← Back
BuildNYC
Two family frame
46-34 211TH STREET
QUEENS · Bayside · BIN 4157104
💬 Discuss this project
1910Year Built
2.5Stories
B2Building Class
R3AZoning
1,468 sfGross Floor Area
2Units
Rent Stabilized0 Active ViolationsFDNY Report ↗
Two family frame · Owner of record: Mahe Group · 4,000 sf lot · 0.37 FAR built · Flood zone X
Locations of Work
ArchitectureElectricalMechanicalPlumbingCivil
Names shown beside floors are taken automatically from the text of filed documents and may be incomplete or wrong.
RoofVertical and horizontal enlargement to two family dwelling1p · 1 filing · 20 docs
AtticVertical and horizontal enlargement to two family dwelling3p · 2 filings · 20 docs
Floor 2Vertical and horizontal enlargement to two family dwelling3p · 2 filings · 20 docs
Floor 1Vertical and horizontal enlargement to two family dwelling7p · 2 filings · 20 docs
CellarVertical and horizontal enlargement to two family dwelling3p · 2 filings · 20 docs
Site & exteriorVertical and horizontal enlargement to two family dwelling4p · 3 filings · 20 docs
▾Owner History (Filing Record)
Companies and organizations named on filings. Individual owners are not shown.
OwnerFilingsMost Recent
Kalico Group2109/13/2026
▾Sales History (ACRIS)
DatePriceUnitSeller → Buyer$/sf
07/01/2026$2.0M—MAHE GROUP LLC → Private party$1,365/sf building
08/30/2024$915K—— → —$623/sf building
▾Design Consultants (Architect / Engineer of Record)
FirmFilingsMost Recent
Tabriz Group Enterprises405/26/2026
Tabriz Design Group310/17/2025
▾Filing Representatives (Expediters)
RepresentativeFilingsMost Recent
Tabriz Group Enterprise503/21/2026
▾Contractors (License-Anchored)
FirmTradeRolesMost Recent
J&J DesignsScaffold404/09/2026
Precision Home DevelopmentGeneral Contractor303/21/2026
Renew PlumbingPlumbing207/08/2026
Gerebuzza ConstructionGeneral Contractor107/08/2026
▾Special Inspection Agencies
AgencyLicense #FilingsMost Recent
Tabriz Group Enterprises3275605/26/2026
Triangle Inspection & Tes7495210/17/2025
Building Lifecycle
All (106)Filed (7)Permit Issued (6)Signed Off (4)Violation (24)Inspection (5)Objection (30)Special Inspection (30)
06/02/2026
Signed off — Alteration CO
PROPOSED HORIZONTAL ENLARGEMENT TO EXISTING TWO STORY AND CELLAR BUILDING AND CONVERSION TO TWO FAMILY DWELLING.
Q01131157-I1
05/28/2026
Special inspection requirement — Fenestration air leakage
BAKHTIAR SHAMLOO
05/28/2026
Special inspection requirement — Fenestration areas
BAKHTIAR SHAMLOO
05/28/2026
Special inspection requirement — Fenestration and door U-factor and product ratings
BAKHTIAR SHAMLOO
05/28/2026
Special inspection requirement — Excavations - Sheeting, Shoring, and Bracing
BAKHTIAR SHAMLOO
05/28/2026
Special inspection requirement — Subsurface Investigations (Borings/Test Pits)
Rajasekhar Sakhamuri
05/28/2026
Special inspection requirement — Concrete - Cast-In-Place
BAKHTIAR SHAMLOO
05/28/2026
Special inspection requirement — Structural Stability – Alterations of existing buildings
BAKHTIAR SHAMLOO
05/28/2026
Special inspection requirement — Masonry
BAKHTIAR SHAMLOO
05/28/2026
Special inspection requirement — Fire-Resistant Penetrations and Joints
BAKHTIAR SHAMLOO
05/28/2026
Special inspection requirement — Energy Code Compliance Inspections
BAKHTIAR SHAMLOO
05/28/2026
Special inspection requirement — Fire-Resistance Rated Construction
BAKHTIAR SHAMLOO
05/28/2026
Special inspection requirement — Final
BAKHTIAR SHAMLOO
05/28/2026
Special inspection requirement — Footing and Foundation
BAKHTIAR SHAMLOO
05/28/2026
Special inspection requirement — Electric vehicle service equipment requirements
BAKHTIAR SHAMLOO
05/28/2026
Special inspection requirement — Air barrier - visual inspection
BAKHTIAR SHAMLOO
05/28/2026
Special inspection requirement — Insulation placement and R values
BAKHTIAR SHAMLOO
05/28/2026
Special inspection requirement — Permanent certificate
BAKHTIAR SHAMLOO
05/28/2026
Special inspection requirement — Interior lighting power
BAKHTIAR SHAMLOO
05/28/2026
Special inspection requirement — Metering
BAKHTIAR SHAMLOO
05/28/2026
Special inspection requirement — Maintenance information
BAKHTIAR SHAMLOO
05/28/2026
Special inspection requirement — Air barrier — testing
BAKHTIAR SHAMLOO
05/26/2026
Filed — Alteration CO
PROPOSED HORIZONTAL ENLARGEMENT TO EXISTING TWO STORY AND CELLAR BUILDING AND CONVERSION TO TWO FAMILY DWELLING.
Q01131157-P2
05/26/2026
Special inspection requirement — Footing and Foundation
BAKHTIAR SHAMLOO
05/26/2026
Special inspection requirement — Concrete - Cast-In-Place
BAKHTIAR SHAMLOO
05/26/2026
Special inspection requirement — Excavations - Sheeting, Shoring, and Bracing
BAKHTIAR SHAMLOO
05/26/2026
Special inspection requirement — Fire-Resistant Penetrations and Joints
BAKHTIAR SHAMLOO
05/26/2026
Special inspection requirement — Masonry
BAKHTIAR SHAMLOO
05/26/2026
Special inspection requirement — Structural Stability – Alterations of existing buildings
BAKHTIAR SHAMLOO
05/26/2026
Special inspection requirement — Subsurface Investigations (Borings/Test Pits)
Rajasekhar Sakhamuri
05/26/2026
Special inspection requirement — Energy Code Compliance Inspections
BAKHTIAR SHAMLOO
05/26/2026
Special inspection requirement — Final
BAKHTIAR SHAMLOO
05/08/2026
Signed off — Alteration CO
PROPOSED HORIZONTAL ENLARGEMENT TO EXISTING TWO STORY AND CELLAR BUILDING AND CONVERSION TO TWO FAMILY DWELLING.
Q01131157-S1
05/06/2026
Permit issued — Mechanical Systems
Q01131157-S1-MS
04/28/2026
Filed — Alteration CO
PROPOSED HORIZONTAL ENLARGEMENT TO EXISTING TWO STORY AND CELLAR BUILDING AND CONVERSION TO TWO FAMILY DWELLING.
Q01131157-S1
03/12/2026
Signed off — Alteration
PROPOSED PLUMBING WORK IN CONJUNCTION WITH ALTERATION APPLICATION #Q01131157.
Q01239503-I1
03/11/2026
Signed off — Alteration
Q01104804-I1
12/04/2025
Inspection — Pass-Final CND-Occupancy Inspection
Pass
View inspection ↗
11/25/2025
Violation issued (HPD, closed)
I
10/23/2025
Filed — Alteration CO
PROPOSED HORIZONTAL ENLARGEMENT TO EXISTING TWO STORY AND CELLAR BUILDING AND CONVERSION TO TWO FAMILY DWELLING.
Q01131157-P1
10/22/2025
Permit issued — Plumbing
Q01239503-I1-PL
10/17/2025
Filed — Alteration
PROPOSED PLUMBING WORK IN CONJUNCTION WITH ALTERATION APPLICATION #Q01131157.
Q01239503-P1
09/16/2025
Permit issued — Construction Fence
Q01104804-I1-FN
08/18/2025
Inspection — Certified Water and Sanitary-WS-Sanitary Piping-Roughing
Certified
View inspection ↗
07/25/2025
Inspection — Certified Gas-Gas-Piping-Roughing
Certified
View inspection ↗
07/25/2025
Inspection — Certified Water and Sanitary-WS-Sanitary Piping-Roughing
Certified
View inspection ↗
07/25/2025
Inspection — Certified Water and Sanitary-WS-Sanitary Piping-Underground
Certified
View inspection ↗
07/08/2025
Permit issued — Plumbing
Q01239503-I1-PL
06/16/2025
Filed — Alteration
PROPOSED PLUMBING WORK IN CONJUNCTION WITH ALTERATION APPLICATION #Q01131157.
Q01239503-I1
06/09/2025
Violation issued (ECB, closed)
Construction
06/09/2025
Violation issued (ECB, closed)
Construction
05/21/2025
Permit issued — Earth Work
Q01131157-I1-GC-CX
05/20/2025
Objection resolved — Addressed
04/03/2025
Objection raised — Admin
04/03/2025
Objection resolved — Addressed
03/24/2025
Objection resolved — Addressed
01/23/2025
Objection resolved — Addressed
01/23/2025
Objection resolved — Addressed
01/23/2025
Objection resolved — Addressed
12/05/2024
Objection resolved — Addressed
Latest 60 of 106 events.
Permit / Filing Register
SourceWork TypeStatusApplicantIssued
DOB NOWMechanical SystemsSigned-offGerebuzza Construction05/06/2026
DOB NOWPlumbingSigned-offRenew Plumbing10/22/2025
DOB NOWConstruction FenceSigned-offJ&J Designs09/16/2025
DOB NOWPlumbingSigned-offRenew Plumbing07/08/2025
DOB NOWEarth WorkPermit IssuedPrecision Home Development05/21/2025
DOB NOWConstruction FenceSigned-offJ&J Designs09/16/2024
1 project · most recent 06/04/2025
General Wiring
FiledStatusContractorScope
06/04/2025CompletePower Surge ElectricGeneral Wiring
1 project · most recent 05/26/2026
FiledStatusContractorScope
05/26/2026Signed-offGerebuzza Construction3 scope_items
▾Field Inspections (DOB CAP) — 5
DateTypeResultReport
12/04/2025Pass-Final CND-Occupancy InspectionPassView ↗
08/18/2025Certified Water and Sanitary-WS-Sanitary Piping-RoughingCertifiedView ↗
07/25/2025Certified Gas-Gas-Piping-RoughingCertifiedView ↗
07/25/2025Certified Water and Sanitary-WS-Sanitary Piping-RoughingCertifiedView ↗
07/25/2025Certified Water and Sanitary-WS-Sanitary Piping-UndergroundCertifiedView ↗
▾Special Inspection Requirements (DOB NOW) — 53
DateRequirementInspectorRole
05/28/2026Fenestration air leakageBAKHTIAR SHAMLOOenergy_progress
05/28/2026Fenestration areasBAKHTIAR SHAMLOOenergy_progress
05/28/2026Fenestration and door U-factor and product ratingsBAKHTIAR SHAMLOOenergy_progress
05/28/2026Excavations - Sheeting, Shoring, and BracingBAKHTIAR SHAMLOOspecial
05/28/2026Subsurface Investigations (Borings/Test Pits)Rajasekhar Sakhamurispecial
05/28/2026Concrete - Cast-In-PlaceBAKHTIAR SHAMLOOspecial
05/28/2026Structural Stability – Alterations of existing buildingsBAKHTIAR SHAMLOOspecial
05/28/2026MasonryBAKHTIAR SHAMLOOspecial
05/28/2026Fire-Resistant Penetrations and JointsBAKHTIAR SHAMLOOspecial
05/28/2026Energy Code Compliance InspectionsBAKHTIAR SHAMLOOprogress
05/28/2026Fire-Resistance Rated ConstructionBAKHTIAR SHAMLOOprogress
05/28/2026FinalBAKHTIAR SHAMLOOprogress
05/28/2026Footing and FoundationBAKHTIAR SHAMLOOprogress
05/28/2026Electric vehicle service equipment requirementsBAKHTIAR SHAMLOOenergy_progress
05/28/2026Air barrier - visual inspectionBAKHTIAR SHAMLOOenergy_progress
05/28/2026Insulation placement and R valuesBAKHTIAR SHAMLOOenergy_progress
05/28/2026Permanent certificateBAKHTIAR SHAMLOOenergy_progress
05/28/2026Interior lighting powerBAKHTIAR SHAMLOOenergy_progress
05/28/2026MeteringBAKHTIAR SHAMLOOenergy_progress
05/28/2026Maintenance informationBAKHTIAR SHAMLOOenergy_progress
05/28/2026Air barrier — testing BAKHTIAR SHAMLOOenergy_progress
05/26/2026Footing and FoundationBAKHTIAR SHAMLOOprogress
05/26/2026Concrete - Cast-In-PlaceBAKHTIAR SHAMLOOspecial
05/26/2026Excavations - Sheeting, Shoring, and BracingBAKHTIAR SHAMLOOspecial
05/26/2026Fire-Resistant Penetrations and JointsBAKHTIAR SHAMLOOspecial
Latest 25 of 53.
▾Documents — 67 on file (BIS + DOB NOW)
▸Plans & Drawings7
▸DOB NOWPlans/Sketch7
08/21/2026Q01104804-I1Request digital key ↗
08/18/2026Q01239503-P1Request digital key ↗
08/18/2026Q01239503-I1Request digital key ↗
Showing 3 of 7 on file for this type
▸Zoning, Tax Lot & Property Records8
▸DOB NOWZD1: DOB Zoning Diagram3
08/17/2026Q01131157-P2Open ↗
08/13/2026Q01131157-I1Open ↗
08/13/2026Q01131157-P1Open ↗
▸DOB NOWZoning Exhibit form (1-5)3
08/17/2026Q01131157-P2Open ↗
08/13/2026Q01131157-I1Open ↗
08/13/2026Q01131157-P1Open ↗
▸DOB NOWHouse Number Verification: TOPO Stamp2
08/13/2026Q01131157-P1Open ↗
08/13/2026Q01131157-I1Open ↗
▸Seals & Professional Certifications25
▸DOB NOWProgress Inspector Seal & Signature11
09/07/2026Q01131157-P2Open ↗
09/07/2026Q01131157-P2Open ↗
09/07/2026Q01131157-P2Open ↗
Showing 3 of 11 on file for this type
▸DOB NOWSpecial Inspector Seal & Signature7
09/07/2026Q01131157-P2Open ↗
09/07/2026Q01131157-P2Open ↗
08/31/2026Q01131157-I1Open ↗
Showing 3 of 7 on file for this type
▸DOB NOWDPL-1: Design Professional Seal & Signature7
08/17/2026Q01131157-P2Open ↗
08/17/2026Q01131157-P1Open ↗
08/17/2026Q01131157-S1Open ↗
Showing 3 of 7 on file for this type
▸Safety & Tenant Protection3
▸DOB NOWStreet Tree Checklist3
08/17/2026Q01131157-P2Open ↗
08/17/2026Q01131157-P1Open ↗
08/15/2026Q01131157-I1Open ↗
▸Environmental & Asbestos6
▸DOB NOWDEP ACP-5: Asbestos Assessment Report6
08/17/2026Q01131157-P2Open ↗
08/17/2026Q01131157-S1Open ↗
08/17/2026Q01131157-P1Open ↗
Showing 3 of 6 on file for this type
▸Inspections & Test Reports4
▸DOB NOWSOIL REPORT3
08/17/2026Q01131157-P2Open ↗
08/13/2026Q01131157-P1Open ↗
08/13/2026Q01131157-I1Open ↗
▸DOB NOWTR4 Test Report and Plot Diagram1
08/13/2026Q01131157-I1Open ↗
▸Other Documents14
▸DOB NOWSite Survey: Initial3
08/17/2026Q01131157-P2Open ↗
08/13/2026Q01131157-I1Open ↗
08/13/2026Q01131157-P1Open ↗
▸DOB NOWLocal Law 92/94 of 2019 Sustainable Roof Zone3
08/17/2026Q01131157-P2Open ↗
08/13/2026Q01131157-P1Open ↗
08/13/2026Q01131157-I1Open ↗
▸DOB NOWPlot Diagram3
08/17/2026Q01131157-P2Open ↗
08/13/2026Q01131157-P1Open ↗
08/13/2026Q01131157-I1Open ↗
▸DOB NOWProperty Ownership Certification3
08/17/2026Q01131157-P2Open ↗
08/17/2026Q01131157-P1Open ↗
08/15/2026Q01131157-I1Open ↗
▸DOB NOWAdjoining Owners Notification1
08/13/2026Q01131157-I1Open ↗
▸DOB NOWFinal Survey1
08/15/2026Q01131157-I1Open ↗