P1Request digital key ↗
08/29/2026M00689697-P4Request digital key ↗
Showing 3 of 24 on file for this type
▸Applications & Permits23
▸BISPLAN / WORK APPROVAL APPLICATION12
11/14/2024122903910Open ↗
06/13/2024122903910Open ↗
01/14/2020122903910Open ↗
Showing 3 of 12 on file for this type
▸BISWORK PERMIT APPLICATION9
07/30/2019110477760Open ↗
01/17/2019110477760Open ↗
05/14/2018110477760Open ↗
Showing 3 of 9 on file for this type
▸DOB NOWHPD Certification Letter or CPC Special Permit2
08/13/2026M00795116-I1Open ↗
08/13/2026M00795116-P1Open ↗
▸Seals & Professional Certifications46
▸DOB NOWDPL-1: Design Professional Seal & Signature24
08/26/2026M00795116-S2Open ↗
08/26/2026M00795116-S1Open ↗
08/26/2026M00795116-I1Open ↗
Showing 3 of 24 on file for this type
▸DOB NOWSpecial Inspector Seal & Signature9
09/23/2026M00795116-P8Open ↗
09/23/2026M00689697-I1Open ↗
08/31/2026M00795116-S2Open ↗
Showing 3 of 9 on file for this type
▸DOB NOWProgress Inspector Seal & Signature8
08/31/2026M00795116-S2Open ↗
08/31/2026M00795116-S2Open ↗
08/28/2026M01375921-P1Open ↗
Showing 3 of 8 on file for this type
▸BISTECHNICAL REPORT: RESPONSIBILITY/CERTIFICATION5
11/22/2019110477760Open ↗
06/27/2014110477760Open ↗
03/26/2012121000692Open ↗
Showing 3 of 5 on file for this type
▸Trade Schedules & Equipment11
▸BISSCHEDULE B - PLUMBING4
07/15/2014110477760Open ↗
04/16/2014110477760Open ↗
03/26/2012121000692Open ↗
Showing 3 of 4 on file for this type
▸BISSCHEDULE B - PLUMBING/SPRINKLER/STANDPIPE3
09/06/2019110477760Open ↗
07/03/2018110477760Open ↗
06/27/2014110477760Open ↗
▸BISSCHEDULE C - HEATING & COMBUSTION EQUIPMENT3
06/27/2014110477760Open ↗
06/18/2009110477760Open ↗
06/18/2009110477760Open ↗
▸BISSELF-CERT PLUMBING NOTICE1
07/21/2010110477760Open ↗
▸Safety & Tenant Protection26
▸DOB NOWHPD-2: Clinton Special District Anti-Harassment Checklist22
08/26/2026M00795116-P8Open ↗
08/26/2026M00795116-P7Open ↗
08/13/2026M01246596-P1Open ↗
Showing 3 of 22 on file for this type
▸DOB NOWCertificate of No Harassment2
08/13/2026M00795116-P1Open ↗
08/13/2026M00795116-I1Open ↗
▸BISHPD-2 - Clinton Special district Anti-Harassment Checklist1
07/07/2009110477760Open ↗
▸BISHPD-1 - Anti-Harassment Area Checklist1
07/07/2009110477760Open ↗
▸Environmental & Asbestos19
▸DOB NOWDEP ACP-5: Asbestos Assessment Report13
08/26/2026M00795116-S3Open ↗
08/26/2026M00795116-S1Open ↗
08/26/2026M00795116-P8Open ↗
Showing 3 of 13 on file for this type
▸BISTHIS IS 'NOT AN ASBESTOS PROJECT'3
03/26/2012121000692Open ↗
06/18/2009110477760Open ↗
06/18/2009110477760Open ↗
▸DOB NOWDEP ACP-20/ACP-21: Asbestos Project Conditional Completion Form/Asbestos Project Completion Form2
08/26/2026M00795116-S2Open ↗
08/26/2026M00795116-I1Open ↗
▸BISASBESTOS-CERTIFICATION (DEP ACP5)1
03/26/2012121000692Open ↗
▸Energy Compliance5
▸BISTECHNICAL REPORT: ENERGY CODE PROGRESS INSPS2
11/22/2019110477760Open ↗
06/27/2014110477760Open ↗
▸DOB NOWEN2: As Built Energy Analysis2
08/26/2026M00795116-I1Open ↗
08/13/2026M00795116-S2Open ↗
▸BISAS-BUILT ENERGY ANALYSIS1
11/22/2019110477760Open ↗
▸Approvals, Objections & Sign-offs25
▸DOB NOWFee Exempt Supporting Document - DOF ACRIS report or BIB letter17
08/26/2026M00795116-S3Open ↗
08/26/2026M00795116-S2Open ↗
08/26/2026M00795116-S1Open ↗
Showing 3 of 17 on file for this type
▸BISLETTERS - SUPPORTING DOCUMENTATION2
07/30/2019110477760Open ↗
04/10/2014110477760Open ↗
▸BISSUPERSEDING LETTER2
05/14/2018110477760Open ↗
05/14/2018110477760Open ↗
▸BISADMINISTRATIVE OBJECTIONS2
03/26/2012121000692Open ↗
05/29/2009110477760Open ↗
▸BISCERTIFICATE OF OCCUPANCY/LOC: REQUEST1
11/22/2019110477760Open ↗
▸DOB NOWUtility Company Final Acceptance Letter1
08/18/2026M01375921-I1Open ↗
▸Cost, Insurance & Ownership5
▸BISCOST AFFIDAVIT5
11/22/2019110477760Open ↗
09/07/2018122903910Open ↗
06/27/2014110477760Open ↗
Showing 3 of 5 on file for this type
▸Filing & Intake Forms4
▸BISEFILING COVER SHEET2
09/07/2018122903910Open ↗
03/26/2012121000692Open ↗
▸BISBOROUGH INTAKE FORM2
11/22/2019110477760Open ↗
07/03/2018110477760Open ↗
▸Other Documents1
▸BISLOCAL LAW 58/1987 WAIVER1
11/22/2019110477760Open ↗