← Back
General warehouse
46-06 57 AVENUE
QUEENS · BIN 4597143
💬 Discuss this project
2016Year Built
2Stories
E1Building Class
M3-1Zoning
362,474 sfGross Floor Area
1Units
LL97 Covered0 Open ViolationsFDNY Report ↗
General warehouse · Owner of record: FIFTY SEVEN AVENUE INVESTMENTS, LLC · 509,476 sf lot · 0.71 FAR built · Flood zone X
Locations of Work
ArchitectureStructuralPlumbingGeneral
Roof1 filing · 20 docs
Floor 24p · 4 filings · 20 docs
Floor 11 filing · 20 docs
3 jobs · most recent 11/02/2023
General Wiring
FiledStatusContractorScope
11/02/2023Permit IssuedKANGAROO ELEC'L CONT.INC.General Wiring
12/10/2021CompleteB & G ELECL CONTR OF NY IGeneral Wiring
02/12/2018CompleteKLEINBERG ELECTRIC, INC.General Wiring
1 job · most recent 08/22/2024
Concrete
FiledStatusContractorScope
08/22/2024Permit IssuedMS ELECTRIC INCConcrete
Building Lifecycle
All (101)Filed (16)Permit Issued (16)Signed Off (7)Violation (4)Inspection (10)Objection (18)Special Inspection (30)
04/30/2025
Violation issued (FDNY_NOV, closed)
12/24/2024
Permit issued — General Construction
Q01034914-I1-GC-CX
12/23/2024
Permit issued — Mechanical Systems
Q01034914-S1-MS
11/12/2024
Permit issued — Mechanical Systems
Q01034914-S1-MS
09/30/2024
Permit issued — General Construction
Q01034914-I1-GC-CX
09/30/2024
Objection resolved — Addressed
09/30/2024
Objection resolved — Addressed
09/30/2024
Objection resolved — Addressed
09/30/2024
Objection resolved — Addressed
09/04/2024
Objection resolved — Addressed
09/04/2024
Objection resolved — Addressed
08/26/2024
Objection raised — Fire_Protection
08/26/2024
Objection raised — Other
08/26/2024
Objection raised — Other
08/26/2024
Objection raised — Other
08/26/2024
Objection raised — Zoning
08/26/2024
Objection raised — Other
08/22/2024
Filed — Alteration
GENERAL CONSTRUCTION ASSOCIATED WITH INSTALLATION OF NEW STATIONARY CUMMINS 800 KW OPTIONAL STANDBY POWER GENERATOR ON NEW CONCRETE PAD.GENERATOR TO USE EXISTING GENERATOR CONNECTION CABINET AND EXISTING MANUAL TRANSFER SWITCH AS PER PLANS FILED HEREWITH
Q01034914-S2
08/22/2024
Filed — Alteration
GENERAL CONSTRUCTION ASSOCIATED WITH INSTALLATION OF NEW STATIONARY CUMMINS 800 KW OPTIONAL STANDBY POWER GENERATOR ON NEW CONCRETE PAD.GENERATOR TO USE EXISTING GENERATOR CONNECTION CABINET AND EXISTING MANUAL TRANSFER SWITCH AS PER PLANS FILED HEREWITH
Q01034914-I1
08/22/2024
Filed — Alteration
GENERAL CONSTRUCTION ASSOCIATED WITH INSTALLATION OF NEW STATIONARY CUMMINS 800 KW OPTIONAL STANDBY POWER GENERATOR ON NEW CONCRETE PAD.GENERATOR TO USE EXISTING GENERATOR CONNECTION CABINET AND EXISTING MANUAL TRANSFER SWITCH AS PER PLANS FILED HEREWITH
Q01034914-S1
08/06/2024
Special inspection requirement — HVAC-R and service water piping design and insulation
Matthew Wavro
08/06/2024
Special inspection requirement — HVAC-R and service water heating system controls
Matthew Wavro
08/06/2024
Special inspection requirement — HVAC-R and service water heating equipment
Matthew Wavro
08/06/2024
Special inspection requirement — Post-installed Anchors
Matthew Wavro
08/05/2024
Special inspection requirement — Concrete - Cast-In-Place
Matthew Wavro
08/05/2024
Special inspection requirement — Post-installed Anchors
Matthew Wavro
08/02/2024
Special inspection requirement — Post-installed Anchors
Matthew Wavro
08/02/2024
Special inspection requirement — Emergency and Standby Power Systems (Generator)
Matthew Wavro
04/12/2024
Special inspection requirement — Mechanical Systems
Matthew Wavro
04/12/2024
Special inspection requirement — Final
Matthew Wavro
04/12/2024
Special inspection requirement — Final
Matthew Wavro
04/12/2024
Special inspection requirement — Fuel-Oil Storage and Fuel-Oil Piping Systems
Matthew Wavro
08/25/2022
Special inspection requirement — Fire-Resistant Penetrations and Joints
ANTHONY MUSUMECI
08/25/2022
Special inspection requirement — Fire-Resistance Rated Construction
ANTHONY MUSUMECI
08/25/2022
Special inspection requirement — Interior lighting power
ANTHONY MUSUMECI
08/25/2022
Special inspection requirement — Lighting controls
ANTHONY MUSUMECI
08/24/2022
Objection resolved — Addressed
08/19/2022
Inspection — Certified Sprinkler-SP-Fixtures-Finish
Certified
View inspection ↗
08/15/2022
Inspection — Certified Sprinkler-SP-Piping Dry/Wet-Hydrostatic Test
Certified
View inspection ↗
07/26/2022
Objection raised — Zoning
07/21/2022
Filed — Alteration CO
Propose 2nd Floor parking area expansion, addition of enclosed stair, general construction built-out per plans filed.
Q00487708-P3
05/31/2022
Signed off — Alteration
INSTALLATION OF TEMPORARY BARRIER AS PER PLANS. NO CHANGE IN USE, EGRESS OR OCCUPANCY.
Q00553825-I1
05/31/2022
Signed off — Alteration
INSTALLATION OF TEMPORARY PLYWOOD FENCE AS PER PLANS. NO CHANGE IN USE, EGRESS OR OCCUPANCY.
Q00553819-I1
05/16/2022
Signed off — Alteration
MODIFICATION OF EXISTING FANS AND NEW FAN OPERATION
Q00509373-I1
04/06/2022
Signed off — Alteration
Structural Framing and reinforcements for new enclosed stair and roof
Q00509360-I1
04/06/2022
Signed off — Alteration
Installation of floor drains for 2fl parking area expansion.
Q00488828-I1
03/30/2022
Signed off — Alteration
Grading plan for Proposed Ramp.
Q00511843-I1
03/16/2022
Signed off — Alteration
Modification of the sprinkler and standpipe system as per the filed plans. No change to use, occupancy or egress.
Q00542522-I1
03/09/2022
Inspection — Certified Sprinkler-Dry Pipe Valve (SP)-Dry Pipe Valve Test
Certified
View inspection ↗
12/17/2021
Inspection — Certified Sprinkler-SP-Fixtures-Finish
Certified
View inspection ↗
12/17/2021
Inspection — Certified StandPipe-SD-Fixtures-Finish-SD
Certified
View inspection ↗
12/13/2021
Inspection — Certified Sprinkler-SP-Piping Dry/Wet-Hydrostatic Test
Certified
View inspection ↗
12/13/2021
Inspection — Certified StandPipe-SD-Piping-Hydrostatic Test
Certified
View inspection ↗
12/13/2021
Inspection — Pass-Final CND-Occupancy Inspection
Pass
View inspection ↗
12/10/2021
Inspection — Certified Water and Sanitary-WS-Fixtures-Finish
Certified
View inspection ↗
12/08/2021
Inspection — Certified Water and Sanitary-WS-Sanitary Piping-Roughing
Certified
View inspection ↗
12/02/2021
Filed — Alteration CO
Propose 2nd Floor parking area expansion, addition of enclosed stair, general construction built-out per plans filed.
Q00487708-P2
12/01/2021
Permit issued — Plumbing
Q00488828-I1-PL
11/30/2021
Special inspection requirement — Fire-Resistant Penetrations and Joints
ANTHONY MUSUMECI
11/30/2021
Special inspection requirement — Interior lighting power
ANTHONY MUSUMECI
Latest 60 of 101 events.
▾Owner History (Filing Record)
Companies and organizations named on filings. Individual owners are not shown.
OwnerFilingsMost Recent
JLL807/08/2026
FIFTY SEVEN AVE INVESTMENTS2503/22/2026
AURORA CONTRACTORS103/22/2026
AMERA CONTRACTORS INC103/22/2026
29-01 BORDEN REALTY603/21/2026
▾Design Consultants (Architect / Engineer of Record)
▾Filing Representatives (Expediters)
RepresentativeFilingsMost Recent
JAM CONSULTANTS, INC.2003/21/2026
AE DESIGN SOLUTION403/21/2026
RPO603/21/2026
ABCO-PEERLESS SPRINKLER203/21/2026
▾Contractors (License-Anchored)
FirmTradeRolesMost Recent
MS ELECTRIC INCGeneral Contractor1007/08/2026
AURORA CONTRACTORS INCGeneral Contractor707/08/2026
EAGLE SCAFFOLDING SVCS INCGeneral Contractor307/08/2026
ABCO-PEERLESS SPRKLR CORPFire Protection207/08/2026
ALEXANDER BADALAMENTIElectrical103/21/2026
JAMES MOYESElectrical103/21/2026
LOUIS L.BUTTERMARK & SONSPlumbing107/08/2026
▾Special Inspection Agencies
AgencyLicense #FilingsMost Recent
SKYLINE ENGINEERING, PLLC267308/22/2024
ETI CONSULTANTS LLC7694807/21/2022
Permit / Filing Register
SourceWork TypeStatusApplicantIssued
DOB NOWGeneral ConstructionPermit IssuedMS ELECTRIC INC12/24/2024
DOB NOWMechanical SystemsPermit IssuedMS ELECTRIC INC12/23/2024
DOB NOWMechanical SystemsPermit IssuedMS ELECTRIC INC11/12/2024
DOB NOWGeneral ConstructionPermit IssuedMS ELECTRIC INC09/30/2024
DOB NOWPlumbingSigned-offLOUIS L.BUTTERMARK & SONS12/01/2021
DOB NOWMechanical SystemsSigned-offAURORA CONTRACTORS INC08/31/2021
DOB NOWGeneral ConstructionSigned-offAURORA CONTRACTORS INC08/31/2021
DOB NOWStructuralSigned-offAURORA CONTRACTORS INC08/31/2021
DOB NOWGeneral ConstructionPermit IssuedAURORA CONTRACTORS INC08/23/2021
DOB NOWConstruction FenceSigned-offEAGLE SCAFFOLDING SVCS IN07/27/2021
DOB NOWProtection and Mechanical MethodsSigned-offEAGLE SCAFFOLDING SVCS IN07/27/2021
DOB NOWSprinklersSigned-offABCO-PEERLESS SPRKLR CORP07/20/2021
DOB NOWSprinklersSigned-offABCO-PEERLESS SPRKLR CORP07/20/2021
DOB NOWGeneral ConstructionSigned-offAURORA CONTRACTORS INC06/23/2021
DOB NOWMechanical SystemsSigned-offAURORA CONTRACTORS INC06/18/2021
DOB NOWStructuralSigned-offAURORA CONTRACTORS INC06/18/2021
BISOTISSUEDAURORA CONTRACTORS INC12/26/2017
BISSPISSUEDW & M SPRINKLER-NYC LLC11/08/2017
BISPLISSUEDVITELLO SEWER W.M H&P SER10/17/2017
BISOTISSUEDEASTERN EXCAVATION INC10/10/2017
BISFSISSUEDJACK PICCINI, INC10/06/2017
BISOTISSUEDEASTERN EXCAVATION INC10/04/2017
BIS—ISSUEDNORTH SHORE NEON SIGN CO09/28/2017
BIS—ISSUEDAURORA CONTRACTORS INC09/18/2017
BISMHISSUEDAURORA CONTRACTORS INC09/12/2017
BISEQISSUEDAURORA CONTRACTORS INC07/20/2017
BISPLISSUEDLOUIS L.BUTTERMARK & SONS06/14/2017
BISOTISSUEDMATERIAL HANDLING SYSTEMS06/08/2017
BISOTISSUEDMATERIAL HANDLING SYSTEMS06/08/2017
BISSDISSUEDABCO-PEERLESS SPRKLR CORP11/30/2016
BIS—ISSUEDAURORA CONTRACTORS INC11/04/2016
BIS—RE-ISSUEDAURORA CONTRACTORS INC11/02/2016
BIS—RE-ISSUEDAURORA CONTRACTORS INC11/02/2016
BISPLISSUEDLOUIS L.BUTTERMARK & SONS10/28/2016
BIS—ISSUEDAURORA CONTRACTORS INC10/12/2016
BIS—ISSUEDAURORA CONTRACTORS INC09/16/2016
BIS—ISSUEDAURORA CONTRACTORS INC07/20/2016
BISEQISSUEDAURORA CONTRACTORS INC07/18/2016
BIS—ISSUEDAURORA CONTRACTORS INC07/18/2016
BISOTISSUEDAURORA CONTRACTORS INC06/17/2016
▾Field Inspections (DOB CAP) — 10
DateTypeResultReport
08/19/2022Certified Sprinkler-SP-Fixtures-FinishCertifiedView ↗
08/15/2022Certified Sprinkler-SP-Piping Dry/Wet-Hydrostatic TestCertifiedView ↗
03/09/2022Certified Sprinkler-Dry Pipe Valve (SP)-Dry Pipe Valve TestCertifiedView ↗
12/17/2021Certified Sprinkler-SP-Fixtures-FinishCertifiedView ↗
12/17/2021Certified StandPipe-SD-Fixtures-Finish-SDCertifiedView ↗
12/13/2021Certified Sprinkler-SP-Piping Dry/Wet-Hydrostatic TestCertifiedView ↗
12/13/2021Certified StandPipe-SD-Piping-Hydrostatic TestCertifiedView ↗
12/13/2021Pass-Final CND-Occupancy InspectionPassView ↗
12/10/2021Certified Water and Sanitary-WS-Fixtures-FinishCertifiedView ↗
12/08/2021Certified Water and Sanitary-WS-Sanitary Piping-RoughingCertifiedView ↗
▾Special Inspection Requirements (DOB NOW) — 38
DateRequirementInspectorRole
08/06/2024HVAC-R and service water piping design and insulationMatthew Wavroenergy_progress
08/06/2024HVAC-R and service water heating system controlsMatthew Wavroenergy_progress
08/06/2024HVAC-R and service water heating equipmentMatthew Wavroenergy_progress
08/06/2024Post-installed AnchorsMatthew Wavrospecial
08/05/2024Concrete - Cast-In-PlaceMatthew Wavrospecial
08/05/2024Post-installed AnchorsMatthew Wavrospecial
08/02/2024Post-installed AnchorsMatthew Wavrospecial
08/02/2024Emergency and Standby Power Systems (Generator)Matthew Wavrospecial
04/12/2024Mechanical SystemsMatthew Wavrospecial
04/12/2024FinalMatthew Wavroprogress
04/12/2024FinalMatthew Wavroprogress
04/12/2024Fuel-Oil Storage and Fuel-Oil Piping SystemsMatthew Wavrospecial
08/25/2022Fire-Resistant Penetrations and JointsANTHONY MUSUMECIspecial
08/25/2022Fire-Resistance Rated ConstructionANTHONY MUSUMECIprogress
08/25/2022Interior lighting powerANTHONY MUSUMECIenergy_progress
08/25/2022Lighting controlsANTHONY MUSUMECIenergy_progress
11/30/2021Fire-Resistant Penetrations and JointsANTHONY MUSUMECIspecial
11/30/2021Interior lighting powerANTHONY MUSUMECIenergy_progress
11/30/2021Lighting controlsANTHONY MUSUMECIenergy_progress
11/30/2021Fire-Resistance Rated ConstructionANTHONY MUSUMECIprogress
11/12/2021Fire-Resistant Penetrations and JointsANTHONY MUSUMECIspecial
11/12/2021Smoke Control Systems TestingANTHONY MUSUMECIspecial
11/12/2021Mechanical SystemsANTHONY MUSUMECIspecial
11/12/2021Electrical motors and elevatorsANTHONY MUSUMECIenergy_progress
11/12/2021Maintenance informationANTHONY MUSUMECIenergy_progress
Latest 25 of 38.
▾Documents — 456 on file (BIS + DOB NOW)
▸Plans & Drawings16
▸DOB NOWPlans/Sketch16
08/27/2026Q00488828-P1Request digital key ↗
08/27/2026Q00488828-I1Request digital key ↗
08/27/2026Q00511843-I1Request digital key ↗
Showing 3 of 16 on file for this type
▸Applications & Permits82
▸BISPLAN / WORK APPROVAL APPLICATION53
10/10/2019421911514Open ↗
05/16/2018420656178Open ↗
04/20/2018421571542Open ↗
Showing 3 of 53 on file for this type
▸BISWORK PERMIT APPLICATION25
12/27/2017440425522Open ↗
11/14/2017421571542Open ↗
10/25/2017421533905Open ↗
Showing 3 of 25 on file for this type
▸BISBPP-5 - Authorization to the Department of Transportation3
On file, but not among the 200 most recently loaded documents for this source.
Showing 0 of 3 on file for this type
▸BISCERTIFICATE OF OCCUPANCY: APPLICATION1
07/03/2017420656178Open ↗
▸Zoning, Tax Lot & Property Records18
▸DOB NOWRestrictive Declaration/Easement 14
08/13/2026Q00487708-P1Open ↗
08/13/2026Q00487708-I1Open ↗
08/13/2026Q00487708-P3Open ↗
Showing 3 of 4 on file for this type
▸DOB NOWZoning Exhibit form (1-5)4
08/13/2026Q00487708-P1Open ↗
08/13/2026Q00487708-P2Open ↗
08/13/2026Q00487708-P3Open ↗
Showing 3 of 4 on file for this type
▸BISADDRESS: NEW HOUSE NUMBER APPROVED2
10/10/2019421911514Open ↗
Showing 1 of 2 on file for this type
▸BISZONING DIAGRAM2
05/24/2018420656178Open ↗
Showing 1 of 2 on file for this type
▸BISZONING EXHIBIT I: CERTIFICATION1
05/24/2018420656178Open ↗
▸BISTAX LOT: FINAL LOT NUMBER ISSUED1
10/10/2019421911514Open ↗
▸BISZONING EXHIBIT III:DESC. & OWNRSHP.STMNT1
05/24/2018420656178Open ↗
▸BISZONING RESOLUTION DETERMINATION1
On file, but not among the 200 most recently loaded documents for this source.
Showing 0 of 1 on file for this type
▸BISEASEMENT AND RESTRICTIVE DECLARATIONS - SUPPPORTING DOCUMENTATION1
12/22/2017420656178Open ↗
▸DOB NOWHouse Number Verification: TOPO Stamp1
08/13/2026Q00487708-I1Open ↗
▸Seals & Professional Certifications105
▸BISTECHNICAL REPORT: RESPONSIBILITY/CERTIFICATION39
06/19/2018420656178Open ↗
03/27/2018421491157Open ↗
03/27/2018421491157Open ↗
Showing 3 of 39 on file for this type
▸DOB NOWProgress Inspector Seal & Signature18
09/02/2026Q00509373-I1Open ↗
09/02/2026Q00509373-I1Open ↗
09/02/2026Q00509373-I1Open ↗
Showing 3 of 18 on file for this type
▸DOB NOWDPL-1: Design Professional Seal & Signature16
08/27/2026Q00509360-I1Open ↗
08/27/2026Q00509373-I1Open ↗
08/27/2026Q00509373-P1Open ↗
Showing 3 of 16 on file for this type
▸DOB NOWSpecial Inspector Seal & Signature15
09/02/2026Q00509373-I1Open ↗
09/02/2026Q00509373-I1Open ↗
09/02/2026Q00509373-I1Open ↗
Showing 3 of 15 on file for this type
▸BISPROFESSIONAL CERTIFICATION STATEMENT7
11/06/2017421571542Open ↗
10/06/2017421534726Open ↗
08/01/2017421533905Open ↗
Showing 3 of 7 on file for this type
▸BISPROFESSIONAL CERTIFIED CHECKLIST5
11/06/2017421571542Open ↗
10/06/2017421534726Open ↗
08/01/2017421533905Open ↗
Showing 3 of 5 on file for this type
▸BISAPPLICANT OWNER SIGNATURE3
08/14/2017440425522Open ↗
Showing 1 of 3 on file for this type
▸BISREQUIRED ITEMS CHECKLIST FOR PROFESSIONAL CERTIFICATION1
On file, but not among the 200 most recently loaded documents for this source.
Showing 0 of 1 on file for this type
▸BISTECHNICAL REPORT STATEMENT OF RESPONSIBILITY1
On file, but not among the 200 most recently loaded documents for this source.
Showing 0 of 1 on file for this type
▸Trade Schedules & Equipment36
▸BISSCHEDULE B - PLUMBING12
03/05/2018420656178Open ↗
09/28/2017420656178Open ↗
06/15/2017420656178Open ↗
Showing 3 of 12 on file for this type
▸BISEQUIPMENT USE PERMITS8
07/10/2018420656178Open ↗
07/10/2018420656178Open ↗
07/10/2018420656178Open ↗
Showing 3 of 8 on file for this type
▸BISSCHEDULE B - PLUMBING/SPRINKLER/STANDPIPE4
04/03/2018421571542Open ↗
11/06/2017421571542Open ↗
11/06/2017421571542Open ↗
Showing 3 of 4 on file for this type
▸BISSCHEDULE C - HEATING & COMBUSTION EQUIPMENT4
08/08/2017440356437Open ↗
08/08/2017440356437Open ↗
08/02/2017440356437Open ↗
Showing 3 of 4 on file for this type
▸BISEQUIPMENT USE APPLICATION/PERMIT3
07/10/2018420656178Open ↗
07/10/2018420656178Open ↗
06/06/2018420656178Open ↗
▸BISPLUMBING - SUPPORTING DOCUMENTATION2
On file, but not among the 200 most recently loaded documents for this source.
Showing 0 of 2 on file for this type
▸BISFA - FDNY APPROVAL : FD-FAA1
04/30/2018421407123Open ↗
▸BISDEP SANITARY SEWER CERTIFICATION (HCP/SCP)1
On file, but not among the 200 most recently loaded documents for this source.
Showing 0 of 1 on file for this type
▸BISSEWER/HOUSE CON SIGNOFF: DEP HC 0211
06/28/2018420656178Open ↗
▸Safety & Tenant Protection11
▸DOB NOWStreet Tree Checklist4
08/13/2026Q00487708-I1Open ↗
08/13/2026Q00487708-P3Open ↗
08/13/2026Q00487708-P2Open ↗
Showing 3 of 4 on file for this type
▸BISSTREET TREE CHECKLIST2
On file, but not among the 200 most recently loaded documents for this source.
Showing 0 of 2 on file for this type
▸BISSTREET TREES: RECEIPT OF STREET TREES SITE PLAN2
On file, but not among the 200 most recently loaded documents for this source.
Showing 0 of 2 on file for this type
▸BISEXCAVATION OR DEMOLITION: 5-DAY NOTICE2
On file, but not among the 200 most recently loaded documents for this source.
Showing 0 of 2 on file for this type
▸BISSTREET TREES SITE PLAN1
On file, but not among the 200 most recently loaded documents for this source.
Showing 0 of 1 on file for this type
▸Energy Compliance27
▸BISTECHNICAL REPORT: ENERGY CODE PROGRESS INSPS11
03/27/2018421491157Open ↗
01/25/2018420656178Open ↗
01/25/2018420656178Open ↗
Showing 3 of 11 on file for this type
▸BISTECHNICAL REPORT: ENERGY CODE - RESPONSIBILITY8
01/26/2018420656178Open ↗
08/02/2017440356437Open ↗
Showing 2 of 8 on file for this type
▸BISAS-BUILT ENERGY ANALYSIS5
04/03/2018421533905Open ↗
03/27/2018421491157Open ↗
01/10/2018420656178Open ↗
Showing 3 of 5 on file for this type
▸DOB NOWEN2: As Built Energy Analysis.2
08/13/2026Q00487708-I1Open ↗
08/13/2026Q00509373-I1Open ↗
▸BISPRELIMINARY COMMISSIONING REPORT CERTIFICATION1
05/24/2018420656178Open ↗
▸Inspections & Test Reports22
▸BISTECHNICAL REPORT: RESPONSIBILITY9
08/02/2017440356437Open ↗
Showing 1 of 9 on file for this type
▸BISHYDRAULIC FLOW CALCULATIONS4
11/06/2017421571542Open ↗
11/06/2017421571542Open ↗
11/06/2017421571542Open ↗
Showing 3 of 4 on file for this type
▸BISTECHNICAL REPORT: CONCRETE DESIGN MIX3
On file, but not among the 200 most recently loaded documents for this source.
Showing 0 of 3 on file for this type
▸BISTECHNICAL REPORT: CONCRETE/TEST CYLINDER2
11/15/2017420656178Open ↗
Showing 1 of 2 on file for this type
▸BISTECHNICAL REPORT: PILE DRIVING2
08/08/2017420656178Open ↗
Showing 1 of 2 on file for this type
▸BISTECHNICAL REPORT: SOIL INSPECTION1
On file, but not among the 200 most recently loaded documents for this source.
Showing 0 of 1 on file for this type
▸BISSOIL REPORT1
On file, but not among the 200 most recently loaded documents for this source.
Showing 0 of 1 on file for this type
▸Approvals, Objections & Sign-offs41
▸BISCERTIFICATE OF OCCUPANCY/LOC: REQUEST16
07/16/2018420656178Open ↗
06/07/2018421407123Open ↗
05/30/2018421571542Open ↗
Showing 3 of 16 on file for this type
▸BISLETTERS - SUPPORTING DOCUMENTATION10
10/10/2019421911514Open ↗
05/22/2018420656178Open ↗
05/22/2018420656178Open ↗
Showing 3 of 10 on file for this type
▸BISSCHEDULE A - OCCUPANCY / USE8
05/16/2018420656178Open ↗
12/15/2017420656178Open ↗
12/13/2017420656178Open ↗
Showing 3 of 8 on file for this type
▸BISNYS DEC TIDAL WETLANDS APPROVAL2
On file, but not among the 200 most recently loaded documents for this source.
Showing 0 of 2 on file for this type
▸BISSUPERSEDING LETTER2
On file, but not among the 200 most recently loaded documents for this source.
Showing 0 of 2 on file for this type
▸BISCONSTRUCTION CODE DETERMINATION2
On file, but not among the 200 most recently loaded documents for this source.
Showing 0 of 2 on file for this type
▸BISADMINISTRATIVE OBJECTIONS1
08/01/2017421533905Open ↗
▸Cost, Insurance & Ownership17
▸BISCOST AFFIDAVIT12
06/07/2018421407123Open ↗
04/30/2018421571542Open ↗
04/26/2018421533905Open ↗
Showing 3 of 12 on file for this type
▸BISPROJECT-SPECIFIC GL INSURANCE4
09/26/2017420656178Open ↗
Showing 1 of 4 on file for this type
▸BISPROJECT SPECIFIC GENERAL LIABILITY INSURANCE1
On file, but not among the 200 most recently loaded documents for this source.
Showing 0 of 1 on file for this type
▸Filing & Intake Forms44
▸BISADDITIONAL INFORMATION21
01/11/2018440356437Open ↗
12/27/2017420656178Open ↗
12/04/2017440425522Open ↗
Showing 3 of 21 on file for this type
▸BISEFILING COVER SHEET12
10/10/2019421911514Open ↗
11/06/2017421571542Open ↗
10/06/2017421534726Open ↗
Showing 3 of 12 on file for this type
▸BISBOROUGH INTAKE FORM7
05/17/2018421571542Open ↗
05/17/2018421533905Open ↗
04/30/2018421571542Open ↗
Showing 3 of 7 on file for this type
▸BISEFILING JOB APPLICATION COVER SHEET4
08/14/2017440425522Open ↗
Showing 1 of 4 on file for this type
▸Other Documents36
▸BISEXTERNAL FORMS - SUPPORTING DOCUMENTATION15
05/24/2018420656178Open ↗
12/04/2017440425522Open ↗
08/14/2017440425522Open ↗
Showing 3 of 15 on file for this type
▸BISBPP - SUPPORTING DOCUMENTATION13
On file, but not among the 200 most recently loaded documents for this source.
Showing 0 of 13 on file for this type
▸BISPLOT DIAGRAM4
10/10/2019421911514Open ↗
05/24/2018420656178Open ↗
02/12/2018420656178Open ↗
Showing 3 of 4 on file for this type
▸BISFIRE SUPP ANSUL APPROVL: FD-FSS2
06/07/2018421407123Open ↗
05/08/2018420656178Open ↗
▸BISFEMA ELEVATION CERT (086-0-33)/ FLOODPROOFING CERT (086-0-34)1
01/26/2018420656178Open ↗
▸DOB NOWFinal Survey1
08/13/2026Q00487708-I1Open ↗