← Back
Two stories - detached, small or mid-size
46-16 195 STREET
QUEENS · BIN 4125383
💬 Discuss this project
1950Year Built
2.5Stories
A1Building Class
R2AZoning
2,228 sfGross Floor Area
1Units
0 Open ViolationsFDNY Report ↗
Two stories - detached, small or mid-size · 4,000 sf lot · 0.56 FAR built · Flood zone X
Locations of Work
Architecture
Floor 27p · 1 filing · 20 docs
Floor 17p · 1 filing · 20 docs
Cellar8p · 1 filing · 20 docs
▾Design Consultants (Architect / Engineer of Record)
FirmFilingsMost Recent
MEHDI GHAZI, P.E., P.C.507/08/2022
▾Filing Representatives (Expediters)
RepresentativeFilingsMost Recent
IBUILD CONSULTING1003/21/2026
▾Contractors (License-Anchored)
FirmTradeRolesMost Recent
XH&RC PLUMBING HEATINGGeneral Contractor603/21/2026
ST SAFETY CONS. INCGeneral Contractor303/21/2026
KJK ELECTRIC INCElectrical103/22/2026
DPH PLUMBING & HTG CORPPlumbing107/08/2026
XH&RC PLBG AND HTG INCPlumbing107/08/2026
▾Special Inspection Agencies
AgencyLicense #FilingsMost Recent
MEHDI GHAZI, P.E. P.C.7129407/08/2022
Building Lifecycle
All (51)Filed (5)Permit Issued (5)Signed Off (2)Violation (1)Inspection (6)Objection (2)Special Inspection (30)
09/14/2022
Signed off — Alteration
INSTALLATION OF PLUMBING WORK AS PER PLAN FILED HEREWITH. NO CHANGE IN USE, OCCUPANCY AND EGRESS.
Q00459275-I1
08/22/2022
Inspection — Pass-Final CND-Occupancy Inspection
Pass
View inspection ↗
07/18/2022
Permit issued — Plumbing
Q00459275-I1-PL
07/12/2022
Special inspection requirement — Fire-Resistant Penetrations and Joints
MEHDI GHAZI
07/12/2022
Special inspection requirement — Energy Code Compliance Inspections
MEHDI GHAZI
07/12/2022
Special inspection requirement — HVAC-R and service water heating system controls
MEHDI GHAZI
07/12/2022
Special inspection requirement — HVAC-R and service water piping design and insulation
MEHDI GHAZI
07/12/2022
Special inspection requirement — HVAC-R and service water heating equipment
MEHDI GHAZI
07/08/2022
Filed — Alteration CO
PROPOSE VERTICAL ENLARGEMENT FOR EXISTING 1-FAMILY DETACHED RESIDENCE. OBTAIN A NEW CERTIFICATE OF OCCUPANCY.
Q00485023-P1
07/08/2022
Filed — Alteration
INSTALLATION OF PLUMBING WORK AS PER PLAN FILED HEREWITH. NO CHANGE IN USE, OCCUPANCY AND EGRESS.
Q00459275-P1
07/08/2022
Special inspection requirement — Mechanical Systems
MEHDI GHAZI
07/08/2022
Special inspection requirement — Structural Stability – Alterations of existing buildings
MEHDI GHAZI
07/08/2022
Special inspection requirement — Energy Code Compliance Inspections
MEHDI GHAZI
07/08/2022
Special inspection requirement — Final
MEHDI GHAZI
07/08/2022
Special inspection requirement — Fire-Resistance Rated Construction
MEHDI GHAZI
07/08/2022
Special inspection requirement — Structural Wood Frame
MEHDI GHAZI
07/08/2022
Special inspection requirement — Air barrier - visual inspection
MEHDI GHAZI
07/08/2022
Special inspection requirement — HVAC-R and service water piping design and insulation
MEHDI GHAZI
07/08/2022
Special inspection requirement — Maintenance information
MEHDI GHAZI
07/08/2022
Special inspection requirement — Fenestration air leakage
MEHDI GHAZI
07/08/2022
Special inspection requirement — Fenestration areas
MEHDI GHAZI
07/08/2022
Special inspection requirement — Chimneys and vents
MEHDI GHAZI
07/08/2022
Special inspection requirement — Permanent certificate
MEHDI GHAZI
07/08/2022
Special inspection requirement — Fenestration and door U-factor and product ratings
MEHDI GHAZI
07/08/2022
Special inspection requirement — HVAC-R and service water heating equipment
MEHDI GHAZI
07/08/2022
Special inspection requirement — Interior lighting power
MEHDI GHAZI
07/08/2022
Special inspection requirement — Ventilation and air distribution system
MEHDI GHAZI
07/08/2022
Special inspection requirement — HVAC-R and service water heating system controls
MEHDI GHAZI
07/08/2022
Special inspection requirement — Fire-Resistant Penetrations and Joints
MEHDI GHAZI
07/08/2022
Special inspection requirement — Energy Code Compliance Inspections
MEHDI GHAZI
07/08/2022
Special inspection requirement — HVAC-R and service water heating system controls
MEHDI GHAZI
07/08/2022
Special inspection requirement — HVAC-R and service water piping design and insulation
MEHDI GHAZI
07/08/2022
Special inspection requirement — HVAC-R and service water heating equipment
MEHDI GHAZI
07/08/2022
Special inspection requirement — Insulation placement and R values
MEHDI GHAZI
07/08/2022
Special inspection requirement — Concrete - Cast-In-Place
MEHDI GHAZI
05/19/2022
Signed off — Alteration
Q00455920-I1
03/25/2022
Violation issued (ECB, closed)
Construction
03/22/2022
Permit issued — General Construction
Q00485023-I1-GC-CX
11/16/2021
Inspection — Certified Gas-Gas-Piping-Roughing
Certified
View inspection ↗
11/16/2021
Inspection — Certified Storm Drainage-ST-Piping-Roughing
Certified
View inspection ↗
11/16/2021
Inspection — Certified Storm Drainage-ST-Piping-Underground
Certified
View inspection ↗
11/16/2021
Inspection — Certified Water and Sanitary-WS-Sanitary Piping-Roughing
Certified
View inspection ↗
11/16/2021
Inspection — Certified Water and Sanitary-WS-Sanitary Piping-Underground
Certified
View inspection ↗
06/23/2021
Permit issued — Plumbing
Q00459275-I1-PL
06/15/2021
Permit issued — General Construction
Q00485023-I1-GC-CX
05/25/2021
Permit issued — Construction Fence
Q00455920-I1-FN
05/20/2021
Filed — Alteration
INSTALLATION OF PLUMBING WORK AS PER PLAN FILED HEREWITH. NO CHANGE IN USE, OCCUPANCY AND EGRESS.
Q00459275-I1
05/20/2021
Filed — Alteration
Q00455920-I1
03/29/2021
Objection raised — Other
03/29/2021
Objection resolved — Addressed
03/21/2021
Filed — Alteration CO
PROPOSE VERTICAL ENLARGEMENT FOR EXISTING 1-FAMILY DETACHED RESIDENCE. OBTAIN A NEW CERTIFICATE OF OCCUPANCY.
Q00485023-I1
Permit / Filing Register
SourceWork TypeStatusApplicantIssued
DOB NOWPlumbingSigned-offXH&RC PLBG AND HTG INC07/18/2022
DOB NOWGeneral ConstructionPermit IssuedST SAFETY CONS. INC03/22/2022
DOB NOWPlumbingSigned-offDPH PLUMBING & HTG CORP06/23/2021
DOB NOWGeneral ConstructionPermit IssuedXH&RC PLUMBING HEATING06/15/2021
DOB NOWConstruction FenceSigned-offXH&RC PLUMBING HEATING05/25/2021
1 job · most recent 07/08/2022
Heating Systems Ventilation Systems
FiledStatusContractorScopeMake / Model / Capacity
07/08/2022Permit IssuedST SAFETY CONS. INCHeating Systems, Ventilation Systems
Heating
Williamson GWA-166-N-T 166,000 BTU · Boiler ×2
Ventilation
Delta Breeze SLM 50 50 CFM · Exhaust Fan ×10
2 jobs · most recent 09/26/2022
General Wiring
FiledStatusContractorScope
09/26/2022CompleteKJK ELECTRIC INCGeneral Wiring
07/01/2021CancelledKJK ELECTRIC INCGeneral Wiring
1 job · most recent 07/08/2022
Masonry Wood
FiledStatusContractorScope
07/08/2022Permit IssuedST SAFETY CONS. INCMasonry, Wood
1 job · most recent 07/08/2022
FiledStatusContractorScope
07/08/2022Permit IssuedST SAFETY CONS. INC—
▾Field Inspections (DOB CAP) — 6
DateTypeResultReport
08/22/2022Pass-Final CND-Occupancy InspectionPassView ↗
11/16/2021Certified Gas-Gas-Piping-RoughingCertifiedView ↗
11/16/2021Certified Storm Drainage-ST-Piping-RoughingCertifiedView ↗
11/16/2021Certified Storm Drainage-ST-Piping-UndergroundCertifiedView ↗
11/16/2021Certified Water and Sanitary-WS-Sanitary Piping-RoughingCertifiedView ↗
11/16/2021Certified Water and Sanitary-WS-Sanitary Piping-UndergroundCertifiedView ↗
▾Special Inspection Requirements (DOB NOW) — 33
DateRequirementInspectorRole
07/12/2022Fire-Resistant Penetrations and JointsMEHDI GHAZIspecial
07/12/2022Energy Code Compliance InspectionsMEHDI GHAZIprogress
07/12/2022HVAC-R and service water heating system controlsMEHDI GHAZIenergy_progress
07/12/2022HVAC-R and service water piping design and insulationMEHDI GHAZIenergy_progress
07/12/2022HVAC-R and service water heating equipmentMEHDI GHAZIenergy_progress
07/08/2022Mechanical SystemsMEHDI GHAZIspecial
07/08/2022Structural Stability – Alterations of existing buildingsMEHDI GHAZIspecial
07/08/2022Energy Code Compliance InspectionsMEHDI GHAZIprogress
07/08/2022FinalMEHDI GHAZIprogress
07/08/2022Fire-Resistance Rated ConstructionMEHDI GHAZIprogress
07/08/2022Structural Wood FrameMEHDI GHAZIprogress
07/08/2022Air barrier - visual inspectionMEHDI GHAZIenergy_progress
07/08/2022HVAC-R and service water piping design and insulationMEHDI GHAZIenergy_progress
07/08/2022Maintenance informationMEHDI GHAZIenergy_progress
07/08/2022Fenestration air leakageMEHDI GHAZIenergy_progress
07/08/2022Fenestration areasMEHDI GHAZIenergy_progress
07/08/2022Chimneys and ventsMEHDI GHAZIspecial
07/08/2022Permanent certificateMEHDI GHAZIenergy_progress
07/08/2022Fenestration and door U-factor and product ratingsMEHDI GHAZIenergy_progress
07/08/2022HVAC-R and service water heating equipmentMEHDI GHAZIenergy_progress
07/08/2022Interior lighting powerMEHDI GHAZIenergy_progress
07/08/2022Ventilation and air distribution systemMEHDI GHAZIenergy_progress
07/08/2022HVAC-R and service water heating system controlsMEHDI GHAZIenergy_progress
07/08/2022Fire-Resistant Penetrations and JointsMEHDI GHAZIspecial
07/08/2022Energy Code Compliance InspectionsMEHDI GHAZIprogress
Latest 25 of 33.
▾Documents — 39 on file (BIS + DOB NOW)
▸Plans & Drawings5
▸DOB NOWPlans/Sketch - Plumbing2
08/26/2026Q00459275-I1Request digital key ↗
08/26/2026Q00459275-P1Request digital key ↗
▸DOB NOWPlans/Sketch2
08/26/2026Q00485023-P1Request digital key ↗
08/15/2026Q00485023-I1Request digital key ↗
▸DOB NOWPlans/Sketch - Construction Fence1
08/27/2026Q00455920-I1Request digital key ↗
▸Zoning, Tax Lot & Property Records3
▸DOB NOWZD1: DOB Zoning Diagram2
08/13/2026Q00485023-I1Open ↗
08/13/2026Q00485023-P1Open ↗
▸DOB NOWHouse Number Verification: TOPO Stamp1
08/13/2026Q00485023-I1Open ↗
▸Seals & Professional Certifications15
▸DOB NOWProgress Inspector Seal & Signature6
09/26/2026Q00485023-P1Open ↗
09/26/2026Q00485023-P1Open ↗
09/01/2026Q00459275-P1Open ↗
Showing 3 of 6 on file for this type
▸DOB NOWDPL-1: Design Professional Seal & Signature5
08/27/2026Q00455920-I1Open ↗
08/26/2026Q00485023-P1Open ↗
08/26/2026Q00485023-I1Open ↗
Showing 3 of 5 on file for this type
▸DOB NOWSpecial Inspector Seal & Signature4
09/26/2026Q00485023-P1Open ↗
09/26/2026Q00485023-P1Open ↗
09/01/2026Q00459275-P1Open ↗
Showing 3 of 4 on file for this type
▸Safety & Tenant Protection3
▸DOB NOWStreet Tree Checklist2
08/13/2026Q00485023-P1Open ↗
08/13/2026Q00485023-I1Open ↗
▸DOB NOWParks Department Acknowledgment Letter for Street Trees Plan1
08/13/2026Q00485023-I1Open ↗
▸Environmental & Asbestos4
▸DOB NOWDEP ACP-5: Asbestos Assessment Report4
08/26/2026Q00485023-P1Open ↗
08/26/2026Q00459275-I1Open ↗
08/15/2026Q00485023-I1Open ↗
Showing 3 of 4 on file for this type
▸Energy Compliance2
▸DOB NOWEN2: As Built Energy Analysis.2
08/13/2026Q00459275-I1Open ↗
08/13/2026Q00485023-I1Open ↗
▸Other Documents7
▸DOB NOWLocal Law 92/94 of 2019 Sustainable Roof Zone2
08/13/2026Q00485023-P1Open ↗
08/13/2026Q00485023-I1Open ↗
▸DOB NOWPlot Diagram2
08/13/2026Q00485023-P1Open ↗
08/13/2026Q00485023-I1Open ↗
▸DOB NOWAdjoining Owners Notification1
08/13/2026Q00485023-I1Open ↗
▸DOB NOWSite Survey: Initial1
08/13/2026Q00485023-P1Open ↗
▸DOB NOWFinal Survey1
08/13/2026Q00485023-I1Open ↗