| Owner | Filings | Most Recent |
|---|---|---|
| MADISON REALTY CAPITAL | 28 | 08/06/2026 |
| OWNERS REP | 20 | 07/08/2026 |
| BARONE STEEL INC | 9 | 03/22/2026 |
| OMNIBUILD CONSTRUCTION | 21 | 03/22/2026 |
| NYCSCA | 1 | 03/22/2026 |
| QB DEVELOPMENT OWNER | 34 | 03/21/2026 |
| 70 47TH QUEENS | 4 | 03/21/2026 |
| Firm | Filings | Most Recent |
|---|---|---|
| AKM ARCHITECTS LLP | 2 | 08/03/2026 |
| LORING CONSULTING ENGINEERS, INC. | 13 | 06/15/2026 |
| DIGROUPARCHITECTURE | 9 | 06/15/2026 |
| LONG ISLAND ENGINEERING & ARCHITECT | 2 | 06/02/2026 |
| LEVIN ENGINEERING PLLC | 3 | 08/07/2025 |
| SILMAN | 1 | 05/23/2025 |
| MG ENGINEERING D.P.C. | 3 | 04/16/2025 |
| MCNAMARA SALVIA | 2 | 04/02/2024 |
| LOMBARDO PROFESSIONAL ENGINEERING | 2 | 10/03/2022 |
| KZ ENGINEERING, P.C | 3 | 08/23/2022 |
| PAUL PERDEK, PROF. ENG. PLLC | 5 | 03/10/2022 |
| HOWARD SHAPIRO & ASSOCIATES, P.C. | 1 | 01/04/2022 |
| PATUXENT ENGINEERING LLC | 1 | 10/15/2021 |
| KN3 ENGINEERING LLC | 2 | 08/27/2021 |
| H & O ENGINEERING, DPC | 2 | 03/26/2021 |
| Representative | Filings | Most Recent |
|---|---|---|
| SOL BUILDING CONSULTING SERVICES | 4 | 03/21/2026 |
| JM ZONING, LLC. | 36 | 03/21/2026 |
| LOMBARDO BUILDING CONSULTANTS | 4 | 03/21/2026 |
| AE DESIGN SOLUTION | 14 | 03/21/2026 |
| A1 EXPEDITING SERVICE CORP. | 3 | 03/21/2026 |
| SYNERGY BUILDING CONSULTANTS | 3 | 03/21/2026 |
| HOWARD I SHAPIRO ASSOCIATES | 2 | 03/21/2026 |
| PATUXENT ENGINEERING | 2 | 03/21/2026 |
| Firm | Trade | Roles | Most Recent |
|---|---|---|---|
| CORE SCAFFOLD SYSTEMS INC. | General Contractor | 22 | 07/08/2026 |
| OMNIBUILD CONSTRUCTION IN | General Contractor | 7 | 08/06/2026 |
| NAVILLUS TILE INC | General Contractor | 7 | 04/09/2026 |
| BARONE STEEL INC | General Contractor | 4 | 03/21/2026 |
| PRIME STRUCTURE INC | General Contractor | 4 | 07/08/2026 |
| PAR PLUMBING CO., INC | Plumbing | 4 | 09/23/2026 |
| A & F FIRE PROTECTION CO | Fire Protection | 3 | 07/08/2026 |
| MONCON INC | General Contractor | 3 | 07/08/2026 |
| M & A PROJECTS INC | General Contractor | 2 | 03/21/2026 |
| STREAM PLUMBING INC | Plumbing | 1 | 06/28/2026 |
| V. VASS ELECTRIC CORP | Electrical | 1 | 03/22/2026 |
| CHAMP PLUMBING & HTG CORP | Plumbing | 1 | 06/28/2026 |
| SELECTRIC ELECL CONT CO I | Electrical | 1 | 03/22/2026 |
| Agency | License # | Filings | Most Recent |
|---|---|---|---|
| UNIVERSAL TESTING AND INS | 400 | 25 | 06/15/2026 |
| SHAHRISH SHUVO ENGINEERIN | 8524 | 1 | 04/16/2025 |
| MCNAMARA/SALVIA OF NEW YO | 4970 | 1 | 03/26/2024 |
| PSI AGENCY INC. | 254 | 1 | 03/26/2024 |
| 20/20 INSPECTIONS INC | 1471 | 2 | 03/14/2022 |
| Source | Work Type | Status | Applicant | Issued |
|---|---|---|---|---|
| DOB NOW | Plumbing | Permit Issued | PAR PLUMBING CO., INC | 09/22/2026 |
| DOB NOW | Structural | Permit Issued | OMNIBUILD CONSTRUCTION IN | 08/05/2026 |
| DOB NOW | Boiler Equipment | Signed-off | CHAMP PLUMBING & HTG CORP | 01/26/2026 |
| DOB NOW | Mechanical Systems | Signed-off | NAVILLUS TILE INC | 01/02/2026 |
| DOB NOW | General Construction | Signed-off | NAVILLUS TILE INC | 12/23/2025 |
| DOB NOW | Plumbing | Permit Issued | PAR PLUMBING CO., INC | 10/22/2025 |
| DOB NOW | Sprinklers | Signed-off | ADVANCED AUTO SPR.CO.,INC | 10/15/2025 |
| DOB NOW | Structural | Signed-off | NAVILLUS TILE INC | 08/25/2025 |
| DOB NOW | Plumbing | Permit Issued | PAR PLUMBING CO., INC | 06/25/2025 |
| DOB NOW | Plumbing | Permit Issued | STREAM PLUMBING INC | 06/16/2025 |
| DOB NOW | Sprinklers | Signed-off | ADVANCED AUTO SPR.CO.,INC | 02/06/2025 |
| DOB NOW | Sprinklers | Signed-off | ADVANCED AUTO SPR.CO.,INC | 09/05/2024 |
| DOB NOW | Mechanical Systems | Signed-off | NAVILLUS TILE INC | 07/31/2024 |
| DOB NOW | General Construction | Signed-off | NAVILLUS TILE INC | 07/31/2024 |
| DOB NOW | Plumbing | Permit Issued | PAR PLUMBING CO., INC | 07/25/2024 |
| DOB NOW | Structural | Permit Issued | OMNIBUILD CONSTRUCTION IN | 05/06/2024 |
| DOB NOW | General Construction | Signed-off | OMNIBUILD CONSTRUCTION IN | 03/28/2023 |
| DOB NOW | Mechanical Systems | Signed-off | OMNIBUILD CONSTRUCTION IN | 11/07/2022 |
| DOB NOW | Protection and Mechanical Methods | Signed-off | BARONE STEEL | 10/18/2022 |
| DOB NOW | Construction Fence | Signed-off | CORE SCAFFOLD SYSTEMS INC | 10/11/2022 |
| DOB NOW | Sidewalk Shed | Signed-off | CORE SCAFFOLD SYSTEMS INC | 08/26/2022 |
| DOB NOW | Protection and Mechanical Methods | Signed-off | CORE SCAFFOLD SYSTEMS INC | 08/26/2022 |
| DOB NOW | Protection and Mechanical Methods | Signed-off | CORE SCAFFOLD SYSTEMS INC | 08/17/2022 |
| DOB NOW | Supported Scaffold | Signed-off | CORE SCAFFOLD SYSTEMS INC | 07/28/2022 |
| DOB NOW | Protection and Mechanical Methods | Signed-off | BARONE STEEL | 06/14/2022 |
| DOB NOW | Boiler Equipment | Signed-off | PALLADINO HEATING SVC INC. | 05/31/2022 |
| DOB NOW | Protection and Mechanical Methods | Signed-off | PRIME STRUCTURE INC | 05/12/2022 |
| DOB NOW | Supported Scaffold | Signed-off | M & A PROJECTS INC | 04/21/2022 |
| DOB NOW | Protection and Mechanical Methods | Signed-off | PRIME STRUCTURE INC | 01/10/2022 |
| DOB NOW | Construction Fence | Signed-off | CORE SCAFFOLD SYSTEMS INC | 10/18/2021 |
| DOB NOW | Construction Fence | Signed-off | MONCON INC | 10/15/2021 |
| DOB NOW | Sidewalk Shed | Signed-off | CORE SCAFFOLD SYSTEMS INC | 08/31/2021 |
| DOB NOW | Protection and Mechanical Methods | Signed-off | CORE SCAFFOLD SYSTEMS INC | 08/26/2021 |
| DOB NOW | Protection and Mechanical Methods | Signed-off | CORE SCAFFOLD SYSTEMS INC | 08/19/2021 |
| DOB NOW | Supported Scaffold | Signed-off | CORE SCAFFOLD SYSTEMS INC | 07/23/2021 |
| DOB NOW | Construction Fence | Signed-off | MONCON INC | 04/07/2021 |
| DOB NOW | Construction Fence | Signed-off | MONCON INC | 12/16/2020 |
| BIS | — | ISSUED | OMNIBUILD CONSTRUCTION IN | 05/24/2023 |
| BIS | PL | ISSUED | MPS PLUMBING & HEATING INC | 12/05/2022 |
| BIS | SD | ISSUED | MPS PLUMBING & HEATING INC | 08/02/2022 |
| Filed | Status | Contractor | Scope | Make / Model / Capacity |
|---|---|---|---|---|
| 06/10/2026 | Signed-off | NAVILLUS TILE INC | Air Conditioning Systems, Heating and Air Conditioning Systems, Heating Systems, Refrigeration Systems | Cooling Arctic Chill PACVMV0300D3-MM 2,592,000 BTU · Chiller ×3 Annexair AHU-I-07-H-C-TB 72,000 CFM ×1 ERP-I-07-EW03-H-C-TB 72,000 CFM ×1 ERP-I-07-H-C-SW05-TB 7,200 CFM ×1 ERP-I-09-H-C-SW-TB 9,600 CFM ×1 ERP-I-25-H-C-SW20-TB 25,000 CFM ×1 Heat / Cool Mitsubishi Electric PKA-A36KA7 38,000 BTU · Fan Coil Indoor ×9 PKA-A12HA7 14,000 BTU · Split System ×6 PKA-A30KA7 34,000 BTU · Vrf Indoor ×3 Lg ARNU363SVA4 37,000 BTU · Vrf Indoor ×3 ARNU123SJS4 13,600 BTU · Vrf Indoor ×2 ARNU303SVA4 32,000 BTU · Vrf Indoor ×1 ARUM168BTE5 189,000 BTU · Vrf Outdoor ×1 Heating Aerco BMK 3000 3,000,000 BTU · Boiler ×2 Lochinvar FBN3001/2212 128823301 3,000,000 BTU · Boiler ×2 FBN3001/2212 128823303 3,000,000 BTU · Boiler ×2 FBN3001 3,000,000 BTU · Boiler ×2 Ventilation — SQ-97-VG 450 CFM · Exhaust Fan ×9 AX-275-0910 12,900 CFM · Exhaust Fan ×3 AX-90-275-0910 12,410 CFM · Exhaust Fan ×3 AX-90-400-0922 24,000 CFM · Exhaust Fan ×3 AX-90-400-0927 28,000 CFM · Exhaust Fan ×3 CSP-A1750 700 CFM · Exhaust Fan ×3 CSP-A390 250 CFM · Exhaust Fan ×3 CSP-A390-VG 150 CFM · Exhaust Fan ×3 CSP-B110 70 CFM · Exhaust Fan ×3 SQ-120-VG 1,110 CFM · Exhaust Fan ×2 SQ-130HP-VG 560 CFM · Exhaust Fan ×2 SQ-160HP-VG 1,470 CFM · Exhaust Fan ×2 AX-54-190-0413 6,740 CFM · Exhaust Fan ×1 BSQ-140HP 1,200 CFM · Exhaust Fan ×1 BSQ-180 3,080 CFM · Exhaust Fan ×1 Greenheck AX-54-190-0413 6,740 CFM · Exhaust Fan ×2 BSQ-140HP 1,200 CFM · Exhaust Fan ×2 BSQ-180 3,080 CFM · Exhaust Fan ×2 SQ-160-A 2,230 CFM · Exhaust Fan ×2 CSP-A390-VG-QD 150 CFM · Exhaust Fan ×1 USF-13-5-B1-00-01-01 1,950 CFM · Exhaust Fan ×1 Twin City Fan DSI-100AE 450 CFM · Exhaust Fan ×4 DSI-135AE 560 CFM · Exhaust Fan ×2 ATAD-050A3 6,740 CFM · Exhaust Fan ×1 ATAD-112A3 24,000 CFM · Exhaust Fan ×1 DSI-100A 700 CFM · Exhaust Fan ×1 DSI-120AE 1,110 CFM · Exhaust Fan ×1 DSI-150ANE 1,470 CFM · Exhaust Fan ×1 DSI-165ANE 2,230 CFM · Exhaust Fan ×1 QSL-365 28,000 CFM · Exhaust Fan ×1 TCVX-28B7 12,410 CFM · Exhaust Fan ×1 TCVX-32D4 12,900 CFM · Exhaust Fan ×1 TL-150S 70 CFM · Exhaust Fan ×1 Trion GREASE VIPER-22123 1,950 CFM · Exhaust Fan ×1 Refrigeration Arctic PACVMV0300D3-MM-FC 2,520,000 BTU · Chiller ×1 |
| Filed | Status | Contractor | Scope |
|---|---|---|---|
| 06/02/2026 | Signed-off | A & F FIRE PROTECTION CO | 876 heads |
| 08/07/2025 | — | — | 5 outlets |
| Filed | Status | Contractor | Scope |
|---|---|---|---|
| 06/15/2026 | Permit Issued | PAR PLUMBING CO., INC | Gas, Water/Sanitary |
| 04/16/2025 | Permit Issued | STREAM PLUMBING INC | Gas |
| Filed | Status | Contractor | Scope |
|---|---|---|---|
| 05/15/2026 | Permit Issued | SELECTRIC ELECL CONT CO I | General Wiring |
| 01/05/2023 | Complete | RIGHT AWAY ELECTRIC LLC | General Wiring |
| 08/02/2022 | Complete | SOLAS ELECTRICAL CORP | — |
| 08/02/2022 | Complete | SOLAS ELECTRICAL CORP | — |
| 04/04/2022 | Complete | JAM ELECTRICAL CORP | — |
| 08/31/2021 | Complete | V. VASS ELECTRIC CORP | — |
| 09/07/2020 | Complete | V. VASS ELECTRIC CORP | — |
| Filed | Status | Contractor | Scope |
|---|---|---|---|
| 08/03/2026 | — | — | 1 scope_items |
| 06/15/2026 | Signed-off | NAVILLUS TILE INC | Steel |
| Date | Type | Result | Report |
|---|---|---|---|
| 08/21/2026 | Pass-Final PL - Underground | Pass | View ↗ |
| 07/20/2026 | Pass-Final PL - Up to 3 Requested Floors | Pass | View ↗ |
| 07/15/2026 | Fail-Final PL - Up to 3 Requested Floors | Fail | View ↗ |
| 04/22/2026 | Pass-Final Boiler Equipment Inspection | Pass | View ↗ |
| 01/30/2026 | Certified Sprinkler-SP-Piping Dry/Wet-Hydrostatic Test | Certified | View ↗ |
| 01/30/2026 | Certified Sprinkler - SP - Roughing | Certified | View ↗ |
| 12/01/2025 | Certified Water and Sanitary-WS-Sanitary Piping-Underground | Certified | View ↗ |
| 10/16/2025 | Certified Sprinkler-SP-Fixtures-Finish | Certified | View ↗ |
| 10/13/2025 | Certified Sprinkler-SP-Piping Dry/Wet-Hydrostatic Test | Certified | View ↗ |
| 08/28/2025 | Pass-Final PL - Up to 3 Requested Floors | Pass | View ↗ |
| 08/04/2025 | Pass-Final PL - Up to 3 Requested Floors | Pass | View ↗ |
| 07/21/2025 | Pass-Final PL - More than 10 Requested Floors | Pass | View ↗ |
| 07/17/2025 | Fail-Final PL - Up to 3 Requested Floors | Fail | View ↗ |
| 04/11/2025 | Certified Water and Sanitary-WS-Sanitary Piping-Roughing | Certified | View ↗ |
| 03/27/2025 | Certified Water and Sanitary-WS-Sanitary Piping-Roughing | Certified | View ↗ |
| 03/17/2025 | Certified Water and Sanitary-WS-Sanitary Piping-Roughing | Certified | View ↗ |
| 02/27/2025 | Certified Sprinkler - SP - Roughing | Certified | View ↗ |
| 02/24/2025 | Certified Sprinkler-SP-Piping Dry/Wet-Hydrostatic Test | Certified | View ↗ |
| 02/24/2025 | Certified Sprinkler - SP - Roughing | Certified | View ↗ |
| 02/18/2025 | Certified Sprinkler-SP-Piping Dry/Wet-Hydrostatic Test | Certified | View ↗ |
| 02/18/2025 | Certified Sprinkler - SP - Roughing | Certified | View ↗ |
| 12/12/2024 | Certified Water and Sanitary-WS-Sanitary Piping-Roughing | Certified | View ↗ |
| 03/31/2023 | Pass-Final General Construction Non-Directive 14 | Pass | View ↗ |
| 02/13/2023 | Pass-Final Boiler Equipment Inspection | Pass | View ↗ |
| Date | Requirement | Inspector | Role |
|---|---|---|---|
| 07/28/2026 | Tenant Protection Plan Compliance | — | special |
| 07/22/2026 | Final | — | progress |
| 07/22/2026 | Fire-Resistance Rated Construction | — | progress |
| 06/16/2026 | Heating Systems | NELSON LOPEZ | special |
| 06/16/2026 | Post-installed Anchors | NELSON LOPEZ | special |
| 06/16/2026 | Fire-Resistant Penetrations and Joints | NELSON LOPEZ | special |
| 06/16/2026 | Mechanical Systems | NELSON LOPEZ | special |
| 06/16/2026 | Final | NELSON LOPEZ | progress |
| 06/16/2026 | Interior lighting power | NELSON LOPEZ | energy_progress |
| 06/16/2026 | Duct leakage testing, insulation and design | NELSON LOPEZ | energy_progress |
| 06/16/2026 | Metering | NELSON LOPEZ | energy_progress |
| 06/16/2026 | Shutoff dampers | NELSON LOPEZ | energy_progress |
| 06/16/2026 | Ventilation and air distribution system | NELSON LOPEZ | energy_progress |
| 06/16/2026 | HVAC-R and service water heating equipment | NELSON LOPEZ | energy_progress |
| 06/16/2026 | Lighting controls | NELSON LOPEZ | energy_progress |
| 06/16/2026 | HVAC-R and service water piping design and insulation | NELSON LOPEZ | energy_progress |
| 06/16/2026 | HVAC-R and service water heating system controls | NELSON LOPEZ | energy_progress |
| 06/16/2026 | Electrical motors and elevators | NELSON LOPEZ | energy_progress |
| 06/16/2026 | Maintenance information | NELSON LOPEZ | energy_progress |
| 06/16/2026 | Sprinkler Systems | NELSON LOPEZ | special |
| 06/16/2026 | Post-installed Anchors | NELSON LOPEZ | special |
| 06/16/2026 | Fire-Resistant Penetrations and Joints | NELSON LOPEZ | special |
| 06/16/2026 | Post-installed Anchors | NELSON LOPEZ | special |
| 06/16/2026 | Fire-Resistant Penetrations and Joints | NELSON LOPEZ | special |
| 06/16/2026 | Mastic and Intumescent Fire-resistant Coatings | NELSON LOPEZ | special |