ECB05/05/2026REISSUE #35717283P DATE OF ISSUE: 06/16/2025. FAILURE TO MAINTAIN BUILDING IN CODE-COMPLIANT MANNER. AT THE TIME OF INSPECTION OBSERVED AND NOTED AT BULKHEAD STAIR B AND S RUNNING CRACKS AND SPALLING AT DOORWAYNothing owed — awaiting certificate of correction
ECB05/05/2026FAILURE TO MAINTAIN BUILDING IN CODE-COMPLIANT MANNER. AT THE TIME OF INSPECTION OBSERVED AND NOTED FPSC DOORS ARE NOT SELF-CLOSING PROPERLYFOR DEFECTIVE HARDWARE DOOR CLOSER OR HINGE AT 1ST. FLOOR CAFETERIA MANothing owed — awaiting certificate of correction
ECB06/16/2025FAILURE TO MAINTAIN BUILDING IN CODE-COMPLIANT MANNER.NOTED AT EXIT 2 & 3,SOFIT AND INTERIOR CEILING,SPALLING AND MOLD.REM:REPAIR AND/OR REPLACE.Nothing owed — awaiting certificate of correction
ECB06/16/2025REISSUE#35684704X FAILURE TO MAINTAIN BUILDING IN CODE-COMPLIANT MANNER.NOTED AT ROOMS 3 FLOOR 313 & 2 FL EXPORTION JOINT COVER PLATE BULGING ON FLOOR CAUSING TRIP HAZARDS.REM:REPAIR AND/OR REPLACE FLOORING.Nothing owed — awaiting certificate of correction
ECB06/16/2025FAILURE TO MAINTAIN BUILDING IN CODE-COMPLIANT MANNER.NOTED AT BULKHEAD STAIRS B & S,RUNNING CRACKS AND SPALLING AT DOORWAYS.REM:REPAIR AND/OR REPLACE.Nothing owed — awaiting certificate of correction
ECB07/15/2024REISSUE#35677250P FAILURE TO MAINTAIN BUILDING IN CODE COMPLIANT MANNER.NOTED AT 1ST,2ND & 3RD FLOOR CORRIDOR.FLOOR EXPANSION JOINTS ARE RAISED 1 LIFTED POSING A TRIPPING HAZARD.REM:REPAIR AND/OR REPLACE.Nothing owed — awaiting certificate of correction
ECB08/05/2021NOV35498460J FAILURE TO MAINTAIN BLDG IN CODECOMPLIANT MANNER.NOTED:RAISED METAL EXPANSION JOINTS ON FL CREATING TRIPPING HAZARD@1FL NEAR RM120,2FL NEAR RM213&3FL NEAR RM313.REPAIR &/OR REPLACE.Nothing owed — awaiting certificate of correction
ECB06/26/2020REISSUE ECB#35447738P FAILURE TO MAINTAIN BLDG IN CODE COMPLIANT MANNER. NOTED: AT 3RD FL NEAR RM 313 & 1ST FL RM 120 METAL EXPANSION JOIST ON FLOOR RAISED/LIFTING CREATING A TRIPPING HAZARD. REMEDY: REPAIR &/ONothing owed — awaiting certificate of correction
ECB08/30/2019FAILURE TO MAINTAIN BLDG IN CODE COMPLIANT MANNER. NOTED: AT THE 1ST FL BY ROOM 120 & 3RD FL BY ROOM 313;THE METAL STRIP ON THE FLOOR OF THE EXPANSION JOIST IS RAISED,CREATING A TRIPPING HAZARD. REMEDY: REPAIRNothing owed — awaiting certificate of correction
ECB12/03/1990WOPRK WITHOUT A PERMIT. WORK NOTED: CONSTRUCTION OF ROOF PARAFIT AND BRICK WORK. (ENTIRE BUILDING) REMEDY: STOP ALL WORK UNTIL A PERMIT IS OBTAINED-EXCEPT TO MAKE SITE SAFE.Nothing owed — awaiting certificate of correction
ECB12/01/1990CONSTRUCTION WORK ON SATURDAY WITHOUT A SPECIAL WKND. WORK VARIANCE ISSUED BY THE DEPT. OF BUILDINGS - DEPT. OF BUILDINGS WORK NOTED: ROOF CONSTRUCTION & REPAIR ROOF PARAPET & BRICKWORK REMEDY: STOP ALL WORK, ONothing owed — awaiting certificate of correction
Public elementary, junior or senior high · Owner of record: NYC DEPARTMENT OF PARKS AND RECREATION · 181,600 sf lot · 0.74 FAR built · Flood zone X