← Back
Predominantly retail with other uses
46-02 QUEENS BOULEVARD
QUEENS · BIN 4533708
💬 Discuss this project
1931Year Built
4Stories
K4Building Class
C4-4AZoning
23,105 sfGross Floor Area
12Units
Rent Stabilized3 Open Violations 2 unresolved · 1 paperwork only ▸FDNY Report ↗
Predominantly retail with other uses · Owner of record: AMERICAN REALTY SUNNYSIDE LLC · 10,829 sf lot · 2.13 FAR built · Flood zone X
Locations of Work
ArchitectureStructuralMechanicalPlumbing
Roof2p · 2 filings · 12 docs
Bulkhead1p · 1 filing · 2 docs
Floor 24p · 5 filings · 19 docs
Floor 12p · 2 filings · 4 docs
Cellar5p · 4 filings · 17 docs
▾Owner History (Filing Record)
Companies and organizations named on filings. Individual owners are not shown.
OwnerFilingsMost Recent
AMERICAN REALTY SUNNYSIDE LLC1303/22/2026
BEN RASABI/ARKEN INC903/22/2026
WASHINGTON MUTAL BANK SUC203/22/2026
AMERICAN SUNYSIDE REALTY903/21/2026
AMERICAN REALTY303/21/2026
KEYFOOD103/21/2026
CHASE MAHATTAN BANK103/21/2026
▾Design Consultants (Architect / Engineer of Record)
FirmFilingsMost Recent
REAL ENGINEERING SERVICES LLC304/05/2024
ADG ENGINEERING111/03/2023
INOA ARCHITECTURE INC. PC105/03/2022
▾Filing Representatives (Expediters)
RepresentativeFilingsMost Recent
BOYD CONSULTING1003/21/2026
Building Lifecycle
All (107)Filed (5)Violation (48)Objection (24)Special Inspection (30)
05/08/2026
Violation issued (HPD, open)
A
02/19/2026
Violation issued (FDNY_NOV, closed)
02/18/2026
Violation issued (FDNY_NOV, closed)
10/02/2025
Violation issued (FDNY_NOV, closed)
07/08/2025
Violation issued (FDNY_ORDER, closed)
06/16/2025
Violation issued (HPD, closed)
A
12/03/2024
Violation issued (ECB, open)
Construction
07/15/2024
Violation issued (FDNY_NOV, closed)
04/17/2024
Violation issued (HPD, closed)
A
04/05/2024
Filed — Alteration
Filing for new sprinkler heads and wet piping for 1st and 2nd floor. New floor control assemblies for 1st and 2ndfloor in conjunction with Alteration CO application no. Q00666093-I1.
Q01017479-I1
03/12/2024
Special inspection requirement — Fire-Resistant Penetrations and Joints
03/12/2024
Special inspection requirement — Post-installed Anchors
03/08/2024
Special inspection requirement — Sprinkler Systems
03/07/2024
Filed — Alteration
Q00751018-I1
02/29/2024
Violation issued (FDNY_NOV, closed)
02/29/2024
Violation issued (FDNY_NOV, closed)
02/16/2024
Filed — Alteration
Filing Mechanical work in conjunction with Alt-1 application no. Q00666093-I1
Q00751040-I1
02/08/2024
Special inspection requirement — Heating Systems
02/08/2024
Special inspection requirement — Fire-Resistance Rated Construction
02/08/2024
Special inspection requirement — Energy Code Compliance Inspections
11/29/2023
Objection resolved — Addressed
11/24/2023
Violation issued (HPD, closed)
I
11/17/2023
Objection resolved — Addressed
11/08/2023
Objection raised — Other
11/08/2023
Objection raised — Admin
11/03/2023
Filed — Alteration
Filing Structural application in conjunction with Alteration CO application no. Q00666093-I1.
Q00751252-I1
11/03/2023
Special inspection requirement — Shutoff dampers
11/03/2023
Special inspection requirement — HVAC-R and service water heating equipment
11/03/2023
Special inspection requirement — HVAC-R and service water piping design and insulation
11/03/2023
Special inspection requirement — HVAC-R and service water heating system controls
11/03/2023
Special inspection requirement — Maintenance information
10/25/2023
Special inspection requirement — Structural Stability – Alterations of existing buildings
10/12/2023
Special inspection requirement — Structural Steel - High Strength Bolting
10/12/2023
Special inspection requirement — Structural Steel - Details
10/12/2023
Special inspection requirement — Concrete - Cast-In-Place
10/12/2023
Special inspection requirement — Masonry
10/12/2023
Special inspection requirement — Subgrade Inspections
10/12/2023
Special inspection requirement — Structural Steel - Welding
03/31/2023
Violation issued (HPD, closed)
A
06/03/2022
Special inspection requirement — Final
06/03/2022
Special inspection requirement — Final
06/03/2022
Special inspection requirement — Mechanical Systems
05/11/2022
Objection raised — Structural
05/11/2022
Objection resolved — Addressed
05/11/2022
Objection raised — Structural
05/11/2022
Objection resolved — Addressed
05/11/2022
Objection raised — Scope
05/11/2022
Objection resolved — Addressed
05/11/2022
Objection raised — Admin
05/11/2022
Objection resolved — Addressed
05/11/2022
Objection raised — Admin
05/11/2022
Objection resolved — Addressed
05/11/2022
Objection raised — Fire_Protection
05/11/2022
Objection resolved — Addressed
05/11/2022
Objection raised — Structural
05/11/2022
Objection resolved — Addressed
05/11/2022
Objection raised — Zoning
05/11/2022
Objection resolved — Addressed
05/11/2022
Objection raised — Fire_Protection
05/11/2022
Objection resolved — Addressed
Latest 60 of 107 events.
Permit / Filing Register
SourceWork TypeStatusApplicantIssued
BISOTISSUEDBRAVO GENERAL CONTRACTOR05/15/2018
BIS—ISSUEDARKEN INC01/22/2015
BISFPISSUEDFIRE COMMAND CO, INC02/26/2014
BISMHISSUEDSHARON ENGINEERING PC12/18/2013
BIS—ISSUEDFIVE TOWN NEON SIGN CO IN10/02/2012
BIS—ISSUEDFIVE TOWN NEON SIGN CO IN10/02/2012
BIS—ISSUEDFIVE TOWN NEON SIGN CO IN10/02/2012
BIS—ISSUEDFIVE TOWN NEON SIGN CO IN10/02/2012
BIS—ISSUEDFIVE TOWN NEON SIGN CO IN10/02/2012
BISFPISSUEDNY FIRE LLC11/10/2011
BISEQISSUEDSUKHMANY CONSTRUCTION INC11/07/2011
BISPLISSUEDSAFETY PLMBG & HTG LLC09/27/2011
BISSPISSUEDACCURATE MECHANICAL INC03/22/2011
BISEQISSUEDARKEN INC02/17/2011
BIS—ISSUEDARKEN INC02/17/2011
BISEQISSUEDSUKHMANY CONSTRUCTION INC02/03/2011
BISEQISSUEDSTUCCO SPECIALISTS, INC11/09/2010
BISEQISSUEDSTUCCO SPECIALISTS, INC10/18/2010
BISPLISSUEDSAFETY PLMBG & HTG LLC09/21/2010
BISEQISSUEDSUKHMANY CONSTRUCTION INC03/23/2010
BIS—ISSUEDARKEN INC01/27/2010
BISEQISSUEDARKEN INC01/27/2010
BISEQISSUEDARKEN INC12/08/2009
BISPLISSUEDJD MASTERS PLBG & HTG10/11/2007
BISBLISSUEDAMOK INC07/03/2007
BISPLISSUEDAMOK INC07/03/2007
BISPLISSUEDFLINT MECHANICAL CORP03/29/2007
BISSPISSUEDFLINT MECHANICAL CORP03/29/2007
BISOTISSUEDCONSORT CONSTRUCTION INC01/26/2007
BIS—ISSUEDNORTH SHORE NEON SIGN CO,INC10/22/1997
BIS—ISSUEDNORTH SHORE NEON SIGN CO,INC10/22/1997
BISMHISSUEDNEW YORK PLG HEATING CORP03/05/1996
BIS—ISSUEDSERVICE SIGN ERECTORS08/17/1994
BIS—ISSUEDSERVICE SIGN ERECTORS08/17/1994
BIS—ISSUEDSERVICE SIGN ERECTORS08/17/1994
BIS—ISSUEDSERVICE SIGN ERECTORS08/17/1994
BIS—ISSUEDSERVICE SIGN ERECTORS08/17/1994
BIS—ISSUEDSERVICE SIGN ERECTORS08/17/1994
BISMHISSUEDFOREMOST INDUSTRIES INC.12/13/1993
BISEQRE-ISSUEDFOREMOST INDUSTRIES INC08/18/1993
+ 2 more permits on file
1 project · most recent 02/16/2024
Heating and Air Conditioning Systems Refrigeration Systems Ventilation Systems
FiledStatusContractorScopeMake / Model / Capacity
02/16/2024——Heating and Air Conditioning Systems, Refrigeration Systems, Ventilation Systems
Heat / Cool
Daikin FXSQ48TAVJU 48,000 BTU · Vrf Indoor ×9
RXYQ120TTJU 114,000 BTU · Vrf Outdoor ×3
DPS020A 8,000 CFM · Rooftop Unit ×2
RXYQ096TTJU 92,000 BTU · Vrf Outdoor ×1
Ventilation
Daikin VAM600GVJU 600 CFM · Erv ×2
VAMA70GVJU 300 CFM · Erv ×1
Refrigeration
— No specs received at time of filing 1 BTU · Refrigeration Unit ×1
1 project · most recent 04/05/2024
FiledStatusContractorScope
04/05/2024———
1 project · most recent 11/03/2023
Steel Concrete Masonry
FiledStatusContractorScope
11/03/2023——Steel, Concrete, Masonry
▾Special Inspection Requirements (DOB NOW) — 41
DateRequirementInspectorRole
03/12/2024Fire-Resistant Penetrations and Joints—special
03/12/2024Post-installed Anchors—special
03/08/2024Sprinkler Systems—special
02/08/2024Heating Systems—special
02/08/2024Fire-Resistance Rated Construction—progress
02/08/2024Energy Code Compliance Inspections—progress
11/03/2023Shutoff dampers—energy_progress
11/03/2023HVAC-R and service water heating equipment—energy_progress
11/03/2023HVAC-R and service water piping design and insulation—energy_progress
11/03/2023HVAC-R and service water heating system controls—energy_progress
11/03/2023Maintenance information—energy_progress
10/25/2023Structural Stability – Alterations of existing buildings—special
10/12/2023Structural Steel - High Strength Bolting—special
10/12/2023Structural Steel - Details—special
10/12/2023Concrete - Cast-In-Place—special
10/12/2023Masonry—special
10/12/2023Subgrade Inspections—special
10/12/2023Structural Steel - Welding—special
06/03/2022Final—progress
06/03/2022Final—progress
06/03/2022Mechanical Systems—special
01/27/2022Fenestration and door U-factor and product ratings—energy_progress
01/27/2022Concrete - Cast-In-Place—special
01/27/2022Exterior Insulation and Finish Systems (EIFS)—special
01/27/2022Fire-Resistant Penetrations and Joints—special
Latest 25 of 41.
▾Documents — 265 on file (BIS + DOB NOW)
▸Plans & Drawings5
▸DOB NOWPlans/Sketch5
08/23/2026Q00751252-I1Request digital key ↗
08/23/2026Q00751040-I1Request digital key ↗
08/23/2026Q00751018-I1Request digital key ↗
Showing 3 of 5 on file for this type
▸Applications & Permits56
▸BISPLAN / WORK APPROVAL APPLICATION26
04/06/2018421618100Open ↗
03/28/2015421023029Open ↗
01/27/2014420940628Open ↗
Showing 3 of 26 on file for this type
▸BISWORK PERMIT APPLICATION22
05/25/2018421618100Open ↗
02/02/2015421023029Open ↗
03/03/2014420940628Open ↗
Showing 3 of 22 on file for this type
▸BISNon-Directive 14 Construction Sign Off Including Sign Applications5
06/14/2013420484719Open ↗
05/31/2013420485460Open ↗
05/31/2013420485479Open ↗
Showing 3 of 5 on file for this type
▸BISCERTIFICATE OF OCCUPANCY: APPLICATION2
03/19/2015421023029Open ↗
04/03/2012410212318Open ↗
▸BISINTENT TO REVOKE APPROVAL/PERMIT1
07/12/2018421618100Open ↗
▸Zoning, Tax Lot & Property Records3
▸BISTAX LOT- FINAL LOT NUMBER ISSUED1
09/14/2012410212318Open ↗
▸BISTAX LOT- TENTATIVE LOT NUMBER ISSUED1
08/01/2012410212318Open ↗
▸DOB NOWZD1: DOB Zoning Diagram1
08/13/2026Q00666093-I1Open ↗
▸Seals & Professional Certifications36
▸BISTECHNICAL REPORT: RESPONSIBILITY/CERTIFICATION21
05/25/2018421618100Open ↗
04/06/2018421618100Open ↗
09/11/2014421023029Open ↗
Showing 3 of 21 on file for this type
▸BISPROFESSIONAL CERTIFIED CHECKLIST5
04/06/2018421618100Open ↗
09/23/2013420890708Open ↗
10/19/2010420276757Open ↗
Showing 3 of 5 on file for this type
▸DOB NOWDPL-1: Design Professional Seal & Signature5
08/23/2026Q01017479-I1Open ↗
08/13/2026Q00751252-I1Open ↗
08/13/2026Q00751018-I1Open ↗
Showing 3 of 5 on file for this type
▸BISPROFESSIONAL CERTIFICATION STATEMENT2
04/06/2018421618100Open ↗
09/23/2013420890708Open ↗
▸BISPROFESSIONAL CERTIFICATION STATEMENT FORM2
On file, but not among the 200 most recently loaded documents for this source.
Showing 0 of 2 on file for this type
▸BISPC FULL REPORT1
On file, but not among the 200 most recently loaded documents for this source.
Showing 0 of 1 on file for this type
▸Trade Schedules & Equipment43
▸BISEQUIPMENT USE PERMITS15
02/20/2014420890708Open ↗
12/31/2013420890708Open ↗
12/31/2013420890708Open ↗
Showing 3 of 15 on file for this type
▸BISSELF-CERT PLUMBING NOTICE10
08/28/2012410212318Open ↗
07/27/2012420296600Open ↗
04/19/2012410212318Open ↗
Showing 3 of 10 on file for this type
▸BISSCHEDULE B - PLUMBING7
01/30/2012410212318Open ↗
01/25/2012410212318Open ↗
06/20/2011410212318Open ↗
Showing 3 of 7 on file for this type
▸BISEQUIPMENT USE APPLICATION-PERMIT5
04/03/2013410212318Open ↗
04/03/2013410212318Open ↗
04/03/2013410212318Open ↗
Showing 3 of 5 on file for this type
▸BISSPRINKLER INSP REPORT : FP-852
07/27/2012420296600Open ↗
03/26/2012420296600Open ↗
▸BISSCHEDULE C - HEATING & COMBUSTION EQUIPMENT1
01/14/2012410212318Open ↗
▸BISDETECTOR:SMOKE-CERTIFICATE OF INSTALLATION1
09/10/2012410212318Open ↗
▸BISSCHEDULE B - PLUMBING/SPRINKLER/STANDPIPE1
01/27/2014420940628Open ↗
▸DOB NOWDEP: Sewer Certification (Sanitary/Storm)1
08/13/2026Q00666093-I1Open ↗
▸Safety & Tenant Protection5
▸BISST-1 Street Tree Checklist1
On file, but not among the 200 most recently loaded documents for this source.
Showing 0 of 1 on file for this type
▸BISSTREET TREE CHECKLIST1
09/11/2014421023029Open ↗
▸BISTenant Protection Plan and Notes1
04/06/2018421618100Open ↗
▸DOB NOWParks Department Acknowledgment Letter for Street Trees Plan1
08/13/2026Q00666093-I1Open ↗
▸DOB NOWStreet Tree Checklist1
08/13/2026Q00666093-I1Open ↗
▸Environmental & Asbestos13
▸BISASBESTOS EXEMPTION CERTIFICATION LETTER5
09/23/2013420890708Open ↗
09/23/2013420890708Open ↗
01/19/2011420296600Open ↗
Showing 3 of 5 on file for this type
▸BISTHIS IS 'NOT AN ASBESTOS PROJECT'4
10/22/2011420496136Open ↗
Showing 1 of 4 on file for this type
▸BISASBESTOS: CERTIFICATION (DEP ACP5)2
09/11/2014421023029Open ↗
01/27/2014420940628Open ↗
▸DOB NOWDEP ACP-5: Asbestos Assessment Report2
08/23/2026Q01017479-I1Open ↗
08/13/2026Q00666093-I1Open ↗
▸Energy Compliance9
▸BISTECHNICAL REPORT: ENERGY CODE PROGRESS INSPS7
05/25/2018421618100Open ↗
04/06/2018421618100Open ↗
01/24/2015421023029Open ↗
Showing 3 of 7 on file for this type
▸BISTR8: Energy Code Progress Inspections1
12/30/2013420890708Open ↗
▸BISAS-BUILT ENERGY ANALYSIS1
01/22/2014420890708Open ↗
▸Inspections & Test Reports4
▸BISTECHNICAL REPORT: CONCRETE/TEST CYLINDER2
09/25/2012410212318Open ↗
Showing 1 of 2 on file for this type
▸BISTECHNICAL REPORT: CONCRETE DESIGN MIX2
08/09/2010410212318Open ↗
Showing 1 of 2 on file for this type
▸Approvals, Objections & Sign-offs44
▸BISADMINISTRATIVE OBJECTIONS14
09/11/2014421023029Open ↗
01/27/2014420940628Open ↗
09/11/2013420890708Open ↗
Showing 3 of 14 on file for this type
▸BISCERTIFICATE OF OCCUPANCY/LOC: REQUEST14
02/20/2014420890708Open ↗
06/14/2013420484719Open ↗
06/08/2013410212318Open ↗
Showing 3 of 14 on file for this type
▸BISLETTERS - SUPPORTING DOCUMENTATION9
07/12/2018421618100Open ↗
03/28/2015421023029Open ↗
12/12/2012410212318Open ↗
Showing 3 of 9 on file for this type
▸BISSCHEDULE A - OCCUPANCY / USE7
09/11/2014421023029Open ↗
12/16/2010410212318Open ↗
12/17/2010410212318Open ↗
Showing 3 of 7 on file for this type
▸Cost, Insurance & Ownership23
▸BISCOST AFFIDAVIT23
04/06/2018421618100Open ↗
03/30/2015421023029Open ↗
09/11/2014421023029Open ↗
Showing 3 of 23 on file for this type
▸Filing & Intake Forms16
▸BISEFILING COVER SHEET14
04/06/2018421618100Open ↗
09/11/2014421023029Open ↗
01/27/2014420940628Open ↗
Showing 3 of 14 on file for this type
▸BISADDITIONAL INFORMATION1
07/24/2012410212318Open ↗
▸BISADDITIONAL INFORMATIONLETTERS - SUPPORTING DOCUMENTATION1
02/12/2013410212318Open ↗
▸Other Documents8
▸BISPLOT DIAGRAM3
03/28/2015421023029Open ↗
09/14/2012410212318Open ↗
Showing 2 of 3 on file for this type
▸BISFIRE SUPP ANSUL APPROVL- FD-FSS2
05/12/2012420496136Open ↗
04/19/2012410212318Open ↗
▸DOB NOWPlot Diagram1
08/13/2026Q00666093-I1Open ↗
▸DOB NOWProperty Ownership Certification1
08/13/2026Q00666093-I1Open ↗
▸DOB NOWLocal Law 92/94 of 2019 Sustainable Roof Zone1
08/13/2026Q00666093-I1Open ↗