← Back
Two family brick
St. Andrew's Episcopal Church
46-09 31 AVENUE · BIN 4013268
💬 Discuss this project
1931Year Built
2Stories
B1Building Class
R5Zoning
1,800 sfGross Floor Area
2Units
1 Open Violation ▸
Two family brick · Owner of record: THE TRUSTEES OF THE ESTATE BELONGING TO THE · 2,000 sf lot · 0.9 FAR built · Flood zone X
Locations of Work
ArchitectureStructuralPlumbingFire Protection
Roof4p · 2 filings · 20 docs
Bulkhead3p · 1 filing · 20 docs
Floor 41p · 1 filing · 20 docs
Floor 31p · 1 filing · 20 docs
Floor 22p · 1 filing · 20 docs
Floor 1
Cellar1p · 1 filing · 20 docs
Basement4p · 1 filing · 20 docs
▾Owner History (Filing Record)
Companies and organizations named on filings. Individual owners are not shown.
OwnerFilingsMost Recent
EPISCOPAL DIOCESE OF LI909/13/2026
ST. ANDREWS PE CHURCH103/22/2026
TRUSTEES OF THE ESTATE TO DIOCES103/21/2026
▾Design Consultants (Architect / Engineer of Record)
FirmFilingsMost Recent
VIBRANCY CONSULTING CORPORATION108/11/2025
PURPOSE BY DESIGN ARCHITECTS PLLC707/22/2025
▾Filing Representatives (Expediters)
RepresentativeFilingsMost Recent
W J PROFESSIONAL EXPEDITING1603/21/2026
Building Lifecycle
All (45)Filed (9)Violation (2)Objection (4)Special Inspection (30)
07/31/2026
Objection resolved — Addressed
07/30/2026
Objection raised — Other
07/27/2026
Filed — Alteration
4 story new residential apartment building with 20 studio units.
Q01421648-I1
01/07/2026
Objection resolved — Addressed
08/28/2025
Objection raised — Other
08/18/2025
Special inspection requirement — Metering
08/18/2025
Special inspection requirement — Electrical motors and elevators
08/11/2025
Filed — Full Demolition
FULL DEMOLITION OF THE MAIN BUILDING
Q01262128-I1
07/28/2025
Special inspection requirement — Construction Operations Influencing Adjacent Structures
07/28/2025
Special inspection requirement — Demolition
07/27/2025
Special inspection requirement — Structural Stability – Alterations of existing Buildings
07/22/2025
Filed — New Building
Q01197909-S1
07/10/2025
Filed — New Building
Q01197909-S2
05/05/2025
Filed — New Building
Q01197909-S3
04/24/2025
Filed — New Building
Q01197909-S4
04/23/2025
Filed — New Building
Q01197909-S5
04/23/2025
Special inspection requirement — Maintenance information
04/23/2025
Special inspection requirement — HVAC-R and service water piping design and insulation
04/23/2025
Special inspection requirement — HVAC-R and service water heating equipment
04/23/2025
Special inspection requirement — HVAC-R and service water heating system controls
04/23/2025
Special inspection requirement — Energy Code Compliance Inspections
04/11/2025
Filed — New Building
Q01197909-S6
04/10/2025
Special inspection requirement — Fire-Resistant Penetrations and Joints
04/10/2025
Special inspection requirement — Sprinkler Systems
04/07/2025
Special inspection requirement — Energy Code Compliance Inspections
04/07/2025
Special inspection requirement — Maintenance information
04/07/2025
Special inspection requirement — Exterior lighting power
04/07/2025
Special inspection requirement — HVAC-R and service water piping design and insulation
04/07/2025
Special inspection requirement — Shutoff dampers
04/07/2025
Special inspection requirement — Interior lighting power
04/07/2025
Special inspection requirement — HVAC-R and service water heating equipment
04/07/2025
Special inspection requirement — Lighting controls
04/07/2025
Special inspection requirement — HVAC-R and service water heating system controls
04/07/2025
Special inspection requirement — Duct leakage testing, insulation and design
04/07/2025
Special inspection requirement — Mechanical Systems
04/07/2025
Special inspection requirement — Final
04/07/2025
Special inspection requirement — Private On-Site Storm Water Disposal Systems-, and Detention Facilities, Installation
04/07/2025
Special inspection requirement — Lighting in dwelling units
03/31/2025
Special inspection requirement — Final
03/31/2025
Special inspection requirement — Excavations - Sheeting, Shoring, and Bracing
03/31/2025
Special inspection requirement — Concrete - Cast-In-Place
03/31/2025
Special inspection requirement — Structural Stability – Alterations of existing buildings
03/26/2025
Filed — New Building
Q01197909-I1
12/15/2006
Violation issued (ECB, closed)
Quality of Life
12/15/2006
Violation issued (DOB, open)
V-DOB VIOLATION - ACTIVE
Nothing on file for this building.
1 project · most recent 07/27/2026
Fence
FiledStatusContractorScope
07/27/2026——Fence
▾Special Inspection Requirements (DOB NOW) — 35
DateRequirementInspectorRole
08/18/2025Metering—energy_progress
08/18/2025Electrical motors and elevators—energy_progress
07/28/2025Construction Operations Influencing Adjacent Structures—special
07/28/2025Demolition—special
07/27/2025Structural Stability – Alterations of existing Buildings—special
04/23/2025Maintenance information—energy_progress
04/23/2025HVAC-R and service water piping design and insulation—energy_progress
04/23/2025HVAC-R and service water heating equipment—energy_progress
04/23/2025HVAC-R and service water heating system controls—energy_progress
04/23/2025Energy Code Compliance Inspections—progress
04/10/2025Fire-Resistant Penetrations and Joints—special
04/10/2025Sprinkler Systems—special
04/07/2025Energy Code Compliance Inspections—progress
04/07/2025Maintenance information—energy_progress
04/07/2025Exterior lighting power—energy_progress
04/07/2025HVAC-R and service water piping design and insulation—energy_progress
04/07/2025Shutoff dampers—energy_progress
04/07/2025Interior lighting power—energy_progress
04/07/2025HVAC-R and service water heating equipment—energy_progress
04/07/2025Lighting controls—energy_progress
04/07/2025HVAC-R and service water heating system controls—energy_progress
04/07/2025Duct leakage testing, insulation and design—energy_progress
04/07/2025Mechanical Systems—special
04/07/2025Final—progress
04/07/2025Private On-Site Storm Water Disposal Systems-, and Detention Facilities, Installation—special
Latest 25 of 35.
▾Documents — 46 on file (BIS + DOB NOW)
▸Plans & Drawings9
▸DOB NOWPlans/Sketch9
08/19/2026Q01197909-S3Request digital key ↗
08/19/2026Q01197909-S1Request digital key ↗
08/19/2026Q01197909-I1Request digital key ↗
Showing 3 of 9 on file for this type
▸Applications & Permits2
▸BISPLAN / WORK APPROVAL APPLICATION1
06/06/2025440823655Open ↗
▸BISBPP-5 - Authorization to the Department of Transportation1
06/06/2025440823655Open ↗
▸Zoning, Tax Lot & Property Records2
▸DOB NOWHouse Number Verification: TOPO Stamp1
08/13/2026Q01197909-I1Open ↗
▸DOB NOWZD1: DOB Zoning Diagram1
08/13/2026Q01197909-I1Open ↗
▸Seals & Professional Certifications10
▸DOB NOWDPL-1: Design Professional Seal & Signature8
08/19/2026Q01197909-S2Open ↗
08/19/2026Q01197909-I1Open ↗
08/19/2026Q01197909-S1Open ↗
Showing 3 of 8 on file for this type
▸BISTECHNICAL REPORT STATEMENT OF RESPONSIBILITY1
06/06/2025440823655Open ↗
▸BISAPPLICANT OWNER SIGNATURE1
06/06/2025440823655Open ↗
▸Safety & Tenant Protection5
▸BISSTREET TREE CHECKLIST2
12/29/2025440823655Open ↗
06/06/2025440823655Open ↗
▸BISBPP: STREET TREES SITE PLAN1
12/29/2025440823655Open ↗
▸DOB NOWParks Department Acknowledgment Letter for Street Trees Plan1
08/19/2026Q01197909-I1Open ↗
▸DOB NOWStreet Tree Checklist1
08/19/2026Q01197909-I1Open ↗
▸Environmental & Asbestos1
▸DOB NOWDEP ACP-5: Asbestos Assessment Report1
08/15/2026Q01262128-I1Open ↗
▸Inspections & Test Reports2
▸DOB NOWTR4 Test Report and Plot Diagram1
08/13/2026Q01197909-S1Open ↗
▸DOB NOWSOIL REPORT1
08/13/2026Q01197909-S1Open ↗
▸Approvals, Objections & Sign-offs9
▸DOB NOWFee Exempt Supporting Document - DOF ACRIS report or BIB letter9
08/19/2026Q01197909-I1Open ↗
08/19/2026Q01197909-S1Open ↗
08/19/2026Q01197909-S2Open ↗
Showing 3 of 9 on file for this type
▸Filing & Intake Forms1
▸BISEFILING JOB APPLICATION COVER SHEET1
06/06/2025440823655Open ↗
▸Other Documents5
▸DOB NOWProperty Ownership Certification2
08/19/2026Q01197909-I1Open ↗
08/13/2026Q01262128-I1Open ↗
▸DOB NOWStructure Photographs1
08/13/2026Q01262128-I1Open ↗
▸DOB NOWSite Survey: Initial1
08/13/2026Q01197909-I1Open ↗
▸DOB NOWLocal Law 92/94 of 2019 Sustainable Roof Zone1
08/13/2026Q01197909-I1Open ↗