← Back
BuildNYC
General warehouse
46-05 56TH ROAD
QUEENS · Sunnyside · BIN 4058890
💬 Discuss this project
1966Year Built
1Stories
E1Building Class
M2-1Zoning
409,473 sfGross Floor Area
1Units
LL97 Covered0 Active Violations 4 likely answered 1 old, status unconfirmed ▸
General warehouse · Owner of record: UPS Inc (NY) · 807,715 sf lot · 0.51 FAR built · Flood zone X
Locations of Work
ArchitectureStructuralMechanicalFire Protection
Names shown beside floors are taken automatically from the text of filed documents and may be incomplete or wrong.
RoofUnited Parcel Service, UPS Maspeth Facility18p · 4 filings · 20 docs
Floor 1United Parcel Service4p · 2 filings · 15 docs
MezzanineUnited Parcel Service7p · 4 filings · 20 docs
▾Owner History (Filing Record)
Companies and organizations named on filings. Individual owners are not shown.
OwnerFilingsMost Recent
United Parcel Service2507/08/2026
UPS Inc (NY)1007/08/2026
CVM507/08/2026
▾Design Consultants (Architect / Engineer of Record)
FirmFilingsMost Recent
Building Engineering Systems204/20/2023
Associated Technology206/30/2022
Christopher Compton203/12/2020
Greenwald Associates111/13/2019
▾Filing Representatives (Expediters)
RepresentativeFilingsMost Recent
PDG Building Consultants403/21/2026
Bohler Engineering203/21/2026
▾Contractors (License-Anchored)
FirmTradeRolesMost Recent
CVM Construction ManagersGeneral Contractor407/08/2026
Malta EnterprisesGeneral Contractor407/08/2026
Standard Fire SuppFire Protection207/08/2026
Industrial Service andGeneral Contractor207/08/2026
Kangaroo Electrical ContElectrical103/21/2026
Alliance Elevator CompanyElectrical103/22/2026
Eastern Electrical ConstructionElectrical103/22/2026
L.E.B. ElectricElectrical103/22/2026
▾Special Inspection Agencies
AgencyLicense #FilingsMost Recent
All State Property Inspec4288204/20/2023
David Katz, P.E6087206/30/2022
Environmental Code Consulting5516203/12/2020
Special Testing & Consulting1688111/13/2019
Building Lifecycle
All (68)Filed (7)Permit Issued (8)Signed Off (3)Violation (30)Inspection (1)Special Inspection (19)
12/01/2023
Signed off — Alteration
Q00855989-I1
11/22/2023
Inspection — Pass-Final General Construction Non-Directive 14
Pass
View inspection ↗
11/14/2023
Signed off — Alteration
THIS APPLICATION IS BEING FILED TO INSTALL SIX NEW VENTILATION FANS ON ROOF CURBS AT FIRST FLOOR ROOF OF WAREHOUSE.
Q00835237-I1
08/16/2023
Permit issued — General Construction
Q00855989-I1-GC-CX
04/20/2023
Filed — Alteration
Q00855989-I1
03/22/2023
Permit issued — Mechanical Systems
Q00835237-I1-GC-CX
02/27/2023
Filed — Alteration
THIS APPLICATION IS BEING FILED TO INSTALL SIX NEW VENTILATION FANS ON ROOF CURBS AT FIRST FLOOR ROOF OF WAREHOUSE.
Q00835237-I1
02/27/2023
Special inspection requirement — Structural Steel - Details
Warren Gordon
02/27/2023
Special inspection requirement — Final
SEBERT DYER
02/27/2023
Special inspection requirement — Structural Steel - Welding
Warren Gordon
02/27/2023
Special inspection requirement — Structural Cold-Formed Steel
Warren Gordon
02/27/2023
Special inspection requirement — Air barrier - visual inspection
SEBERT DYER
02/27/2023
Special inspection requirement — Maintenance information
SEBERT DYER
02/27/2023
Special inspection requirement — Mechanical Systems
SEBERT DYER
02/27/2023
Special inspection requirement — Fire-Resistant Penetrations and Joints
SEBERT DYER
12/06/2022
Permit issued — Sprinklers
Q00256879-I1-EW-SP
06/30/2022
Filed — Alteration
Mechanical work as per plans filed.
Q00561059-P1
06/28/2022
Special inspection requirement — HVAC-R and service water heating equipment
David Katz
06/28/2022
Special inspection requirement — HVAC-R and service water piping design and insulation
David Katz
06/28/2022
Special inspection requirement — HVAC-R and service water heating system controls
David Katz
06/28/2022
Special inspection requirement — Mechanical Systems
David Katz
06/28/2022
Special inspection requirement — Final
David Katz
06/02/2022
Violation issued (DOB, closed)
V*-DOB VIOLATION - DISMISSED
04/20/2022
Permit issued — Mechanical Systems
Q00561059-I1-MS
09/22/2021
Permit issued — Mechanical Systems
Q00561059-I1-MS
08/03/2021
Filed — Alteration
Mechanical work as per plans filed.
Q00561059-I1
06/03/2021
Violation issued (DOB, closed)
V*-DOB VIOLATION - DISMISSED
07/27/2020
Signed off — Alteration
Installation of structural support and cross-over platforms with stairs for processing conveyor system within the existing freight terminal as per plans filed herewith.
Q00225542-I1
03/12/2020
Filed — Alteration
Installation of structural support and cross-over platforms with stairs for processing conveyor system within the existing freight terminal as per plans filed herewith.
Q00225542-P1
03/12/2020
Special inspection requirement — Structural Steel - Welding
Daniel Karpen
03/12/2020
Special inspection requirement — Structural Steel - High Strength Bolting
Daniel Karpen
03/12/2020
Special inspection requirement — Structural Cold-Formed Steel
Daniel Karpen
03/12/2020
Special inspection requirement — Post-installed Anchors
Daniel Karpen
03/12/2020
Special inspection requirement — Final
CHRISTOPHER COMPTON
11/19/2019
Permit issued — Structural
Q00225542-I1-ST
11/14/2019
Permit issued — Sprinklers
Q00256879-I1-EW-SP
11/13/2019
Filed — Alteration
MODIFICATION TO EXISTING SPRINKLER SYSTEM ON THE FIRST FLOOR AND MEZZANINE. NO CHANGE IN USE, EGRESS OR OCCUPANCY UNDER THIS APPLICATION.
Q00256879-I1
11/08/2019
Violation issued (DOB, open)
V-DOB VIOLATION - ACTIVE
11/08/2019
Violation issued (DOB, open)
V-DOB VIOLATION - ACTIVE
10/31/2019
Special inspection requirement — Sprinkler Systems
SEBASTIAN SETTEDUCATE JR., P.E
10/29/2019
Permit issued — Structural
Q00225542-I1-ST
10/25/2019
Filed — Alteration
Installation of structural support and cross-over platforms with stairs for processing conveyor system within the existing freight terminal as per plans filed herewith.
Q00225542-I1
09/06/2019
Violation issued (DOB, open)
V-DOB VIOLATION - ACTIVE
02/16/2019
Violation issued (DOB, open)
V-DOB VIOLATION - ACTIVE
01/26/2018
Violation issued (DOB, open)
V-DOB VIOLATION - ACTIVE
05/04/2016
Violation issued (DOB, closed)
V*-DOB VIOLATION - Resolved
05/02/2015
Violation issued (DOB, closed)
V*-DOB VIOLATION - DISMISSED
04/09/2015
Violation issued (DOB, closed)
V*-DOB VIOLATION - Resolved
06/06/2014
Violation issued (DOB, closed)
V*-DOB VIOLATION - DISMISSED
04/07/2014
Violation issued (DOB, closed)
V*-DOB VIOLATION - Resolved
12/19/2013
Violation issued (DOB, closed)
V*-DOB VIOLATION - Resolved
06/03/2013
Violation issued (DOB, closed)
V-DOB VIOLATION - ACTIVE
08/27/2012
Violation issued (DOB, closed)
V*-DOB VIOLATION - Resolved
05/03/2012
Violation issued (DOB, closed)
V*-DOB VIOLATION - DISMISSED
10/05/2011
Violation issued (DOB, closed)
V*-DOB VIOLATION - Resolved
08/18/2010
Violation issued (DOB, closed)
V*-DOB VIOLATION - Resolved
01/04/2008
Violation issued (DOB, closed)
V*-DOB VIOLATION - Resolved
10/16/2006
Violation issued (DOB, closed)
V*-DOB VIOLATION - Resolved
01/31/2005
Violation issued (DOB, closed)
V-DOB VIOLATION - ACTIVE
01/31/2005
Violation issued (DOB, closed)
V-DOB VIOLATION - ACTIVE
Latest 60 of 68 events.
Permit / Filing Register
SourceWork TypeStatusApplicantIssued
DOB NOWGeneral ConstructionSigned-offCVM Construction Managers08/16/2023
DOB NOWMechanical SystemsSigned-offCVM Construction Managers03/22/2023
DOB NOWSprinklersSigned-offStandard Fire Supp12/06/2022
DOB NOWMechanical SystemsSigned-offMalta Enterprises04/20/2022
DOB NOWMechanical SystemsSigned-offMalta Enterprises09/22/2021
DOB NOWStructuralSigned-offIndustrial Service and11/19/2019
DOB NOWSprinklersSigned-offStandard Fire Supp11/14/2019
DOB NOWStructuralSigned-offIndustrial Service and10/29/2019
BISOTISSUEDIndustrial Service and10/11/2019
BISPLISSUEDCape Plumbing06/24/2019
BISMHISSUEDCVM Construction Managers04/15/2019
BISOTISSUEDCVM Construction Managers04/15/2019
BISOTISSUEDCVM Construction Managers11/16/2018
BISMHISSUEDCVM Construction Managers11/16/2018
BISOTISSUEDCVM Construction Managers02/14/2018
BISMHISSUEDCVM Construction Managers02/14/2018
BISOTISSUEDGibraltar Contracting01/21/2011
BISSPISSUEDDevo Fire Protection04/14/2009
BISOTISSUEDRoux Associates03/05/2009
BIS—ISSUEDA.M.A. Holdings05/22/2008
BIS—ISSUEDA.M.A. Holdings05/22/2008
BIS—ISSUEDA.M.A. Holdings04/25/2008
BIS—ISSUEDA.M.A. Holdings04/25/2008
BIS—ISSUEDA.M.A. Holdings04/25/2008
BISOTISSUEDThe Baranello Organization11/06/1997
BISFSISSUEDMetropolitan Heat and Power11/24/1995
BISSPISSUEDNational Sprinkler10/28/1993
BIS—ISSUEDFalco Construction02/27/1992
BISFPISSUEDAllied Fire Control Service11/01/1991
BIS—ISSUEDFalco Construction08/28/1991
BISPLISSUEDAztec Plumbing & Heating04/18/1990
BIS—ISSUEDBrand Asbestos Control Co02/16/1990
1 project · most recent 06/30/2022
Air Conditioning Systems
FiledStatusContractorScopeMake / Model / Capacity
06/30/2022Signed-offMalta EnterprisesAir Conditioning Systems
Cooling
Mitsubishi Electric TPKFYP030KM142A 30,000 BTU · Vrf Indoor ×2
TUMYP0361AK43NA 36,000 BTU · Vrf Outdoor ×2
5 projects · most recent 11/21/2025
General Wiring
FiledStatusContractorScope
11/21/2025Permit IssuedThree Son's Electrical CoGeneral Wiring
04/03/2023Permit IssuedL.E.B. ElectricGeneral Wiring
08/31/2021CompleteAlliance Elevator Company—
09/14/2020CompleteEastern Electrical Construction2 meters
01/07/2020CompleteValentine ElectricGeneral Wiring
▾Field Inspections (DOB CAP) — 1
DateTypeResultReport
11/22/2023Pass-Final General Construction Non-Directive 14PassView ↗
▾Special Inspection Requirements (DOB NOW) — 19
DateRequirementInspectorRole
02/27/2023Structural Steel - DetailsWarren Gordonspecial
02/27/2023FinalSEBERT DYERprogress
02/27/2023Structural Steel - WeldingWarren Gordonspecial
02/27/2023Structural Cold-Formed SteelWarren Gordonspecial
02/27/2023Air barrier - visual inspectionSEBERT DYERenergy_progress
02/27/2023Maintenance informationSEBERT DYERenergy_progress
02/27/2023Mechanical SystemsSEBERT DYERspecial
02/27/2023Fire-Resistant Penetrations and JointsSEBERT DYERspecial
06/28/2022HVAC-R and service water heating equipmentDavid Katzenergy_progress
06/28/2022HVAC-R and service water piping design and insulationDavid Katzenergy_progress
06/28/2022HVAC-R and service water heating system controlsDavid Katzenergy_progress
06/28/2022Mechanical SystemsDavid Katzspecial
06/28/2022FinalDavid Katzprogress
03/12/2020Structural Steel - WeldingDaniel Karpenspecial
03/12/2020Structural Steel - High Strength BoltingDaniel Karpenspecial
03/12/2020Structural Cold-Formed SteelDaniel Karpenspecial
03/12/2020Post-installed AnchorsDaniel Karpenspecial
03/12/2020FinalCHRISTOPHER COMPTONprogress
10/31/2019Sprinkler SystemsSEBASTIAN SETTEDUCATE JR., P.Especial
▾Tenants in the building
TenantSpaceFloorsRenovation projects
United Parcel ServiceIndustrial / WarehouseFloor 1, Mezzanine
Project Q00855989 Alteration · LOC Issued · 04/20/2023
Project Q00256879 Alteration · Permit Entire · 11/13/2019
Project Q00225542 Alteration · LOC Issued · 10/25/2019
UPS Maspeth FacilityIndustrial / WarehouseRoof
Project Q00561059 Alteration · Permit Entire · 08/03/2021
Names are taken automatically from the text of each project’s filed documents (title blocks and cover sheets) and screened to exclude owners, landlords and designers. They may be incomplete or wrong; check the filing.
▾Documents — 115 on file (BIS + DOB NOW)
▸Plans & Drawings7
▸DOB NOWPlans/Sketch4
08/26/2026Q00561059-P1Request digital key ↗
08/26/2026Q00561059-I1Request digital key ↗
08/25/2026Q00835237-I1Request digital key ↗
Showing 3 of 4 on file for this type
▸DOB NOWPlans/Sketch - Structural2
08/28/2026Q00225542-I1Request digital key ↗
08/15/2026Q00225542-P1Request digital key ↗
▸DOB NOWPlans/Sketch - Sprinkler1
08/28/2026Q00256879-I1Request digital key ↗
▸Applications & Permits23
▸BISWORK PERMIT APPLICATION11
10/15/2019421797292Open ↗
07/17/2019421531710Open ↗
04/19/2019421531710Open ↗
Showing 3 of 11 on file for this type
▸BISPLAN / WORK APPROVAL APPLICATION11
10/10/2019421797292Open ↗
09/24/2019421797292Open ↗
09/03/2019421797292Open ↗
Showing 3 of 11 on file for this type
▸BISPLAN - WORK & PERMITS - SUPPPORTING DOCUMENTATION1
07/24/2020421797292Open ↗
▸Seals & Professional Certifications41
▸DOB NOWSpecial Inspector Seal & Signature11
09/02/2026Q00835237-I1Open ↗
09/02/2026Q00835237-I1Open ↗
09/02/2026Q00835237-I1Open ↗
Showing 3 of 11 on file for this type
▸BISTECHNICAL REPORT: RESPONSIBILITY/CERTIFICATION9
10/15/2019421797292Open ↗
09/03/2019421797292Open ↗
02/15/2018421531710Open ↗
Showing 3 of 9 on file for this type
▸DOB NOWDPL-1: Design Professional Seal & Signature7
08/28/2026Q00256879-I1Open ↗
08/28/2026Q00225542-P1Open ↗
08/28/2026Q00225542-I1Open ↗
Showing 3 of 7 on file for this type
▸DOB NOWProgress Inspector Seal & Signature6
09/02/2026Q00835237-I1Open ↗
09/02/2026Q00835237-I1Open ↗
09/02/2026Q00835237-I1Open ↗
Showing 3 of 6 on file for this type
▸BISPROFESSIONAL CERTIFIED CHECKLIST4
09/03/2019421797292Open ↗
01/20/2011420315331Open ↗
04/15/2009420006344Open ↗
Showing 3 of 4 on file for this type
▸BISPROFESSIONAL CERTIFICATION STATEMENT FORM3
01/20/2011420315331Open ↗
04/15/2009420006344Open ↗
02/09/2009410223093Open ↗
▸BISPROFESSIONAL CERTIFICATION STATEMENT1
09/03/2019421797292Open ↗
▸Trade Schedules & Equipment5
▸BISSCHEDULE B - PLUMBING2
08/07/2009420006344Open ↗
04/15/2009420006344Open ↗
▸BISSCHEDULE B - PLUMBING/SPRINKLER/STANDPIPE1
08/24/2017421531710Open ↗
▸BISSPRINKLER INSP REPORT : FP-851
11/09/2009420006344Open ↗
▸BISSELF-CERT PLUMBING NOTICE1
11/09/2009420006344Open ↗
▸Environmental & Asbestos12
▸DOB NOWDEP ACP-5: Asbestos Assessment Report7
08/28/2026Q00256879-I1Open ↗
08/28/2026Q00225542-P1Open ↗
08/28/2026Q00225542-I1Open ↗
Showing 3 of 7 on file for this type
▸BISTHIS IS 'NOT AN ASBESTOS PROJECT'2
01/20/2011420315331Open ↗
04/15/2009420006344Open ↗
▸BISASBESTOS: CERTIFICATION (DEP ACP5)2
10/10/2019421797292Open ↗
11/01/2017421531710Open ↗
▸BISASBESTOS EXEMPTION CERTIFICATION LETTER1
02/09/2009410223093Open ↗
▸Energy Compliance5
▸BISTECHNICAL REPORT: ENERGY CODE PROGRESS INSPS3
09/03/2019421797292Open ↗
02/15/2018421531710Open ↗
08/24/2017421531710Open ↗
▸BISAS-BUILT ENERGY ANALYSIS1
07/24/2020421797292Open ↗
▸DOB NOWEN2: As Built Energy Analysis.1
08/13/2026Q00561059-I1Open ↗
▸Inspections & Test Reports1
▸BISTECHNICAL REPORT: RESPONSIBILITY1
07/24/2020421797292Open ↗
▸Approvals, Objections & Sign-offs5
▸BISADMINISTRATIVE OBJECTIONS3
01/20/2011420315331Open ↗
04/15/2009420006344Open ↗
02/09/2009410223093Open ↗
▸BISCERTIFICATE OF OCCUPANCY/LOC: REQUEST2
07/24/2020421797292Open ↗
04/14/2009410223093Open ↗
▸Cost, Insurance & Ownership8
▸BISCOST AFFIDAVIT8
07/24/2020421797292Open ↗
09/03/2019421797292Open ↗
08/29/2017421531710Open ↗
Showing 3 of 8 on file for this type
▸Filing & Intake Forms7
▸BISEFILING COVER SHEET7
09/03/2019421797292Open ↗
10/09/2018421672675Open ↗
08/24/2017421531710Open ↗
Showing 3 of 7 on file for this type
▸Other Documents1
▸DOB NOWPARTIAL DEMO: 10-DAY Notice1
08/13/2026Q00855989-I1Open ↗