← Back
Parks / recreation facility
56-01 GRAND CENTRAL PKWY
QUEENS · BIN 4615694
💬 Discuss this project
1939Year Built
—Stories
Q1Building Class
PARKZoning
1,258,350 sfGross Floor Area
1Units
LL97 Covered36 Open Violations 9 unresolved · 27 paperwork only ▸FDNY Report ↗
Parks / recreation facility · Owner of record: NYC DEPARTMENT OF PARKS AND RECREATION · 17,870,000 sf lot · 0.07 FAR built · Flood zone X
Locations of Work
StructuralElectricalMechanicalPlumbingFire ProtectionGeneral
Roof8p · 4 filings · 20 docs
Floor 141p · 1 filing · 20 docs
Floor 13
Floor 12
Floor 11
Floor 10
Floor 9
Floor 8
Floor 7
Floor 6
Floor 5
Floor 4
Floor 36p · 3 filings · 20 docs
Floor 26p · 3 filings · 20 docs
Floor 19p · 3 filings · 20 docs
▾Owner History (Filing Record)
Companies and organizations named on filings. Individual owners are not shown.
OwnerFilingsMost Recent
NYC SCHOOL CONSTRUCTION AUTHORITY6607/08/2026
DEPARTMENT OF EDUCATION103/22/2026
SLS,CO103/22/2026
▾Design Consultants (Architect / Engineer of Record)
▾Filing Representatives (Expediters)
RepresentativeFilingsMost Recent
JMG CONSULTANTS1203/21/2026
HIGH POINT PIPING PROTECTION803/21/2026
JMV ASSOCIATES2403/21/2026
JMV ASSOCIATES LLC103/21/2026
TAREK M ZEID P E103/21/2026
▾Contractors (License-Anchored)
FirmTradeRolesMost Recent
NAVILLUS TILE INCGeneral Contractor1507/08/2026
CURRENT FIRE PROTECTION INCFire Protection807/08/2026
R.A.M.S. MECHANICAL INCGeneral Contractor807/08/2026
ORBIT PLBG & HTG INCPlumbing303/22/2026
EAGLE 1 MECHANICAL, INCPlumbing307/08/2026
TRU-VAL ELECTRIC CORP.Electrical203/22/2026
MICHAEL SZERBATYElectrical103/21/2026
AGIR ELEC'L LTD. D/B/AElectrical103/22/2026
▾Special Inspection Agencies
AgencyLicense #FilingsMost Recent
UNIVERSAL TESTING AND INS4001901/18/2023
Building Lifecycle
All (132)Filed (23)Permit Issued (26)Signed Off (9)Violation (5)Inspection (13)Objection (26)Special Inspection (30)
10/22/2025
Violation issued (ECB, closed)
Construction
03/14/2025
Violation issued (FDNY_NOV, closed)
04/15/2024
Signed off — Alteration
PROPOSED STRUCTURAL WORK FOR PROPOSED NEW SCHOOL BUILDING PRE-K CENTER AT NEW YORK HALL OF SCIENCE -DOB # 421737044.
Q00211858-I1
04/02/2024
Signed off — Alteration
Q00226553-I1
03/27/2024
Signed off — Alteration
FILING FOR SEISMIC BRACING DESIGN FOR MECHANICAL TRADE. @PRE-K CENTER AT NEW YORK HALL OF SCIENCE JOB IN CONJUNCTION WITH NEW BUILDING DOB # 421737044
Q00608455-I1
03/27/2024
Signed off — Alteration
FILING FOR SEISMIC DESIGN FOR ELECTRICAL TRADE INSTALLATIONS. JOB IN CONJUNCTION WITH NEW BUILDING DOB # 421737044.
Q00609110-I1
03/26/2024
Signed off — Alteration
PROPOSED MECHANICAL WORK FOR NEW SCHOOL BUILDING PRE-K CENTER AT NEW YORK HALL OF SCIENCE.
Q00212412-I1
06/30/2023
Violation issued (FDNY_NOV, closed)
06/01/2023
Signed off — Alteration
PROPOSED PLUMBING, STANDPIPE AND SPRINKLER WORK FOR NEW SCHOOL BUILDING PRE-K CENTER AT THE NEW YORK HALL OF SCIENCE - DOB # 421737044.
Q00212371-I1
04/30/2023
Violation issued (FDNY_NOV, closed)
04/18/2023
Inspection — Certified Sprinkler-SP-Fixtures-Finish
Certified
View inspection ↗
04/18/2023
Inspection — Certified StandPipe-SD-Fixtures-Finish-SD
Certified
View inspection ↗
04/13/2023
Inspection — Certified Sprinkler (SP) - Booster Pump Test
Certified
View inspection ↗
04/13/2023
Inspection — Certified Sprinkler-SP-Piping Dry/Wet-Hydrostatic Test
Certified
View inspection ↗
04/13/2023
Inspection — Certified StandPipe-SD-Piping-Hydrostatic Test
Certified
View inspection ↗
04/11/2023
Permit issued — Standpipe
Q00212371-I1-EW-SP
04/10/2023
Permit issued — Standpipe
Q00212371-I1-EW-SD
03/07/2023
Permit issued — Mechanical Systems
Q00226553-I1-MS
03/02/2023
Violation issued (FDNY_NOV, closed)
01/20/2023
Special inspection requirement — Post-installed Anchors
NELSON LOPEZ
01/20/2023
Special inspection requirement — Final
NELSON LOPEZ
01/20/2023
Special inspection requirement — Seismic Isolation Systems
NELSON LOPEZ
01/18/2023
Filed — Alteration
FILING FOR SEISMIC BRACING DESIGN FOR MECHANICAL TRADE. @PRE-K CENTER AT NEW YORK HALL OF SCIENCE JOB IN CONJUNCTION WITH NEW BUILDING DOB # 421737044
Q00608455-P2
12/29/2022
Signed off — Alteration
PROPOSED SITE PLUMBING FOR CIVIL WORK FILED UNDER NEW SCHOOL BUILDING PRE-K CENTER AT NEW YORK HALL OF SCIENCE - DOB # 421737044.
Q00212434-I1
12/06/2022
Signed off — Alteration
INSTALLATION OF NEW SPRINKLER AND STANDPIPE SYSTEM
Q00491145-I1
10/19/2022
Signed off — Alteration
Q00348436-I1
08/16/2022
Special inspection requirement — Post-installed Anchors
NELSON LOPEZ
08/16/2022
Special inspection requirement — Seismic Isolation Systems
NELSON LOPEZ
08/16/2022
Special inspection requirement — Final
NELSON LOPEZ
08/15/2022
Filed — Alteration
FILING FOR SEISMIC DESIGN FOR ELECTRICAL TRADE INSTALLATIONS. JOB IN CONJUNCTION WITH NEW BUILDING DOB # 421737044.
Q00609110-P2
08/12/2022
Special inspection requirement — Post-installed Anchors
NELSON LOPEZ
08/12/2022
Special inspection requirement — Final
NELSON LOPEZ
08/12/2022
Special inspection requirement — Seismic Isolation Systems
NELSON LOPEZ
06/28/2022
Special inspection requirement — HVAC insulation and sealing
NELSON LOPEZ
06/28/2022
Special inspection requirement — Final
NELSON LOPEZ
06/28/2022
Special inspection requirement — HVAC and service water heating system controls
NELSON LOPEZ
06/28/2022
Special inspection requirement — HVAC and service water heating equipment
NELSON LOPEZ
06/28/2022
Special inspection requirement — Mechanical Systems
NELSON LOPEZ
06/28/2022
Special inspection requirement — Shutoff dampers
NELSON LOPEZ
06/27/2022
Filed — Alteration
PROPOSED MECHANICAL WORK FOR NEW SCHOOL BUILDING PRE-K CENTER AT NEW YORK HALL OF SCIENCE.
Q00212412-P2
06/14/2022
Special inspection requirement — Shutoff dampers
NELSON LOPEZ
06/14/2022
Special inspection requirement — HVAC and service water heating equipment
NELSON LOPEZ
06/14/2022
Special inspection requirement — HVAC and service water heating system controls
NELSON LOPEZ
06/14/2022
Special inspection requirement — HVAC insulation and sealing
NELSON LOPEZ
06/14/2022
Special inspection requirement — Mechanical Systems
NELSON LOPEZ
06/14/2022
Special inspection requirement — Final
NELSON LOPEZ
06/08/2022
Permit issued — Structural
Q00211858-I1-ST
05/23/2022
Special inspection requirement — Sprinkler Systems
NELSON LOPEZ
05/23/2022
Special inspection requirement — Seismic Isolation Systems
NELSON LOPEZ
05/23/2022
Special inspection requirement — Standpipe Systems
NELSON LOPEZ
05/19/2022
Permit issued — General Construction
Q00608455-I1-GC
05/18/2022
Permit issued — General Construction
Q00609110-I1-GC
05/18/2022
Permit issued — Construction Fence
Q00348436-I1-FN
05/17/2022
Filed — Alteration
INSTALLATION OF NEW SPRINKLER AND STANDPIPE SYSTEM
Q00491145-P3
05/12/2022
Permit issued — Standpipe
Q00491145-I1-EW-SD
05/11/2022
Permit issued — Sprinklers
Q00491145-I1-EW-SP
05/11/2022
Special inspection requirement — Sprinkler Systems
NELSON LOPEZ
05/11/2022
Special inspection requirement — Seismic Isolation Systems
NELSON LOPEZ
05/11/2022
Special inspection requirement — Standpipe Systems
NELSON LOPEZ
04/21/2022
Permit issued — Standpipe
Q00212371-I1-PL
Latest 60 of 132 events.
Permit / Filing Register
SourceWork TypeStatusApplicantIssued
DOB NOWStandpipeSigned-offCURRENT FIRE PROTECTION I04/11/2023
DOB NOWStandpipeSigned-offCURRENT FIRE PROTECTION I04/10/2023
DOB NOWMechanical SystemsSigned-offR.A.M.S. MECHANICAL INC03/07/2023
DOB NOWStructuralSigned-offNAVILLUS TILE INC06/08/2022
DOB NOWGeneral ConstructionSigned-offNAVILLUS TILE INC05/19/2022
DOB NOWGeneral ConstructionSigned-offNAVILLUS TILE INC05/18/2022
DOB NOWConstruction FenceSigned-offNAVILLUS TILE INC05/18/2022
DOB NOWStandpipeSigned-offCURRENT FIRE PROTECTION I05/12/2022
DOB NOWSprinklersSigned-offCURRENT FIRE PROTECTION I05/11/2022
DOB NOWStandpipeSigned-offEAGLE 1 MECHANICAL, INC04/21/2022
DOB NOWConstruction FenceSigned-offNAVILLUS TILE INC04/07/2022
DOB NOWMechanical SystemsSigned-offR.A.M.S. MECHANICAL INC03/29/2022
DOB NOWMechanical SystemsSigned-offR.A.M.S. MECHANICAL INC03/29/2022
DOB NOWMechanical SystemsSigned-offR.A.M.S. MECHANICAL INC02/16/2022
DOB NOWPlumbingSigned-offEAGLE 1 MECHANICAL, INC11/26/2021
DOB NOWGeneral ConstructionSigned-offNAVILLUS TILE INC11/17/2021
DOB NOWGeneral ConstructionSigned-offNAVILLUS TILE INC11/15/2021
DOB NOWStructuralSigned-offNAVILLUS TILE INC10/06/2021
DOB NOWMechanical SystemsSigned-offR.A.M.S. MECHANICAL INC07/09/2021
DOB NOWStandpipeSigned-offCURRENT FIRE PROTECTION I06/17/2021
DOB NOWSprinklersSigned-offCURRENT FIRE PROTECTION I06/17/2021
DOB NOWStandpipeSigned-offEAGLE 1 MECHANICAL, INC05/21/2021
DOB NOWStandpipeSigned-offCURRENT FIRE PROTECTION I04/07/2021
DOB NOWStandpipeSigned-offCURRENT FIRE PROTECTION I04/02/2021
DOB NOWConstruction FenceSigned-offNAVILLUS TILE INC01/28/2021
DOB NOWConstruction FenceSigned-offNAVILLUS TILE INC05/28/2020
BISOTISSUEDNAVILLUS TILE INC05/17/2022
BIS—ISSUEDNAVILLUS TILE INC05/17/2022
BIS—ISSUEDNAVILLUS TILE INC12/03/2021
BISOTISSUEDNAVILLUS TILE INC12/03/2021
BIS—ISSUEDNAVILLUS TILE INC12/03/2021
BISOTISSUEDNAVILLUS TILE INC07/08/2021
BIS—ISSUEDNAVILLUS TILE INC05/03/2021
BISOTISSUEDNAVILLUS TILE INC02/09/2021
BIS—ISSUEDNAVILLUS TILE INC01/28/2021
BIS—ISSUEDNAVILLUS TILE INC12/04/2020
BIS—ISSUEDNAVILLUS TILE INC11/27/2020
BIS—ISSUEDNAVILLUS TILE INC11/27/2020
5 projects · most recent 11/01/2022
General Wiring
FiledStatusContractorScope
11/01/2022CompleteTRU-VAL ELECTRIC CORP.General Wiring
11/12/2021CompleteNYCOM ELECTRICAL CORP—
07/28/2021CompleteTRU-VAL ELECTRIC CORP.1 meters, 1 new_meters
07/21/2021CancelledTRU-VAL ELECTRIC CORP.1 meters, 1 new_meters
04/04/2020CompleteAGIR ELEC'L LTD. D/B/A—
▾Field Inspections (DOB CAP) — 13
DateTypeResultReport
04/18/2023Certified Sprinkler-SP-Fixtures-FinishCertifiedView ↗
04/18/2023Certified StandPipe-SD-Fixtures-Finish-SDCertifiedView ↗
04/13/2023Certified Sprinkler (SP) - Booster Pump TestCertifiedView ↗
04/13/2023Certified Sprinkler-SP-Piping Dry/Wet-Hydrostatic TestCertifiedView ↗
04/13/2023Certified StandPipe-SD-Piping-Hydrostatic TestCertifiedView ↗
04/01/2022Certified Storm Drainage-ST-Piping-UndergroundCertifiedView ↗
03/28/2022Certified Storm Drainage-ST-Piping-UndergroundCertifiedView ↗
03/22/2022Certified Storm Drainage-ST-Piping-UndergroundCertifiedView ↗
03/11/2022Certified Storm Drainage-ST-Piping-Water TestCertifiedView ↗
03/08/2022Certified Storm Drainage-ST-Piping-UndergroundCertifiedView ↗
11/12/2021Certified Storm Drainage-ST-Piping-RoughingCertifiedView ↗
09/17/2021Certified Storm Drainage-ST-Piping-UndergroundCertifiedView ↗
09/17/2021Certified Water and Sanitary-WS-Sanitary Piping-UndergroundCertifiedView ↗
▾Special Inspection Requirements (DOB NOW) — 68
DateRequirementInspectorRole
01/20/2023Seismic Isolation SystemsNELSON LOPEZspecial
01/20/2023FinalNELSON LOPEZprogress
01/20/2023Post-installed AnchorsNELSON LOPEZspecial
08/16/2022FinalNELSON LOPEZprogress
08/16/2022Seismic Isolation SystemsNELSON LOPEZspecial
08/16/2022Post-installed AnchorsNELSON LOPEZspecial
08/12/2022Seismic Isolation SystemsNELSON LOPEZspecial
08/12/2022FinalNELSON LOPEZprogress
08/12/2022Post-installed AnchorsNELSON LOPEZspecial
06/28/2022HVAC and service water heating system controls NELSON LOPEZenergy_progress
06/28/2022HVAC and service water heating equipment NELSON LOPEZenergy_progress
06/28/2022Mechanical SystemsNELSON LOPEZspecial
06/28/2022FinalNELSON LOPEZprogress
06/28/2022Shutoff dampersNELSON LOPEZenergy_progress
06/28/2022HVAC insulation and sealing NELSON LOPEZenergy_progress
06/14/2022Mechanical SystemsNELSON LOPEZspecial
06/14/2022FinalNELSON LOPEZprogress
06/14/2022HVAC and service water heating equipment NELSON LOPEZenergy_progress
06/14/2022Shutoff dampersNELSON LOPEZenergy_progress
06/14/2022HVAC and service water heating system controls NELSON LOPEZenergy_progress
06/14/2022HVAC insulation and sealing NELSON LOPEZenergy_progress
05/23/2022Standpipe SystemsNELSON LOPEZspecial
05/23/2022Seismic Isolation SystemsNELSON LOPEZspecial
05/23/2022Sprinkler SystemsNELSON LOPEZspecial
05/11/2022Sprinkler SystemsNELSON LOPEZspecial
Latest 25 of 68.
▾Tenants in the building
TenantSpaceFloorsRenovation projects
PS369Q PRE-K CENTER at NEW YOK HALL OF SCIENCEEducationFloors 1–3, Roof
Project Q00609110 Alteration · LOC Issued · 10/12/2021
New York Hall Of ScienceEducationFloors 1–3
Project Q00226553 Alteration · LOC Issued · 10/11/2019
Read from each project’s drawing title blocks and cover sheets and checked twice; a name appears only when it is the occupant, never the owner, landlord or designer.
▾Documents — 339 on file (BIS + DOB NOW)
▸Plans & Drawings30
▸DOB NOWPlans/Sketch11
08/27/2026Q00609110-P1Request digital key ↗
08/27/2026Q00609110-I1Request digital key ↗
08/27/2026Q00609110-P2Request digital key ↗
Showing 3 of 11 on file for this type
▸DOB NOWPlans/Sketch - Plumbing6
08/27/2026Q00212371-I1Request digital key ↗
08/26/2026Q00212434-I1Request digital key ↗
08/26/2026Q00212434-P1Request digital key ↗
Showing 3 of 6 on file for this type
▸DOB NOWPlans/Sketch - Mechanical Systems4
08/28/2026Q00226553-I1Request digital key ↗
08/26/2026Q00212412-P2Request digital key ↗
08/26/2026Q00212412-P1Request digital key ↗
Showing 3 of 4 on file for this type
▸DOB NOWPlans/Sketch - Sprinkler3
08/27/2026Q00212371-P1Request digital key ↗
08/27/2026Q00212371-I1Request digital key ↗
08/15/2026Q00212371-P2Request digital key ↗
▸DOB NOWPlans/Sketch - Standpipe3
08/27/2026Q00212371-I1Request digital key ↗
08/27/2026Q00212371-P1Request digital key ↗
08/15/2026Q00212371-P2Request digital key ↗
▸DOB NOWPlans/Sketch - Structural2
08/15/2026Q00211858-I1Request digital key ↗
08/15/2026Q00211858-P1Request digital key ↗
▸DOB NOWPlans/Sketch - Construction Fence1
08/28/2026Q00348436-I1Request digital key ↗
▸Applications & Permits30
▸BISPLAN / WORK APPROVAL APPLICATION21
09/09/2025421737044Open ↗
11/03/2021421961782Open ↗
07/21/2021421737044Open ↗
Showing 3 of 21 on file for this type
▸BISWORK PERMIT APPLICATION7
08/13/2021421961782Open ↗
08/12/2021421737044Open ↗
08/12/2021421737044Open ↗
Showing 3 of 7 on file for this type
▸BISBPP-DOT: SIDEWALK/CURB/ROAD WORK PERMITS1
07/12/2023421903319Open ↗
▸BISCertificate Of Occupancy Application1
05/19/2022421737044Open ↗
▸Zoning, Tax Lot & Property Records3
▸BISFLOOD ZONE COMPLIANCE1
08/23/2023421961782Open ↗
▸BISCO OBJ: VERIFY ADDRESS-TOPO STAMP1
06/23/2022421737044Open ↗
▸BISZONING DIAGRAM1
11/08/2019421737044Open ↗
▸Seals & Professional Certifications82
▸DOB NOWSpecial Inspector Seal & Signature32
09/23/2026Q00212412-P1Open ↗
09/02/2026Q00491145-I1Open ↗
09/02/2026Q00491145-I1Open ↗
Showing 3 of 32 on file for this type
▸DOB NOWDPL-1: Design Professional Seal & Signature23
08/28/2026Q00226553-I1Open ↗
08/28/2026Q00211858-P1Open ↗
08/28/2026Q00211858-I1Open ↗
Showing 3 of 23 on file for this type
▸DOB NOWProgress Inspector Seal & Signature23
09/23/2026Q00212412-P1Open ↗
09/23/2026Q00212412-P1Open ↗
09/01/2026Q00212371-I1Open ↗
Showing 3 of 23 on file for this type
▸BISTECHNICAL REPORT: RESPONSIBILITY/CERTIFICATION4
05/02/2017421380801Open ↗
05/02/2017421380801Open ↗
05/02/2017421380801Open ↗
Showing 3 of 4 on file for this type
▸Trade Schedules & Equipment6
▸BISSCHEDULE B - PLUMBING/SPRINKLER/STANDPIPE2
05/02/2017421380801Open ↗
05/02/2017421380801Open ↗
▸BISDep Sanitary Sewer Certification Hcp Scp1
07/11/2022421737044Open ↗
▸BISSewer Connection Dep Sd1 Amp Sd21
07/13/2022421737044Open ↗
▸BISHvac Service Water Heating Equipment1
06/30/2022421737044Open ↗
▸BISHvac Service Water Heating System Controls1
07/05/2022421737044Open ↗
▸Safety & Tenant Protection3
▸BISSTREET TREE CHECKLIST2
01/04/2021421903319Open ↗
08/14/2019421737044Open ↗
▸BISSTREET TREE SIGNOFF1
03/16/2023421737044Open ↗
▸Energy Compliance17
▸BISTechnical Report Energy Code Responsibility5
02/24/2021421737044Open ↗
02/24/2021421737044Open ↗
01/27/2021421737044Open ↗
Showing 3 of 5 on file for this type
▸BISTECHNICAL REPORT: ENERGY CODE PROGRESS INSPS3
05/02/2017421380801Open ↗
05/02/2017421380801Open ↗
08/14/2019421737044Open ↗
▸BISTR8: ENERGY CODE PROGRESS INSPS TECHNICAL REPORT1
07/01/2020421961782Open ↗
▸BISExterior Lighting Power1
07/05/2022421737044Open ↗
▸BISFenestration Areas1
06/30/2022421737044Open ↗
▸BISInsulation Placement R Values1
06/30/2022421737044Open ↗
▸BISAs Built Energy Analysis En21
07/05/2022421737044Open ↗
▸BISPreliminary Commissioning Report Certification1
05/20/2024421737044Open ↗
▸BISEnergy Code Compliance Inspections1
07/07/2022421737044Open ↗
▸BISAir Sealing And Insulation Visual1
07/05/2022421737044Open ↗
▸DOB NOWPreliminary Commissioning Report Certification1
08/13/2026Q00212412-I1Open ↗
▸Inspections & Test Reports26
▸BISTechnical Report Responsibility11
08/11/2021421737044Open ↗
02/23/2021421737044Open ↗
02/09/2021421737044Open ↗
Showing 3 of 11 on file for this type
▸BISTechnical Report Responsibility Certification4
10/04/2019421737044Open ↗
08/19/2019421737044Open ↗
08/14/2019421737044Open ↗
Showing 3 of 4 on file for this type
▸BISTECHNICAL REPORT: CONCRETE DESIGN MIX3
08/03/2021421737044Open ↗
05/10/2021421737044Open ↗
01/05/2021421737044Open ↗
▸BISTECHNICAL REPORT: CONCRETE/TEST CYLINDER2
05/10/2021421737044Open ↗
01/05/2021421737044Open ↗
▸BISCONCRETE - PRECAST1
06/30/2022421737044Open ↗
▸BISWall Panels Curtain Walls And Veneers1
06/30/2022421737044Open ↗
▸BISDemolition Dm Job Signoff1
07/19/2022421737044Open ↗
▸BISTR21
08/02/2023421737044Open ↗
▸BISFire Resistant Penetrations And Joints Firestop1
07/05/2022421737044Open ↗
▸BISSUBGRADE INSP / SOILS-SITE PREP1
06/30/2022421737044Open ↗
▸Approvals, Objections & Sign-offs65
▸DOB NOWFee Exempt Supporting Document - DOF ACRIS report or BIB letter23
08/28/2026Q00226553-I1Open ↗
08/27/2026Q00212371-P2Open ↗
08/27/2026Q00212371-P1Open ↗
Showing 3 of 23 on file for this type
▸DOB NOWDesign Commission Approval City Owned (Exterior Work)20
08/27/2026Q00609110-P1Open ↗
08/27/2026Q00609110-I1Open ↗
08/26/2026Q00491145-I1Open ↗
Showing 3 of 20 on file for this type
▸DOB NOWDesign Commission Sign Off City Owned (Exterior Work)8
08/13/2026Q00608455-I1Open ↗
08/13/2026Q00491145-I1Open ↗
08/13/2026Q00212371-I1Open ↗
Showing 3 of 8 on file for this type
▸BISLETTERS - SUPPORTING DOCUMENTATION4
08/13/2021421961782Open ↗
08/06/2021421737044Open ↗
11/30/2020421737044Open ↗
Showing 3 of 4 on file for this type
▸BISSCHEDULE A - OCCUPANCY / USE4
12/23/2020421737044Open ↗
11/01/2019421737044Open ↗
08/14/2019421737044Open ↗
Showing 3 of 4 on file for this type
▸BISDESIGN COMM. SIGNOFF: CITY-OWNED PROPERTY (EXTERIOR WORK)2
03/16/2023421903319Open ↗
07/01/2020421961782Open ↗
▸BISCERTIFICATE OF OCCUPANCY/LOC: REQUEST1
09/18/2023421961782Open ↗
▸BISDESIGN COMM. APPROVAL: CITY-OWNED PROPERTY (EXTERIOR WORK)1
07/01/2020421961782Open ↗
▸BISFINAL1
09/18/2023421961782Open ↗
▸BISSuperseding Letter1
05/10/2021421737044Open ↗
▸Cost, Insurance & Ownership7
▸BISProject Specific Gl Insurance3
08/12/2021421737044Open ↗
05/10/2021421737044Open ↗
02/24/2021421737044Open ↗
▸BISCOST AFFIDAVIT2
05/27/2020421961782Open ↗
05/02/2017421476432Open ↗
▸BISBPP-11 - Affidavit as to Roadway Pavement And/Or Sidewalk and Curb Construction1
07/12/2023421903319Open ↗
▸BISCOST AFFIDAVIT (FINAL): PW31
02/09/2023421961782Open ↗
▸Filing & Intake Forms33
▸BISEFILING COVER SHEET15
05/26/2020421961782Open ↗
05/26/2020421961782Open ↗
11/12/2019421903319Open ↗
Showing 3 of 15 on file for this type
▸BISADDITIONAL INFORMATION14
08/30/2023421961782Open ↗
07/12/2023421903319Open ↗
07/11/2022421737044Open ↗
Showing 3 of 14 on file for this type
▸BISBOROUGH INTAKE FORM4
08/13/2021421961782Open ↗
08/06/2021421737044Open ↗
05/10/2021421737044Open ↗
Showing 3 of 4 on file for this type
▸Other Documents15
▸BISBPP - SUPPORTING DOCUMENTATION5
07/12/2023421903319Open ↗
07/12/2023421903319Open ↗
01/04/2021421903319Open ↗
Showing 3 of 5 on file for this type
▸BISPLOT DIAGRAM3
12/24/2020421903319Open ↗
10/04/2019421737044Open ↗
08/14/2019421737044Open ↗
▸BISShutoff Dampers1
07/05/2022421737044Open ↗
▸BISBPP-PARKS: PLANT NEW TREE1
07/12/2023421903319Open ↗
▸BISDuct Design Insulation And Leakage Testing1
06/30/2022421737044Open ↗
▸BISFire Resistive Rated Construction1
06/30/2022421737044Open ↗
▸BISBPP: PHOTOS-SIGNED/SEALED BY APPLICANT1
01/04/2021421903319Open ↗
▸BISVestibules1
07/05/2022421737044Open ↗
▸BISPROTECTION OF EXPOSED FOUNDATION INSULATION1
06/30/2022421737044Open ↗