← Back
Two family converted from one family
459 WHITE PLAINS ROAD
BRONX · BIN 2092601
💬 Discuss this project
1925Year Built
1.5Stories
B3Building Class
R5Zoning
1,425 sfGross Floor Area
2Units
Two family converted from one family · Owner of record: 459 WHITE PLAINS ROAD LLC · 3,475 sf lot · 0.41 FAR built · Flood zone X
Locations of Work
Architecture
Roof1p · 1 filing · 9 docs
▾Design Consultants (Architect / Engineer of Record)
FirmFilingsMost Recent
TOM PETERSEN ARCHITECT, LLC105/27/2026
▾Contractors (License-Anchored)
FirmTradeRolesMost Recent
SOLAR CONTRACTING LLCGeneral Contractor107/08/2026
▾Special Inspection Agencies
AgencyLicense #FilingsMost Recent
THOMAS PETERSEN ARCHITECT7854105/27/2026
Building Lifecycle
All (8)Filed (1)Permit Issued (1)Signed Off (1)Special Inspection (5)
07/30/2026
Signed off — Alteration
SCOPE OF WORK IS SOLELY FOR THE INSTALLATION OF THE SOLAR ELECTRONIC GENERATING SYSTEM. ALL OTHER WORK IS NOT TO BE RELIED UPON AS BEINGAPPROVED AND/OR PERMITTED BY THE NYC DEPARTMENT OF BUILDINGS.
X01406914-I1
06/02/2026
Permit issued — Solar
X01406914-I1-SL
05/27/2026
Filed — Alteration
SCOPE OF WORK IS SOLELY FOR THE INSTALLATION OF THE SOLAR ELECTRONIC GENERATING SYSTEM. ALL OTHER WORK IS NOT TO BE RELIED UPON AS BEINGAPPROVED AND/OR PERMITTED BY THE NYC DEPARTMENT OF BUILDINGS.
X01406914-I1
05/25/2026
Special inspection requirement — Fire-Resistant Penetrations and Joints
TOM PETERSEN
05/25/2026
Special inspection requirement — Structural Stability – Alterations of existing buildings
TOM PETERSEN
05/25/2026
Special inspection requirement — Energy Code Compliance Inspections
TOM PETERSEN
05/25/2026
Special inspection requirement — Final
TOM PETERSEN
05/25/2026
Special inspection requirement — Air barrier - visual inspection
TOM PETERSEN
Permit / Filing Register
SourceWork TypeStatusApplicantIssued
DOB NOWSolarSigned-offSOLAR CONTRACTING LLC06/02/2026
1 project · most recent 07/27/2026
FiledStatusContractorScope
07/27/2026CompleteSOLAR ELEC CONTRACTNG LLC—
1 project · most recent 05/27/2026
FiledStatusContractorScope
05/27/2026Signed-offSOLAR CONTRACTING LLC19 panels, 8.3 kw, 1,095.2 roof_area_sqft
▾Special Inspection Requirements (DOB NOW) — 5
DateRequirementInspectorRole
05/25/2026Fire-Resistant Penetrations and JointsTOM PETERSENspecial
05/25/2026Structural Stability – Alterations of existing buildingsTOM PETERSENspecial
05/25/2026Energy Code Compliance InspectionsTOM PETERSENprogress
05/25/2026FinalTOM PETERSENprogress
05/25/2026Air barrier - visual inspectionTOM PETERSENenergy_progress
▾Documents — 9 on file (BIS + DOB NOW)
▸Plans & Drawings1
▸DOB NOWPlans/Sketch1
08/16/2026X01406914-I1Request digital key ↗
▸Seals & Professional Certifications6
▸DOB NOWProgress Inspector Seal & Signature3
09/25/2026X01406914-I1Open ↗
09/25/2026X01406914-I1Open ↗
09/25/2026X01406914-I1Open ↗
▸DOB NOWSpecial Inspector Seal & Signature2
09/25/2026X01406914-I1Open ↗
09/25/2026X01406914-I1Open ↗
▸DOB NOWDPL-1: Design Professional Seal & Signature1
08/16/2026X01406914-I1Open ↗
▸Environmental & Asbestos1
▸DOB NOWDEP ACP-5: Asbestos Assessment Report1
08/16/2026X01406914-I1Open ↗
▸Approvals, Objections & Sign-offs1
▸DOB NOWUtility Company Final Acceptance Letter1
08/16/2026X01406914-I1Open ↗